ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-3.pdf

PDF 15 MB Posted

Attached to
Traction Power Substation Rehabilitation Program – Contract 5 Broad, Loudon, Park and Castor Substations Project
Solicitation number
RFP 26-00105-AJEB
Issued by
Philadelphia County, Philadelphia City, Pennsylvania

About this file

This file contains construction drawings for SEPTA's (Southeastern Pennsylvania Transportation Authority) Traction Power Substation Rehabilitation Program – Contract 5, covering the Loudon Subway/Elevated Trains Traction Power Substation Rehabilitation. The drawings represent a 50% design submission dated August 22, 2025, and include comprehensive architectural, structural, mechanical, electrical, fire alarm, traction power, and communications plans. The project involves rehabilitation work at the Loudon substation, with detailed demolition and proposed construction plans for basement and first floor areas, roof systems, electrical power distribution (13.2kV and 4.8kV systems), HVAC systems, fire alarm systems, and SCADA integration. The drawings specify equipment layouts, single-line diagrams, equipment elevations, grounding plans, protection and relay schemes, and staging activities for phased construction (Stages 1, 2, and 3) to maintain operational continuity during rehabilitation.

The project is being managed by SEPTA's Buildings & Bridges (B&B) Department under Work Order No. 276494, with engineering services provided by Meliora Design (civil, water resources, and structural engineering) located in Phoenixville, PA. The drawings include detailed specifications for DC rectifiers, circuit breakers, transformers, battery and control systems, cable and duct bank installations, and communication infrastructure including fiber optic networks. The submission includes over 300 individual drawing sheets covering all disciplines, with equipment schedules for lighting fixtures, electrical panels, mechanical HVAC units, plumbing fixtures, and traction power equipment. The drawings indicate this is a design-bid-build project with specifications for demolition of existing equipment and installation of new substation components while maintaining existing transit operations.

View the file

Other files

File Type Posted
Addendum-10-Contract-5-Substations-Step-1-8-25-26.pdf PDF
Addendum-9-Contract-5-Substations-Step-1-8-20-26.pdf PDF
Addendum-8-Contract-5-Substations-Step-1-8-10-26.pdf PDF
Addendum-7-DWG-7E-16563_28_color_a.pdf PDF
Addendum-7-REV1-Markups-11x17_SEPTA_CONTRACT-5_50_LOUDON.pdf PDF
Addendum-7-Contract-5-Substations_Rehab-Step-1-8-5-26.pdf PDF
Addendum-6-Contract-5-Substations-Step-1-7-6-26.pdf PDF
Managing-Asbestos-In-Place-Addendum-5.pdf PDF
SEPTA-Environmental-Report-combined-Addendum-5.pdf PDF
Broad-Roof-Replacement-100-DWG_Set-Addendum-5.pdf PDF
Management-of-Lead-Paint-in-SEPTA-Construction-Projects-Document-3001-Addendum-5.pdf PDF
Orange-Blue-Green-line-emerg.-lght-single-line-diag.-Addendum-5.pdf PDF
Park-Peco-Info-Addendum-5.pdf PDF
Market-PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Broad-Peco-Info-Addendum-5.pdf PDF
Tentative-Layout-of-WESS-Equipment-in-Park-TPSS_22-Jan-2018-Addendum-5.pdf PDF
Loudon-WESS-Details-REV3_signed-171108-Addendum-5.pdf PDF
PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Addendum-5-Contract-5-Substations-Step-1-6-25-26.pdf PDF
SEPTA-Station-20-Sansom-Points-List-Addendum-5.pdf PDF
3004-ACM-Handling-Program-2023-Addendum-5.pdf PDF
DWG-7E-16563_28_color_a-Addendum-5.pdf PDF
Pre-Qualification-Meeting_-RFQ_-26-00105-AJEB-Substation-attendance-report-6-10-26.pdf PDF
Addendum-3-Contract-5-Substations-Step-1-6-10-26.pdf PDF
SIte-Visit-Attendance-Meeting-Power-Substation-Contract-5-6-11-26.pdf PDF
Addendum-4-Contract-5-Substations-Step-1-6-15-26.pdf PDF
Site-Visit-Attendance-Meeting-Substation-Contract-5-6-12-26.pdf PDF
Addendum-2-Contract-5-Substations-Step-1-6-4-26.pdf PDF
22x34-Loudon-Contract-5-Drawings-Addendum-3.pdf PDF
22x34-Broad-Street-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-3.pdf PDF
22x34-Castor-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-2.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-1.pdf PDF
22x34-General-Notes-Contract-5-Drawings-Addendum-3.pdf PDF
Addendum-1-Contract-5-Substations-Step-1-6-3-26.pdf PDF
22x34-Park-Contract-5-Drawings-Addendum-3.pdf PDF
JAL192590415-Substation-Rehab-Contract-5-Step-1.pdf PDF
ATTACHMENT-3-Form-330.pdf PDF
JAL192590415-Invitation-to-Propose-2-Step-Process-Traction-Substation.pdf PDF
ATTACHMENT-4-Addendum-Acknowledgement-1.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-1.pdf PDF
ATTACHMENT-1-SEPTA-Contract-5-Substations-50-Specifications.pdf PDF
Exhibit-FEDERAL-CONSTRUCTION-CONTRACT-STEP-2-CONTRACT-5-SUBSTATIONS.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-2-1.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OF

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S318 19 21 299 448

17AN-S318 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

S3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street Phoenixville, PA 19460

(610) 933-0123

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S319 20 21 300 448

17AN-S319 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

S3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S320 21 21 301 448

17AN-S320 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

S3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

GE

NE

RA

L

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

DNP

DJM

M300 1 10

305 452

17AN-M300 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

ABBREVIATIONS: GENERAL NOTES:LEGEND-SYMBOLS:

SYMBOL DESCRIPTION

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M301 2 10

306 452

17AN-M301 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

KEYED NOTES:

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M302 3 10

307 452

17AN-M302 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

DE

M

OL

IT

IO

N

RO

OF

P

LA

N

AS SHOWN 1:1

DNP

DJM

M303 4 10

308 452

17AN-M303 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M304 5 10

309 452

17AN-M304 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M305 6 10

310 452

17AN-M305 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

PR

OP

OS

ED

R

OO

F

PL

AN

AS SHOWN 1:1

DNP

DJM

M306 7 10

311 452

17AN-M306 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

EN

LA

RG

ED

P

LA

NS

AS SHOWN 1:1

DNP

DJM

M307 8 10

312 452

17AN-M307 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

DEMOLITION KEYED NOTES:

NEW WORK KEYED NOTES:

SC

HE

DU

LE

S

AS SHOWN 1:1

DNP

DJM

M308 9 10

313 452

17AN-M308 ----

GRILLE/REGISTER/DIFFUSER SCHEDULE

SPLIT SYSTEM SCHEDULE

ENERGY RECOVERY VENTILATOR

INFRARED RADIANT HEATER SCHEDULE

UNIT HEATER SCHEDULE

AIR COMPRESSOR SCHEDULE

PLUMBING SCHEDULE

ELECTRIC WATER HEATER SCHEDULE SUMP PUMP SCHEDULE

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

EXHAUST FAN SCHEDULE

M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

AS SHOWN 1:1

DNP

DJM

M309 10 10 314 452

17AN-M309 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

M3

.D

WG

50% SUBMISSION

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

AC

LJ

E300 1 14

315 452

17AN-E300 ----

S

S

S

ELECTRICAL ABBREVIATIONS:SINGLE LINE SYMBOLS:

STANDARD MOUNTING HEIGHTS:

SYMBOL DESCRIPTION

LINETYPE CONVENTIONS:

DETAIL CALLOUT SYMBOLS:

ELECTRICAL / LIGHTING SYMBOLS:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

LJ

E301 2 14

316 452

17AN-E301 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:DEMOLITION SCOPE OF WORK:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

AC

LJ

E302 3 14

317 452

17AN-E302 ----

KEYED NOTES:GENERAL NOTES:DEMOLITION SCOPE OF WORK:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

LJ

E303 4 14

318 452

17AN-E303 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

DEMOLITION SCOPE OF WORK:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

AC

LJ

E304 5 14

319 452

17AN-E304 ----

GENERAL NOTES:DEMOLITION SCOPE OF WORK:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

LJ

E305 6 14

320 452

17AN-E305 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

PROPOSED SCOPE OF WORK:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

AC

LJ

E306 7 14

321 452

17AN-E306 ----

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

LJ

E307 8 14

322 452

17AN-E307 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

GENERAL NOTES:PROPOSED SCOPE OF WORK:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

LJ

E308 9 14

323 452

17AN-E308 ----

GENERAL NOTES:PROPOSED SCOPE OF WORK:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN 1:1

MM

JIB

E309 10 14 324 452

17AN-E309 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

EL

EC

TR

IC

AL

PR

OP

OS

ED

S

IN

GL

E

LI

NE

D

IA

GR

AM

AS SHOWN 1:1

MM

JIB

E310 11 14 325 452

17AN-E310 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

EL

EC

TR

IC

AL

S

CH

ED

UL

ES

AS SHOWN 1:1

AC

LJ

E311 12 14 326 452

17AN-E311 ----

CATALOG NO.MANUFACTURER

LAMP INFORMATION

LUMINAIRE SCHEDULE

MOUNTINGDESCRIPTIONTYPE LAMP

QTYTYPE WATTS

EACH VOLTS

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

PA

NE

L

SC

HE

DU

LE

S

- S

HE

ET

AS SHOWN 1:1

AC

LJ

E312 13 14 327 452

17AN-E312 ----

PANEL SCHEDULE

PANEL SCHEDULE

PANEL SCHEDULE

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

E3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

EL

EC

TR

IC

AL

PA

NE

L

SC

HE

DU

LE

S

- S

HE

ET

AS SHOWN 1:1

AC

LJ

E313 14 14 328 452

17AN-E313 ----

FI

RE

A

LA

RM

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

WAB

AS

FA300

1 6

329 452

17AN-FA300 0

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

0.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

FIRE ALARM NOTES (CONT):

DEMOLITION NOTES:

LEGEND-SYMBOLS: DEMOLITION NOTES (CONT): GENERAL NOTES (CONT): GENERAL NOTES (CONT):

SYMBOL DESCRIPTION

FIRE ALARM NOTES:

FI

RE

A

LA

RM

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

AS

FA301

2 6

330 452

17AN-FA301 0

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

1.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

AS

FA302

3 6

331 452

17AN-FA302 0

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

2.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

AS

FA303

4 6

332 452

17AN-FA303 0

GENERAL NOTES:

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

3.D

WG

FI

RE

A

LA

RM

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

AS

FA304

5 6

333 452

17AN-FA304 0

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

4.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

FI

RE

A

LA

RM

FA

DE

TA

IL

S

AS SHOWN 1:1

WAB

AS

FA305

6 6

334 452

17AN-FA305 0

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

FA

5.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

TR

AC

TI

O

N P

O W

ER

TP

AB

BR

EV

IA

TI

ON

S

NTS -

ARG

BH

1 34

336 452

17AN-TP300 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

0.D

WG

50% SUBMISSION

TR

AC

TI

O

N P

O W

ER

LE

GE

ND

S

SY

M

BO

LS

NTS 1:1

DMW

BH

TP301

2 34

333 452

17AN-TP301 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

1.D

WG

TR

AC

TI

O

N P

O W

ER

DE

VI

CE

T

AB

LE

S

NTS 1:1

DMW

BH

TP302

3 34

334 452

17AN-TP302 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

2.D

WG

TR

AC

TI

O

N P

O W

ER

S

UB

ST

AT

IO

N

SI

TE

P

LA

N

AS SHOWN -

DMW

YL

TP305

4 34

335 452

17AN-305 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

5.D

WG

TR

AC

TI

O

N P

O W

ER

EX

IS

TI

NG

S

IN

GL

E

LI

NE

D

IA

GR

AM

NTS -

ARG

BH

TP306

5 34

336 452

17AN-TP306 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

6.D

WG

TR

AC

TI

O

N P

O W

ER

EX

IS

TI

NG

F

IR

ST

F

LO

OR

E

QU

IP

M

EN

T

PL

AN

AS SHOWN -

ARG

BH

TP307

6 34

337 452

17AN-TP307 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

7.D

WG

TR

AC

TI

O

N P

O W

ER

EX

IS

TI

NG

B

AS

EM

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MLB

LY

TP308

7 34

338 452

17AN-TP308 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

8.D

WG

NOT FOR CONSTRUCTIONNOT FOR CONSTRUCTION

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

S

IN

GL

E

LI

NE

D

IA

GR

AM

NTS -

ARG

BH

TP309

8 34

342 452

17AN-TP309 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

9.D

WG

TR

AC

TI

O

N P

O W

ER

ST

AG

IN

G

AC

TI

VI

TI

ES

N

OT

ES

NTS -

ARG

YL

TP310

9 34

340 452

17AN-TP310 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

0.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

1.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN -

MLB

YL

TP311

10 34 341 452

17AN-TP311 -

TR

AC

TI

O

N P

O W

ER

ST

AG

E

FI

RS

T

FL

OO

R

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MLB

YL

TP312

11 34 342 452

17AN-TP312 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

2.D

WG

TR

AC

TI

O

N P

O W

ER

ST

AG

E

BA

SE

M

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MB

YL

TP313

12 34 343 452

17AN-TP313 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

3.D

WG

TR

AC

TI

O

N P

O W

ER

ST

AG

E

SI

NG

LE

L

IN

E

DI

AG

RA

M

NTS -

ARG

YL

TP314

13 34 347 452

17AN-TP314 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

4.D

WG

TR

AC

TI

O

N P

O W

ER

ST

AG

E

FI

RS

T

FL

OO

R

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

ARG

YL

TP315

14 34 345 452

17AN-TP315 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

5.D

WG

TR

AC

TI

O

N P

O W

ER

ST

AG

E

BA

SE

M

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MLB

YL

TP316

15 34 346 452

17AN-TP316 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

6.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

7.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN -

ARG

YL

TP317

16 34 350 452

17AN-TP317 -

TR

AC

TI

O

N P

O W

ER

ST

AG

E

FI

RS

T

FL

OO

R

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MB

YL

TP318

17 34 348 452

17AN-TP318 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

8.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

9.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

BA

SE

M

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MLB

YL

TP319

18 34 349 452

17AN-TP319 -

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

F

IR

ST

F

LO

OR

E

QU

IP

M

EN

T

PL

AN

AS SHOWN -

ARG

YL

TP320

19 34 350 452

17AN-TP320 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

0.D

WG

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

B

AS

EM

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MB

YL

TP321

20 34 351 452

17AN-TP321 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

1.D

WG

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A V KW

G W R

CS

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A

AS TS

V

VS

KW

MULTI

FUNCTION

METER/ IED

A

G W R

AS TS

V

VS

KW

CS

HAM

HS

B

HAM

HS

B

G W R

AS TSVSCS

HAM

HS

B

G W R

AS TSVSCS

HAM

HS

B

G W R

AS TSVSCS

HAM

HS

B

G W R

AS TSVSCS

HAM

HS

B

MULTI

FUNCTION

METER/ IED

A V KW

G W R

AS TSVSCS

HAM

HS

B

MULTI

FUNCTION

METER/ IED

A V KW

G W R

AS TSVSCS

HAM

HS

B

G W R

AS TSVSCS

HAM

HS

BW W

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A V KW

MULTI

FUNCTION

METER/ IED

A

G W R

AS TS

HAM

HS

B

V

VS

KW

CS

MULTI

FUNCTION

METER/ IED

A V KW

G W R

AS TS

HAM

HS

B

VSCS

G W R

AS TS

HAM

HS

B

VSCS

G W R

AS TS

HAM

HS

B

VSCS

G W R

AS TS

HAM

HS

B

VSCS

OF

OF

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

F

IR

ST

F

LO

OR

E

QU

IP

M

EN

T

EL

EV

AT

IO

NS

NTS -

ARG

YL

TP326

21 34 355 452

17AN-TP326 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

6.D

WG

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

B

AS

EM

EN

T

EQ

UI

PM

EN

T

EL

EV

AT

IO

NS

NTS -

ARG

YL

TP327

22 34 353 452

17AN-TP327 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

7.D

WG

TR

AC

TI

O

N P

O W

ER

.2 K

V

CA

BL

E

DU

CT

B

AN

K

AS SHOWN -

ARG

YL

TP332

23 34 354 452

17AN-TP332 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

2.D

WG

TR

AC

TI

O

N P

O W

ER

4.

KV

C

AB

LE

D

UC

T

BA

NN

K

AS SHOWN -

MB

YL

TP333

24 34 355 452

17AN-TP333 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

3.D

WG

TR

AC

TI

O

N P

O W

ER

BA

TT

ER

Y

CO

NT

RO

L

DI

AG

RA

M

NTS -

ARG

YL

TP334

25 34 359 452

17AN-TP334 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

4.D

WG

TR

AC

TI

O

N P

O W

ER

PR

OT

EC

TI

ON

R

EL

AY

S

IN

GL

E

LI

NE

D

IA

GR

AM

SH

EE

T

NTS -

ARG

YL

TP337

26 34 357 452

17AN-TP337 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

7.D

WG

TR

AC

TI

O

N P

O W

ER

PR

OT

EC

TI

ON

R

EL

AY

S

IN

GL

E

LI

NE

D

IA

GR

AM

SH

EE

T

NTS -

ARG

YL

TP338

27 34 361 452

17AN-TP338 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

8.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

9.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

CI

RC

UI

T

BR

EA

KE

R

CO

NT

RO

L

DI

AG

RA

M S

- T

YP

IC

AL

NTS -

DMW

BH

TP339

28 34

362 452

17AN-TP339 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

0.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

DC

R

EC

TI

FI

ER

C

ON

TR

OL

S

CH

EM

AT

IC

NTS -

DMW

BH

TP340

29 34 360 452

17AN-TP340 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

1.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

DC

G

RO

UN

D

FA

UL

T

PR

OT

EC

TI

ON

S

CH

EM

E

NTS 1:1

DMW

BH

TP341

30 34

361 452

17AN-TP341 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

2.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

DC

R

EM

OT

E

CO

NT

RO

L

BO

AR

D

CO

NT

RO

L

SC

HE

M

AT

IC

NTS -

DMW

YL

TP342

31 34

365 452

17AN-TP342 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

3.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

SC

AD

A

PO

IN

TS

L

IS

T

NTS -

MLB

YL

TP343

32 34 366 452

17AN-TP343 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

5.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

GR

OU

ND

IN

G

PL

AN

AS SHOWN -

MB

YL

TP345

33 34 363 452

17AN-TP345 -

TR

AC

TI

O

N P

O W

ER

GR

OU

ND

IN

G

DE

TA

IL

S

NTS -

DMW

YL

TP346

34 34 364 452

17AN-TP346 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

TP

6.D

WG

M

EC

H

AN

IC

AL

GE

NE

RA

L

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

DC

EH

M100 1 8

365 452

17AN-COM300 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

SECURITY SYMBOLS LEGEND: GENERAL CONSTRUCTION NOTES: GENERAL TELECOMMUNICATIONS NOTES:

SYMBOL DESCRIPTION

ELECTRONICS ABBREVIATIONS:

TELECOMMUNICATION SYMBOLS LEGEND:

LINETYPE CONVENTIONS:

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DC

EH

M100 2 8

366 452

17AN-COM301 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DC

EH

M100 3 8

367 452

17AN-COM302 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DC

EH

M100 4 8

368 452

17AN-COM303 ----

KEYED NOTES:

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

DC

EH

M100 5 8

369 452

17AN-COM304 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

CO

M

M U

N

IC

AT

IO

N S

IN

TE

RF

AC

E

CA

BI

NE

T

CA

BL

E

PL

AN

S

AS SHOWN -

MLB

MW

COM305

6 8

371 452

17AN-COM305 -

M

EC

H

AN

IC

AL

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN 1:1

DC

EH

M100 7 8

370 452

17AN-COM306 ----

KEYED NOTES:

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

LO

U

DO

N

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276494

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

0\1

7A N-

CO

M3

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

CO

M

M U

N

IC

AT

IO

N S

FI

BE

R

NO

DE

D

IA

GR

AM

NTS -

MLB/ARG

EZ

COM307

8 8

372 452

17AN-COM307 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

3\1

7A N-

C4

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

CI

VI

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

AS SHOWN -

ARG

SG

C400 1 3

378 452

17AN-C400 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

3\1

7A N-

C4

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

CI

VI

L

SI

TE

P

LA

N

AS SHOWN -

ARG

SG

C401 2 3

379 452

17AN-C401 -

Xref ..\d1689126\TP-FIRST FLOOR PROPOSED.dwg

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

3\1

7A N-

C4

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

CI

VI

L

FE

NC

E

SI

GN

D

ET

AI

LS

AS SHOWN -

ARG

SG

C402 3 3

380 452

17AN-C403 -

AR

CH

IT

EC

TU

RA

L

GE

NE

RA

L

NO

TE

S

LE

GE

ND

S

AS SHOWN 1:1

AC

BF

A400 1 12

380 452

17AN-A400 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

A4

.D

WG

AR

CH

IT

EC

TU

RA

L

AB

BR

EV

IA

TI

ON

S

AS SHOWN 1:1

AC

BF

A401 2 12

381 452

17AN-A401 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

A4

.D

WG

AR

CH

IT

EC

TU

RA

L

CO

DE

D

AT

A

AS SHOWN 1:1

AC

BF

A402 3 12

382 452

17AN-A402 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

A4

.D

WG

AR

CH

IT

EC

TU

RA

L

GR

OU

ND

F

LO

OR

R

EM

OV

AL

P

LA

N

AS SHOWN 1:1

AC

BF

A403 4 12

383 452

17AN-A403 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

A4

.D

WG

AR

CH

IT

EC

TU

RA

L

RO

OF

R

EM

OV

AL

P

LA

N

AS SHOWN 1:1

AC

BF

A404 5 12

384 452

17AN-A404 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CA

ST

O R

RO

UT

E

T

RO

LL

EY

L

IN

E

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017 276496

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

A4

.D

WG

AR

CH

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .