Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-2.pdf

PDF 18 MB Posted

Attached to
Traction Power Substation Rehabilitation Program – Contract 5 Broad, Loudon, Park and Castor Substations Project
Solicitation number
RFP 26-00105-AJEB
Issued by
Philadelphia County, Philadelphia City, Pennsylvania

About this file

This file contains architectural and structural engineering construction drawings (50% submission stage, not for construction) for SEPTA's Traction Power Substation Rehabilitation Program – Contract 5 covering Park, Broad, Loudon, and Castor substations along the Subway/Elevated Trains line. The drawing set includes detailed architectural plans (sheets A214-A220), structural plans and details (sheets S200-S222), mechanical systems (sheets M200-M211), electrical systems (sheets E200-E217), fire alarm systems (sheets FA200-FA207), traction power systems (sheets TP200-TP246), and communications systems (sheets COM200-COM207) across multiple building levels including basement, first floor, mezzanine, and roof. The drawings show existing conditions, demolition plans, proposed equipment layouts, single-line diagrams, equipment elevations, cable/duct bank routing, grounding plans, protection/relay diagrams, SCADA points lists, staging plans (Stages 1-3), and comprehensive construction details for rehabilitation of 13.2kV and 4.8kV electrical distribution systems, DC rectifier equipment, transformers, circuit breakers, batteries, control boards, HVAC, plumbing, lighting, and fire protection systems. Work Order Number is 276482 with a submission date of August 22, 2025, and drawings printed October 19-21, 2025.

The drawings are prepared by multiple engineering consultants including Meliora Design (structural engineering, 259 Morgan Street, Phoenixville, PA 19460, phone 610-933-0123) and require approval signatures from SEPTA's Project Manager, Manager of Architecture/Engineering, Director of Engineering B&B, System Safety, Chief Rail Transit Officer, Chief Engineering Officer B&B, and Chief Engineer EM&C. The traction power drawings detail phased construction staging to maintain continuous service during rehabilitation, with existing single-line diagrams showing equipment to be removed and proposed diagrams showing new 13.2kV switchgear, transformers, DC rectifiers (750VDC and 600VDC), protective relays, multifunction meters/IEDs, circuit breakers, batteries, grounding systems, and SCADA integration. Structural drawings include concrete repair details, foundation details, steel framing plans for first floor and mezzanine levels, fall protection systems, and building details across six detail sheets (S217-S222). All drawings are marked as 50% submission status and explicitly noted as "NOT FOR CONSTRUCTION," indicating design development phase requiring contractor completion of final design from these documents per the two-step procurement RFQ requirements.

View the file

Other files

File Type Posted
Addendum-10-Contract-5-Substations-Step-1-8-25-26.pdf PDF
Addendum-9-Contract-5-Substations-Step-1-8-20-26.pdf PDF
Addendum-8-Contract-5-Substations-Step-1-8-10-26.pdf PDF
Addendum-7-DWG-7E-16563_28_color_a.pdf PDF
Addendum-7-REV1-Markups-11x17_SEPTA_CONTRACT-5_50_LOUDON.pdf PDF
Addendum-7-Contract-5-Substations_Rehab-Step-1-8-5-26.pdf PDF
Addendum-6-Contract-5-Substations-Step-1-7-6-26.pdf PDF
Managing-Asbestos-In-Place-Addendum-5.pdf PDF
SEPTA-Environmental-Report-combined-Addendum-5.pdf PDF
Broad-Roof-Replacement-100-DWG_Set-Addendum-5.pdf PDF
Management-of-Lead-Paint-in-SEPTA-Construction-Projects-Document-3001-Addendum-5.pdf PDF
Orange-Blue-Green-line-emerg.-lght-single-line-diag.-Addendum-5.pdf PDF
Park-Peco-Info-Addendum-5.pdf PDF
Market-PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Broad-Peco-Info-Addendum-5.pdf PDF
Tentative-Layout-of-WESS-Equipment-in-Park-TPSS_22-Jan-2018-Addendum-5.pdf PDF
Loudon-WESS-Details-REV3_signed-171108-Addendum-5.pdf PDF
PECO-fault-duty-letters-dc-TPSS-Addendum-5.pdf PDF
Addendum-5-Contract-5-Substations-Step-1-6-25-26.pdf PDF
SEPTA-Station-20-Sansom-Points-List-Addendum-5.pdf PDF
3004-ACM-Handling-Program-2023-Addendum-5.pdf PDF
DWG-7E-16563_28_color_a-Addendum-5.pdf PDF
Pre-Qualification-Meeting_-RFQ_-26-00105-AJEB-Substation-attendance-report-6-10-26.pdf PDF
Addendum-3-Contract-5-Substations-Step-1-6-10-26.pdf PDF
SIte-Visit-Attendance-Meeting-Power-Substation-Contract-5-6-11-26.pdf PDF
Addendum-4-Contract-5-Substations-Step-1-6-15-26.pdf PDF
Site-Visit-Attendance-Meeting-Substation-Contract-5-6-12-26.pdf PDF
Addendum-2-Contract-5-Substations-Step-1-6-4-26.pdf PDF
22x34-Loudon-Contract-5-Drawings-Addendum-3.pdf PDF
22x34-Broad-Street-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-3.pdf PDF
22x34-Castor-Contract-5-Drawings-Addendum-3.pdf PDF
Attachment-2-11x17_SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-DRAWINGS-SET-1.pdf PDF
22x34-General-Notes-Contract-5-Drawings-Addendum-3.pdf PDF
Addendum-1-Contract-5-Substations-Step-1-6-3-26.pdf PDF
22x34-Park-Contract-5-Drawings-Addendum-3.pdf PDF
JAL192590415-Substation-Rehab-Contract-5-Step-1.pdf PDF
ATTACHMENT-3-Form-330.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-3.pdf PDF
JAL192590415-Invitation-to-Propose-2-Step-Process-Traction-Substation.pdf PDF
ATTACHMENT-4-Addendum-Acknowledgement-1.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-1.pdf PDF
ATTACHMENT-1-SEPTA-Contract-5-Substations-50-Specifications.pdf PDF
Exhibit-FEDERAL-CONSTRUCTION-CONTRACT-STEP-2-CONTRACT-5-SUBSTATIONS.pdf PDF
ATTACHMENT-2-SEPTA_CONTRACT-5_MARKET_50_BROAD-PARK-LOUDON-CASTOR-Drawings-SET-2-1.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OF

AR

CH

IT

EC

TU

RA

L

EX

IS

TI

NG

IN

TE

RI

OR

E

LE

VA

TI

ON

S I

AS SHOWN 1:1

AC

ZH

A214 15 21 149 448

17AN-A214 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

AR

CH

IT

EC

TU

RA

L A2

E

XI

ST

IN

G

EL

EV

AT

IO

NS

I

AS SHOWN 1:1

AC

ZH

16 21 150 448

17AN-A215 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

AR

CH

IT

EC

TU

RA

L A2

E

LE

VA

TI

ON

S

II

AS SHOWN 1:1

AC

ZH

A216 17 21 151 448

17AN-A216 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

AR

CH

IT

EC

TU

RA

L A2

P

HO

TO

D

ET

AI

LS

I

AS SHOWN 1:1

AC

ZH

18 21 152 448

17AN-A217 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

AR

CH

IT

EC

TU

RA

L A2

P

HO

TO

D

ET

AI

LS

II

AS SHOWN 1:1

AC

ZH

19 21 153 448

17AN-A218 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

OF

AR

CH

IT

EC

TU

RA

L

DE

TA

IL

S I

AS SHOWN 1:1

AC

ZH

A219 20 21 154 448

17AN-A219 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

AR

CH

IT

EC

TU

RA

L M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

SH

EE

T

AS SHOWN 1:1

AC

ZH

A220 21 21 155 448

17AN-A220 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

9\1

7A N-

A2

.D

WG

ST

RU

CT

U

RA

L

GE

NE

RA

L

NO

TE

S

AB

BR

EV

IA

TI

ON

S

N/A -

SEB

JWA

S200 1 23

157 452

17AN-S200 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street Phoenixville, PA 19460

(610) 933-0123

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

BA

SE

M

EN

T

1/4" = 1'-0" -

SEB

JWA

S201 2 23

158 452

17AN-S201 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

FI

RS

T

FL

OO

R

1/4" = 1'-0" -

SEB

JWA

S202 3 23

159 452

17AN-S202 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

M

EZ

ZA

NI

NE

1/4" = 1'-0" -

SEB

JWA

S203 4 23

160 452

17AN-S203 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

EX

IS

TI

NG

C

ON

DI

TI

ON

S

RE

M

OV

AL

RO

OF

1/4" = 1'-0" -

SEB

JWA

S204 5 23

161 452

17AN-S204 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

B

AS

EM

EN

T

PL

AN

1/4" = 1'-0" -

SEB

JWA

S205 6 23

162 452

17AN-S205 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

1/4" = 1'-0" -

SEB

JWA

S206 7 23

163 452

17AN-S206 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

M

EZ

ZA

NI

NE

P

LA

N

1/4" = 1'-0" -

SEB

JWA

S207 8 23

164 452

17AN-S207 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

PR

OP

OS

ED

R

OO

F

PL

AN

1/4" = 1'-0" -

SEB

JWA

S208 9 23

165 452

17AN-S208 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

FI

RS

T

FL

OO

R

FR

AM

IN

G

PL

AN

1/4" = 1'-0" -

SEB

JWA

S209 10 23 166 452

17AN-S209 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

M

EZ

ZA

NI

NE

F

RA

M

IN

G

PL

AN

1/4" = 1'-0" -

SEB

JWA

S210 11 23 167 452

17AN-S210 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

SEB

JWA

S211 12 23 168 452

17AN-S211 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S212 13 23 169 452

17AN-S212 -

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street Phoenixville, PA 19460

(610) 933-0123

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

ST

RU

CT

U

RA

L

CO

NC

RE

TE

R

EP

AI

R

DE

TA

IL

S

- S

HE

ET

AS NOTED -

MKT

JWA

S213 14 23 170 452

17AN-S213 -

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street Phoenixville, PA 19460

(610) 933-0123

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

ST

RU

CT

U

RA

L

FO

UN

DA

TI

ON

D

ET

AI

LS

AS NOTED -

SEB

JWA

S214 15 23 171 452

17AN-S214 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

ST

EE

L

DE

TA

IL

S

AS NOTED -

SEB

JWA

S215 16 23 172 452

17AN-S215 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

FA

LL

P

RO

TE

CT

IO

N

DE

TA

IL

S

AS NOTED -

SEB

JWA

S216 17 23 173 452

17AN-S216 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S217 18 23 174 452

17AN-S217 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S218 19 23 175 452

17AN-S218 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S219 20 23 176 452

17AN-S219 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S220 21 23 177 452

17AN-S220 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S221 22 23 178 452

17AN-S221 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

ST

RU

CT

U

RA

L

BU

IL

DI

NG

D

ET

AI

LS

SH

EE

T

AS NOTED -

SEB

JWA

S222 23 23 179 452

17AN-S222 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/19

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

8\1

7A N-

S2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

Meliora Design Civil, Water Resources, and Structural Engineering

259 Morgan Street

M

EC

H

AN

IC

AL

GE

NE

RA

L

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

DNP

DJM

M200 1 12

180 452

17AN-M200 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

ABBREVIATIONS: GENERAL NOTES:LEGEND-SYMBOLS:

SYMBOL DESCRIPTION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M201 2 12

181 452

17AN-M201 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

KEYED NOTES:

GENERAL NOTES:

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M202 3 12

182 452

17AN-M202 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M203 4 14

183 452

17AN-M203 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

DE

M

OL

IT

IO

N

RO

OF

P

LA

N

AS SHOWN 1:1

DNP

DJM

M204 5 12

184 452

17AN-M204 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

DNP

DJM

M205 6 12

185 452

17AN-M205 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M206 7 12

186 452

17AN-M206 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

DNP

DJM

M207 8 12

187 452

17AN-M207 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

PR

OP

OS

ED

R

OO

F

PL

AN

AS SHOWN 1:1

DNP

DJM

M208 9 12

188 452

17AN-M208 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

M

EC

H

AN

IC

AL

EN

LA

RG

ED

P

LA

NS

AS SHOWN 1:1

DNP

DJM

M209 10 12 189 452

17AN-M209 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

50% SUBMISSION

M

EC

H

AN

IC

AL

SC

HE

DU

LE

S

AS SHOWN 1:1

DNP

DJM

M210 11 12 190 452

17AN-M210 ----

GRILLE/REGISTER/DIFFUSER SCHEDULE

SPLIT SYSTEM SCHEDULE

ENERGY RECOVERY VENTILATOR

INFRARED RADIANT HEATER SCHEDULE

UNIT HEATER SCHEDULE

AIR COMPRESSOR SCHEDULE

PLUMBING SCHEDULE

ELECTRIC WATER HEATER SCHEDULE SUMP PUMP SCHEDULE

EXHAUST FAN SCHEDULE

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

M

EC

H

AN

IC

AL

M

IS

CE

LL

AN

EO

US

D

ET

AI

LS

AS SHOWN 1:1

DNP

DJM

M211 12 12 191 452

17AN-M211 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

1\1

7A N-

M2

.D

WG

EL

EC

TR

IC

AL

NO

TE

S

SY

M

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

MM

JIB

E200 1 18

192 453

17AN-E200 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

S

S

S

ELECTRICAL ABBREVIATIONS:SINGLE LINE SYMBOLS:

STANDARD MOUNTING HEIGHTS:

SYMBOL DESCRIPTION

LINETYPE CONVENTIONS:

DETAIL CALLOUT SYMBOLS:

ELECTRICAL / LIGHTING SYMBOLS:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

MM

JIB

E201 2 18

193 452

17AN-E201 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

DEMOLITION SCOPE OF WORK:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E202 3 18

194 452

17AN-E202 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

DEMOLITION SCOPE OF WORK: GENERAL NOTES:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

PO

W

ER

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E203 4 18

195 452

17AN-E203 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

MM

JIB

E204 5 18

196 452

17AN-E204 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E205 6 18

197 452

17AN-E205 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

LI

GH

TI

NG

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E206 7 18

198 452

17AN-E206 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

MM

JIB

E207 8 18

199 452

17AN-E207 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

PROPOSED SCOPE OF WORK:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E208 9 18

200 452

17AN-E208 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

P

OW

ER

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E209 10 18 201 452

17AN-E209 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

MM

JIB

E210 11 18 202 452

17AN-E210 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

GENERAL NOTES:PROPOSED SCOPE OF WORK:

S

OF

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

MM

JIB

E211 12 18 203 452

17AN-E211 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

EL

EC

TR

IC

AL

PR

OP

OS

ED

L

IG

HT

IN

G

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

MM

JIB

E212 13 18 204 452

17AN-E212 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

GENERAL NOTES:PROPOSED SCOPE OF WORK:

EL

EC

TR

IC

AL

DE

M

OL

IT

IO

N

SI

NG

LE

L

IN

E

DI

AG

RA

M

AS SHOWN 1:1

MM

JIB

E213 14 18 205 452

17AN-E213 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

EL

EC

TR

IC

AL

PR

OP

OS

ED

S

IN

GL

E

LI

NE

D

IA

GR

AM

AS SHOWN 1:1

MM

JIB

E214 15 18 206 452

17AN-E214 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

EL

EC

TR

IC

AL

EL

EC

TR

IC

AL

S

CH

ED

UL

ES

AS SHOWN 1:1

MM

JIB

E215 16 18 207 452

17AN-E215 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

CATALOG NO.MANUFACTURER

LAMP INFORMATION

LUMINAIRE SCHEDULE

MOUNTINGDESCRIPTIONTYPE LAMP

QTYTYPE WATTS

EACH VOLTS

EL

EC

TR

IC

AL

PA

NE

L

SC

HE

DU

LE

S

- S

HE

ET

AS SHOWN 1:1

MM

JIB

E216 17 18 208 452

17AN-E216 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

PANEL SCHEDULE

PANEL SCHEDULE

PANEL SCHEDULE

EL

EC

TR

IC

AL

PA

NE

L

SC

HE

DU

LE

S

- S

HE

ET

AS SHOWN 1:1

MM

JIB

E217 18 18 209 452

17AN-E217 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

6\1

7A N-

E2

.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

NO

TE

S, S

YM

BO

LS

A

BB

RE

VI

AT

IO

NS

AS SHOWN 1:1

WAB

CJM

FA200

1 8

210 452

17AN-FA200 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

0.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

FIRE ALARM NOTES (CONT):

DEMOLITION NOTES:

LEGEND-SYMBOLS: DEMOLITION NOTES (CONT): GENERAL NOTES (CONT): GENERAL NOTES (CONT):

SYMBOL DESCRIPTION

FIRE ALARM NOTES:

FI

RE

A

LA

RM

DE

M

OL

IT

IO

N

BA

SE

M

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

FA201

2 8

211 452

17AN-FA201 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

1.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

DE

M

OL

IT

IO

N

FI

RS

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

FA202

3 8

212 452

17AN-FA202 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

2.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

FI

RE

A

LA

RM

DE

M

OL

IT

IO

N M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

FA203

4 8

213 452

17AN-FA203 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

3.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

PR

OP

OS

ED

B

AS

EM

EN

T

FL

OO

R

PL

AN

AS SHOWN 1:1

WAB

CJM

FA204

5 8

214 452

17AN-FA204 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

4.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

PR

OP

OS

ED

F

IR

ST

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

FA205

6 8

215 452

17AN-FA205 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

5.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

FI

RE

A

LA

RM

PR

OP

OS

ED

M

EZ

ZA

NI

NE

F

LO

OR

P

LA

N

AS SHOWN 1:1

WAB

CJM

FA206

7 8

216 452

17AN-FA206 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

6.D

WG

50% SUBMISSION

FI

RE

A

LA

RM

DE

TA

IL

S

AS SHOWN 1:1

WAB

CJM

FA207

8 8

217 452

17AN-FA207 ----

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

5\1

7A N-

FA

7.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

GENERAL NOTES:

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

0.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

AB

BR

EV

IA

TI

ON

S

NTS -

ARG

BH

TP200

1 35

218 452

17AN-TP200 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

1.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

LE

GE

ND

S

SY

M

BO

LS

NTS 1:1

DMW

BH

TP201

2 35

219 453

17AN-TP201 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

2.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

DE

VI

CE

T

AB

LE

S

NTS -

DMW

BH

TP202

3 35

219 448

17AN-TP202 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

5.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

SU

BS

TA

TI

ON

S

IT

E

PL

AN

NTS -

DMW

BH

TP205

4 35

221 453

17AN-TP205 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

6.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

EX

IS

TI

NG

S

IN

GL

E

LI

NE

D

IA

GR

AM

NTS -

DMW

BH

TP206

5 35

222 453

17AN-TP206 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

7.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

EX

IS

T

ME

ZZ

F

IR

ST

F

LO

OR

E

QU

IP

P

LA

NS

NTS -

ARG

BH

TP207

6 35

223 453

17AN-TP207 -

TR

AC

TI

O

N P

O W

ER

EX

IS

TI

NG

B

AS

EM

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MLB

YL

TP208

7 35

224 453

17AN-TP208 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

8.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

9.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

PR

OP

OS

ED

S

IN

GL

E

LI

NE

D

IA

GR

AM

NTS -

YL

BH

TP209

8 35

225 453

17AN-TP209 -

TR

AC

TI

O

N P

O W

ER

ST

AG

IN

G

AC

TI

VI

TI

ES

N

OT

ES

NTS -

ARG

YL

TP210

9 35

226 453

17AN-TP210 -

SHEET NUMBER

DWG. NO.:

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

0.D

WG

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

1.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

SI

NG

LE

L

IN

E

DI

AG

RA

M

NTS -

YL

VS

TP211

10 35

227 453

17AN-TP211 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

2.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

M

EZ

ZA

NI

NE

F

IR

ST

F

LO

OR

E

QU

IP

P

LA

NS

NTS -

MB

YL

TP212

11 35

228 453

17AN-TP212 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

PA

RK

SU

BW

AY

/E

LE

VA

TE

D

TR

AI

NS

TR

AC

TI

O N

P O

W

ER

S U

BS

TA

TI

O

N

RE

H

AB

IL

IT

AT

IO

N

08/22/2025 276482

ST

AT

US

: 5

0%

SU

BM

ISS

IO

N

DA

TE

PR

IN

TE

D:

/21

/20

C:

\PW

WO

RK

IN

G\

PIT

T\D

2\1

7A N-

TP

3.D

WG

50% SUBMISSION

NOT FOR CONSTRUCTION

OF

OF

TR

AC

TI

O

N P

O W

ER

ST

AG

E

BA

SE

M

EN

T

EQ

UI

PM

EN

T

PL

AN

AS SHOWN -

MB

YL

TP213

12 35

229 453

17AN-TP213 -

OF

OF

SHT. NO.:

REV. NO.:

CK

'D

DA

TE

RE

V

DE

SC

RI

PT

IO

N

BY

AP

'D

SCALE:

DRAWN BY:DATE:

WORK ORDER NO.:

SCALE FACTOR:

CHECKED BY:

ARCHIVE NO.:

COMPUTER FILE NO.:

PROJECT MANAGER

MANAGER - ARCH / ENGINEERING

DIRECTOR OF ENGINEERING - B&B

SYSTEM SAFETY

CHIEF RAIL TRANSIT OFFICER

CHIEF ENGINEERING OFFICER - B&B

CHIEF ENGINEER - EM&C

P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .