This is a List of Attachments for Solicitation No. 140R2026R0017 for the Folsom Dam Warehouse Bridge Crane Replacement project in Folsom, California. The document serves as an index of all required and supporting documents for this federal contract opportunity.
The primary deliverable is the replacement of a bridge crane in the Folsom Dam Warehouse. Key technical documents include a comprehensive Statement of Work (438 pages) and detailed specifications covering automation control systems, programmable logic controllers, electrical materials and methods, commissioning of electrical equipment, removal of existing cranes, and bridge crane installation with electrical components. The solicitation includes 20 pages of technical drawings and references General Decision Number CA20260007 for wage determination requirements. Bidders must submit a Limitations on Subcontracting form, Risk Assessment/Value Added analysis, and Past Performance Questionnaire with their proposals. Supporting documents include a Bi-Weekly Risk Report, DI-137 Release of Claims form, pre-proposal meeting agenda, virtual site tour documentation, RFP checklist, and two sets of Questions and Answers (dated 9.1.2026 and 9.25.2026). Site visit information is provided in two separate documents. All technical specifications have been amended through Amendment 0004, indicating this is a revised solicitation with multiple rounds of clarifications and updates.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: 140R2026R0017 Folsom Dam Warehouse – Bridge Crane Replacement Folsom, California
J - 1
Section J – List of Attachments
NO. TITLE OF DOCUMENT OR FORM
NO. OF
PAGES
1 Statement of Work (SOW) 438
1a 00 01 10 – Table of Contents_Amend 0004 2
1b 01 33 00 – Submittal_Amend 0004 22
1c 25 00 01 – Automation Control System_Amend 0004 34
1d 25 12 10 – Programmable Logic Controller_Amend 0004 18
1e 26 05 02 – Basic Electrical Materials and Methods_Amend 0004 6
1f 26 08 00 – Commissioning of Electrical Equipment_Amend 0004 18
1g 41 22 13 – Removal of Existing Cranes_Amend 0004 4
1h 41 22 14 – Bridge Crane_Amend 0004 24
1i 41 22 15 – Bridge Crane Electrical Components_Amend 0004 38
1j 52 00 00 – Drawings_Amend 0004 4
2 Drawings – Folsom Crane Mod_11x17_Amend 0004 20
3 Bi-Weekly Risk Report (BWRR) 1
4 General Decision Number CA20260007 Wage Determination 62
5 DI-137 – Release of Claims 1
6 Limitations on Subcontracting (LOS) – Submit with Proposal 1
7 Risk Assessment/Value Added – Submit with Proposal 2
8 Past Performance Questionnaire (PPQ) – Submit with Proposal 7
9 Pre-Proposal Meeting Agenda (dated 8.5.2026) 4
10 Virtual Folsom Dam Warehouse (dated 8.5.2026) 16
Solicitation No.: 140R2026R0017 Folsom Dam Warehouse – Bridge Crane Replacement Folsom, California
J - 2
11 Request for Proposal (RFP) Checklist 2
12 Questions and Answers (dated 9.1.2026) 9
12a Questions and Answers (dated 9.25.2026) 5
13 Site Visit 5
13a Second Site Visit 1
END OF SECTION J
| a. Relevant Project Experience |
| b. Project Approach Narrative |
| a. CPARS Review |
| b. Subcontractor or Team Member Past Performance |
| c. Optional Project Descriptions |
| d. Past Performance Questionnaires (PPQs) – See Attachment 8 |
| e. Additional Sources |
| f. Offeror Option |
| 1. Recency |
| 2. Relevancy |
| 3. Quality |