Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-1.pdf
PDF 17 MB Posted
- Solicitation number
- RFP 26-00105-AJEB
- Issued by
- Philadelphia County, Philadelphia City, Pennsylvania
About this file
This is a 50% design submission drawing set for SEPTA's Contract 5 Traction Power Substation Rehabilitation Program covering the Broad, Park, Loudon, and Castor substations along the Broad-Ridge Spur Subway/Elevated Trains line. The drawing set contains 123 sheets dated October 16-22, 2025, spanning general, civil, architectural, structural, mechanical, electrical, fire alarm, and traction power disciplines. The documents include site plans, floor plans (basement, first floor, mezzanage, roof), demolition plans, equipment layouts, single-line electrical diagrams, elevation drawings, construction details, staging plans, schedules, and specifications for rehabilitation work at each substation facility. The drawings reference Work Order 276491 and multiple computer file numbers, with sheets marked "50% SUBMISSION NOT FOR CONSTRUCTION" indicating this is an interim design deliverable requiring further development before bid and construction.
The drawing set supports the two-step procurement with RFQ responses due July 15, 2026, pre-qualification meeting June 10, 2026, mandatory site visits June 11-12, 2026, and a 2,035 calendar day construction period from Notice to Proceed. The technical drawings detail replacement of 13.2kV and 12kV switchgear, DC rectifier systems (750VDC and 600VDC), transformers, station batteries, protective relays, SCADA systems, HVAC equipment, fire protection systems, lighting, and communications infrastructure across multiple building levels. Staged construction plans show phased equipment installation to maintain continuous traction power service during rehabilitation. Environmental remediation work includes asbestos removal, lead paint abatement, contaminated soil remediation, and PCB surveys. The drawings are prepared by multiple engineering consultants including Meliora Design and reference SEPTA's standard specifications for buildings and bridges (B&B) and electrification, maintenance, and construction (EM&C) divisions with required approvals from Project Manager, Manager of Architecture/Engineering, Director of Engineering, System Safety, Chief Rail Transit Officer, Chief Engineering Officer B&B, and Chief Engineer EM&C.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
CO
VE
R
SH
EE
T
NTS -
MLB
VS
G100 1 10 1 452
17AN-G100 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
IN
DE
X
OF
D
RA
W
IN
GS
GE
NE
RA
L
BR
OA
D
NTS -
MB
VS
G101 2 10 2 452
17AN-G101 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
IN
DE
X
OF
D
RA
W
IN
GS
PA
RK
NTS -
MB
VS
G102 3 10 3 452
17AN-G102 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
IN
DE
X
OF
D
RA
W
IN
GS
LO
UD
ON
NTS -
MB
VS
G103 4 10 4 452
17AN-G103 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
IN
DE
X
OF
D
RA
W
IN
GS
CA
ST
OR
NTS -
MB
VS
G104 5 10 5 452
17AN-G104 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
GE
NE
RA
L
NO
TE
S
NTS -
MB
VS
G105 6 10 6 452
17AN-G105 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
DE
SC
RI
PT
IO
N
OF
W
OR
K
NTS -
MB
VS
G107 7 10 7 452
17AN-G107 -
30% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
G
EN
ER
AL
SU
GG
ES
TE
D
OV
ER
AL
L
ST
AG
IN
G
NTS -
MB
VS
G108 8 10 8 452
17AN-G108 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
W
OR
KI
NG
C
LE
AR
AN
CE
S
FO
R
EL
EC
TR
IC
AL
E
QU
IP
M
EN
T
NTS -
MLB
EZ
G109 9 10 9 452
17AN-G109 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
CO
N
TR
AC
T
BR
OA
D
- P
AR
K -
LO
UD
ON
- C
AS
TO
R
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
10/16/2017
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
4\1
7A N-
G1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
G
EN
ER
AL
CA
BL
ES
C
ON
CU
IT
S
- S
CH
ED
UL
E
TE
M
PL
AT
E
NTS -
MB
VS
G110 10 10 10 452
17AN-G108 -
ONE STORY BRICK
BUILDING#1335
TWO STORY BRICK
DWELLING#1325
BRICK /MASONRY
BUILDING
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
7\1
7A N-
C1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
CI
VI
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
AS SHOWN -
ARG
SEG
C100 1 3 11 452
17AN-C100 -
ONE STORY BRICK
BUILDING#1335
TWO STORY BRICK
DWELLING#1325
BRICK /MASONRY
BUILDING
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
7\1
7A N-
C1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
CI
VI
L
SI
TE
P
LA
N
AS SHOWN -
ARG
SEG
C101 2 3 12 452
17AN-C101 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
7\1
7A N-
C1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
CI
VI
L
CU
RB
P
AV
EM
EN
T
DE
TA
IL
S
AS SHOWN -
ARG
SEG
C102 3 3 13 452
17AN-C102 -
OF
AR
CH
IT
EC
TU
RA
L
GE
NE
RA
L
NO
TE
S
LE
GE
ND
S
AS SHOWN 1:1
AC
BF
A100 1 23 14 452
17AN-A100 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
AB
BR
EV
IA
TI
ON
S
AS SHOWN 1:1
AC
BF
A101 2 23 15 452
17AN-A101 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
CO
DE
D
AT
A
AS SHOWN 1:1
AC
JM
A102 3 23 16 452
17AN-A102 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
GR
OU
ND
F
LO
OR
R
EM
OV
AL
P
LA
N
AS SHOWN 1:1
AC
BF
A103 4 23 17 453
17AN-A103 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L M
EZ
ZA
NI
NE
R
EM
OV
AL
P
LA
NS
AS SHOWN 1:1
AC
BF
A104 5 23 18 452
17AN-A104 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
BA
SE
M
EN
T
RE
M
OV
AL
P
LA
N
AS SHOWN 1:1
AC
BF
A105 6 23 19 453
17AN-A105 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
RO
OF
R
EM
OV
AL
P
LA
N
AS SHOWN 1:1
AC
BF
A106 7 23 20 452
17AN-A106 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PR
OP
OS
ED
G
RO
UN
D
FL
OO
R
PL
AN
AS SHOWN 1:1
AC
BF
A107 8 23 21 452
17AN-A107 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PR
OP
OS
ED
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
NS
AS SHOWN 1:1
AC
BF
A108 9 23 22 452
17AN-A108 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PR
OP
OS
ED
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
AC
BF
A109 10 23 23 452
17AN-A109 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A110 11 23 24 452
17AN-A110 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A111 12 23 25 452
17AN-A111 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
IN
TE
RI
OR
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A112 13 23 26 452
17AN-A112 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
IN
TE
RI
OR
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A113 14 23 27 452
17AN-A113 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
IN
TE
RI
OR
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A114 15 23 28 452
17AN-A114 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
IN
TE
RI
OR
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A115 16 23 29 452
17AN-A115 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PR
OP
OS
ED
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A116 17 23 30 452
17AN-A116 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PR
OP
OS
ED
E
LE
VA
TI
ON
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A117 18 23 31 452
17AN-A117 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PH
OT
O
DE
TA
IL
S
- S
HE
ET
AS SHOWN 1:1
AC
JM
A118 19 23 32 453
17AN-A118.dwg -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
4/2/2017 276491
ST
AT
US
: 3
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
30% SUBMISSION
AR
CH
IT
EC
TU
RA
L
PH
OT
O
DE
TA
IL
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A119 20 23 33 452
17AN-A119 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L
PH
OT
O
DE
TA
IL
S
- S
HE
ET
AS SHOWN 1:1
AC
BF
A120 21 23 34 452
17AN-A120 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
OF
AR
CH
IT
EC
TU
RA
L M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
SH
EE
T
AS SHOWN 1:1
AC
BF
A121 22 23 35 452
17AN-A121 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
AR
CH
IT
EC
TU
RA
L M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
SH
EE
T
AS SHOWN 1:1
AC
BF
A122 23 23 36 452
17AN-A122 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
A1
.D
WG
ST
RU
CT
U
RA
L
GE
NE
RA
L
NO
TE
S
AB
BR
EV
IA
TI
ON
S
N/A -
MKT
JWA
S100 1 18 37 452
17AN-S100 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street Phoenixville, PA 19460
(610) 933-0123
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
BA
SE
M
EN
T
1/8" = 1'-0" -
MKT
JWA
S101 2 17 38 452
17AN-S101 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
FI
RS
T
FL
OO
R
1/8" = 1'-0" -
MKT
JWA
S102 3 17 39 452
17AN-S102 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
M
EZ
ZA
NI
NE
1/8" = 1'-0" -
MKT
JWA
S103 4 17 40 452
17AN-S103 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
RO
OF
1/8" = 1'-0" -
MKT
JWA
S104 5 17 41 452
17AN-S104 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
F
IR
ST
F
LO
OR
F
RA
M
IN
G
PL
AN
1/8" = 1'-0" -
MKT
JWA
S105 6 17 42 452
17AN-S105 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
M
EZ
ZA
NI
NE
F
RA
M
IN
G
PL
AN
1/8" = 1'-0" -
MKT
JWA
S106 7 17 43 452
17AN-S106 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
B
AS
EM
EN
T
PL
AN
AS NOTED -
MKT
JWA
S107 8 17 44 452
17AN-S107 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
F
IR
ST
F
LO
OR
P
LA
N
1/8" = 1'-0" -
MKT
JWA
S108 9 17 45 452
17AN-S108 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
M
EZ
ZA
NI
NE
P
LA
N
1/8" = 1'-0" -
MKT
JWA
S109 10 17 46 452
17AN-S109 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
R
OO
F
LA
YO
UT
1/8" = 1'-0" -
MKT
JWA
S110 11 17 47 452
17AN-S110 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S111 12 17 48 452
17AN-S111 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S112 12 17 49 452
17AN-S112 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S113 14 17 50 452
17AN-S113 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
FO
UN
DA
TI
ON
P
AD
D
ET
AI
LS
AS NOTED -
MKT
JWA
S114 15 17 51 452
17AN-S114 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
FA
LL
P
RO
TE
CT
IO
N
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S115 16 17 52 452
17AN-S115 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
MKT
JWA
S116 17 17 53 452
17AN-S116 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
MKT
JWA
S117 18 18 54 453
17AN-S117 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/15
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
S1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
M
EC
H
AN
IC
AL
GE
NE
RA
L
NO
TE
S, S
YM
BO
LS
A
BB
RE
VI
AT
IO
NS
AS SHOWN 1:1
DNP
DJM
M100 1 10 55 452
17AN-M100 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
ABBREVIATIONS: GENERAL NOTES:LEGEND-SYMBOLS:
SYMBOL DESCRIPTION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
BA
SE
M
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
DNP
DJM
M101 2 10 56 453
17AN-M101 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
KEYED NOTES:GENERAL NOTES:
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
FI
RS
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
M102 3 10 57 453
17AN-M102 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
DNP
DJM
M103 4 10 58 453
17AN-M103 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
RO
OF
P
LA
N
AS SHOWN 1:1
DNP
DJM
M104 5 10 59 453
17AN-M104 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
DNP
DJM
M105 6 10 60 453
17AN-M105 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
DNP
DJM
M106 7 10 61 453
17AN-M106 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
DJM
M107 8 12 61 452
17AN-M107 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
R
OO
F
PL
AN
AS SHOWN 1:1
DNP
DJM
M108 8 10 62 453
17AN-M108 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
EN
LA
RG
ED
P
LA
NS
AS SHOWN 1:1
DNP
DJM
M109 9 10 63 453
17AN-M109 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
DEMOLITION KEYED NOTES:GENERAL NOTES:
M
EC
H
AN
IC
AL
SC
HE
DU
LE
S
AS SHOWN 1:1
DNP
DJM
M110 11 12 64 452
17AN-M110 ----
GRILLE/REGISTER/DIFFUSER SCHEDULE
ENERGY RECOVERY VENTILATOR
INFRARED RADIANT HEATER SCHEDULE
UNIT HEATER SCHEDULE
AIR COMPRESSOR SCHEDULE
PLUMBING SCHEDULE
ELECTRIC WATER HEATER SCHEDULE
SUMP PUMP SCHEDULE
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
50% SUBMISSION
SPLIT SYSTEM SCHEDULE
M
EC
H
AN
IC
AL
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
AS SHOWN 1:1
DNP
DJM
M111 10 10 64 452
17AN-M111 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
M1
.D
WG
EL
EC
TR
IC
AL
NO
TE
S, S
YM
BO
LS
A
BB
RE
VI
AT
IO
NS
AS SHOWN 1:1
MM
JIB
E100 1 17 65 452
17AN-E100 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
S
S
S
ELECTRICAL ABBREVIATIONS:SINGLE LINE SYMBOLS:
STANDARD MOUNTING HEIGHTS:
SYMBOL DESCRIPTION
LINETYPE CONVENTIONS:
DETAIL CALLOUT SYMBOLS:
ELECTRICAL / LIGHTING SYMBOLS:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
E101 2 17 67 452
17AN-E101 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
DEMOLITION SCOPE OF WORK: GENERAL NOTES: KEYED NOTES:
S
OF
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E102 3 17 68 452
17AN-E102 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E103 4 17 69 452
17AN-E103 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
S S
S
S
OF
OF
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
E104 5 17 69 453
17AN-E104 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
S S
S
S S
S
S S
S S
S
S
OF
OF
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E105 6 17 71 452
17AN-E105 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
S S
OF
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E106 7 17 71 453
17AN-E106 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
E107 8 17 72 453
17AN-E107 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
PROPOSED SCOPE OF WORK: GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E108 9 17 73 453
17AN-E108 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
PROPOSED SCOPE OF WORK: GENERAL NOTES: KEYED NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E109 10 17 75 452
17AN-E109 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
S S
S
OF
OF
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
BA
SE
M
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
E110 11 17 76 452
17AN-E110 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
PROPOSED SCOPE OF WORK: GENERAL NOTES:
S
S S
S
S S S S S S S
S S
S
OF
OF
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
FI
RS
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
E111 12 17 77 452
17AN-E111 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
OF
OF
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
E112 13 17 78 452
17AN-E112 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
SI
NG
LE
L
IN
E
DI
AG
RA
M
AS SHOWN 1:1
WAB
CJM
E113 14 17 79 452
17AN-E113 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
S
IN
GL
E
LI
NE
D
IA
GR
AM
AS SHOWN 1:1
WAB
CJM
E114 15 17 80 452
17AN-E114 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
PROPOSED SCOPE OF WORK:
EL
EC
TR
IC
AL
EL
EC
TR
IC
AL
S
CH
ED
UL
ES
AS SHOWN 1:1
WAB
CJM
E115 16 17 81 452
17AN-E115 ----
CATALOG NO.MANUFACTURER
LAMP INFORMATION
LUMINAIRE SCHEDULE
MOUNTINGDESCRIPTIONTYPE LAMP
QTYTYPE WATTS
EACH VOLTS
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
BR
O
AD
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O
N P
O W
ER
S
U
BS
TA
TI
O N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276491
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
E1
.D
WG
EL
EC
TR
IC
AL
PA
NE
L
SC
HE
DU
LE
S
AS SHOWN 1:1
WAB
CJM
E116 17 17 82 452
17AN-E116 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .