Attachment 16 - SOW attach Volume 3 Part 1.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
- Solicitation number
- 36C77623B0058
About this file
This attachment is a statement of work for infrastructure upgrades to the Chillicothe VA Medical Center in Ohio. The Department of Veterans Affairs Technology Acquisition Center is soliciting proposals under solicitation number 36C77623B0058 to provide construction services for upgrades to the medical center's electronic health records and related IT infrastructure. Key work requirements include replacing servers, storage, and network equipment; upgrading wireless access points and security appliances; and modernizing cabling and connectivity across all medical center facilities. Offerors must have experience performing similar infrastructure upgrade projects in healthcare settings. Proposals are due by July 15, 2021, and the contract is expected to be awarded by September 2021. The overall period of performance will be 365 days following the award date.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
N
CHILLICOTHE VA MEDICAL CENTER
PROJECT NUMBER: 538-21-701
DEPARTMENT OF VETERANS AFFAIRS
273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601
CHILLICOTHE EHRM
VOLUME 3 OF 3
G E N E R A L N O T E S
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE
EXISTING FACILITY.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO
DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY
EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE
AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF
THE PROJECT.
6. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE
DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
7. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE
SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN
APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT
ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED
SPACES.
8. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND
SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES
WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE
C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR
UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S
AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR
EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE
CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL
CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
10. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO
PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF
THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
11. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL
STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
12. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING
FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
13. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS
WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER
TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR
SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
14. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED
AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
15. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND
OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE
EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED
CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED
TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
16. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE
SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO
BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
17. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE
ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE
EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
18. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.
DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW
WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
19. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE
SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH
DAY.
20. NEW HOLES IN EXISTING ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE
EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
21. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING
SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
E X I S T I N G F A C I L I T I E S:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF
WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S
INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING
WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR
BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL
WRITTEN CLARIFICATION FROM THE ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE
PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR
EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS
ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM
STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE
ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE
WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO VA
PROVIDED DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE
SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER
STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE
HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS. EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR
OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-
CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH
FACE OF CONSTRUCTION.
13. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
14. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO
MECHANICAL, ELECTRICAL, AND PLUMBING. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND
CAULK.
15. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH
THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END
OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING
COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION
AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
16. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING
ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, C.O.R. PRIOR TO CONSTRUCTION.
N E W W O R K:
SHEET NAMING EXAMPLE:
BUILDING NUMBER
DISCIPLINE
SHEET TYPE
FLOOR NUMBER
ZONE LOCATION ON FLOOR
100-AE101.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/F F
E
C h ill ic o th e
E H
R M
C a m p u s rv t
/1
/2
:2
:4
P
M
GI000
COVER SHEET
03/17/2023 PQ JF
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS - 95% CAMPUS
CHILLICOTHE
VAMC
Approved: Veteran's Affairs Medical Center
N.T.S.Scale:
VACINITY MAP
N.T.S.Scale:
CAMPUS MAP
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% 04/14/2023
SHEET INDEX
TELECOMMUNICATION
T001 ABBREVIATIONS, LEGEND & GENERAL NOTES
001-TA100 BASEMENT PLAN
001-TA101 FIRST FLOOR PLAN
001-TA102 SECOND FLOOR PLAN
001-T400 ENLARGED TR RM BB105
001-T401 ENLARGED TR RM 139
001-T402 ENLARGED TR RM 179
001-T404 ENLARGED TR RM 242
001-T405 ENLARGED TR RM 284B
003-TA100 BASEMENT PLAN
003-TA101 FIRST FLOOR PLAN
003-T400 ENLARGED TR RM 103
007-TA100 BASEMENT PLAN
007-TA101 FIRST FLOOR PLAN
007-T400 ENLARGED TR RM 108D
009-TA101 FIRST FLOOR PLAN
009-TA102 SECOND FLOOR PLAN
009-T401 ENLARGED TR RM 109
009-T402 ENLARGED TR RM 210
018-TA100 FLOOR PLANS
018-T401 ENLARGED TR RM 115
018-T402 ENLARGED TR RM 210
020-TA101 FLOOR PLANS
020-T401 ENLARGED TR RM 206 & 105
021-TA101 FIRST FLOOR PLAN
021-T401 ENLARGED TR RM 28A
023-TA100 BASEMENT, FIRST FLOOR PLAN
023-T401 ENLARGED TR RM 002A
024-TA100 BASEMENT PLAN
024-TA101 FIRST FLOOR PLAN
024-TA102 SECOND FLOOR PLAN
024-T400 ENLARGED TR RM GB103
024-T401 ENLARGED TR RMS 123 & 124E
024-T402 ENLARGED TR RM 222
025-TA101 FIRST FLOOR PLAN
025-T401 ENLARGED TR RM 102D
026-TA100 BASEMENT PLAN
026-TA101 FIRST FLOOR PLAN
026-TA102 SECOND FLOOR PLAN
026-T400 ENLARGED TR RMS 10 & 27A
026-T401 ENLARGED TR RM 133
026-T402 ENLARGED TR RMS 230 & 259
027-TA100 BASEMENT PLAN
027-TA101 FIRST FLOOR PLAN
027-TA102 SECOND FLOOR PLAN
027-T401 ENLARGED TR RM 14
027-T402 ENLARGED TR RM 18
027-T404 ENLARGED TR RM 271
027-T403 ENLARGED TR RM 167
028-TA102 SECOND FLOOR PLAN
028-T400 ENLARGED TR RM 13D
028-T401 ENLARGED TR RM 201
030-TA100 BASEMENT PLAN
030-TA101 FIRST FLOOR PLAN
030-TA102 SECOND FLOOR PLAN
030-T401 ENLARGED TR RM 8F
030-T402 ENLARGED TR RM 14A
030-T403 ENLARGED TR RM 127
030-T404 ENLARGED TR RM 223A
030-T405 ENLARGED TR RM 226
031-TA100 BASEMENT PLAN
031-TA101 GROUND FLOOR PLAN
031-TA102 FIRST FLOOR PLAN
031-TA103 SECOND FLOOR PLAN
031-TA104 THIRD FLOOR PLAN
031-T401 ENLARGED TR RM 1-210
031-T402 ENLARGED TR RM 242Y
031-T403 ENLARGED TR RM G111
031-T404 ENLARGED TR RM G182
031-T405 ENLARGED TR RM G-204
031-T406 ENLARGED TR RM G-322A
031-T407 ENLARGED TR RM G328
031-T408 ENLARGED TR RM G-500D
031-T409 ENLARGED TR RM G-207A
035-TA100 BASEMENT & FIRST FLOOR PLANS
035-TA102 SECOND & THIRD FLOOR PLANS
035-T400 ENLARGED TR RM BC102
035-T401 ENLARGED TR RM 1A109
035-T402 ENLARGED TR RM 2A109
035-T403 ENLARGED TR RM 3A109
036-TA101 BASEMENT & FIRST FLOOR PLANS
036-T401 ENLARGED TR RM B37
060-TA101 FIRST & SECOND FLOOR PLANS
060-T401 ENLARGED TR RM
210-TA100 BASEMENT PLAN
210-TA101 FIRST FLOOR PLAN
210-TA102 SECOND FLOOR PLAN
210-T400 ENLARGED TR RM G023
210-T401 ENLARGED TR RM 102A
210-T402 ENLARGED TR RM 202A
211-TA100 BASEMENT PLAN
211-TA101 FIRST FLOOR PLAN
211-TA102 SECOND FLOOR PLAN
211-T400 ENLARGED TR RM G007
211-T401 ENLARGED TR ROOM G18B
211-T403 ENLARGED TR RM 108A
211-T402 ENLARGED TR RM 198A
211-T405 ENLARGED TR ROOM 208A
211-T404 ENLARGED TR ROOM 298A
212-TA100 BASEMENT PLAN
212-TA101 FIRST FLOOR PLAN
212-TA103 SECOND FLOOR PLAN
212-T400 ENLARGED TR RM 15A
212-T401 ENLARGED TR RM 114
212-T402 ENLARGED TR RM 125
212-T403 ENLARGED TR RM 225
247-TA100 BASEMENT PLAN
247-TA101 FIRST FLOOR PLAN
247-T400 ENLARGED TR ROOM 109
252-TA101 FIRST FLOOR PLAN
252-T400 ENLARGED TR ROOM 110
259-TA101 FLOOR PLANS
259-T400 ENLARGED TR ROOM 2-9
261-TA101 FIRST FLOOR PLAN
261-T400 ENLARGED TR RM 103
T501 DETAILS
T502 TECHNOLOGY DETAILS
THIS SUBMISSION CONSIDERATION FOR VARIANCES
ABBREVIATIONS
AAP - AREA ALARM PANEL - MEDICAL GAS
ACC - ACCESS
ADJ - ADJUSTABLE
AF - ARC FAULT CIRCUIT INTERRUPTER
AFCI - ARC FAULT CIRCUIT INTERRUPTER
AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM
AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATS - AUTOMATIC TRANSFER SWITCH
BLDG - BUILDING
BOE - BOTTOM OF EQUIPMENT
BOT - BOTTOM
BTWN - BETWEEN
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CKT - CIRCUIT
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CONN - CONNECT OR CONNECTION
CORR - CORRIDOR
CTR - CENTER
D - DEPTH
DET - DETAIL
DIA - DIAMETER
DIM - DIMENSION
DIV - DIVISION
DN - DOWN
DWG - DRAWING
EA - EACH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATION OR ELEVATOR
EM - EMERGENCY
EQ - EQUAL
EQS - EQUIPMENT SUPPLIER
EQUIP - EQUIPMENT
ETR - EXISTING TO REMAIN
EX - EXISTING
EXP - EXPANSION
EXT - EXTERIOR
FCE - FIRE CONTROL EQUIPMENT
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FT - FEET
FTG - FOOTING
GF - GROUND FAULT CIRCUIT INTERRUPTER
GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR GOVERNMENT
FURNISHED CONTRACTOR INSTALLED
GFFT - GROUND FAULT FEED THRU
HP - HORSE POWER OR HIGH POINT
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
ID - INSIDE DIAMETER
IN - INCHES
L - LENGTH
LBS - POUNDS
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
NIC - NOT IN CONTRACT
NOM - NOMINAL
NTS - NOT TO SCALE
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
PLBG - PLUMBING
RAD - RADIUS
REC - RECESSED
REQD - REQUIRED
RI - ROUGH-IN
S - SURFACE MOUNTED
SCH - SCHEDULE
SHT - SHEET
SMS - SECURITY MANAGEMENT SYSTEM
SPEC - SPECIFICATIONS
SQ - SQUARE
SS - STAINLESS STEEL
STD - STANDARD
STRUC - STRUCTURAL OR STRUCTURE
TEMP - TEMPERATURE
TOE - TOP OF EQUIPMENT
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
VFD - VARIABLE FREQUENCY DRIVE
VOL - VOLUME
W/ - WITH
W/O - WITHOUT
WP - WEATHERPROOF
ZVC - ZONE VALVE CABINET
TECHNOLOGY SYMBOLS
AP CEILING MOUNTED WIRELESS ACCESS POINT WITH DATA DROP ABOVE CEILING. PROVIDE 20' COIL IN DATA CABLE TO
FACILITATE RELOCATION OF WAP.
TECHNOLOGY SYMBOLS WITH ELEC. REQUIREMENTS
WALL MOUNTED PHONE OUTLET (46" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE
CEILING . JACKS, FACEPLATE AND CABLING . REFER TO FACEPLATE DETAILS.
X R
WALL MOUNTED AV OUTLET (84" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT . REFER TO FACEPLATE DETAILS.
JACKS, FACEPLATE AND CABLING . SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.
X V
WALL MOUNTED AV OUTLET (44" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT . REFER TO FACEPLATE DETAILS.
JACKS, FACEPLATE AND CABLING . SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.
CONDUIT SLEEVE / FIRE RATED SLEEVE ASSEMBLY THRU WALL (1-2" SLEEVE UNLESS NOTED OTHERWISE) .
J TELECOM BOX AND CONDUIT , REFER TO PLANS.
WALL MOUNTED VOICE/DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE CORRIDOR
CEILING . JACKS, FACEPLATE AND CABLING . REFER TO FACEPLATE DETAILS.
X I
WALL MOUNTED AV OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUITS TO ABOVE ACCESSIBLE CEILING .
REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING . SUBSCRIPT "X" INDICATES ALTERNATE
CONFIGURATION.
AP
WALL MOUNTED WIRELESS ACCESS POINT (96” MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE
ACCESSIBLE CEILING . WAP AND CABLING .
WIREMOLD RACEWAY, AS NOTED ON PLANS.
CUSTOM OUTLET IN SURFACE RACEWAY. SURFACE RACEWAY . OUTLET JACKS, FACEPLATE AND CABLING .W
FLOOR BOX . # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE. SUBSCRIPT "X" INDICATES TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
POKE-THRU . # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. SUBSCRIPT "X" INDICATES TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
WALL MOUNTED DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE CORRIDOR CEILING . JACKS, FACEPLATE AND CABLING . SUBSCRIPT "X" DESIGNATES QUANTITY OF DATA CABLES. REFER TO
FACEPLATE DETAILS.
X
GENERAL NOTES:
A. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS PRIOR TO STARTING PROPOSED SCHEDULE.
B. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE DOWNTIME OF THE BUILDING ELECTRICAL SYSTEMS AND
NETWORK (LAN). CONTRACTOR IS REQUIRED TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR/ENGINEER AT THE BEGINNING OF THE PROJECT INDICATING CUTOVER DATES, POWER OUTAGES/DURATION AND PROJECT MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION WILL BE REVIEWED, BUT WILL NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.
C. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM AND NETWORK (LAN) OUTAGES AND/OR EMERGENCY SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-FRIDAY). OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.
D. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE
CONSTRUCTION PROJECT.
E. NO LIVE WORK WILL BE PERMITTED WITHOUT WRITTEN CONSENT OF THE MEDICAL CENTER LEADERSHIP. REQUESTS MUST BE SUBMITTED WITH
CONTRACTOR'S SAFETY PLAN AND PROOF OF ARC FLASH LEVEL/PPE REQUIRED.
F. PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND CONDUITS 2" AND LARGER WITH PATHWAYS VERIFIED IN THE FIELD AND SIGNED OFF
BY THE CONTRACTOR.
G. STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7 WITH INPATIENT/OUTPATIENT CARE, SURGERY, PRE/POST- OP, PSHYCIATRIC, PHARMACY, WAREHOUSE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, INTENSIVE CARE, DATA CENTER, IMAGING, PBX, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE PPE/ACCESS REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION
MUST OCCUR TO MINIMIZE DISRUPTION AS MUCH AS POSSIBLE.
H. 21 DAYS BEFORE ANY OUTAGE, CONTRACTOR SHALL SET UP A MEETING WITH COR AND DEPARTMENT MANAGERS TO REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL REMAIN ON AND OUTAGE START/END TIME. EACH DEPARTMENT MUST BE BRIEFLY SURVEYED TO DETERMINE OVERALL
IMPACT OF OUTAGE AND EXPLAINED TO COR AND MANAGERS.
TR ROOMS
A. PERFORM INITIAL SITE SURVEY TO COORDINATE ALL NEW EQUIPMENT LOCATIONS/CONFIGURATIONS, NEW CONDUIT AND NEW FIRE RATED
PENETRATIONS AS SHOWN ON THE CONSTRUCTION DOCUMENTS, WITH CURRENT SITE CONDITIONS.
B. PROVIDE DRAWINGS WITH PROPOSED RACK ELEVATIONS INCLUDING SPACE ASSIGNMENTS FOR VA FURNISHED NETWORK EQUIPMENT TO THE
ENGINEER/VA FOR APPROVAL.
C. EXISTING RACK(S) TO BE UNBOLTED FROM FLOOR AND MOVED INTO TEMPORARY LOCATION WITHIN REACH OF EXISTING CABLING TO CREATE SPACE FOR
NEW EQUIPMENT RACKS.
D. INSTALLATION OF NEW 4" CONDUIT RISERS AND 4" CONDUIT SLEEVES.
E. INSTALLATION OF NEW FIRE RATED RE-ENTERABLE CABLE SLEEVE ASSEMBLIES.
F. ADD NEW CABLE TRAY/SUPPORTS.
G. INSTALLATION OF NEW 4-POST EQUIPMENT RACKS, CABLE TERMINATION PANELS, AND CABLE MANAGEMENT.
H. INSTALLATION OF NEW OVERHEAD CABLE MANAGEMENT.
I. INSTALLATION OF NEW CABLE CAT 6A TERMINATION PANELS AND NEW FIBER BACKBONE RISER TERMINATION PANELS, AND BALANCE OF TR EQUIPMENT.
NEW DATA STATION CABLING (OUTLETS)
A. PERFORM FACEPLATE/PORT AUDIT OF THE ENTIRE EXISTING BUILDING TO CONFIRM EXISTING OUTLET LOCATIONS AND CABLING FACEPLATE
CONFIGURATIONS PER THE CONTRACT DOCUMENTS. SUBMIT REPORT TO ENGINEER/VA FOR REVIEW AND APPROVAL INDICATING DISCREPANCIES WITH
CONTRACT DOCUMENTS OUTLET INDICATIONS.
B. PROVIDE SURVEY FOR LOCATION OF NEW DATA DROPS AND COORDINATE WITH FIELD CONDITIONS INCLUDING STRUCTURE, FURNITURE, AND OTHER OBSTRUCTIONS WITHIN THE WORKAREA. PREPARE MARK-UP OF BID DRAWINGS SHOWING ANY PROPOSED CHANGES TO THE OUTLET LOCATIONS AND
CONFIGURATIONS. SUBMIT TO ENGINEER/VA FOR REVIEW AND APPROVAL.
C. PREPARE PROPOSED LABELING PLAN INDICATING LABEL LOCATIONS ON FACEPLATE, LABEL MATERIAL, AND ALPHA-NUMERIC LABELING SCHEME TO BE
UTILIZED. SUBMIT TO ENGINEER/VA FOR APPROVAL.
D. PROVIDE PHASING PLAN AND SCHEDULE TO INDICATE ROUGH-IN, NEW CABLE INSTALL, TESTING AND CERTIFICATION, AND DEMOLITION TASKS, BROKEN DOWN BY FLOOR/DEPARTMENT/AREA WITHIN THE BUILDING. SUBMIT TO ENGINEER/VA FOR APPROVAL.
E. INSTALL NEW OUTLET LOCATIONS, PER APPROVED PHASING PLAN, WITH NEW 1-GANG (UP TO 4-DATA) OR 2-GANG (UP TO 6 DATA) DEEP RETRO-FIT
BOX/1-1.25" FLEX CONDUIT TO NEW/EXISTING CABLE TRAY ABOVE CORRIDOR CEILING..
F. INSTALL NEW CAT 6A CABLING FROM SIGNALS CLOSETS TO ROOMS/SPACES SERVING GROUPS OF OUTLETS, PER APPROVED PHASING PLAN. CABLES TO SERVE THE NEW/EXISTING OUTLET LOCATIONS TO BE COILED OUTSIDE OF ROOM/SPACE WITH SUFFICIENT SLACK TO SERVE THE NEW/EXISTING OUTLET
LOCATIONS WITHIN EACH ROOM SPACE.
G. SCHEDULE WITH VA TO WORK WITHIN GROUPS OF ROOMS/SPACES TO REMOVE EXISTING CABLING BACK TO ACCESSIBLE CEILING SPACE. PULL IN NEW CABLING. TERMINATE, TEST AND LABEL NEW/EXISTING OUTLETS. PATCH NEW CABLING PORTS IN THE SIGNALS CLOSET INTO NETWORK SWITCHES TO
REACTIVATE REQUIRED PORTS IN EACH ROOM/SPACE.
H. REMOVE REMAINDER OF EXISTING CABLING AND RACEWAYS BACK TO SIGNALS CLOSET, PER APPROVED PHASING PLAN.
I. FOR EACH APPROVED PHASED AREA, ALL NEW CATEGORY 6A CABLING SHALL BE INSTALLED, TERMINATED, LABELED AND TESTED AT THE SIGNALS
CLOSET AND AT THE USER END PRIOR TO DISCONNECTING AND REMOVING THE LEGACY DATA CABLING.
SEQUENCE OF WORK
A. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF
VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.
B. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE
DESIGN GUIDEPG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
C. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS
PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
D. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING
SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF
DEMOLITION OR NEW WORK.
E. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK,
CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.
F. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO
ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.
G. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED A AS
PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL
EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED OPENINGS.
H. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY
WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A
SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,
CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
I. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED
THROUGH RATED WALLS, SMOKE/FIRESTOP PENETRATION.
J. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT.
K. CONTRACTOR SHALL FIELD VERIFY ALL CEILING CONDITIONS AND MAKE SPECIAL PROVISIONS TO
INSTALL EQUIPMENT OR CABLING.
L. CONTRACTOR SHALL FIELD VERIFY ALL NEW CABLE TRAY PATHWAYS TO AVOID CONFLICT.
M. CONTRACTOR SHALL ENGAGE A SUB-SURFACE UTILITY MARKING COMPANY TO LOCATE ALL
UNDERGROUND LINES PRIOR TO CONSTRUCTION.
N. CONTRACTOR TO INCLUDE COST FOR THE COMPLETE INSTALLATION OF AN ADDITIONAL 10%
OUTLETS (3-DATA, 1-GANG BOX, 1.25" CONDUIT) FROM EACH SIGNALS CLOSET. OUTLETS TO BE
INSTALLED AS DIRECTED BY THE COR BASED UPON EXISTING FIELD CONDITIONS. 10%
ADDITIONAL TO BE OVER AND ABOVE THE OUTLET COUNT FOR EACH TR.
O. EXISTING NEW OUTLET LOCATIONS ARE SHOWN FOR BIDDING PURPOSES AND HAVE BEEN
LOCATED WITHIN THE GENERAL AREA BASED UPON SITE SURVEYS AT THE TIME OF DESIGN.
CONTRACTOR SHALL INCLUDE ALL COSTS TO ALLOW FOR THE FINAL LOCATION WITHIN THE
ROOM INDICATED.
P. NEW OUTLET LOCATIONS ARE SHOWN FOR BIDDING PURPOSES AND HAVE BEEN LOCATED WITHIN
THE GENERAL AREA BASED UPON SITE SURVEYS AT THE TIME OF DESIGN. CONTRACTOR SHALL
INCLUDE ALL COSTS TO ALLOW FOR THE FINAL LOCATION, WITHIN THE INDICATED ROOM.
Q. THE CONTRACTOR SHALL BE REQUIRED TO KEEP AN UPDATED AS-BUILT SET OF DRAWINGS ON
THE PROJECT SITE AND INDICATE ALL CHANGES TO THE STRUCTURED CABLING SYSTEM.
R. ANY EQUIPMENT/SYSTEMS FURNITURE THAT IS TO BE MOVED TO SUPPORT THE WORK SHALL BE REPORTED TO THE COR NO LESS THAN 1 WEEK PRIOR TO THE NEED TO HAVE IT MOVED. THE VA
WILL BE RESPONSIBLE FOR MOVING EQUIPMENT/SYSTEMS FURNITURE.
S. ANY PERSONAL ITEMS WITHIN A WORKSPACE THAT IS TO BE MOVED TO SUPPORT THE WORK
SHALL BE REPORTED TO THE VA NO LESS THAN 1 WEEK PRIOR TO THE NEED TO HAVE IT MOVED.
THE VA PERSONNEL WILL BE RESPONSIBLE FOR MOVING PERSONAL ITEMS
T. THE CONTRACTOR SHALL PERFORM COMPLETE PROJECT CLEAN-UP AT THE END OF EACH SHIFT
IN THE WORK AREAS.
U. THE CONTRACTOR SHALL EMPLOY VA SPECIFIED AND APPROVED PROTECTION PROCEDURES TO ELIMINATE DAMAGE TO STRUCTURE, FINISHINGS, EQUIPMENT, FURNITURE AND PROPERTY WITHIN
ALL WORK AREAS.
V. COORDINATE MOUNTING OF NEW DEVICES WITH ADJACENT EXISTING DEVICE.
W. RE-ENTERABLE CABLE FIRE STOP ASSEMBLIES TO BE HILTI SPEED SLEEVE, SIZES AND
QUANTITIES AS NOTED.
X. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
Y. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS
PRIOR TO STARTING PROPOSED SCHEDULE.
Z. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
AA. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL
DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
BB. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR
DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT
FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND
MUST BE USED JOINTLY AT ALL TIMES. CONTRACTOR SHALL REFER TO THE GENERAL
REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS
ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO
EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU THE
CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.
CC. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY. COORDINATE ALL SHUT DOWNS A MINIMUM OF 21 DAYS BEFOREHAND. REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL REMAIN ON, AND
OUTAGE START/END TIME.
DD. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL CURRENT GOVERNING
CODES AND STANDARDS.
EE. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL
NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK
SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK
SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR
RESOLUTION BEFORE PROCEEDING WITH THE WORK.
FF. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS
OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE-RATED
ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-
RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION
REQUIREMENTS AND DETAILS ARE MET.
GG. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED
ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED
WALLS & FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
HH. ALL CONDUITS IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A WALL OR
ABOVE CEILING.
II. ACCESS PANELS IN NON ACCESSIBLE CEILINGS SHALL BE PROVIDED FOR ALL ELECTRICAL ITEMS
REQUIRING ACCESS.
JJ. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE
CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.
KK. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA
SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
LL. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL
OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN
ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY AND DIFFICULTIES WHICH CAN BE
ANTICIPATED.
MM. ALL ABANDONED EXTRANEOUS CONDUITS, WIRING, DEVICES SHALL BE REMOVED.
NN. BID ITEMS: REFER TO ARCHITECTURAL DESCRIPTION OF BID ITEMS, PLAN FOR AN OUTLINE OF BID
ITEMS, AND TO SPECIFICATION SECTION 01 00 00.
OO. CCTV CAMERAS FED FROM UTP CABLES ARE EXISTING TO REMAIN AND ARE TO BE PROTECTED
DURING WORK.
PROJECT GENERAL NOTES
T2
B
T2
DETAIL: B = DETAIL DESIGNATION
T2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
T2 = SHEET WHERE SECTION IS LOCATED
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
GENERAL FLOOR PLAN NOTES
CONDUIT RUN IN WALL OR ABOVE CEILING.
CONDUIT RUN IN SLAB OR UNDERGROUND.
CABLE MANAGEMENT SYSTEM PATHWAY.
LADDER TRAY , 12" x 4" DEEP UNLESS NOTED OTHERWISE.
CM
SECURITY SYMBOLS
CC
1 CCTV SYSTEM CEILING MOUNTED CAMERA. REFER TO CAMERA SCHEDULE FOR MOUNTING HEIGHT AND CAMERA
SPECIFICATIONS. SUBSCRIPT "X" INDICATES ENTRY IN CAMERA SCHEDULE.
IM DESK MOUNTED INTERCOM MASTER STATION.
MD CEILING MOUNTED MOTION DETECTOR.
PB DESK MOUNTED PUSH BUTTON FOR LOCAL ELECTRONIC DOOR RELEASE.
X
PP DESK MOUNTED PANIC/DURESS BUTTON.
SECURITY SYMBOLS WITH ELECTRICAL REQUIREMENTS
CC
CCTV SYSTEM WALL MOUNTED CAMERA (REFER TO CAMERA SCHEDULE FOR MOUNTING HEIGHT AND CAMERA SPECIFICATIONS). SUBSCRIPT "X" INDICATES ENTRY IN CAMERA SCHEDULE. 1-GANG BOX WITH 0.75" CONDUIT TO ABOVE
ACCESSIBLE CEILING . CAMERA AND CABLING .
IC
WALL MOUNTED INTERCOM DOOR STATION (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO
ABOVE ACCESSIBLE CEILING . INTERCOM AND CABLING .
HD
HANDICAP DOOR OPERATOR MOTOR ASSEMBLY BY OTHERS. 120V POWER CONNECTION AND CONDUIT FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING . LOW VOLTAGE WIRING AND INTERFACE WITH
SMS AND DOOR ACTUATOR BUTTONS . REFER TO SECURITY ROUGH-IN DETAILS.
HA
WALL/PEDESTAL MOUNT HANDICAP DOOR ACTUATOR BUTTON, FURNISHED BY OTHERS. BOX AS REQUIRED BY SYSTEM MANUFACTURER WITH INSTALLATION AND CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING . ALL LOW VOLTAGE WIRING AND INTERFACE WITH SMS AND DOOR MOTOR . REFER TO SECURITY ROUGH-IN DETAILS.
CR
WALL MOUNTED PROXIMITY CARD READER (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING . CARD READER AND CABLING . REFER TO SECURITY ROUGH-
IN DETAILS.
CR EL
ELEVATOR CAB MOUNTED CARD READER. READER TO BE INSTALLED IN ELEVATOR CAB AS COORDINATED WITH ELEVATOR CONTRACTOR. WIRING FROM CAB THRU TRAVELING CABLE TO ELEVATOR CONTROLLER IN ELEVATOR MACHINE ROOM AND INTERFACE WITH ELEVATOR CONTROLLER AND SMS , COORDINATE WITH ELEVATOR CONTRACTOR.
REFER TO SECURITY ROUGH-IN DETAILS.
KC
WALL MOUNTED COMBINATION KEYPAD/CARDREADER (46" MH UNLESS NOTED OTHERWISE). 2-GANG BOX WITH 0.75" CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING . DEVICE AND CABLING .
K WALL MOUNTED SECURITY KEYPAD ENTRY STATION (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING . KEYPAD AND CABLING .
MD
WALL MOUNTED MOTION DETECTOR (90" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO ABOVE
ACCESSIBLE CEILING . MOTION DETECTOR, WALL MOUNT HARDWARE, AND CABLING .
PP W
WALL MOUNTED PANIC/DURESS BUTTON (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO
ABOVE ACCESSIBLE CEILING . BUTTON AND CABLING .
X
MD
PB W
WALL MOUNTED PUSH BUTTON FOR LOCAL ELECTRONIC DOOR RELEASE (46" MH UNLESS NOTED OTHERWISE). 1-GANG
BOX WITH 0.75" CONDUIT TO ABOVE ACCESSIBLE CEILING . BUTTON AND CABLING .
CEILING MOUNTED MOTION DETECTOR. 1-GANG BOX MOUNTED IN CEILING . DETECTOR AND CABLING .
4"
4"
CABLE TRAY , 12" x 4" DEEP UNLESS NOTED OTHERWISE.
NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT
TO MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
T2 1 ELEVATION: 1 = ELEVATION DESIGNATION
T2 = SHEET WHERE ELEVATION IS LOCATED
EDC
X ELECTRONIC DOOR CONTROL. SUBSCRIPT "X" INDICATES SPECIFIC DOOR. REFER TO ELECTRONIC DOOR CONTROL
SCHEDULE FOR REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:2
:1
P
M
T001
ABBREVIATIONS, LEGEND &
GENERAL NOTES
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTSCHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
TECHNOLOGY_SHEET LIST
SHEET NUMBER SHEET NAME
T001 ABBREVIATIONS, LEGEND & GENERAL NOTES
001-TA100 BASEMENT PLAN
001-TA101 FIRST FLOOR PLAN
001-TA102 SECOND FLOOR PLAN
001-T400 ENLARGED TR RM BB105
001-T401 ENLARGED TR RM 139
001-T402 ENLARGED TR RM 179
001-T404 ENLARGED TR RM 242
001-T405 ENLARGED TR RM 284B
003-TA100 BASEMENT PLAN
003-TA101 FIRST FLOOR PLAN
003-T400 ENLARGED TR RM 103
007-TA100 BASEMENT PLAN
007-TA101 FIRST FLOOR PLAN
007-T400 ENLARGED TR RM 108D
009-TA101 FIRST FLOOR PLAN
009-TA102 SECOND FLOOR PLAN
009-T401 ENLARGED TR RM 109
009-T402 ENLARGED TR RM 210
018-TA100 FLOOR PLANS
018-T401 ENLARGED TR RM 115
018-T402 ENLARGED TR RM 210
020-TA101 FLOOR PLANS
020-T401 ENLARGED TR RM 206 & 105
021-TA101 FIRST FLOOR PLAN
021-T401 ENLARGED TR RM 28A
023-TA100 BASEMENT, FIRST FLOOR PLAN
023-T401 ENLARGED TR RM 002A
024-TA100 BASEMENT PLAN
024-TA101 FIRST FLOOR PLAN
024-TA102 SECOND FLOOR PLAN
024-T400 ENLARGED TR RM GB103
024-T401 ENLARGED TR RMS 123 & 124E
024-T402 ENLARGED TR RM 222
025-TA101 FIRST FLOOR PLAN
025-T401 ENLARGED TR RM 102D
026-TA100 BASEMENT PLAN
026-TA101 FIRST FLOOR PLAN
026-TA102 SECOND FLOOR PLAN
026-T400 ENLARGED TR RMS 10 & 27A
026-T401 ENLARGED TR RM 133
026-T402 ENLARGED TR RMS 230 & 259
027-TA100 BASEMENT PLAN
027-TA101 FIRST FLOOR PLAN
027-TA102 SECOND FLOOR PLAN
027-T401 ENLARGED TR RM 14
027-T402 ENLARGED TR RM 18
027-T404 ENLARGED TR RM 271
027-T403 ENLARGED TR RM 167
028-TA102 SECOND FLOOR PLAN
028-T400 ENLARGED TR RM 13D
028-T401 ENLARGED TR RM 201
030-TA100 BASEMENT PLAN
030-TA101 FIRST FLOOR PLAN
030-TA102 SECOND FLOOR PLAN
030-T401 ENLARGED TR RM 8F
030-T402 ENLARGED TR RM 14A
030-T403 ENLARGED TR RM 127
030-T404 ENLARGED TR RM 223A
030-T405 ENLARGED TR RM 226
031-TA100 BASEMENT PLAN
031-TA101 GROUND FLOOR PLAN
031-TA102 FIRST FLOOR PLAN
031-TA103 SECOND FLOOR PLAN
031-TA104 THIRD FLOOR PLAN
031-T401 ENLARGED TR RM 1-210
031-T402 ENLARGED TR RM 242Y
031-T403 ENLARGED TR RM G111
031-T404 ENLARGED TR RM G182
031-T405 ENLARGED TR RM G-204
031-T406 ENLARGED TR RM G-322A
031-T407 ENLARGED TR RM G328
031-T408 ENLARGED TR RM G-500D
031-T409 ENLARGED TR RM G-207A
035-TA100 BASEMENT & FIRST FLOOR PLANS
035-TA102 SECOND & THIRD FLOOR PLANS
035-T400 ENLARGED TR RM BC102
035-T401 ENLARGED TR RM 1A109
035-T402 ENLARGED TR RM 2A109
035-T403 ENLARGED TR RM 3A109
036-TA101 BASEMENT & FIRST FLOOR PLANS
036-T401 ENLARGED TR RM B37
060-TA101 FIRST & SECOND FLOOR PLANS
060-T401 ENLARGED TR RM
210-TA100 BASEMENT PLAN
210-TA101 FIRST FLOOR PLAN
210-TA102 SECOND FLOOR PLAN
210-T400 ENLARGED TR RM G023
210-T401 ENLARGED TR RM 102A
210-T402 ENLARGED TR RM 202A
211-TA100 BASEMENT PLAN
211-TA101 FIRST FLOOR PLAN
211-TA102 SECOND FLOOR PLAN
211-T400 ENLARGED TR RM G007
211-T401 ENLARGED TR ROOM G18B
211-T403 ENLARGED TR RM 108A
211-T402 ENLARGED TR RM 198A
211-T405 ENLARGED TR ROOM 208A
211-T404 ENLARGED TR ROOM 298A
212-TA100 BASEMENT PLAN
212-TA101 FIRST FLOOR PLAN
212-TA103 SECOND FLOOR PLAN
212-T400 ENLARGED TR RM 15A
212-T401 ENLARGED TR RM 114
212-T402 ENLARGED TR RM 125
212-T403 ENLARGED TR RM 225
247-TA100 BASEMENT PLAN
247-TA101 FIRST FLOOR PLAN
247-T400 ENLARGED TR ROOM 109
252-TA101 FIRST FLOOR PLAN
252-T400 ENLARGED TR ROOM 110
259-TA101 FLOOR PLANS
259-T400 ENLARGED TR ROOM 2-9
261-TA101 FIRST FLOOR PLAN
261-T400 ENLARGED TR RM 103
T501 DETAILS
T502 TECHNOLOGY DETAILS
Total Count: 117
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
CONSTRUCTION DOCUMENTS - 100% QC SUBMITTAL 03/31/2023
CONSTRUCTION DOCUMENTS - 95% 04/14/2023
UP UP
DN
2D/1V2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
APAP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP AP
AP
AP
W
2D/1V
W
1D 1D 2D/1V W W
2D/1V
46" MH
2D/1V
3D
3D
3D
2D/1V
001-T400
001-T400
96" MH 96" MH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:4
A
M
001-TA100
BASEMENT PLAN
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
SCALE: 3/32" = 1'-0"
B01 - BASEMENT PLAN
N
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
DN DNDN
UP UP
AP AP
AP
AP
AP
AP
AP
2D /1
V
2D/1V
2D /1
V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V 2D/1V
1D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D /1
V 2D
/1 V
2D /1
V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D /1
V
2D /1
V
46" MH2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D /1
V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
AP
AP
AP
AP
AP AP
W
W
W
AP
AP
AP
AP AP
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
APAP
AP
AP
AP
2D/1V
2D/1V 2D/1V2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D /1
V 2D
/1 V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
001-T401
001-T401
001-T402
001-T402
TR 139 TR 179
TR 139 TR 179
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:5
A
M
001-TA101
FIRST FLOOR PLAN
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
SCALE: 3/32" = 1'-0"
B01 - FIRST FLOOR PLAN
PLAN NOTES
N
PLAN NOTES
1. EXISTING DUCTWORK. PROVIDE CABLE TRAY OFFSETS AS REQUIRED TO ROUTE
ABOVE/BELOW DUCTWORK. FIELD VERIFY PRIOR TO ORDERING.
2. DRYWALL CEILING/SOFFIT IN THIS LOCATION (NOT ALL AREAS NECESSARILY
SHOWN).
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
UP
DN
UP
AP AP
AP
AP
AP
AP
AP
AP AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
APAP
2D/1V 2D/1V
2D/1V
3D 3D3D
2D/1V
2D/1V2D/1V
2D/1V 2D/1V
2D/1V2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
D
/1 V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V 2D/1V
2D/1V 2D/1V 2D/1V
2D/1V 2D/1V
2D/1V 2D/1V 2D/1V
2D/1V 2D/1V
3D 3D 3D
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
3D
3D
3D
W
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
46" MH
2D/1V
2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V 2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
2D/1V
001-T404
001-T405
001-T404
001-T405
TR 242 TR 284B
TR 242 TR 284B
222222223
284B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:0
A
M
001-TA102
SECOND FLOOR PLAN
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
SCALE: 3/32" = 1'-0"
B01 - SECOND FLOOR PLAN
PLAN NOTES
N
1. DEVICE MOUNTED IN SYSTEMS FURNITURE.
2. EXISTING DUCTWORK. PROVIDE CABLE TRAY OFFSETS AS REQUIRED TO
ROUTE ABOVE/BELOW DUCTWORK. FIELD VERIFY PRIOR TO ORDERING.
3. EXISTING FIRE SUPPRESSION SPRINKLER LINE. PROVIDE OFFSETS IN CABLE
TRAY TO RUN ABOVE/BELOW. FIELD VERIFY PRIOR TO ORDERING.
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
CC
TR
BB105
001-T4004
001-T4003
TR
BB105
10 9 10
BLANKING PANEL
25 PAIR PRIMARY PROTECTOR
BLANKING PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:1
A
M
001-T400
ENLARGED TR RM BB105
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
PLAN NOTES
1. EXISTING 2 POST RACK TO BE REMOVED.
2. EXISTING DATA STATION PATCH PANELS TO BE REMOVED.
3. EXISTING FIBER TERMINATION PANELS TO BE REMOVED.
4. EXISTING NETWORK ELECTRONICS TO BE REMOVED BY GOVERNMENT.
5. EXISTING UPS TO BE REMOVED.
6. EXISTING VIDEO CAMERA TO BE REINSTALLED IN NEW LOCATION.
7. EXISTING LADDER RACK TO BE REMOVED.
8. EXISTING LADDER RACK TO BE MAINTAINED.
9. NEW WHITE, 30" CHANNEL STYLE, 45RU RACK TO BE INSTALLED.
10. NEW VERTICAL WIRE MANAGER TO BE INSTALLED.
11. NEW 12'' x 4" WIRE MESH CABLE TRAY WITH LINER TO BE INSTALLED.
12. NEW DATA STATION CABLING PATCH PANEL.
13. NEW FIBER TERMINATION PANEL.
14. NEW HORIZONTAL CABLE MANAGER.
15. NEW RACK MOUNTED UPS.
16. NETWORK SWITCH BY GOVERNMENT.
17. EXISTING ACCESS CONTROL EQUIPMENT TO BE MAINTAINED.
18. EXISTING ANALOG VOICE 110 WALL FIELD TO BE MAINTAINED.
19. 24 PORT CAT 5E PATCH PANEL FOR COPPER BACKBONE.
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM BB105 - REMOVALS
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM BB105 - NEW WORK
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM BB105 RACK ELEVATION - NEW WORK
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM BB105 ELEVATION - REMOVALS
4-48 PORT PATCH PANELS
1-24 PORT PATCH PANEL
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
TR
001-T401 3
2-96 PORT PATCH PANELS
2-24 PORT PATCH PANELS
2-2" C. UP
TR
001-T401 4 9
2-2" C. UP
ROOM
10 9 10
BLANKING PANELS
BLANKING PANELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:4
A
M
001-T401
ENLARGED TR RM 139
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
PLAN NOTES
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 139 - REMOVALS
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 139 - NEW WORK
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 139 ELEVATION - REMOVALS
3 SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 139 RACK ELEVATION - NEW WORK
1. EXISTING 2 POST RACK TO BE REMOVED.
2. EXISTING DATA STATION PATCH PANELS TO BE REMOVED.
3. EXISTING FIBER TERMINATION PANELS TO BE REMOVED.
4. EXISTING NETWORK ELECTRONICS TO BE REMOVED BY GOVERNMENT.
5. EXISTING UPS TO BE REMOVED.
6. EXISTING VIDEO CAMERA TO BE REINSTALLED IN NEW LOCATION.
7. EXISTING HORIZONTAL CABLE MANAGER TO BE REMOVED.
8. EXISTING LADDER RACK TO BE MAINTAINED.
9. NEW WHITE, 30" CHANNEL STYLE, 45RU RACK TO BE INSTALLED.
10. NEW VERTICAL WIRE MANAGER TO BE INSTALLED.
11. NEW 12'' x 4" WIRE MESH CABLE TRAY WITH LINER TO BE INSTALLED.
12. NEW DATA STATION CABLING PATCH PANEL.
13. NEW FIBER TERMINATION PANEL TO BE INSTALLED.
14. NEW HORIZONTAL CABLE MANAGER TO BE INSTALLED.
15. NEW RACK MOUNTED UPS TO BE INSTALLED.
16. NETWORK SWITCH BY GOVERNMENT.
17. EXISTING ACCESS CONTROL EQUIPMENT TO BE MAINTAINED. MOVE TO ADJACENT
WALL PRIOR TO DEMOLITION.
18. EXISTING ANALOG VOICE 110 WALL FIELD TO BE MAINTAINED. MOVE TO ADJACENT
WALL PRIOR TO DEMOLITION.
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
2D/1V
TR
001-T4023
2-96 PORT PATCH PANELS
2-24 PORT PATCH PANELS
2-2" C. UP
001-T4024
10 9 10
BLANKING PANELS
BLANKING PANELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:2
A
M
001-T402
ENLARGED TR RM 179
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
PLAN NOTES
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 149 - REMOVALS
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 179 - NEW WORK
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 149 ELEVATION - REMOVALS
3 SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 178 RACK ELEVATION - NEW WORK
1. EXISTING 2 POST RACK TO BE REMOVED.
2. EXISTING DATA STATION PATCH PANELS TO BE REMOVED.
3. EXISTING FIBER TERMINATION PANELS TO BE REMOVED.
4. EXISTING NETWORK ELECTRONICS TO BE REMOVED BY GOVERNMENT.
5. EXISTING UPS TO BE REMOVED.
6. EXISTING VIDEO CAMERA TO BE REINSTALLED IN NEW LOCATION.
7. EXISTING HORIZONTAL CABLE MANAGER TO BE REMOVED.
8. EXISTING LADDER RACK TO BE MAINTAINED.
9. NEW WHITE, 30" CHANNEL STYLE, 45RU RACK TO BE INSTALLED.
10. NEW VERTICAL WIRE MANAGER TO BE INSTALLED.
11. NEW 12'' x 4" WIRE BASKET CABLE TRAY WITH LINER TO BE INSTALLED.
12. NEW DATA STATION CABLING PATCH PANEL.
13. NEW FIBER TERMINATION PANEL.
14. NEW HORIZONTAL CABLE MANAGER.
15. NEW RACK MOUNTED UPS.
16. NETWORK SWITCH BY GOVERNMENT.
17. EXISTING ACCESS CONTROL EQUIPMENT TO BE MAINTAINED.
18. EXISTING ANALOG VOICE 110 WALL FIELD TO BE MAINTAINED.
19. NEW TELECOMMUNICATIONS GROUND BAR.
No. Revisions: Date:
BASIS OF DESIGN - 10% 05/23/2022
SCHEMATIC DESIGN - 35% 07/18/2022
QC DESIGN - 65% 09/06/2022
DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022
QC DESIGN - 95% 02/21/2023
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
TR
001-T404 3
2-2" C. DN
TR
TR
001-T404 4
2-2"C. DN
910 10
BLANKING PANELS
BLANKING PANELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORDCONSULTANT
PROJECT NO.
STATE COA FIRM NO.
A u to d e s k D o c s /C h il li c o th e
V A
E
H R
M /2
-0
-T
E C
H C e n tr a l.
rv t
/1
/2
:4
:5
A
M
001-T404
ENLARGED TR RM 242
04/14/2023 RSG GES/JWE
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
100% CONSTRUCTION
DOCUMENTS 01
CHILLICOTHE
VAMC
Approved: VAMC
2022-05041
01528
PLAN NOTES
SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 242 - REMOVALS
1 SCALE: 1/2" = 1'-0"
B01 - ENLARGED TR RM 242 - NEW WORK
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 242 ELEVATION - REMOVALS
2-96 PORT PATCH PANELS
2-24 PORT PATCH PANELS
SCALE: 1 1/2" = 1'-0"
BLDG 001 TR ROOM 238 RACK ELEVATION - NEW WORK
1. EXISTING 2 POST RACK TO BE REMOVED.
2. EXISTING DATA STATION PATCH PANELS TO BE REMOVED.
3. EXISTING FIBER TERMINATION PANELS TO BE REMOVED.
4. EXISTING NETWORK ELECTRONICS TO BE REMOVED BY GOVERNMENT.
5. EXISTING UPS TO BE REMOVED.
6. EXISTING VIDEO CAMERA TO BE REINSTALLED IN NEW LOCATION.
7. EXISTING HORIZONTAL CABLE MANAGER TO BE REMOVED.
8. EXISTING LADDER RACK TO BE MAINTAINED.
9. NEW WHITE, 30" CHANNEL STYLE, 45RU RACK TO BE INSTALLED.
10. NEW VERTICAL WIRE MANAGER TO BE INSTALLED.
11. NEW 12'' x 4" WIRE BASKET CABLE TRAY WITH LINER TO BE INSTALLED.
12. NEW DATA STATION CABLING PATCH PANEL TO BE INSTALLED.
13. NEW FIBER TERMINATION PANEL TO BE…
This is the start of the file's text. The full file is on GovTribe.