Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-1.pdf

PDF 17 MB Posted

Attached to
Traction Power Substation Rehabilitation Program – Contract 5 Broad, Loudon, Park and Castor Substations Project
Solicitation number
RFP 26-00105-AJEB
Issued by
Philadelphia County, Philadelphia City, Pennsylvania

About this file

This is a 50% design submission drawing set for SEPTA's Contract 5 Traction Power Substation Rehabilitation Program covering the Broad, Park, Loudon, and Castor substations along the Broad-Ridge Spur Subway/Elevated Trains line. The drawing set contains 123 sheets dated October 16-22, 2025, spanning general, civil, architectural, structural, mechanical, electrical, fire alarm, and traction power disciplines. The documents include site plans, floor plans (basement, first floor, mezzanage, roof), demolition plans, equipment layouts, single-line electrical diagrams, elevation drawings, construction details, staging plans, schedules, and specifications for rehabilitation work at each substation facility. The drawings reference Work Order 276491 and multiple computer file numbers, with sheets marked "50% SUBMISSION NOT FOR CONSTRUCTION" indicating this is an interim design deliverable requiring further development before bid and construction.

The drawing set supports the two-step procurement with RFQ responses due July 15, 2026, pre-qualification meeting June 10, 2026, mandatory site visits June 11-12, 2026, and a 2,035 calendar day construction period from Notice to Proceed. The technical drawings detail replacement of 13.2kV and 12kV switchgear, DC rectifier systems (750VDC and 600VDC), transformers, station batteries, protective relays, SCADA systems, HVAC equipment, fire protection systems, lighting, and communications infrastructure across multiple building levels. Staged construction plans show phased equipment installation to maintain continuous traction power service during rehabilitation. Environmental remediation work includes asbestos removal, lead paint abatement, contaminated soil remediation, and PCB surveys. The drawings are prepared by multiple engineering consultants including Meliora Design and reference SEPTA's standard specifications for buildings and bridges (B&B) and electrification, maintenance, and construction (EM&C) divisions with required approvals from Project Manager, Manager of Architecture/Engineering, Director of Engineering, System Safety, Chief Rail Transit Officer, Chief Engineering Officer B&B, and Chief Engineer EM&C.

View the file

Other files

File Type Posted
Addendum-10-Contract-5-Substations-Step-1-8-25-26.pdf PDF
Addendum-9-Contract-5-Substations-Step-1-8-20-26.pdf PDF
Addendum-8-Contract-5-Substations-Step-1-8-10-26.pdf PDF
Addendum-7-DWG-7E-16563_28_color_a.pdf PDF
Addendum-7-REV1-Markups-11x17_SEPTA_CONTRACT-5_50_LOUDON.pdf PDF
Addendum-7-Contract-5-Substations_Rehab-Step-1-8-5-26.pdf PDF
Addendum-6-Contract-5-Substations-Step-1-7-6-26.pdf PDF
Managing-Asbestos-In-Place-Addendum-5.pdf PDF
SEPTA-Environmental-Report-combined-Addendum-5.pdf PDF
Broad-Roof-Replacement-100-DWG_Set-Addendum-5.pdf PDF
Management-of-Lead-Paint-in-SEPTA-Construction-Projects-Document-3001-Addendum-5.pdf PDF
Orange-Blue-Green-line-emerg.-lght-single-line-diag.-Addendum-5.pdf PDF
Park-Peco-Info-Addendum-5.pdf PDF
Market-PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Broad-Peco-Info-Addendum-5.pdf PDF
Tentative-Layout-of-WESS-Equipment-in-Park-TPSS_22-Jan-2018-Addendum-5.pdf PDF
Loudon-WESS-Details-REV3_signed-171108-Addendum-5.pdf PDF
PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Addendum-5-Contract-5-Substations-Step-1-6-25-26.pdf PDF
SEPTA-Station-20-Sansom-Points-List-Addendum-5.pdf PDF
3004-ACM-Handling-Program-2023-Addendum-5.pdf PDF
DWG-7E-16563_28_color_a-Addendum-5.pdf PDF
Pre-Qualification-Meeting_-RFQ_-26-00105-AJEB-Substation-attendance-report-6-10-26.pdf PDF
Addendum-3-Contract-5-Substations-Step-1-6-10-26.pdf PDF
SIte-Visit-Attendance-Meeting-Power-Substation-Contract-5-6-11-26.pdf PDF
Addendum-4-Contract-5-Substations-Step-1-6-15-26.pdf PDF
Site-Visit-Attendance-Meeting-Substation-Contract-5-6-12-26.pdf PDF
Addendum-2-Contract-5-Substations-Step-1-6-4-26.pdf PDF
22x34-Loudon-Contract-5-Drawings-Addendum-3.pdf PDF
22x34-Broad-Street-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-3.pdf PDF
22x34-Castor-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-2.pdf PDF
22x34-General-Notes-Contract-5-Drawings-Addendum-3.pdf PDF
Addendum-1-Contract-5-Substations-Step-1-6-3-26.pdf PDF
22x34-Park-Contract-5-Drawings-Addendum-3.pdf PDF
JAL192590415-Substation-Rehab-Contract-5-Step-1.pdf PDF
ATTACHMENT-3-Form-330.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-3.pdf PDF
JAL192590415-Invitation-to-Propose-2-Step-Process-Traction-Substation.pdf PDF
ATTACHMENT-4-Addendum-Acknowledgement-1.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-1.pdf PDF
ATTACHMENT-1-SEPTA-Contract-5-Substations-50-Specifications.pdf PDF
Exhibit-FEDERAL-CONSTRUCTION-CONTRACT-STEP-2-CONTRACT-5-SUBSTATIONS.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-2-1.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

CO

VE

R

SH

EE

T

NTS -

MLB

VS

G100 1 10 1 452

17AN-G100 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

IN

DE

X

OF

D

RA

W

IN

GS

GE

NE

RA

L

BR

OA

D

NTS -

MB

VS

G101 2 10 2 452

17AN-G101 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

IN

DE

X

OF

D

RA

W

IN

GS

PA

RK

NTS -

MB

VS

G102 3 10 3 452

17AN-G102 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

IN

DE

X

OF

D

RA

W

IN

GS

LO

UD

ON

NTS -

MB

VS

G103 4 10 4 452

17AN-G103 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

IN

DE

X

OF

D

RA

W

IN

GS

CA

ST

OR

NTS -

MB

VS

G104 5 10 5 452

17AN-G104 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

GE

NE

RA

L

NO

TE

S

NTS -

MB

VS

G105 6 10 6 452

17AN-G105 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

DE

SC

RI

PT

IO

N

OF

W

OR

K

NTS -

MB

VS

G107 7 10 7 452

17AN-G107 -

30% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

G

EN

ER

AL

SU

GG

ES

TE

D

OV

ER

AL

L

ST

AG

IN

G

NTS -

MB

VS

G108 8 10 8 452

17AN-G108 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

W

OR

KI

NG

C

LE

AR

AN

CE

S

FO

R

EL

EC

TR

IC

AL

E

QU

IP

M

EN

T

NTS -

MLB

EZ

G109 9 10 9 452

17AN-G109 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

CO

N

TR

AC

T

BR

OA

D

- P

AR

K -

LO

UD

ON

- C

AS

TO

R

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

10/16/2017

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

4\1

7A N-

G1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

G

EN

ER

AL

CA

BL

ES

C

ON

CU

IT

S

- S

CH

ED

UL

E

TE

M

PL

AT

E

NTS -

MB

VS

G110 10 10 10 452

17AN-G108 -

ONE STORY BRICK

BUILDING#1335

TWO STORY BRICK

DWELLING#1325

BRICK /MASONRY

BUILDING

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

C1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

CI

VI

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

AS SHOWN -

ARG

SEG

C100 1 3 11 452

17AN-C100 -

ONE STORY BRICK

BUILDING#1335

TWO STORY BRICK

DWELLING#1325

BRICK /MASONRY

BUILDING

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

C1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

CI

VI

L

SI

TE

P

LA

N

AS SHOWN -

ARG

SEG

C101 2 3 12 452

17AN-C101 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

7\1

7A N-

C1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

CI

VI

L

CU

RB

P

AV

EM

EN

T

DE

TA

IL

S

AS SHOWN -

ARG

SEG

C102 3 3 13 452

17AN-C102 -

OF

AR

CH

IT

EC

TU

RA

L

GE

NE

RA

L

NO

TE

S

LE

GE

ND

S

AS SHOWN 1:1

AC

BF

A100 1 23 14 452

17AN-A100 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

AB

BR

EV

IA

TI

ON

S

AS SHOWN 1:1

AC

BF

A101 2 23 15 452

17AN-A101 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

CO

DE

D

AT

A

AS SHOWN 1:1

AC

JM

A102 3 23 16 452

17AN-A102 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

GR

OU

ND

F

LO

OR

R

EM

OV

AL

P

LA

N

AS SHOWN 1:1

AC

BF

A103 4 23 17 453

17AN-A103 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L M

EZ

ZA

NI

NE

R

EM

OV

AL

P

LA

NS

AS SHOWN 1:1

AC

BF

A104 5 23 18 452

17AN-A104 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

BA

SE

M

EN

T

RE

M

OV

AL

P

LA

N

AS SHOWN 1:1

AC

BF

A105 6 23 19 453

17AN-A105 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

RO

OF

R

EM

OV

AL

P

LA

N

AS SHOWN 1:1

AC

BF

A106 7 23 20 452

17AN-A106 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PR

OP

OS

ED

G

RO

UN

D

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

BF

A107 8 23 21 452

17AN-A107 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PR

OP

OS

ED

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

NS

AS SHOWN 1:1

AC

BF

A108 9 23 22 452

17AN-A108 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

AC

BF

A109 10 23 23 452

17AN-A109 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A110 11 23 24 452

17AN-A110 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A111 12 23 25 452

17AN-A111 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

IN

TE

RI

OR

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A112 13 23 26 452

17AN-A112 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

IN

TE

RI

OR

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A113 14 23 27 452

17AN-A113 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

IN

TE

RI

OR

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A114 15 23 28 452

17AN-A114 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

IN

TE

RI

OR

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A115 16 23 29 452

17AN-A115 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PR

OP

OS

ED

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A116 17 23 30 452

17AN-A116 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PR

OP

OS

ED

E

LE

VA

TI

ON

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A117 18 23 31 452

17AN-A117 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PH

OT

O

DE

TA

IL

S

- S

HE

ET

AS SHOWN 1:1

AC

JM

A118 19 23 32 453

17AN-A118.dwg -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

4/2/2017 276491

ST

AT

US

: 3

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

30% SUBMISSION

AR

CH

IT

EC

TU

RA

L

PH

OT

O

DE

TA

IL

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A119 20 23 33 452

17AN-A119 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L

PH

OT

O

DE

TA

IL

S

- S

HE

ET

AS SHOWN 1:1

AC

BF

A120 21 23 34 452

17AN-A120 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

OF

AR

CH

IT

EC

TU

RA

L M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

SH

EE

T

AS SHOWN 1:1

AC

BF

A121 22 23 35 452

17AN-A121 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

AR

CH

IT

EC

TU

RA

L M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

SH

EE

T

AS SHOWN 1:1

AC

BF

A122 23 23 36 452

17AN-A122 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

A1

.D

WG

ST

RU

CT

U

RA

L

GE

NE

RA

L

NO

TE

S

AB

BR

EV

IA

TI

ON

S

N/A -

MKT

JWA

S100 1 18 37 452

17AN-S100 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street Phoenixville, PA 19460

(610) 933-0123

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

BA

SE

M

EN

T

1/8" = 1'-0" -

MKT

JWA

S101 2 17 38 452

17AN-S101 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

FI

RS

T

FL

OO

R

1/8" = 1'-0" -

MKT

JWA

S102 3 17 39 452

17AN-S102 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

M

EZ

ZA

NI

NE

1/8" = 1'-0" -

MKT

JWA

S103 4 17 40 452

17AN-S103 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

RO

OF

1/8" = 1'-0" -

MKT

JWA

S104 5 17 41 452

17AN-S104 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

F

IR

ST

F

LO

OR

F

RA

M

IN

G

PL

AN

1/8" = 1'-0" -

MKT

JWA

S105 6 17 42 452

17AN-S105 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

M

EZ

ZA

NI

NE

F

RA

M

IN

G

PL

AN

1/8" = 1'-0" -

MKT

JWA

S106 7 17 43 452

17AN-S106 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

B

AS

EM

EN

T

PL

AN

AS NOTED -

MKT

JWA

S107 8 17 44 452

17AN-S107 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

1/8" = 1'-0" -

MKT

JWA

S108 9 17 45 452

17AN-S108 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

M

EZ

ZA

NI

NE

P

LA

N

1/8" = 1'-0" -

MKT

JWA

S109 10 17 46 452

17AN-S109 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

R

OO

F

LA

YO

UT

1/8" = 1'-0" -

MKT

JWA

S110 11 17 47 452

17AN-S110 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S111 12 17 48 452

17AN-S111 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S112 12 17 49 452

17AN-S112 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S113 14 17 50 452

17AN-S113 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

FO

UN

DA

TI

ON

P

AD

D

ET

AI

LS

AS NOTED -

MKT

JWA

S114 15 17 51 452

17AN-S114 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

FA

LL

P

RO

TE

CT

IO

N

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S115 16 17 52 452

17AN-S115 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

MKT

JWA

S116 17 17 53 452

17AN-S116 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

MKT

JWA

S117 18 18 54 453

17AN-S117 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/15

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

S1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

M

EC

H

AN

IC

AL

GE

NE

RA

L

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

DNP

DJM

M100 1 10 55 452

17AN-M100 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

ABBREVIATIONS: GENERAL NOTES:LEGEND-SYMBOLS:

SYMBOL DESCRIPTION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M101 2 10 56 453

17AN-M101 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

KEYED NOTES:GENERAL NOTES:

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

M102 3 10 57 453

17AN-M102 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M103 4 10 58 453

17AN-M103 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

RO

OF

P

LA

N

AS SHOWN 1:1

DNP

DJM

M104 5 10 59 453

17AN-M104 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M105 6 10 60 453

17AN-M105 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M106 7 10 61 453

17AN-M106 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

DJM

M107 8 12 61 452

17AN-M107 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

R

OO

F

PL

AN

AS SHOWN 1:1

DNP

DJM

M108 8 10 62 453

17AN-M108 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

EN

LA

RG

ED

P

LA

NS

AS SHOWN 1:1

DNP

DJM

M109 9 10 63 453

17AN-M109 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

DEMOLITION KEYED NOTES:GENERAL NOTES:

M

EC

H

AN

IC

AL

SC

HE

DU

LE

S

AS SHOWN 1:1

DNP

DJM

M110 11 12 64 452

17AN-M110 ----

GRILLE/REGISTER/DIFFUSER SCHEDULE

ENERGY RECOVERY VENTILATOR

INFRARED RADIANT HEATER SCHEDULE

UNIT HEATER SCHEDULE

AIR COMPRESSOR SCHEDULE

PLUMBING SCHEDULE

ELECTRIC WATER HEATER SCHEDULE

SUMP PUMP SCHEDULE

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

50% SUBMISSION

SPLIT SYSTEM SCHEDULE

M

EC

H

AN

IC

AL

M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

AS SHOWN 1:1

DNP

DJM

M111 10 10 64 452

17AN-M111 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

M1

.D

WG

EL

EC

TR

IC

AL

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

MM

JIB

E100 1 17 65 452

17AN-E100 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

S

S

S

ELECTRICAL ABBREVIATIONS:SINGLE LINE SYMBOLS:

STANDARD MOUNTING HEIGHTS:

SYMBOL DESCRIPTION

LINETYPE CONVENTIONS:

DETAIL CALLOUT SYMBOLS:

ELECTRICAL / LIGHTING SYMBOLS:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

E101 2 17 67 452

17AN-E101 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

DEMOLITION SCOPE OF WORK: GENERAL NOTES: KEYED NOTES:

S

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E102 3 17 68 452

17AN-E102 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E103 4 17 69 452

17AN-E103 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

S S

S

S

OF

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

E104 5 17 69 453

17AN-E104 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

S S

S

S S

S

S S

S S

S

S

OF

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E105 6 17 71 452

17AN-E105 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

S S

OF

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E106 7 17 71 453

17AN-E106 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

E107 8 17 72 453

17AN-E107 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

PROPOSED SCOPE OF WORK: GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E108 9 17 73 453

17AN-E108 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

PROPOSED SCOPE OF WORK: GENERAL NOTES: KEYED NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E109 10 17 75 452

17AN-E109 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

S S

S

OF

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

E110 11 17 76 452

17AN-E110 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

PROPOSED SCOPE OF WORK: GENERAL NOTES:

S

S S

S

S S S S S S S

S S

S

OF

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

E111 12 17 77 452

17AN-E111 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

OF

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

E112 13 17 78 452

17AN-E112 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN 1:1

WAB

CJM

E113 14 17 79 452

17AN-E113 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

S

IN

GL

E

LI

NE

D

IA

GR

AM

AS SHOWN 1:1

WAB

CJM

E114 15 17 80 452

17AN-E114 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

PROPOSED SCOPE OF WORK:

EL

EC

TR

IC

AL

EL

EC

TR

IC

AL

S

CH

ED

UL

ES

AS SHOWN 1:1

WAB

CJM

E115 16 17 81 452

17AN-E115 ----

CATALOG NO.MANUFACTURER

LAMP INFORMATION

LUMINAIRE SCHEDULE

MOUNTINGDESCRIPTIONTYPE LAMP

QTYTYPE WATTS

EACH VOLTS

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

BR

O

AD

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O

N P

O W

ER

S

U

BS

TA

TI

O N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276491

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

E1

.D

WG

EL

EC

TR

IC

AL

PA

NE

L

SC

HE

DU

LE

S

AS SHOWN 1:1

WAB

CJM

E116 17 17 82 452

17AN-E116 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .