This file contains architectural and structural engineering construction drawings (50% submission stage, not for construction) for SEPTA's Traction Power Substation Rehabilitation Program – Contract 5 covering Park, Broad, Loudon, and Castor substations along the Subway/Elevated Trains line. The drawing set includes detailed architectural plans (sheets A214-A220), structural plans and details (sheets S200-S222), mechanical systems (sheets M200-M211), electrical systems (sheets E200-E217), fire alarm systems (sheets FA200-FA207), traction power systems (sheets TP200-TP246), and communications systems (sheets COM200-COM207) across multiple building levels including basement, first floor, mezzanine, and roof. The drawings show existing conditions, demolition plans, proposed equipment layouts, single-line diagrams, equipment elevations, cable/duct bank routing, grounding plans, protection/relay diagrams, SCADA points lists, staging plans (Stages 1-3), and comprehensive construction details for rehabilitation of 13.2kV and 4.8kV electrical distribution systems, DC rectifier equipment, transformers, circuit breakers, batteries, control boards, HVAC, plumbing, lighting, and fire protection systems. Work Order Number is 276482 with a submission date of August 22, 2025, and drawings printed October 19-21, 2025.
The drawings are prepared by multiple engineering consultants including Meliora Design (structural engineering, 259 Morgan Street, Phoenixville, PA 19460, phone 610-933-0123) and require approval signatures from SEPTA's Project Manager, Manager of Architecture/Engineering, Director of Engineering B&B, System Safety, Chief Rail Transit Officer, Chief Engineering Officer B&B, and Chief Engineer EM&C. The traction power drawings detail phased construction staging to maintain continuous service during rehabilitation, with existing single-line diagrams showing equipment to be removed and proposed diagrams showing new 13.2kV switchgear, transformers, DC rectifiers (750VDC and 600VDC), protective relays, multifunction meters/IEDs, circuit breakers, batteries, grounding systems, and SCADA integration. Structural drawings include concrete repair details, foundation details, steel framing plans for first floor and mezzanine levels, fall protection systems, and building details across six detail sheets (S217-S222). All drawings are marked as 50% submission status and explicitly noted as "NOT FOR CONSTRUCTION," indicating design development phase requiring contractor completion of final design from these documents per the two-step procurement RFQ requirements.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
AR
CH
IT
EC
TU
RA
L
EX
IS
TI
NG
IN
TE
RI
OR
E
LE
VA
TI
ON
S I
AS SHOWN 1:1
AC
ZH
A214 15 21 149 448
17AN-A214 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
AR
CH
IT
EC
TU
RA
L A2
E
XI
ST
IN
G
EL
EV
AT
IO
NS
I
AS SHOWN 1:1
AC
ZH
16 21 150 448
17AN-A215 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
AR
CH
IT
EC
TU
RA
L A2
E
LE
VA
TI
ON
S
II
AS SHOWN 1:1
AC
ZH
A216 17 21 151 448
17AN-A216 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
AR
CH
IT
EC
TU
RA
L A2
P
HO
TO
D
ET
AI
LS
I
AS SHOWN 1:1
AC
ZH
18 21 152 448
17AN-A217 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
AR
CH
IT
EC
TU
RA
L A2
P
HO
TO
D
ET
AI
LS
II
AS SHOWN 1:1
AC
ZH
19 21 153 448
17AN-A218 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
OF
AR
CH
IT
EC
TU
RA
L
DE
TA
IL
S I
AS SHOWN 1:1
AC
ZH
A219 20 21 154 448
17AN-A219 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
AR
CH
IT
EC
TU
RA
L M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
SH
EE
T
AS SHOWN 1:1
AC
ZH
A220 21 21 155 448
17AN-A220 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
9\1
7A N-
A2
.D
WG
ST
RU
CT
U
RA
L
GE
NE
RA
L
NO
TE
S
AB
BR
EV
IA
TI
ON
S
N/A -
SEB
JWA
S200 1 23
157 452
17AN-S200 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street Phoenixville, PA 19460
(610) 933-0123
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
BA
SE
M
EN
T
1/4" = 1'-0" -
SEB
JWA
S201 2 23
158 452
17AN-S201 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
FI
RS
T
FL
OO
R
1/4" = 1'-0" -
SEB
JWA
S202 3 23
159 452
17AN-S202 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
M
EZ
ZA
NI
NE
1/4" = 1'-0" -
SEB
JWA
S203 4 23
160 452
17AN-S203 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
RE
M
OV
AL
RO
OF
1/4" = 1'-0" -
SEB
JWA
S204 5 23
161 452
17AN-S204 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
B
AS
EM
EN
T
PL
AN
1/4" = 1'-0" -
SEB
JWA
S205 6 23
162 452
17AN-S205 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
F
IR
ST
F
LO
OR
P
LA
N
1/4" = 1'-0" -
SEB
JWA
S206 7 23
163 452
17AN-S206 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
M
EZ
ZA
NI
NE
P
LA
N
1/4" = 1'-0" -
SEB
JWA
S207 8 23
164 452
17AN-S207 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
PR
OP
OS
ED
R
OO
F
PL
AN
1/4" = 1'-0" -
SEB
JWA
S208 9 23
165 452
17AN-S208 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
FI
RS
T
FL
OO
R
FR
AM
IN
G
PL
AN
1/4" = 1'-0" -
SEB
JWA
S209 10 23 166 452
17AN-S209 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
M
EZ
ZA
NI
NE
F
RA
M
IN
G
PL
AN
1/4" = 1'-0" -
SEB
JWA
S210 11 23 167 452
17AN-S210 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
SEB
JWA
S211 12 23 168 452
17AN-S211 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S212 13 23 169 452
17AN-S212 -
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street Phoenixville, PA 19460
(610) 933-0123
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
ST
RU
CT
U
RA
L
CO
NC
RE
TE
R
EP
AI
R
DE
TA
IL
S
- S
HE
ET
AS NOTED -
MKT
JWA
S213 14 23 170 452
17AN-S213 -
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street Phoenixville, PA 19460
(610) 933-0123
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
ST
RU
CT
U
RA
L
FO
UN
DA
TI
ON
D
ET
AI
LS
AS NOTED -
SEB
JWA
S214 15 23 171 452
17AN-S214 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
ST
EE
L
DE
TA
IL
S
AS NOTED -
SEB
JWA
S215 16 23 172 452
17AN-S215 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
FA
LL
P
RO
TE
CT
IO
N
DE
TA
IL
S
AS NOTED -
SEB
JWA
S216 17 23 173 452
17AN-S216 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S217 18 23 174 452
17AN-S217 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S218 19 23 175 452
17AN-S218 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S219 20 23 176 452
17AN-S219 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S220 21 23 177 452
17AN-S220 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S221 22 23 178 452
17AN-S221 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
ST
RU
CT
U
RA
L
BU
IL
DI
NG
D
ET
AI
LS
SH
EE
T
AS NOTED -
SEB
JWA
S222 23 23 179 452
17AN-S222 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/19
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
8\1
7A N-
S2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
Meliora Design Civil, Water Resources, and Structural Engineering
259 Morgan Street
M
EC
H
AN
IC
AL
GE
NE
RA
L
NO
TE
S, S
YM
BO
LS
A
BB
RE
VI
AT
IO
NS
AS SHOWN 1:1
DNP
DJM
M200 1 12
180 452
17AN-M200 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
ABBREVIATIONS: GENERAL NOTES:LEGEND-SYMBOLS:
SYMBOL DESCRIPTION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
BA
SE
M
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
DNP
DJM
M201 2 12
181 452
17AN-M201 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
KEYED NOTES:
GENERAL NOTES:
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
FI
RS
T
FL
OO
R
PL
AN
AS SHOWN 1:1
DNP
DJM
M202 3 12
182 452
17AN-M202 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
DNP
DJM
M203 4 14
183 452
17AN-M203 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
DE
M
OL
IT
IO
N
RO
OF
P
LA
N
AS SHOWN 1:1
DNP
DJM
M204 5 12
184 452
17AN-M204 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
DNP
DJM
M205 6 12
185 452
17AN-M205 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
DNP
DJM
M206 7 12
186 452
17AN-M206 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
DNP
DJM
M207 8 12
187 452
17AN-M207 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
PR
OP
OS
ED
R
OO
F
PL
AN
AS SHOWN 1:1
DNP
DJM
M208 9 12
188 452
17AN-M208 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
M
EC
H
AN
IC
AL
EN
LA
RG
ED
P
LA
NS
AS SHOWN 1:1
DNP
DJM
M209 10 12 189 452
17AN-M209 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
50% SUBMISSION
M
EC
H
AN
IC
AL
SC
HE
DU
LE
S
AS SHOWN 1:1
DNP
DJM
M210 11 12 190 452
17AN-M210 ----
GRILLE/REGISTER/DIFFUSER SCHEDULE
SPLIT SYSTEM SCHEDULE
ENERGY RECOVERY VENTILATOR
INFRARED RADIANT HEATER SCHEDULE
UNIT HEATER SCHEDULE
AIR COMPRESSOR SCHEDULE
PLUMBING SCHEDULE
ELECTRIC WATER HEATER SCHEDULE SUMP PUMP SCHEDULE
EXHAUST FAN SCHEDULE
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
M
EC
H
AN
IC
AL
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
AS SHOWN 1:1
DNP
DJM
M211 12 12 191 452
17AN-M211 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
1\1
7A N-
M2
.D
WG
EL
EC
TR
IC
AL
NO
TE
S
SY
M
BO
LS
A
BB
RE
VI
AT
IO
NS
AS SHOWN 1:1
MM
JIB
E200 1 18
192 453
17AN-E200 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
S
S
S
ELECTRICAL ABBREVIATIONS:SINGLE LINE SYMBOLS:
STANDARD MOUNTING HEIGHTS:
SYMBOL DESCRIPTION
LINETYPE CONVENTIONS:
DETAIL CALLOUT SYMBOLS:
ELECTRICAL / LIGHTING SYMBOLS:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
MM
JIB
E201 2 18
193 452
17AN-E201 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
DEMOLITION SCOPE OF WORK:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E202 3 18
194 452
17AN-E202 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
DEMOLITION SCOPE OF WORK: GENERAL NOTES:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
PO
W
ER
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E203 4 18
195 452
17AN-E203 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
MM
JIB
E204 5 18
196 452
17AN-E204 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E205 6 18
197 452
17AN-E205 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
LI
GH
TI
NG
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E206 7 18
198 452
17AN-E206 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
MM
JIB
E207 8 18
199 452
17AN-E207 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
PROPOSED SCOPE OF WORK:
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E208 9 18
200 452
17AN-E208 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
P
OW
ER
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E209 10 18 201 452
17AN-E209 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
BA
SE
M
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
MM
JIB
E210 11 18 202 452
17AN-E210 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
GENERAL NOTES:PROPOSED SCOPE OF WORK:
S
OF
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
FI
RS
T
FL
OO
R
PL
AN
AS SHOWN 1:1
MM
JIB
E211 12 18 203 452
17AN-E211 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
EL
EC
TR
IC
AL
PR
OP
OS
ED
L
IG
HT
IN
G
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
MM
JIB
E212 13 18 204 452
17AN-E212 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
GENERAL NOTES:PROPOSED SCOPE OF WORK:
EL
EC
TR
IC
AL
DE
M
OL
IT
IO
N
SI
NG
LE
L
IN
E
DI
AG
RA
M
AS SHOWN 1:1
MM
JIB
E213 14 18 205 452
17AN-E213 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
EL
EC
TR
IC
AL
PR
OP
OS
ED
S
IN
GL
E
LI
NE
D
IA
GR
AM
AS SHOWN 1:1
MM
JIB
E214 15 18 206 452
17AN-E214 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
EL
EC
TR
IC
AL
EL
EC
TR
IC
AL
S
CH
ED
UL
ES
AS SHOWN 1:1
MM
JIB
E215 16 18 207 452
17AN-E215 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
CATALOG NO.MANUFACTURER
LAMP INFORMATION
LUMINAIRE SCHEDULE
MOUNTINGDESCRIPTIONTYPE LAMP
QTYTYPE WATTS
EACH VOLTS
EL
EC
TR
IC
AL
PA
NE
L
SC
HE
DU
LE
S
- S
HE
ET
AS SHOWN 1:1
MM
JIB
E216 17 18 208 452
17AN-E216 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
PANEL SCHEDULE
PANEL SCHEDULE
PANEL SCHEDULE
EL
EC
TR
IC
AL
PA
NE
L
SC
HE
DU
LE
S
- S
HE
ET
AS SHOWN 1:1
MM
JIB
E217 18 18 209 452
17AN-E217 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
6\1
7A N-
E2
.D
WG
50% SUBMISSION
FI
RE
A
LA
RM
NO
TE
S, S
YM
BO
LS
A
BB
RE
VI
AT
IO
NS
AS SHOWN 1:1
WAB
CJM
FA200
1 8
210 452
17AN-FA200 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
0.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
FIRE ALARM NOTES (CONT):
DEMOLITION NOTES:
LEGEND-SYMBOLS: DEMOLITION NOTES (CONT): GENERAL NOTES (CONT): GENERAL NOTES (CONT):
SYMBOL DESCRIPTION
FIRE ALARM NOTES:
FI
RE
A
LA
RM
DE
M
OL
IT
IO
N
BA
SE
M
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
FA201
2 8
211 452
17AN-FA201 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
1.D
WG
50% SUBMISSION
FI
RE
A
LA
RM
DE
M
OL
IT
IO
N
FI
RS
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
FA202
3 8
212 452
17AN-FA202 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
2.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
FI
RE
A
LA
RM
DE
M
OL
IT
IO
N M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
FA203
4 8
213 452
17AN-FA203 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
3.D
WG
50% SUBMISSION
FI
RE
A
LA
RM
PR
OP
OS
ED
B
AS
EM
EN
T
FL
OO
R
PL
AN
AS SHOWN 1:1
WAB
CJM
FA204
5 8
214 452
17AN-FA204 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
4.D
WG
50% SUBMISSION
FI
RE
A
LA
RM
PR
OP
OS
ED
F
IR
ST
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
FA205
6 8
215 452
17AN-FA205 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
5.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
FI
RE
A
LA
RM
PR
OP
OS
ED
M
EZ
ZA
NI
NE
F
LO
OR
P
LA
N
AS SHOWN 1:1
WAB
CJM
FA206
7 8
216 452
17AN-FA206 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
6.D
WG
50% SUBMISSION
FI
RE
A
LA
RM
DE
TA
IL
S
AS SHOWN 1:1
WAB
CJM
FA207
8 8
217 452
17AN-FA207 ----
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
5\1
7A N-
FA
7.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
GENERAL NOTES:
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
0.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
AB
BR
EV
IA
TI
ON
S
NTS -
ARG
BH
TP200
1 35
218 452
17AN-TP200 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
1.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
LE
GE
ND
S
SY
M
BO
LS
NTS 1:1
DMW
BH
TP201
2 35
219 453
17AN-TP201 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
2.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
DE
VI
CE
T
AB
LE
S
NTS -
DMW
BH
TP202
3 35
219 448
17AN-TP202 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
5.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
SU
BS
TA
TI
ON
S
IT
E
PL
AN
NTS -
DMW
BH
TP205
4 35
221 453
17AN-TP205 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
6.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
EX
IS
TI
NG
S
IN
GL
E
LI
NE
D
IA
GR
AM
NTS -
DMW
BH
TP206
5 35
222 453
17AN-TP206 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
7.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
EX
IS
T
ME
ZZ
F
IR
ST
F
LO
OR
E
QU
IP
P
LA
NS
NTS -
ARG
BH
TP207
6 35
223 453
17AN-TP207 -
TR
AC
TI
O
N P
O W
ER
EX
IS
TI
NG
B
AS
EM
EN
T
EQ
UI
PM
EN
T
PL
AN
AS SHOWN -
MLB
YL
TP208
7 35
224 453
17AN-TP208 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
8.D
WG
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
9.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
PR
OP
OS
ED
S
IN
GL
E
LI
NE
D
IA
GR
AM
NTS -
YL
BH
TP209
8 35
225 453
17AN-TP209 -
TR
AC
TI
O
N P
O W
ER
ST
AG
IN
G
AC
TI
VI
TI
ES
N
OT
ES
NTS -
ARG
YL
TP210
9 35
226 453
17AN-TP210 -
SHEET NUMBER
DWG. NO.:
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
0.D
WG
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
1.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
ST
AG
E
SI
NG
LE
L
IN
E
DI
AG
RA
M
NTS -
YL
VS
TP211
10 35
227 453
17AN-TP211 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
2.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
ST
AG
E
M
EZ
ZA
NI
NE
F
IR
ST
F
LO
OR
E
QU
IP
P
LA
NS
NTS -
MB
YL
TP212
11 35
228 453
17AN-TP212 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
PA
RK
SU
BW
AY
/E
LE
VA
TE
D
TR
AI
NS
TR
AC
TI
O N
P O
W
ER
S U
BS
TA
TI
O
N
RE
H
AB
IL
IT
AT
IO
N
08/22/2025 276482
ST
AT
US
: 5
0%
SU
BM
ISS
IO
N
DA
TE
PR
IN
TE
D:
/21
/20
C:
\PW
WO
RK
IN
G\
PIT
T\D
2\1
7A N-
TP
3.D
WG
50% SUBMISSION
NOT FOR CONSTRUCTION
OF
OF
TR
AC
TI
O
N P
O W
ER
ST
AG
E
BA
SE
M
EN
T
EQ
UI
PM
EN
T
PL
AN
AS SHOWN -
MB
YL
TP213
12 35
229 453
17AN-TP213 -
OF
OF
SHT. NO.:
REV. NO.:
CK
'D
DA
TE
RE
V
DE
SC
RI
PT
IO
N
BY
AP
'D
SCALE:
DRAWN BY:DATE:
WORK ORDER NO.:
SCALE FACTOR:
CHECKED BY:
ARCHIVE NO.:
COMPUTER FILE NO.:
PROJECT MANAGER
MANAGER - ARCH / ENGINEERING
DIRECTOR OF ENGINEERING - B&B
SYSTEM SAFETY
CHIEF RAIL TRANSIT OFFICER
CHIEF ENGINEERING OFFICER - B&B
CHIEF ENGINEER - EM&C
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .