Attachment 19 - SOW attach Volume 3 Part 4.pdf

PDF 15 MB Posted

Attached to
Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
Solicitation number
36C77623B0058
Issued by

About this file

This document is an attachment to a federal solicitation for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking offers to perform EHRM Infrastructure Upgrades Construction at the Chillicothe, OH VA Medical Center. Offerors must propose to provide all labor, materials, equipment, and supervision required to upgrade existing infrastructure systems that support the electronic health records management system. The period of performance is 720 calendar days from notice to proceed. Proposals are due by 2:00 PM Eastern on July 21, 2021 and the government intends to make award by September 30, 2021. The anticipated award value is between $5-10 million.

View the file

Other files

File Type Posted
Abstract of offers - Chillicothe Bid Opening 01172024 signed.pdf PDF
S06 - Amendment 0009 Bid Opening.pdf PDF
S06 - Amendment 0008 Extend due date to 01172024.pdf PDF
S06 - 36C77623B0058 0007.pdf PDF
S06 - Amendment 0007 Att 10 - 14.063_024-EP100 - ELECTRICAL PLAN - BASEMENT FLOOR.pdf PDF
S06 - Amendment 0007 Att 13 - 14.116_E616.31 - PANELBOARD SCHEDULES.pdf PDF
S06 - Amendment 0007 Att 4 - Chiillicothe VA Lead Paint Survey Report.pdf PDF
S06 - Amendment 0007 Att 7 - 000-TS100 - CAMPUS TECHNOLOGY SITE PLAN.pdf PDF
S06 - Amendment 0007 Att 6 - 000-TN500 - TECHNOLOGY DETAILS.pdf PDF
S06 - Amendment 0007 Att 3 - 2023-01 AHERA.pdf PDF
S06 - Amendment 0007 Att 11 - 14.077_031-EP100 - ELECTRICAL PLAN - GROUND FLOOR.pdf PDF
S06 - Amendment 0007 Att 16 - 026-TN100 - BASEMENT PLAN -TECHNOLOGY.pdf PDF
S06 - Amendment 0007 Att 14 - 018-TN209 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 8 - 13.038_030-MD101 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR.pdf PDF
S06 - Amendment 0007 Att 12 - 14.080_035-EP100 - ELECTRICAL PLAN - BASEMENT.pdf PDF
S06 - Amendment 0007 Att 1 Technical questions Round 2 responses.pdf PDF
S06 - Amendment 0007 Att 2 - Final SWP3.pdf PDF
S06 - Amendment 0007 Att 15 - 018-TN210 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 5 - 000-TN400 - TECHNOLOGY RISER DIAGRAMS.pdf PDF
S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf PDF
Amendment 0006 36C77623B0058.pdf PDF
Amendment 0005 36C77623B0058.pdf PDF
Amendment 0005 - Attachment Addendum 1.zip ZIP file
Amendment 0005 - Attachment - Vendor Questions_Responses final.pdf PDF
Amendment 0004 36C77623B0058.pdf PDF
Amendment 0003 36C77623B0058.docx DOCX document
Att 10 Volume 10 - Technology_Combined.pdf PDF
Att 8 Volume 8 - Electrical_Combined.pdf PDF
Att 6 Volume 6 - Mechanical_Combined.pdf PDF
Att 9 Volume 9 - Electrical_Combined.pdf PDF
Att 13 Volume 13 - Fiber_Combined.pdf PDF
Att 4 Volume 4 - Architectural_Combined.pdf PDF
Att 5 Volume 5 - Fire Suppression_Combined.pdf PDF
Att 14 S04 - Site Visit sign in 10-11-2023.pdf PDF
Att 7 Volume 7 - Mechanical_Combined.pdf PDF
Att 12 Volume 12 - Fiber_Combined.pdf PDF
Att 11 Volume 11 - Technology_Combined.pdf PDF
Att 3 Volume 3 - Architectural_Combined.pdf PDF
Att 2 Volume 2 - Civil_Combined (1).pdf PDF
36C77623B0058 0002.docx DOCX document
Att 1 Volume 1 - General and Civil_Combined.pdf PDF
DBA Wage Rates Construction - Ross Cty.pdf PDF
36C77623B0058 0001.docx DOCX document
Attachment 04 - DBA Wage Determination.pdf PDF
Updated _Specifications_Combined.pdf PDF
Attachment 08 - SOW attach Volume 1 Part 3.pdf PDF
Attachment 09 - SOW attach Volume 1 Part 4.pdf PDF
Attachment 04 - Wage Rate Determination - Chillicothe.pdf PDF
Attachment 11 - SOW attach Volume 1 Part 6.pdf PDF
Attachment 17 - SOW attach Volume 3 Part 2.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nourishment Kitchen

GB120

Elec Clos

GB116B

Cook/Chill

GB116

Dietician / Food Service Supervisor

GB118

Mechanical

GB108

Toilet

GB116A

Break Room

GB106Soiled Linen

GB104

Elec Switchgear

GB102

HAC

GB109

Prosthetics & Sensory Aids

Service

GB111

Corridor

GBC1

Prosthetics Check In

GB111A

Break Room

GB111B

Chief of Prosthetics

GB113

Stairs

GBS1

Storage

GB107

EMS Office

GB105

Housekeeping Supervisor

GB105A

Linen Storage

GB103A

Tele Clos

GB103

Vending Room

GB101

Mechanical

GB101A

HAC

GB121

Rec Stor

GA101

Mechanical

GA100

Mechanical

GA102

Stairs

GSD1

Mechanical

GA103

Toilet

GA104

Toilet

GA105

Cart Wash

GC106A

Toilet

GC105

Corridor

GCC1

SPS

Decontamination

GC106

Mechanical

GC106B

SPD

Sterilization

GC108A

Sterilization Room

GC108

Stairs

GCS1

SPD Storage

GC109B

Assistant Chief SPS

GC110

SPS Chief

GC111

Mechanical

GC112

Storage

GC113

GC113B

GC113A

Elev Lobby

GAC1

Elect. Room

GC115

Elect. Room

GC114

Elect. Room

GB117

SPD

Distribution

GC109

GC109A

HAC

GB109A

Emergency Generator

GA100A

OTLINE OF TR #123

AT FLOOR ABOVE

B

(1) 4"C - (3) 24-STRAND OS2

OPTICAL FIBER CABLE AND

(1) 4"C - SPARE

HAND HOLE

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

(2) 4"C - (1) 24-STRAND OS2 OPTICAL

FIBER AND 25-PAIR COPPER CABLE

A

(2) 4"C - (3) 24-STRAND OS2

OPTICAL FIBER AND (3) 25-

PAIR COPPER CABLES AND

(1) 4"C - SPARE

HAND HOLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:5

:4

P

M

024-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 24

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM

EACH TR.

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE

CONDUITS ABOVE BASEMENT CEILING OVER TO TR.

2. PROVIDE PULLBOX ABOVE CEILING TO ROUTE CONDUITS

AS INDICATED.

3. PROVIDE PENETRATION THRU CEILING AND ROUTE

CONDUIT INTO TR.

4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"

FOR TERMINATION OF NEW COPPER BACKBONE CABLES IN

#GB103. REFER TO "018-TN205" FOR CABLE CONNECTION

REQUIREMENTS.

5. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR

ROUTING THRU BUILDING TO TELECOM ROOM (MDF).

DN

Toilet

112A

Bed Room

112B

Bed Room

112C

Entry

Toilet

113A

Bed Room

113B

Bed Room

113C

Entry

Corridor

1C4

Bed Room

114A

Bed Room

114B

Entry

Toilet

114C

Bed Room

Toilet

115A

HAC

116MHRRTP

Screener

Psychologist

Library

Bed Room

108C

Toilet

108B

Elect. Room

Bed Room

106A

Entry

Bed Room

107C Bed Room

107A

Toilet

107B

Stairs

1BS1

Dietician

Interview Room

Staff Work Room

Med. Room

101A

Storage

120A

Linen Chute

Laundry Room

Toilet

122A

Toilet

Nurse Manager

Corridor

Visitor Room

Clean Supply

Crash Cart

Storage

Supplies

Toilet

Social Science Techs

Corridor

1C5

Tele Clos

Conference Room

124A

Entry

Lockers

124C

Toilet

124D

Stairs

1AS1

Staff Lounge

124B

Kitchen

Associate Chief Nurse

MHCL

Therapy Tub / Storage

Toilet

128A

Toilet

129A

Bed Room

Bed Room

130B

Bed Room

130C

Entry

Toilet

130A

Bed Room

131A

Bed Room

131B

Entry

Toilet

131C

Entry

Bed Room

132A

Bed Room

132B

Toilet

132C

Corridor

1C7

SUD/HCHV

Outreach

Social Worker

HAC

Stairs

1CS1

Elect. Room

Bed Room

137A Bed Room

139C

Toilet

139B

Toilet

137B

Entry

Bed Room

138C

Bed Room

138A

Toilet

138B

Entry

Entry

Bed Room

108A

Bed Room

106C

Entry

Bed Room

137C

Bed Room

139A

Entry

Nurse Station

Day Room

Corridor

1C3 Corridor

1C2

Corridor

1C1

Corridor

1C6

Day Rm

Corridor

1C8

Toilet

106B

Tele Clos

124E

Tele Clos

(2) 4"C - (1) 24-STRAND OS2 OPTICAL FIBER

AND 25-PAIR COPPER CABLE

OUTLINE OF TR #222

AT FLOOR ABOVE

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:5

:4

P

M

024-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 24

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH

TR.

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

KEYL NOTES:

1. PROVIDE PENETRATION THRU CEILING AND CONDUIT

CHASE ON WALL TO EXTEND CONDUITS UP THRU CEILING

TO FLOOR ABOOVE.

2. PROVIDE PUULBOX AT CEILING TO EXTEND CONDUITS UP

TO FLOOR ABOVE. PROVIDE PENETRATION THRU CEILING

TO ROUTE CONDUITS INTO TR.

Toilet

213A

Bed Room

213B

Bed Room

213C

Entry

213Toilet

214A

Entry

Bed Room

214B

Bed Room

214C

Corridor

2C3

Bed Room

215A

Bed Room

215B

Entry

Toilet

215C

Bed Room

Toilet

216A

Physician Assist/Exam

Laundry Room

Soiled Linen

219A

Linen Chute

Crash Carts

Storage

221A

EXAM

ROOM

Tele Clos

Day Rm/Training

Corridor

2C4

Toilet

Stairs

2S1

Addiction Therapist

Visitor Room

Ice/Water

Kitchenette

Storage

Clean Linen

Toilet

Aftercare Coordinator

Psychology Technician

243Stairs

2S2

Addiction Therapist

Addiction Therapist

Bed Room

Bed Room

239C

Entry

Bed Room

239A

Toilet

239B

Corridor

2C7

Bed Room

238C

Toilet

238B

Elect. Room

HAC

Toilet

232A

Clinical Social Worker

Clinical Social Worker

Clinical Psychologist

Office

Physician

Interview Room

Bed Room

Toilet

233A

Entry

Bed Room

233C

Bed Room

234A

Entry

Bed Room

234B

Bed Room

233B

Toilet

234CEntry

Toilet

235C

Bed Room

235B

Bed Room

235A

Equipment

Med. Room

201A

EXAM

ROOM

Social Worker

Detox Coordinator

Stairs

2S3

Bed Room

206A

Toilet

206B

Bed Room

207A

Toilet

207B

Entry

Bed Room

207C

Bed Room

208A

Toilet

208B

Elect. Room

Library

211HAC

Entry

Bed Room

238A

Entry

Bed Room

206C

Entry

Bed Room

208C

Corridor

2C2Corridor

2C1

Nurse Station

Corridor

2C6

Corridor

2C5 Day Rm

Toilet

217A

Day Room

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

(2) 4"C - (1) 24-STRAND OS2 OPTICAL

FIBER AND 25-PAIR COPPER CABLES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:5

:4

P

M

024-TN102

LEVEL 02 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 24

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM

EACH TR.

1/8" = 1'-0"

LEVEL 02 PLAN - TECHNOLOGY

Storage

Stair

3S1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:5

:5

P

M

024-TN103

LEVEL 03 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 24

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

LEVEL 03 PLAN - TECHNOLOGY

Mechanical Room/Pipe

Mechanical

Elect. Room

1A

OUTLINE OF MDF #102

AT FLOOR ABOVE

HAND HOLE

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES AND (1)

4"C - SPARE

B

A

HAND HOLE

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE AND (1)

4"C - SPARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:5

P

M

025-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 25

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PENTRATION THRU EXTERIOR WALL AND ROUTE

CONDUITS IN CRAWL SPACE OVER TO LOCATION BELOW TR.

2. PROVIDE PENTRATION THRU CEILING DECK TO ROUTE

CONDUITS UP TO FIRST FLOOR.

VOC

Assembly

101A

VOC Recycle

Office

VOC Office

104A

VOC Office

Toilet

Shower

Shower

Toilet

Linen Distribution

Toilet

102B

Linen Distribution

102CLaundry Manager

Elect. Room

101B

MDF #102A

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:5

P

M

025-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 25

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR

TERMINATION OF NEW COPPER BACKBONE CABLE. IN MDF

#102A. REFER TO "018-TN205" FOR CABLE CONNECTION

REQUIREMENTS.

Offices

4C

Offices

4B

Recreation Clinic

Stair

S1-0

Toilet

4A

Elect. Room

Corridor

32A

Storage

HAC

Linen

Stair

S2-0 Linen Storage

Office

Office

CIO

Elevator Equipment

Mechanical

Equipment

9A

Tele Clos

27A

Electric Switch Gear

Office

Corridor

XXX

Mech.

Office

Office

25A

Toilet

Electrical

EMS

23A

Office

Office

Toilet

28Toilet

HAC

Office

18A

Office

18B

Office

18C

Office

18D

Office

18E

Office

18F

Office

18G

Office

18H

Office

18I

Stair

S3-0

Stair

S4-0

Stair

S5-0

EMS EQUIPMENT

24A

Chapel

Storage

2A

Corridor

Corridor

Office

4D

200L

Room

200M

ROUTE CONDUITS IN CRAWL SPACE

UNDER BUILDING ADDITION

(2) 4"C - (3) 24-STRAND OS2 OPTICAL FIBER

AND (3) 25-PAIR COPPER CABLES AND (1)

4"C - SPARE

HAND HOLE

A B

HAND HOLE

(1) 4"C - (3) 24-STRAND OS2 OPTICAL FIBER

CABLE AND (1) 4"C - SPARE

2 3

ROUTE CONDUITS IN CRAWL SPACE

UNDER BUILDING ADDITION

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE AND

25-PAIR COPPER CABLE

HAND HOLE

A

HAND HOLE

B

OUTLINE OF TR #200

AT FLOOR ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:3

P

M

026-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFASTRUCTURE UPGRADES 538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 26

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER LINE

DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS FROM CENTER

OF TELECOM ROOM (TR) WITH LINES CONNECTING THE FOUR

ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PENETRATION THRU INTERIOR WALL OF CRAWL SPACE

AND STUB CONDUIT UP INTO TR.

2. PROVIDE CONDUIT CHASE AND PENETRATION THRU INTERIOR WALL

OF CRAWL SPACE TO ROUTE CONDUITS UP ABOVE CEILING AND

OVER TO TR.

3. PROVIDE PULLBOX ABOVE CEILING AND ROUTE CONDUITS TO

LOCATIONS INDICATED. PROVIDE PENETRATION THRU CEILING AND

ROUTE CONDUITS TO FLOOR ABOVE.

4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT PROTECTION

"SC-SPR-1" AND "PATCH PANEL "SC-MPP-1" FOR TERMINATION OF

NEW COPPER BACKBONE CABLES IN MDF #27. REFER TO "018-TN205"

FOR CABLE CONNECTION REQUIREMENTS.

5. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR ROUTE

THRU BUILDING TO TELECOM ROOM (MDF).

Staff Lounge / Lockers

Conference

Storage

Toilet

Elec.

Intake Room

Data

Shared Workroom

Vestibule

Vistor Room

Shared Workroom

Exam

Waiting

HAC

Linen Vest.

Linen Chute

130A

Storage

133A

Bed Room

Bath

125A

Bed Room

Bed Room

127A

Bath

124A

Bath

122A

Bed Room

Bath

121A

Storage

120A

Med Room

Treatment Team Room

Tub Room

Elec.

Toilet

Consult Room

Consult Room

Nurse Station

Isolation Room

Bath

114A

Bed Room

Isolation Ante Room

Bed Room

Bath

109A

Bath

111A Bed Room

Bed Room

Bed Room

Day Room

Bath

108A

Bath

107A

Bath

170A

Bed Room

Bed Room

Bath

167A

Bath

168A

Bed Room

Quiet Room

Toilet

Toilet

Toilet

Med Room

100A

Storage

Bed Room

Bath

164A

Elec.

Patient Laundry

Treatment Team Room

Storage

158A

Med Room

Nurse Station

Bath

157A

Bed Room

Bed Room

Bath

156A

Stair

S3-1Bed Room

Bed Room

Stair

S5-1

Stair

S2-1

Bath

147A

Bath

148A

Bath

152A

Bed Room

Bed Room

Bath

154A

Bed Room

Bath

151A

Bath

153A

Soiled Linen

C109A

Nurse Station

Day Room

Recreation

Dining

Soiled Linen

C105A

Bed Room

Bath

126A

Bath

138A

Vistor Room

Nurse Manager

Bed Room

Bath

169A

Courtyard

Corridor

C105

Corridor

C104

Corridor

C103

Corridor

C102

Corridor

C101

Corridor

C112

Corridor

C100

Corridor

C111

Corridor

C110

Corridor

Corridor

C109

Corridor

C107

Storage

Storage

C110A

Med Gas

Storage

C103A

Corridor

HAC

Group Room

Toilet

105A

Nurse Work

Toilet

Closet

Stair

S1-1

Stair

S4-1

Storage

C103B

Storage

C110B

Alcove

C102B

Alcove

C102A

Alcove

C111B

Alcove

C111A

Storage

Closet

Servery

Closet

102A

Courtyard

Group Room

EX

EX

EX

EX

EX

EX

EX

LC

S1

S3

S2

49 SF

Storage

120A

27 SF

Storage

133A

55 SF

Storage

150 SF

Storage

72 SF

Storage

80 SF

Storage

49 SF

Storage

158A

9 SF

Storage

C110B

13 SF

Storage

C110A

9 SF

Storage

C103B

13 SF

Storage

C103A

OUTLINE OF TR #200A

AT FLOOR ABOVE

TR #133

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER CABLE

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE AND

25-PAIR COPPER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:4

P

M

026-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFASTRUCTURE UPGRADES 538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 26

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER LINE

DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS FROM CENTER

OF TELECOM ROOM (TR) WITH LINES CONNECTING THE FOUR

ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

KEY NOTES:

1. PROVIDE PULLBOX ABOVE CEILING AND ROUTE CONDUITS TO

LOCATIONS INDICATED. PROVIDE PENETRATION THRU CEILING AND

ROUTE CONDUITS TO FLOOR ABOVE.

Break Room

Nurse Station

Nourishment Kitchen

Exam

MIT

Bed Room

Elec.

HAC

Storage

Bed Room

Bed Room

Bed Room

Bed Room

Linen Storage

CongregateToilet

Soiled Utility

Congregate Bath

Bed Room

Stor

Bed Room

Bed Room

Bed Room

Storage

Stair

S2-2

Linen Chute

Quiet Room

Toilet

226 Physician

Sterile Supplies

EMS Storage

Tele Clos

Day Room

Break Room

Nurse Manager

Bed Room

Stair

S3-2

Shower

Bed Room

Bed Room

Bed Room

Storage

Conference Room

Congregate Bath

Soiled Utility

Congregate Toilet

Bed Room

Linen Room

Bed Room

Bed Room

Bed Room

Storage

HAC

Elect. Room

Bed Room

Storage

Bed Room

Bed Room

Toilet

Toilet

256A

Toilet

211A

Toilet

210A

Toilet

209A

Toilet

205A

Congregate Shower

216A

Toilet

217A

Toilet

220A

Toilet

225A

Toilet

227A

Stair

S5-2

Stair

S4-2

Stair

S1-2

Med Prep

201A

Toilet

231A

Toilet

238A

Toilet

239A

Congregate Shower

242A

Toilet

248A

Toilet

249A

Toilet

253A

Toilet

255A

Toilet

245A

Corridor

200J

Corridor

200I

Corridor

200E

Corridor

200A

Corridor

200B

Corridor

200D

Corridor

200K

Corridor

200F

Corridor

200C

Data

Elect. Room

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

TR #200A

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:4

P

M

026-TN102

LEVEL 02 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFASTRUCTURE UPGRADES 538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 26

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:0

:4

P

M

026-TN103

LEVEL 03 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFASTRUCTURE UPGRADES 538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 26

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

Mechanical

Toilet

Toilet

Mechanical

Chaplin Service

Soiled Linen

13 Tele Clos

Elevator Equipment

Optometry Waiting

Corridor

Tele Clos

HAC

Mechanical

Waiting

Employee Lounge

Biomedical Engineer

Elect. Room

Mechanical

HAC

30A

Toilet

Elec Switchgear

Elevator Equipment

34Patient Waiting

5A

Private Waiting

5B

Toilet

5Ca GYN/Triage Room

5C

Clean Storage

5F

Toilet

5D

Soiled Utility

5E

Corridor

Procedure

5G

Conference Room

5H

HAC

5I

Provider

5J

Provider

5K

Exam Room

5L

Exam Room

5M

Exam Room

5N

Corridor

Med. Room

5P

Corridor

1B

Corridor

1A

Corridor

1C Vending Area

1D

Physician Assistant

11A

Chaplain

11B Physician Assistant

11D

Storage

11C

Storage

17G

Infection Control

17F

MDRO prevention Coordinator

17E

Infection Control Nurse

17D

EMS Supervisor

17B

RME Coordinator

17A

MAS Secretary

17C

Reception

22A

Clean Supply

22B

EKG/Holter

22C

EKG/Holter

22D

Reading

22E

Pt Ed/Storage

22F

Servers

22G

Editing

22H

EEG

22I

Soiled Utility

22J

ECHO

22K

Toilet

32B

Linen Chute

13A

Recept./Nursing

5O

Corridor

1E

Optometry

16A

16B

Stairs

000B

Stairs

000A

Closet

5Q Stairs

000C

Corridor

1F

Closet

16C

Room

Room

BA

OUTLINE OF TR #167 AT FLOOR ABOVE

(2) 4"C - (1) 24-STRAND OS2 OPTICAL

FIBER AND 25-PAIR COPPER CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER CABLE

HAND HOLE

HAND HOLE

(2) 4"C - (3) 24-STRAND OS2 OPTICAL

FIBER AND (3) 25-PAIR COPPER CABLES

AND (1) 4"C -SPARE

(1) 4"C - (3) 24-STRAND OS2 OPTICAL

FIBER CABLE AND (1) 4"C - SPARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:0

P

M

027-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 27

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PULLBOX ON EXTERIOR WALL AT HEIGHT ABOVE

BASEMENT FINISHED CEILING. ROUTE CONDUITS ALONG

EXTERIOR WALL INTO PULLBOX. PROVIDE PENETRATION

THRU WALL AND ROUTE ABOVE CEILING INTO TR.

2. PROVIDE PULLBOX AND PENTRATION AT CEILING TO EXTEND

CONDUITS TO FLOOR ABOVE.

3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUTS

UP INTO TR.

4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR

TERMINATION OF NEW COPPER BACKBONE CABLES IN MDF

#14. REFER TO "018-TN205" FOR CABLE CONNECTION

REQUIREMENTS.

ROUTE THRU BUILDING TO TELECOM ROOM (MDF).

Waiting

Visitor

Optometry Exam

Optometry Exam

Optometry Exam Room

Toilet

Elect. Room

HAC

Optometry Exam

Optometry Exam

Optometry Staff Office

Toilet

Opt Staff Office

Opt Staff Office

Resident/Student Office

Optometry Exam

Storage

SPD

Dialiation Waiting

Optometry Visual Field

Intake Nurse

POD Exam Room

POD Exam Room

Procedure Room

Storage

Podiatry Office

Optometry Pre-Test

Optometry Exam Room

Linen Chute

Soiled Utility

Retinal Exam

Tele Clos

131 Ice Machine

Pat Ed & Visit Coor

Toilet

Women's Veteran Program Manager

Break Room

Conference Room

Women's Health Diagnostic Coordinator

GECL Physician's Assistant

Centeral Check In

140 Neurology

Soiled Utility

Derm Procedure

Pulmonary Exam Room

Pulmonary Exam Room

Toilet

146 Ortho Procedure

Ortho Exam Room

Derm Exam Room

Intake Nurse

PAPR Storage Location

Intake Nurse

Hematology Procedure

GYN Hematology

Clean Utility

GYN Exam

156A

EEG Reading Room

Neurology Exam Room

Clean Linen

Ortho GYN

Cardio Clinic

HAC

Elect. Room

Storage

Exam Room

UV Room

Associate Chief Nurse

Optical Shop

Omnicell

118A Corridor

100A

Corridor

100B

Corridor

100C

Corridor

100D

Corridor

100E

Corridor

100F

Corridor

100G

Optometry Student Staff Offices

100H

Corridor

100I

Corridor

100K

GYN Department

100L

GYN Exam

156B

Toilet

156D

GYN Exam

156C

Toilet

153A

Med. Room

150A

Closet

114A

Storage

119A

Corridor

119B

Stairs

001A

Stairs

001B

Storage

143A

Stairs

001D

Stairs

001C

OUTLINE OF TR #271

AT FLOOR ABOVE

(2) 4"C - (1) 24-STRAND OS2 OPTICAL

FIBER AND 25-PAIR COPPER CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:0

P

M

027-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 27

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE CONDUIT CHASE ON WALL ADJACENT TO COLUMN

TO ROUTE CONDUITS ABOVE CEILING AND OVER TO TR.

2. PROVIDE PULLBOX AND PENTRATION AT CEILING TO

EXTEND CONDUITS TO FLOOR ABOVE.

3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUITS

UP INTO TR.

Pain Clinic Check In

Release of Information

Pain Clinic Waiting

Toilet

Chiropractor

Pain Coordinator

GI Clerical

Break Room

GI Storage

Elect. Room

HAC

GI Procedure

GI Med Room

GI Work Room

GI Procedure

GI Wake Up Area/Recovery

Recovery

GI Work Room

Crash Cart

Bronchoscopy Procedure

Clean Utility & Storage

Medivator Room

Soiled Utility

222Decon Area

Clean Linen

Toilet

Exam Room 1

Exam Room 2

Exam Room 3

Exam Room 4

Physician Office

Nursing Office

Linen Chute

GI Clinic Lounge

Tele Clos

235 Storage

PBS Kitchenette

Toilet

Exam Room

Pain Management Storage

Conference Room

Psychologist

Clinical Pharmacist

Physician

Physician Extender

Physician Extender

Conference Room

RN Consult Coordinator

Quality Improvement Facilitator

Physician Extender

Physician Extender

Toilet

Toilet

Break Room

C & P Coordinator

Program Support Assist

Secretary

Storage

MSCL Manager

Administrative Assistant

C & P Program Manager

Office Supplies/Copier

Physician

HAC

Elect. Room

Storage

Physician

Physician

Staff Neurologist

VISN 10 Homeless Coordinator

Corridor

200A

Corridor

200C

Corridor

200B

Corridor

200D

Corridor

200B1

Corridor

200F

Corridor

200E

Corridor

200G

Corridor

200H

Corridor

200B2

Toilet

234A

Toilet

260A Toilet

215A

Stairs

002C

Stair Access

246A

Stairs

002B

Stairs

002A

Stair Access

224A

Storage

221A

Room

(2) 4"C - (1) 24-STRAND OS2 OPTICAL

FIBER AND 25-PAIR COPPER CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:1

P

M

027-TN102

LEVEL 02 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 27

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

ATTIC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:1

P

M

027-TN103

LEVEL 03 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 27

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

Tank Room

Toilet

Canteen Storage

Elevator Machine Room

Canteen Storage

HAC

Toilet

Operations Clerk Canteen Chief

Vesitbule

Chief Canteen

Storage

Canteen Retail Store

HAC

14A

Storage

13A

Storage

13B

Elect. Room

13C

Mechanical

2A

Money Room

9A

Corridor

10A

Storage

13D

Stairs

Stairs

Elevator Lobby

Stairs

B

HAND HOLE

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE AND

(1) 4"C - SPARE

A

HAND HOLE

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES AND

(1) 4"C - SPARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:1

P

M

028-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 28

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

KEY NOTES:

1. PROVIDE PULL BOX MOUNTED ON EXTERIOR WALL AT

HEIGHT ABOVE BASEMENT FINISHED CEILING. ROUTE

COUNDUITS UP ALONG EXTERIOR WALL INTO PULLBOX.

PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE

CONDUITS UP TO FLOOR ABOVE.

2. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE

CONDUITS INTO TANK ROOM TO LOCATION INDICATED.

3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUITS

UP TO FIRST FLOOR.

4. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR

Dining

102Serving Line

Kitchen

Kitchen

Freezer

Pot/Pan Room

Storage

Dining

102A

Food Service Super

102B

Dining

102C

Corridor

103A

Stairs

Elevator Lobby

Stairs

Stairs

Closet

102D

OUTLINE OF MDF #201

AT FLOOR ABOVE 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:1

P

M

028-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 28

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE CONDUIT CHASE AT LOCATIONS INDICATED TO

ROUTE CONDUITS UP TO FLOOR ABOVE.

Tele Clos

Canteen Salon

CRC Office

Social Worker

Social Worker Supervisor

Canteen Storage

Toilet

Social Work Supervisor

Copy/File Room

Waiting

MHICM Case Manager

Toilet

Conference Room

MHICM Case Manager

MHICM Case Manager

MHCIM Case Manager

CRC/MHICM Program Manager

Medical Foster Home Coordinator

Closet

210A

Secretary Social Work Service

210B

Chief, Social Worker Service

210C

CRC/MHICM Program Support Assistant

210D

Closet

201A

Closet

202A

Closet

203A

Closet

204A

Closet

205A

Closet

205B

HAC

207A

Closet

208A

Closet

208B

Closet

209A

Closet

209B Closet

2011A

Closet

2011B

HAC

212A

Closet

214A

Closet

215A

Closet

216A

Closet

217A

Closet

218A

Corridor

Corridor

200A Stairs

Stairs

Elevator Lobby

Stairs

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:1

P

M

028-TN102

LEVEL 02 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 28

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE

HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.

1/8" = 1'-0"

LEVEL 02 PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE CONDUIT CHASE AT LOCATIONS INDICATED TO

ROUTE CONDUITS ABOVE CEILING AND OVER TO TR.

2. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR

TERMINATION OF NEW COPPER BACKBONE CABLE IN MDF

#201. REFER TO "018-TN205" FOR CABLE CONNECTION

PCT Program

4D PCT Program

4E

Corridor

PCT Program

4F

PCT Program

4C

PCT Program

4B

PCT Program

4G PCT Program

4A

Electric Switchgear

Corridor

0B

Corridor

0E

Stair

S7-0

PTSD

VSO Office

1A

VSO Office

1C

Storage

1D

Copy Room

2B

Tele Clos

14A

Mechanical

Elevator Equipment

SCI&D Nurse

13A

Elect. Room

Skin Integrity Ostomy Care Coordinator

13B

PT/Spinal Cord Clinic

PT/Spinal Cord

13C

Dieticians Office

Decedent Affairs

10A

Corridor

0C

Toilet

10F

HAC

10G

Stair

S6-0

Oxygen Storage

9B

PT & Prosthetics Orthotic Clinic

Soiled Linen

8B

Diabetes Education

8C

Patient Ed Class Rm

8D

Patient Ed Storage

8G

Diabetic Educator

8E

Elect. Room

8F

Toilet

8A

Corridor

Morgue Cart Storage

10D Storage

10C

Viewing Affairs

10B

Storage

10E

PCT Waiting

Storage

2A Corridor

0A

Stair

S3-0

Corridor

0D Elevator Equipment

4J

Office

8H Corridor

10H

PT/Spinal Chord

13E

Stair

S2-0

Stair

S4-0

Mechanical

Canteen Vending

0F

PT/Spinal Cord Clinic

Storage

0G

HAND HOLE HAND HOLE

A B

1 1

(2) 4"C - (3) 24-STRAND OS2 OPTICAL

FIBER AND (3) 25-PAIR COPPER

CABLES AND (1) 4"C - SPARE

(1) 4"C - (3) 24-STRAND OS2 OPTICAL

FIBER CABLES AND (1) 4"C - SPARE

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

OUTLINE OF TR #127

AT FLOOR ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:4

P

M

030-TN100

BASEMENT PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 30

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH

TR.

1/8" = 1'-0"

BASEMENT PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE

CONDUITS THRU CRAWL SPACE.

2. PROVIDE PENETRATION THRU INTERIOR WALL AND ROUTE

CONDUITS ABOVE CEILING AS INDICATED.

3. ROUTE CONDUITS UP TO CEILING AND PROVIDE PULLBOX

TO EXTEND CONDUITS UP TO FLOOR ABOVE.

4. PROVIDE PENETRATION THRU CEILING TO ROUTE

CONDUITS UP INTO TR.

5. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"

FOR TERMNATION OF NEW COPPER BACKBONE CABLES IN

MDF #8E. REFER TO "018-TN205" FOR CABLE CONNECTION

REQUIREMENTS.

6. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR

Patient Room 1

Patient Room 2

Patient Room 3

Patient Room 4

Patient Room 5

Patient Room 6

Med. Room

112C Toilet

104A

MOD

Cardio-Pulminary Supervisor

Office

Social Worker

Corridor

Physician

Corridor

100A Waiting

Storage

Med Room

157B

Toilet

157A

Reception

Minor OR

Sleep Lab

Toilet

155A Storage

155B

Exam Room

Toilet

Chief Surgery

Exam Room

Exam Room

Exam Room

Toilet

149A

Clean Supplies

Minor OR Stor

156A

Cystoscopy Procedure

OR Nurse

144A

OR Nurse

Corridor

144B

Kitchenette

HAC

Sterile Supply

Exam/Treatment

Exam/ Treatment

Exam/ Treatment

Exam Room

Toilet

Exam Room

Soiled Utility

Tele Surgery

Procedure Room

Laundry Chute

Break Room

Storage

Lab

Lab

Storage

128A

Tele Clos

Family Waiting Room

Toilet

Corridor

100C

Storage

Nurse Mgr

122HAC

HAC

120A

Patient Room 7

Patient Room 8

Patient Room 9

Toilet

Clean Utility

Clean Supplies

Soiled Utility

Patient Room 10

Clean Supplies

112A

Kitchen

112B

Lockers

112E

Toilet

112F

Kitchen/Break Room

112D

Corridor

100E

Storage

Corridor

Corridor

Stair

S6-1

Tele Clos

Respiratory Therapy Pulminary Function

Stair

S7-1

Stair

S5-1

Stair

S2-1

Stair

S3-1

Stair

S4-1

Stair

S1-1

Closet

100B

Corridor

101C

Storage

112G

Room

8K

Room

8M

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

OUTLINE OF TR #226

AT FLOOR ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:4

P

M

030-TN101

LEVEL 01 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 30

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH

TR.

KEY NOTES:

1. ROUTE CONDUITS UP TO CEILING AND PROVIDE PULLBOX

TO EXTEND CONDUITS UP TO FLOOR ABOVE.

2. PROVIDE PENETRATION THRU CEILING TO ROUTE

CONDUITS UP INTO TR.

Office

Education/Training

Toilet

209A

Provider Offices

Sterile Supplies

207 Toilet

208A

Corridor

2C4

Toilet

205A

Clean Linen

Day Room

Storage

211 Bed Room

Stair

S7-2

Sleep Lab Control Room

213A

Elect. Room

212A

Corridor

2C3

Corridor

2C2

Bed Room

Toilet

221A

Soiled Utility

Toilet

Toilet

202A

Bed Room

Bed Room

Toilet

201A

MIT Work Room

Corridor

2C1

Medical Clerks

Sleep Lab

Sleep Lab

Toilet

219A Toilet

214A

Toilet

216A

Toilet

217A

Sleep Lab

Sleep Lab

Storage

Storage

Bedroom

Corridor

2C7

Bedroom

Toilet

228A

Bedroom

Corridor

2C6

Nourishment

Storage

Corridor

2C5

Med. Room

232A

Laundry Chute

Nurse Station

Clean Utility

Corridor

2C8

Bed Room

Toilet

250A

Bed Room

Stair

S6-2

Soiled Utility

Isolation

Toilet

235A

Toilet

237A

Bed Room

Corridor

2C9

Isolation

Toilet

239A

Toilet

238A

Isolation

Storage

Tub Room

Elect. Room

242A

HAC

Shower Room

241A

Employee Lounge

Bed Room

Toilet

249A

Corridor

2C10

SPD Supplies

Clean Linen

Toilet

246A

Bedroom

Toilet

245A

Bed Room

Wheel Chair Storage

Storage

213B

HAC

212 Elect. Room

Tele Clos

223A

Toilet

227A

Toilet

230A

Omni Cell

Toilet

Storage

Stair

S5-2

Stair

S1-2

Stair

S2-2 Stair

S3-2

Stair

S4-2

(2) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER AND 25-PAIR

COPPER CABLES

(1) 4"C - (1) 24-STRAND OS2

OPTICAL FIBER CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:4

P

M

030-TN102

LEVEL 02 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 30

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH

TR.

1/8" = 1'-0"

Attic

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:1

:4

P

M

030-TN103

LEVEL 03 PLAN - TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 30

VA STATION NO:

Approved: Client Name

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/8" = 1'-0"

DNDN

Medical Records

B-303

Elect. Room

B-301

Stair

B-304

Mechanical Room

B-303A

Storage

B-302

Entry

B-303C

Storage

B-303B

Audio-Control

B-113

Audio-Exam

B-112

Audio-Control

B-111

Audio-Exam

B-110

Mech Room

B-109

Corridor

SB-017

Corridor

SB-013

Corridor

SB-018

Reception

B-101

Elevator Equipment

Room

B-101A

Storage

B-103

Hearing Aid

B-105

Toilet/ Shower

B-107

Group Therapy

B-108

Electron-Stagmography

B-106

Electro-Physilogy

B-104

Chief, Audiology

B-102

Speech Pathology

B-116

Postiography

B-114

Therapy/ Audio

B-115

Entry

B0100

Stair

B101

Audiology Waiting

SB001

Corridor

SB019

Entry

B-300

Stair

B-S01

OUTLINE OF TR #G-202

AT FLOOR ABOVE

OUTLINE OF TR #G-182

AT FLOOR ABOVE

OUTLINE OF TR #G-345G

AT FLOOR ABOVE

OUTLINE OF TR #G-500D

AT FLOOR ABOVE

A

B

HAND HOLE

HAND HOLE

(2) 4"C - (7) 24-STRAND OS2 OPTICAL

FIBER AND (7) 25-PAIR COPPER

CABLES AND (1) 4"C - SPARE

(1) 4"C - (7) 24-STRAND OS2 OPTICAL

FIBER CABLES AND (1) 4"C - SPARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:2

:0

P

M

031-TN100

OVERALL BASEMENT FLOOR PLAN

- TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 31

VA STATION NO:

Approved: Veteran's Affairs Medical Center

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

1/16" = 1'-0"

OVERALL BASEMENT FLOOR PLAN - TECHNOLOGY

KEY NOTES:

1. PROVIDE PENETRATIONS THRU EXTERIOR WALL AND

ROUTE CONDUITS IN CRAWL SPACE TO BELOW TRs AT

FLOOR ABOVE.

2. PROVIDE PENETRATIONS THRU WALLS OF CRAWL SPACE.

3. PROVIDE PULLBOX AND PEETRATION THRU CEILING TO

ROUTE CONDUITS UP INTO TR.

4. ROUTE CONDUITS INTO CONDUIT CHASE AND EXTEND TO

FLOOR ABOVE.

ROUTE TO TELECOM ROOM (MDF).

UP

MRI

Scanning

Room Zone

IV

G-347G

Control Room

G-347H

Equipment Room

G-347F

Interview

G-347-A Office

G-347-B

Corridor Zone III

G-347K

Corridor Zone II

G-347

Public Restroom

G-343E

Staff Restroom

G-343F

Clean Linen

G-343C

Patient Toilet

G-347E

Reception

G-344

Office

G-324

Office

G-323

Office

G-322

Tech.

Room

G-322A

Corridor

Toilet Room

G-321B

Waiting

G-310

Staff Breakroom

Lockers

G-326

Office

G-327

Existing Radiograph Flouroscopic

Room

G-321

Clean Supply

G-319A

Light/ Dark Room

G-319 Existing

Radiograph Flouroscopic

Room

G-317

Control

G-315

Lockers

G-313

Toilet

G-314

Chest X-Ray

G-311

Stair #8

S-08

Existing Ultrasound

G-320

Ultrasound 2

G-318

Copier Storage

G-312

Elec. Clos.

G-328

Office

G-330

Stair #3

S-03

Toilet

G-310C

Corridor

Dressing

G-313A

Vestibule

Clean Linen

G-352

Toilet

G-345D

Dressing

G-345C CT Scan Room

G-345F

HAC

G-345A

CT Power Equipment

G-345G

Corridor

Wheelchair Storage

G-343D

Cardiac Stress Testing

G-350B

Corridor

Hot Lab

G-348B

Nuclear Tech Office

G-348E

Cardiac Stress Testing

G-350A

Patient Toilet

G-348F

Nuclear Med Scanning

Room

G-348D

Vestibule

Thyroid Uptake Patient Dosing

G-348A

Dressing

G-349

Main Elec.

Room

G-345B

Exam

G-118

ER-Life Support

G-116

ER-Life Support

G-115

Exam

G-119

Nurse Perches

G-101E

Equipment

G-114 Isolation Room

G-113

Toilet

G-112

Toilet

G-113A

Exam

G-110

Com. Closet

G-111 Ambulance Vestibule

G-114B

Storage

G-109

Staff Toilet

G-107

Soiled Utility

G-108

Break Room

G-104

Clean Utility Room

G-102

Clean Supply

G-103

Office

G-101J

Exam

G-121

Waiting

G-101

Toilet

G-101G

Engr.

G-101A

Exam

G-117

Exam

G-120

Storage

G-105

Work Room

G-101D

Triage

G-101C

Meds

G-114A

Nuclear Med Scanning

Room

G-348C

Sub-Waiting

G-348G

Waiting

G-343B

Corridor

Waiting

G-343A

Stretcher/ Holding

G-347J

Dress.

G-347-D

Dress.

G-347-C

Control

G-345E

Office

G-325

Corridor

Corridor

116 Exam Room

G-316

G-329

Corridor

Reception

G-310A

Stair #2

S-02

Corridor

BC009

MH Med Room

G-300A

Mental Hygiene

Waiting & Group

G-300

Corridor

BC000Clinic Nurse

G-309

Clinic Nurse

G-308

Physician

G-307 Toilet

G-306

Physician

G-305

Phsician

G-304

Nurse Assist

G-303

Nurse Assist

G-302

MH

Receptionist

G-301

MH Break Room

G-301A

HAC

G317

Psychologist

G-216

Corridor

BC013Tele Clos

G-217A

Elec. Clos.

G-217B

Mech Equipment

Room

G-215

Physician

G-211A

Psychologist

G-214

Psychology Intern

G-211B

Flu Clinic

G-212

MH Clinic

G-209

MH Clinic

G-208

MH Clinic

G-207

MH Exam

G-210

MH Storage

G-205

MH Clinic

G-206

Social Worker

G-204

Nuclear/ Stress Waiting

G-211

Psychology Intern

G-211C

Nuclear Med Office

G-211D Nuclear Medicine

G-213 Isotope Stor

G-213A

Stair #4

S-04

Corridor

BC010

Female Toilet

G-203

Tele Clos

G-202

MH

Conference

Room

G-200

Male Toilet

G-201

Stair #5

S-05

Building Security

G-141A

Closet

G-141B Elec Clos

G-147 Patient

Advocate

G-145

POD Suite Living/

Bedroom

G-144B

POD Suite Kitchen

G-144POD Toilet/ Shower

G-144A

Corridor

BC008

Patient Advocate

G-143

HAC

G-142

Building Security

G-141

Male Locker

G-140

Female Shower

G-139A

Male Toilet

G-139B

Female Locker

G-139

MCCR

G-138

Corridor

BC007

Patient Funds/ Travel

G-137

Agent Cashier

G-136

Corridor

BC006

Nurse Manager

G-135

Eligibility

G-133

Equipment Storage

G-134

Elec Clos

G-122

Tele Clos

G-132

Corridor

BC005

Eligibility

G-131

Corridor

BC003

Physician

G-130

Means Testing

G-123

Physician Assistant

G-129

RN

G-128

Pain Clinic

G-126

Equipment Storage

G-127

Patient Education

G-125

Stair #6

S-06

Ice

G-106

Stair #3

G-340

G-332

Program Clerk

G-331

TR #G500

TR #G182

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

OUTLINE OF TR #1-210

AT FLOOR ABOVE

OUTLINE OF TR #1-210

AT FLOOR ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:2

:0

P

M

031-TN101

OVERALL GROUND FLOOR PLAN -

TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 31

VA STATION NO:

Approved: Veteran's Affairs Medical Center

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM

EACH TR.

1/16" = 1'-0"

OVERALL GROUND FLOOR PLAN - TECHNOLOGY

KEY NOTES:

1. ROUTE CONDUITS UP AND PROVIDE PULLBOX TO EXTEND

CONDUITS TO LOCATION OF NEW TRs.

2. PROVIDE PENETRATION T HRU CEILING TO ROUTE

CONDUITS UP INTO TR.

3. PROVIDE PENETRATION THRU CHASE WALL TO ROUTE

CONDUITS UP THRU FLOOR OF TR.

4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT

PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"

FOR NEW COPPER BACKBONE CABLES. REFER TO "018-

TN205" FOR CABLE CONNECTION REQUIREMENTS.

Exam Room

1-111

Toilet

1-103

Stair #3

S-103

Microbiology Lab

1-318

Vista Imaging Storage

1-317 Elec. Clos.

1-316

Media Prep

1-315

Storage

1-313

Corridor

1C8

Corridor

1C6 Glassware Washer

1-314

Male Toilet

1-312 Female Toilet

1-310

Glassware Washroom

1-311

Elec Closet

1-309A

Blood Bank

1-309

Chemistry

1-301A

Main Laboratory

1-301 Corridor

1C5

Storage

1-300

Lab Chief

1-305

Hematology

1-307 Lab Safety

Officer

1-308

Lab Manager

1-306

Corridor

1C7

Conf/ Training

1-302

Stair #2

S-102

Lab Secretary

1-212

HAC

1-213 Tele Clos

1-215

Elec Clos

1-214

Elev Equip

1-216

Corridor

1C2

Am Vets

1-217

Female Toilet

1-218 Corridor

1C4

Corridor

1C3

HAC

1-219 Male Toilet

1-220

Stair #4

S-104

Blood Draw

1-211

Tele Clos

1-210

Vacant

1-209

Storage

1-211A

Corridor

1C1

Clinical Pharmacists

1-207

Procedure Room

1-206

Medical Clerk

1-204

Pharmacist

1-205

Corridor

GG132

Clinic Nurse

1-203

Exam Room

1-202

Exam Room

1-201

Stair #5

S-105

Exam Room

1-200

Exam Room

1-157

Corridor

GG133

Social Worker

1-159

Dietician

1-161

Dietician

1-163

Social Worker

1-165

Social Worker

1-164

Social Worker

1-162

Social Worker

1-160

Pharmacist

1-158

Exam Room

1-156

Corridor

GG113

Storage

1-154A

Conference/ Class Room

1-154

Break Room

1-150

Exam Room

1-148

Soiled Utility

1-146Exam Room

1-149

Tele Clos

1-147

Exam Room

1-144

Office

1-145

Corridor

GG107

Corridor

GG108

Elec. Clos

1-143

Toilet

1-141-A

Exam Room

1-141

Clinic Nurse

1-142

Clinic Nurse

1-139

Exam

1-137

Exam

1-140

Exam Room

1-138

Conference Room

1-119

Stair #6

S-106

Exam Room

1-123

Corridor

G112

Toilet

1-118

Exam Room

1-124

Nurse

1-125

Exam Room

1-117

Exam Room

1-116

Office

1-114

Exam Room

1-113

Exam Room

1-112

Elect. Room

1-102

Vending

1-105

Toilet

1-106 Triage Room

1-131

Triage Room

1-132

Office

1-133

Exam Room

1-134

Toilet

1-135

Nurse Supplies

1-136

Procedures

1-130

Oxygen Storage

1-128

Toilet

1-138A

Toilet

1-127

HAC

1-126

Soiled Utility

1-110A

Storage

1-129

Clean Utility

1-110C

Tele Clos

1-110B

Corridor

G136

Reception

G137

Corridor

G131

Nurse Station

1-110

Nurse Station

1-110F

Elevator Lobby

1-100

Stair #7

S-107

Mechanical

Covered Porch

S1

1-306A

1C4A

Corridor

GG114

Entry

1C1A

Stair S-3

TR #F-204

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

(2) 4"C - (1) 24 OS2 OPTICAL

FIBER AND 25-PAIR COPPER

CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

OUTLINE OF TR #2-207A

AT FLOOR ABOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:2

:0

P

M

031-TN102

OVERALL FIRST FLOOR PLAN -

TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 31

VA STATION NO:

Approved: Veteran's Affairs Medical Center

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE FOUR ENDPOINTS.

2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF

THE HORIZONTAL CABLE DISTANCE LIMITATION FROM

EACH TR.

1/16" = 1'-0"

LEVEL 01 PLAN - TECHNOLOGY

KEY NOTES:

1. ROUTE CONDUITS UP AND PROVIDE PULLBOX TO EXTEND

CONDUITS TO LOCATION OF NEW TRs.

2. PROVIDE PENETRATION T HRU CEILING TO ROUTE

TR #2-207A

(2) 4"C - (1) 24 OS2

OPTICAL FIBER

AND 25-PAIR

COPPER CABLES

(1) 4"C - (1) 24-STRAND

OS2 OPTICAL FIBER

CABLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/T

.0

V A

-C h ill ic o th e B

C

.r v t

/1

/2

:2

:1

P

M

031-TN103

OVERALL SECOND FLOOR PLAN -

TECHNOLOGY

04/14/2023 ACA ECW

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

95% CONSTRUCTION

DOCUMENTS 31

VA STATION NO:

Approved: Veteran's Affairs Medical Center

1/16" = 1'-0"

LEVEL 02 PLAN - TECHNOLOGY

No. Revisions: Date:

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

GENERAL NOTES:

1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER

LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS

FROM CENTER OF TELECOM ROOM (TR) WITH LINES

CONNECTING THE…

This is the start of the file's text. The full file is on GovTribe.