This is a Pre-Proposal Conference presentation for the Folsom Dam Warehouse Bridge-Crane Replacement Project issued by the Bureau of Reclamation, Department of Interior.

The project involves modernizing the Folsom Dam Warehouse bridge crane due to safety concerns. The solicitation was issued July 31, 2026, with a contract duration of 600 calendar days. Key dates include: contractor questions due August 14, 2026 at 12:00 pm PST (noon); proposal receipt date August 31, 2026 at 5:00 pm PST; technical evaluation review completed September 2, 2026; discussions if applicable September 7, 2026; final proposal revisions due September 11, 2026; and award anticipated September 30, 2026. The site visit is scheduled for August 6, 2026 at 1:00 pm PST at 7794 Folsom Dam Road, Folsom, CA, requiring advance registration and appropriate PPE (safety vest, hard hat, safety glasses, sturdy footwear). All contractor questions must be submitted in writing to the Contracting Officer and Contract Specialist; responses will be provided in writing as amendments to become integral to the contract. The solicitation uses SF1442 form and is classified under NAICS Code 237990 (Other Heavy and Civil Engineering Construction) with a $45 million size standard. This procurement is set aside exclusively for small business concerns under FAR Subpart 19.106 for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The contracting officer is Stephanie Lindner; the project manager is Elvan Childs; the Contracting Officer's Representative is Sean Frische (Civil Engineer); and the technical engineer is Matt Becker.

View the file

Other files

File Type Posted
Attachment_4_-_Wage_Determination_9_3_2026_0006.pdf PDF
Section_J_10_2_2026_0006.pdf PDF
Section_L_10_2_2026_0006.pdf PDF
Sol_140R2026R0017_Amd_0006.pdf PDF
Attachment_11_-_RFP_Checklist_10_2_2026_0006.pdf PDF
Attachment_14_-_Breaker_10_2_2026_0006.pdf PDF
Amendment_No__5_Questions-Answers_9_25_2026_0005.pdf PDF
Sol_140R2026R0017_Amd_0005.pdf PDF
Folsom_Warehouse_Crane_-_Site_Visit_2_Attendance_0005.pdf PDF
Section_J_9_25_2026_0005.pdf PDF
26_08_00_-_Commissioning_of_Electrical_Equipment_Amend_0004_0004.pdf PDF
25_12_10_-_Programmable_Logic_Controller_Amend_0004_0004.pdf PDF
26_05_02_-_Basic_Electrical_Materials_and_Methods_Amend_0004_0004.pdf PDF
Attachment_13_-_Folsom_Warehouse_Crane_Site_Visit_0004.pdf PDF
00_01_10_-_Table_of_Contents_Amend_0004_0004.pdf PDF
RFQ-140R2026R0017_SF1442_9_2_2026_0004.pdf PDF
25_00_01_-_Automation_Control_System_Amend_0004_0004.pdf PDF
Attachment_2_-_FolsomCraneMod_11x17_Amend_0004_0004.pdf PDF
52_00_00_-_Drawings_Amend_0004_0004.pdf PDF
41_22_14_-_Bridge_Crane_Amend_0004_0004.pdf PDF
01_33_00_-_Submittals_Amend_0004_0004.pdf PDF
41_22_15_-_Bridge_Crane_Electrical_Components_Amend_0004_0004.pdf PDF
Attachment_12_Questions_and_Answers_9_1_2026_0004.pdf PDF
Sol_140R2026R0017_Amd_0004.pdf PDF
41_22_13_-_Removal_of_Existing_Cranes_Amend_0004_0004.pdf PDF
Attachment_11_-_RFP_Checklist_9_1_2026_0004.pdf PDF
C06_01_Attachment_9_-_Pre-Proposal_Meeting_Agenda_8_5_2026_0003.pdf PDF
Sol_140R2026R0017_Amd_0003.pdf PDF
Sol_140R2026R0017_Amd_0002.pdf PDF
Sol_140R2026R0017_Amd_0001.pdf PDF
C05_04_Attachment_8_-_RFP_Checklist_7_11_2026.pdf PDF
C05_04_RFP-140R2026R0017_SF1442_7_31_2026.pdf PDF
C05_04__Attachment_1_-_SOW_7_1_2026.pdf PDF
C05_04_Attachment_7_-_PPQ_6_30_2026.docx DOCX document
C05_04_Attachment_3_-_Wage_Determination_6_22_2026.pdf PDF
Sol_140R2026R0017.pdf PDF
C05_04_Attachment_6_-_Risk_Assessment-Value_Add_7_14_2026.docx DOCX document
C05_04_Attachment_5_-_LOS_6_24_2026.xlsx XLSX spreadsheet
C05_04_Attachment_4_-_Release_of_Claims_6_23_2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Folsom Dam Warehouse Bridge-Crane Replacement

Project Pre-Proposal Conference 7794 Folsom Dam Road, Folsom, CA

August 5, 2026

Presentation Agenda – Stephanie Lindner

• Introductions – Stephanie Lindner

• Contractor Introductions

• Solicitation Summary – Stephanie Lindner

• Who is the Expert? – Stephanie Lindner

• Location – Stephanie Lindner

• Background – Matt Becker

• Project Purpose and Requirements – Matt Becker

• Schedule – Stephanie Lindner

• Site Visit Agenda – Sean Frische

• Site Visit Guide-lines – Stephanie Lindner

• Closing Remarks and Q & A – Stephanie Lindner

Introductions – Stephanie Lindner

Department of Interior, California Great Basin (CGB) Regional Office:

Stephanie Lindner, Contracting Officer (CO)

Reclamation, Regional Construction Office (RCO):

Sean Frische, Civil Engineer (COR)

Reclamation, California Great Basin (CGB):

Elvan Childs, Project Manager (PM)

Technical Service Center (TSC) Matt Becker, Engineer

• Organizational Structure: Contracting project team members work for the Department of Interior (DOI), RCO, TSC, as well as the other project team members work for the Bureau of Reclamation (BOR) within the Department of Interior.

Contractor Introductions – Stephanie Lindner

Solicitation Summary – Stephanie Lindner Solicitation Issued: July 31, 2026 (Two Amendments) Communication Protocol: ALL QUESTIONS WILL BE ASKED IN WRITING AND WILL BE

ANSWERED IN WRITING IN ORDER TO BECOME INTEGRAL TO THE CONTRACT.

NOTHING STATED OTHERWISE WILL BECOME PART OF THE CONTRACT.

The cut-off date and time for submittal of questions is 12:00 pm, noon (PST) on Friday, August 14, 2026. Any questions received after this may not be responded to and therefore not included in an amendment.

The proposal due date is 5:00 pm (PST) on Monday, August 31, 2026, so it is imperative to submit all questions in writing as soon as practicable.

SF1442

NAICS Code 237990 - Other Heavy and Civil Engineering Construction (Size Standard $45M)

Set aside exclusively for small business concerns in accordance with FAR Subpart 19.106 (Service-

Disabled Veteran-Owned Small Business (SDVOSB) Program.5

Solicitation Summary – Stephanie Lindner

Solicitation Issued: July 31, 2026 SECTION C - Specifications/Appendices – Matt will cover shortly.

SECTION F –Commencement, Prosecution, and Completion of Work SECTION I - Contract Clauses (Revolutionary FAR Overhaul – RFO) SECTION H – Special Contract Requirements SECTION J - List of Documents, Exhibits and Other Attachments SECTION L - Instructions, Conditions and Notices to Bidders SECTION M - Evaluation Factors for Award

Updates, clarifications, changes will be addressed via Amendment.

Who is the Expert? – Stephanie Lindner

• How are they similar?

• All have clear bottles.

• All have blue labels.

• All have water.

• How are they different?

• One bottle has a green lid.

• Bottle shapes are somewhat different.

• Labels are in different locations on the bottle.

• If no notable differences then price becomes the most becomes the most important Factor.

Who is the Expert? – Stephanie Lindner

Who is an Expert? - Stephanie Lindner •The technical evaluation criteria in this solicitation are designed to give each Offeror a fair and meaningful opportunity to demonstrate its expertise and distinguish its proposal from others.

• It is the responsibility of each Offeror to clearly present the strengths, capabilities, and unique aspects of its team and approach.

•Proposals should be written to convincingly show how the Offeror’s experience and methods provide value and set them apart from their competitors.

Location Map – Stephanie Lindner

Background – Matthew Becker

- Modernize Folsom Dam Warehouse Bridge Crane due to safety concerns.

Project Purpose and Requirements – Matthew Becker

Schedule – Stephanie Lindner

• Contract Duration: 600 Calendar Days

Description Date Solicitation Issuance: July 31, 2026 Preproposal Conference: August 5, 2026 Site Visit: August 6, 2026 Contractor Questions Due: August 14, 2026 Proposal Receipt Date: August 31, 2026 Technical Evaluation Review Completed: September 2, 2026 Discussions, if applicable: September 7, 2026 Date for Receipt of Final Proposal Revisions: September 11, 2026 Final Technical Evaluation Review: September 14, 2026 Award: September 30, 2026

Site Visit Agenda – Sean Frische

• Site visit starts: Thursday, August 6, 2026, at 1:00pm PST.

• Location: 7794 Folsom Dam Road, Folsom, CA (Main Security Check-point)

• You must register in advance with Sean Frische.

• PPE Required – Wear appropriate clothing for active construction site (i.e., safety vest, hard hat, safety glasses, and sturdy footwear/no open toe shoes).

• A Job Hazard Analysis (JHA) will be presented to the group prior to walking the site.

• Sign-in Sheet will be shared via Amendment.

• Site Visit Guidelines No questions will be addressed during the site visit.

All questions shall be formally submitted to the Contracting Officer and Contract

Specialist as stated in Section L of the solicitation.

Government responses at the site visit are not to be construed as solicitation supplements.

An amendment will be issued by the government to address industry questions.

The attendees of virtual preproposal conference, in person site visit sign in sheet, this PowerPoint, and the site visit agenda will be issued as an amendment via email.

Site Visit Guidelines - Stephanie Lindner

Closing Remarks and Q & A – Stephanie Lindner

Folsom Dam Warehouse Bridge-Crane Replacement Project
Presentation Agenda – Stephanie Lindner
Introductions – Stephanie Lindner
Contractor Introductions – Stephanie Lindner
Solicitation Summary – Stephanie Lindner
Solicitation Summary – Stephanie Lindner
Who is the Expert? – Stephanie Lindner
Who is the Expert? – Stephanie Lindner
Who is an Expert? - Stephanie Lindner
Location Map – Stephanie Lindner
Background – Matthew Becker
Project Purpose and Requirements – Matthew Becker
Schedule – Stephanie Lindner
Slide Number 14
Slide Number 15
Slide Number 16

File details come from the government source that posted it. Updated .