Attachment 19 - SOW attach Volume 3 Part 4.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
- Solicitation number
- 36C77623B0058
About this file
This document is an attachment to a federal solicitation for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking offers to perform EHRM Infrastructure Upgrades Construction at the Chillicothe, OH VA Medical Center. Offerors must propose to provide all labor, materials, equipment, and supervision required to upgrade existing infrastructure systems that support the electronic health records management system. The period of performance is 720 calendar days from notice to proceed. Proposals are due by 2:00 PM Eastern on July 21, 2021 and the government intends to make award by September 30, 2021. The anticipated award value is between $5-10 million.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nourishment Kitchen
GB120
Elec Clos
GB116B
Cook/Chill
GB116
Dietician / Food Service Supervisor
GB118
Mechanical
GB108
Toilet
GB116A
Break Room
GB106Soiled Linen
GB104
Elec Switchgear
GB102
HAC
GB109
Prosthetics & Sensory Aids
Service
GB111
Corridor
GBC1
Prosthetics Check In
GB111A
Break Room
GB111B
Chief of Prosthetics
GB113
Stairs
GBS1
Storage
GB107
EMS Office
GB105
Housekeeping Supervisor
GB105A
Linen Storage
GB103A
Tele Clos
GB103
Vending Room
GB101
Mechanical
GB101A
HAC
GB121
Rec Stor
GA101
Mechanical
GA100
Mechanical
GA102
Stairs
GSD1
Mechanical
GA103
Toilet
GA104
Toilet
GA105
Cart Wash
GC106A
Toilet
GC105
Corridor
GCC1
SPS
Decontamination
GC106
Mechanical
GC106B
SPD
Sterilization
GC108A
Sterilization Room
GC108
Stairs
GCS1
SPD Storage
GC109B
Assistant Chief SPS
GC110
SPS Chief
GC111
Mechanical
GC112
Storage
GC113
GC113B
GC113A
Elev Lobby
GAC1
Elect. Room
GC115
Elect. Room
GC114
Elect. Room
GB117
SPD
Distribution
GC109
GC109A
HAC
GB109A
Emergency Generator
GA100A
OTLINE OF TR #123
AT FLOOR ABOVE
B
(1) 4"C - (3) 24-STRAND OS2
OPTICAL FIBER CABLE AND
(1) 4"C - SPARE
HAND HOLE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
(2) 4"C - (1) 24-STRAND OS2 OPTICAL
FIBER AND 25-PAIR COPPER CABLE
A
(2) 4"C - (3) 24-STRAND OS2
OPTICAL FIBER AND (3) 25-
PAIR COPPER CABLES AND
(1) 4"C - SPARE
HAND HOLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:5
:4
P
M
024-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 24
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM
EACH TR.
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE
CONDUITS ABOVE BASEMENT CEILING OVER TO TR.
2. PROVIDE PULLBOX ABOVE CEILING TO ROUTE CONDUITS
AS INDICATED.
3. PROVIDE PENETRATION THRU CEILING AND ROUTE
CONDUIT INTO TR.
4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"
FOR TERMINATION OF NEW COPPER BACKBONE CABLES IN
#GB103. REFER TO "018-TN205" FOR CABLE CONNECTION
REQUIREMENTS.
5. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR
ROUTING THRU BUILDING TO TELECOM ROOM (MDF).
DN
Toilet
112A
Bed Room
112B
Bed Room
112C
Entry
Toilet
113A
Bed Room
113B
Bed Room
113C
Entry
Corridor
1C4
Bed Room
114A
Bed Room
114B
Entry
Toilet
114C
Bed Room
Toilet
115A
HAC
116MHRRTP
Screener
Psychologist
Library
Bed Room
108C
Toilet
108B
Elect. Room
Bed Room
106A
Entry
Bed Room
107C Bed Room
107A
Toilet
107B
Stairs
1BS1
Dietician
Interview Room
Staff Work Room
Med. Room
101A
Storage
120A
Linen Chute
Laundry Room
Toilet
122A
Toilet
Nurse Manager
Corridor
Visitor Room
Clean Supply
Crash Cart
Storage
Supplies
Toilet
Social Science Techs
Corridor
1C5
Tele Clos
Conference Room
124A
Entry
Lockers
124C
Toilet
124D
Stairs
1AS1
Staff Lounge
124B
Kitchen
Associate Chief Nurse
MHCL
Therapy Tub / Storage
Toilet
128A
Toilet
129A
Bed Room
Bed Room
130B
Bed Room
130C
Entry
Toilet
130A
Bed Room
131A
Bed Room
131B
Entry
Toilet
131C
Entry
Bed Room
132A
Bed Room
132B
Toilet
132C
Corridor
1C7
SUD/HCHV
Outreach
Social Worker
HAC
Stairs
1CS1
Elect. Room
Bed Room
137A Bed Room
139C
Toilet
139B
Toilet
137B
Entry
Bed Room
138C
Bed Room
138A
Toilet
138B
Entry
Entry
Bed Room
108A
Bed Room
106C
Entry
Bed Room
137C
Bed Room
139A
Entry
Nurse Station
Day Room
Corridor
1C3 Corridor
1C2
Corridor
1C1
Corridor
1C6
Day Rm
Corridor
1C8
Toilet
106B
Tele Clos
124E
Tele Clos
(2) 4"C - (1) 24-STRAND OS2 OPTICAL FIBER
AND 25-PAIR COPPER CABLE
OUTLINE OF TR #222
AT FLOOR ABOVE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:5
:4
P
M
024-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 24
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH
TR.
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
KEYL NOTES:
1. PROVIDE PENETRATION THRU CEILING AND CONDUIT
CHASE ON WALL TO EXTEND CONDUITS UP THRU CEILING
TO FLOOR ABOOVE.
2. PROVIDE PUULBOX AT CEILING TO EXTEND CONDUITS UP
TO FLOOR ABOVE. PROVIDE PENETRATION THRU CEILING
TO ROUTE CONDUITS INTO TR.
Toilet
213A
Bed Room
213B
Bed Room
213C
Entry
213Toilet
214A
Entry
Bed Room
214B
Bed Room
214C
Corridor
2C3
Bed Room
215A
Bed Room
215B
Entry
Toilet
215C
Bed Room
Toilet
216A
Physician Assist/Exam
Laundry Room
Soiled Linen
219A
Linen Chute
Crash Carts
Storage
221A
EXAM
ROOM
Tele Clos
Day Rm/Training
Corridor
2C4
Toilet
Stairs
2S1
Addiction Therapist
Visitor Room
Ice/Water
Kitchenette
Storage
Clean Linen
Toilet
Aftercare Coordinator
Psychology Technician
243Stairs
2S2
Addiction Therapist
Addiction Therapist
Bed Room
Bed Room
239C
Entry
Bed Room
239A
Toilet
239B
Corridor
2C7
Bed Room
238C
Toilet
238B
Elect. Room
HAC
Toilet
232A
Clinical Social Worker
Clinical Social Worker
Clinical Psychologist
Office
Physician
Interview Room
Bed Room
Toilet
233A
Entry
Bed Room
233C
Bed Room
234A
Entry
Bed Room
234B
Bed Room
233B
Toilet
234CEntry
Toilet
235C
Bed Room
235B
Bed Room
235A
Equipment
Med. Room
201A
EXAM
ROOM
Social Worker
Detox Coordinator
Stairs
2S3
Bed Room
206A
Toilet
206B
Bed Room
207A
Toilet
207B
Entry
Bed Room
207C
Bed Room
208A
Toilet
208B
Elect. Room
Library
211HAC
Entry
Bed Room
238A
Entry
Bed Room
206C
Entry
Bed Room
208C
Corridor
2C2Corridor
2C1
Nurse Station
Corridor
2C6
Corridor
2C5 Day Rm
Toilet
217A
Day Room
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
(2) 4"C - (1) 24-STRAND OS2 OPTICAL
FIBER AND 25-PAIR COPPER CABLES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:5
:4
P
M
024-TN102
LEVEL 02 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 24
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM
EACH TR.
1/8" = 1'-0"
LEVEL 02 PLAN - TECHNOLOGY
Storage
Stair
3S1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:5
:5
P
M
024-TN103
LEVEL 03 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 24
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
LEVEL 03 PLAN - TECHNOLOGY
Mechanical Room/Pipe
Mechanical
Elect. Room
1A
OUTLINE OF MDF #102
AT FLOOR ABOVE
HAND HOLE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES AND (1)
4"C - SPARE
B
A
HAND HOLE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE AND (1)
4"C - SPARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:5
P
M
025-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 25
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENTRATION THRU EXTERIOR WALL AND ROUTE
CONDUITS IN CRAWL SPACE OVER TO LOCATION BELOW TR.
2. PROVIDE PENTRATION THRU CEILING DECK TO ROUTE
CONDUITS UP TO FIRST FLOOR.
VOC
Assembly
101A
VOC Recycle
Office
VOC Office
104A
VOC Office
Toilet
Shower
Shower
Toilet
Linen Distribution
Toilet
102B
Linen Distribution
102CLaundry Manager
Elect. Room
101B
MDF #102A
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:5
P
M
025-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 25
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR
TERMINATION OF NEW COPPER BACKBONE CABLE. IN MDF
#102A. REFER TO "018-TN205" FOR CABLE CONNECTION
REQUIREMENTS.
Offices
4C
Offices
4B
Recreation Clinic
Stair
S1-0
Toilet
4A
Elect. Room
Corridor
32A
Storage
HAC
Linen
Stair
S2-0 Linen Storage
Office
Office
CIO
Elevator Equipment
Mechanical
Equipment
9A
Tele Clos
27A
Electric Switch Gear
Office
Corridor
XXX
Mech.
Office
Office
25A
Toilet
Electrical
EMS
23A
Office
Office
Toilet
28Toilet
HAC
Office
18A
Office
18B
Office
18C
Office
18D
Office
18E
Office
18F
Office
18G
Office
18H
Office
18I
Stair
S3-0
Stair
S4-0
Stair
S5-0
EMS EQUIPMENT
24A
Chapel
Storage
2A
Corridor
Corridor
Office
4D
200L
Room
200M
ROUTE CONDUITS IN CRAWL SPACE
UNDER BUILDING ADDITION
(2) 4"C - (3) 24-STRAND OS2 OPTICAL FIBER
AND (3) 25-PAIR COPPER CABLES AND (1)
4"C - SPARE
HAND HOLE
A B
HAND HOLE
(1) 4"C - (3) 24-STRAND OS2 OPTICAL FIBER
CABLE AND (1) 4"C - SPARE
2 3
ROUTE CONDUITS IN CRAWL SPACE
UNDER BUILDING ADDITION
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE AND
25-PAIR COPPER CABLE
HAND HOLE
A
HAND HOLE
B
OUTLINE OF TR #200
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:3
P
M
026-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFASTRUCTURE UPGRADES 538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 26
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER LINE
DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS FROM CENTER
OF TELECOM ROOM (TR) WITH LINES CONNECTING THE FOUR
ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENETRATION THRU INTERIOR WALL OF CRAWL SPACE
AND STUB CONDUIT UP INTO TR.
2. PROVIDE CONDUIT CHASE AND PENETRATION THRU INTERIOR WALL
OF CRAWL SPACE TO ROUTE CONDUITS UP ABOVE CEILING AND
OVER TO TR.
3. PROVIDE PULLBOX ABOVE CEILING AND ROUTE CONDUITS TO
LOCATIONS INDICATED. PROVIDE PENETRATION THRU CEILING AND
ROUTE CONDUITS TO FLOOR ABOVE.
4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT PROTECTION
"SC-SPR-1" AND "PATCH PANEL "SC-MPP-1" FOR TERMINATION OF
NEW COPPER BACKBONE CABLES IN MDF #27. REFER TO "018-TN205"
FOR CABLE CONNECTION REQUIREMENTS.
5. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR ROUTE
THRU BUILDING TO TELECOM ROOM (MDF).
Staff Lounge / Lockers
Conference
Storage
Toilet
Elec.
Intake Room
Data
Shared Workroom
Vestibule
Vistor Room
Shared Workroom
Exam
Waiting
HAC
Linen Vest.
Linen Chute
130A
Storage
133A
Bed Room
Bath
125A
Bed Room
Bed Room
127A
Bath
124A
Bath
122A
Bed Room
Bath
121A
Storage
120A
Med Room
Treatment Team Room
Tub Room
Elec.
Toilet
Consult Room
Consult Room
Nurse Station
Isolation Room
Bath
114A
Bed Room
Isolation Ante Room
Bed Room
Bath
109A
Bath
111A Bed Room
Bed Room
Bed Room
Day Room
Bath
108A
Bath
107A
Bath
170A
Bed Room
Bed Room
Bath
167A
Bath
168A
Bed Room
Quiet Room
Toilet
Toilet
Toilet
Med Room
100A
Storage
Bed Room
Bath
164A
Elec.
Patient Laundry
Treatment Team Room
Storage
158A
Med Room
Nurse Station
Bath
157A
Bed Room
Bed Room
Bath
156A
Stair
S3-1Bed Room
Bed Room
Stair
S5-1
Stair
S2-1
Bath
147A
Bath
148A
Bath
152A
Bed Room
Bed Room
Bath
154A
Bed Room
Bath
151A
Bath
153A
Soiled Linen
C109A
Nurse Station
Day Room
Recreation
Dining
Soiled Linen
C105A
Bed Room
Bath
126A
Bath
138A
Vistor Room
Nurse Manager
Bed Room
Bath
169A
Courtyard
Corridor
C105
Corridor
C104
Corridor
C103
Corridor
C102
Corridor
C101
Corridor
C112
Corridor
C100
Corridor
C111
Corridor
C110
Corridor
Corridor
C109
Corridor
C107
Storage
Storage
C110A
Med Gas
Storage
C103A
Corridor
HAC
Group Room
Toilet
105A
Nurse Work
Toilet
Closet
Stair
S1-1
Stair
S4-1
Storage
C103B
Storage
C110B
Alcove
C102B
Alcove
C102A
Alcove
C111B
Alcove
C111A
Storage
Closet
Servery
Closet
102A
Courtyard
Group Room
EX
EX
EX
EX
EX
EX
EX
LC
S1
S3
S2
49 SF
Storage
120A
27 SF
Storage
133A
55 SF
Storage
150 SF
Storage
72 SF
Storage
80 SF
Storage
49 SF
Storage
158A
9 SF
Storage
C110B
13 SF
Storage
C110A
9 SF
Storage
C103B
13 SF
Storage
C103A
OUTLINE OF TR #200A
AT FLOOR ABOVE
TR #133
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER CABLE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE AND
25-PAIR COPPER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:4
P
M
026-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFASTRUCTURE UPGRADES 538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 26
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER LINE
DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS FROM CENTER
OF TELECOM ROOM (TR) WITH LINES CONNECTING THE FOUR
ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
KEY NOTES:
1. PROVIDE PULLBOX ABOVE CEILING AND ROUTE CONDUITS TO
LOCATIONS INDICATED. PROVIDE PENETRATION THRU CEILING AND
ROUTE CONDUITS TO FLOOR ABOVE.
Break Room
Nurse Station
Nourishment Kitchen
Exam
MIT
Bed Room
Elec.
HAC
Storage
Bed Room
Bed Room
Bed Room
Bed Room
Linen Storage
CongregateToilet
Soiled Utility
Congregate Bath
Bed Room
Stor
Bed Room
Bed Room
Bed Room
Storage
Stair
S2-2
Linen Chute
Quiet Room
Toilet
226 Physician
Sterile Supplies
EMS Storage
Tele Clos
Day Room
Break Room
Nurse Manager
Bed Room
Stair
S3-2
Shower
Bed Room
Bed Room
Bed Room
Storage
Conference Room
Congregate Bath
Soiled Utility
Congregate Toilet
Bed Room
Linen Room
Bed Room
Bed Room
Bed Room
Storage
HAC
Elect. Room
Bed Room
Storage
Bed Room
Bed Room
Toilet
Toilet
256A
Toilet
211A
Toilet
210A
Toilet
209A
Toilet
205A
Congregate Shower
216A
Toilet
217A
Toilet
220A
Toilet
225A
Toilet
227A
Stair
S5-2
Stair
S4-2
Stair
S1-2
Med Prep
201A
Toilet
231A
Toilet
238A
Toilet
239A
Congregate Shower
242A
Toilet
248A
Toilet
249A
Toilet
253A
Toilet
255A
Toilet
245A
Corridor
200J
Corridor
200I
Corridor
200E
Corridor
200A
Corridor
200B
Corridor
200D
Corridor
200K
Corridor
200F
Corridor
200C
Data
Elect. Room
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
TR #200A
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:4
P
M
026-TN102
LEVEL 02 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFASTRUCTURE UPGRADES 538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 26
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:0
:4
P
M
026-TN103
LEVEL 03 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFASTRUCTURE UPGRADES 538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 26
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
Mechanical
Toilet
Toilet
Mechanical
Chaplin Service
Soiled Linen
13 Tele Clos
Elevator Equipment
Optometry Waiting
Corridor
Tele Clos
HAC
Mechanical
Waiting
Employee Lounge
Biomedical Engineer
Elect. Room
Mechanical
HAC
30A
Toilet
Elec Switchgear
Elevator Equipment
34Patient Waiting
5A
Private Waiting
5B
Toilet
5Ca GYN/Triage Room
5C
Clean Storage
5F
Toilet
5D
Soiled Utility
5E
Corridor
Procedure
5G
Conference Room
5H
HAC
5I
Provider
5J
Provider
5K
Exam Room
5L
Exam Room
5M
Exam Room
5N
Corridor
Med. Room
5P
Corridor
1B
Corridor
1A
Corridor
1C Vending Area
1D
Physician Assistant
11A
Chaplain
11B Physician Assistant
11D
Storage
11C
Storage
17G
Infection Control
17F
MDRO prevention Coordinator
17E
Infection Control Nurse
17D
EMS Supervisor
17B
RME Coordinator
17A
MAS Secretary
17C
Reception
22A
Clean Supply
22B
EKG/Holter
22C
EKG/Holter
22D
Reading
22E
Pt Ed/Storage
22F
Servers
22G
Editing
22H
EEG
22I
Soiled Utility
22J
ECHO
22K
Toilet
32B
Linen Chute
13A
Recept./Nursing
5O
Corridor
1E
Optometry
16A
16B
Stairs
000B
Stairs
000A
Closet
5Q Stairs
000C
Corridor
1F
Closet
16C
Room
Room
BA
OUTLINE OF TR #167 AT FLOOR ABOVE
(2) 4"C - (1) 24-STRAND OS2 OPTICAL
FIBER AND 25-PAIR COPPER CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER CABLE
HAND HOLE
HAND HOLE
(2) 4"C - (3) 24-STRAND OS2 OPTICAL
FIBER AND (3) 25-PAIR COPPER CABLES
AND (1) 4"C -SPARE
(1) 4"C - (3) 24-STRAND OS2 OPTICAL
FIBER CABLE AND (1) 4"C - SPARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:0
P
M
027-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 27
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PULLBOX ON EXTERIOR WALL AT HEIGHT ABOVE
BASEMENT FINISHED CEILING. ROUTE CONDUITS ALONG
EXTERIOR WALL INTO PULLBOX. PROVIDE PENETRATION
THRU WALL AND ROUTE ABOVE CEILING INTO TR.
2. PROVIDE PULLBOX AND PENTRATION AT CEILING TO EXTEND
CONDUITS TO FLOOR ABOVE.
3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUTS
UP INTO TR.
4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR
TERMINATION OF NEW COPPER BACKBONE CABLES IN MDF
#14. REFER TO "018-TN205" FOR CABLE CONNECTION
REQUIREMENTS.
ROUTE THRU BUILDING TO TELECOM ROOM (MDF).
Waiting
Visitor
Optometry Exam
Optometry Exam
Optometry Exam Room
Toilet
Elect. Room
HAC
Optometry Exam
Optometry Exam
Optometry Staff Office
Toilet
Opt Staff Office
Opt Staff Office
Resident/Student Office
Optometry Exam
Storage
SPD
Dialiation Waiting
Optometry Visual Field
Intake Nurse
POD Exam Room
POD Exam Room
Procedure Room
Storage
Podiatry Office
Optometry Pre-Test
Optometry Exam Room
Linen Chute
Soiled Utility
Retinal Exam
Tele Clos
131 Ice Machine
Pat Ed & Visit Coor
Toilet
Women's Veteran Program Manager
Break Room
Conference Room
Women's Health Diagnostic Coordinator
GECL Physician's Assistant
Centeral Check In
140 Neurology
Soiled Utility
Derm Procedure
Pulmonary Exam Room
Pulmonary Exam Room
Toilet
146 Ortho Procedure
Ortho Exam Room
Derm Exam Room
Intake Nurse
PAPR Storage Location
Intake Nurse
Hematology Procedure
GYN Hematology
Clean Utility
GYN Exam
156A
EEG Reading Room
Neurology Exam Room
Clean Linen
Ortho GYN
Cardio Clinic
HAC
Elect. Room
Storage
Exam Room
UV Room
Associate Chief Nurse
Optical Shop
Omnicell
118A Corridor
100A
Corridor
100B
Corridor
100C
Corridor
100D
Corridor
100E
Corridor
100F
Corridor
100G
Optometry Student Staff Offices
100H
Corridor
100I
Corridor
100K
GYN Department
100L
GYN Exam
156B
Toilet
156D
GYN Exam
156C
Toilet
153A
Med. Room
150A
Closet
114A
Storage
119A
Corridor
119B
Stairs
001A
Stairs
001B
Storage
143A
Stairs
001D
Stairs
001C
OUTLINE OF TR #271
AT FLOOR ABOVE
(2) 4"C - (1) 24-STRAND OS2 OPTICAL
FIBER AND 25-PAIR COPPER CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:0
P
M
027-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 27
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE CONDUIT CHASE ON WALL ADJACENT TO COLUMN
TO ROUTE CONDUITS ABOVE CEILING AND OVER TO TR.
2. PROVIDE PULLBOX AND PENTRATION AT CEILING TO
EXTEND CONDUITS TO FLOOR ABOVE.
3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUITS
UP INTO TR.
Pain Clinic Check In
Release of Information
Pain Clinic Waiting
Toilet
Chiropractor
Pain Coordinator
GI Clerical
Break Room
GI Storage
Elect. Room
HAC
GI Procedure
GI Med Room
GI Work Room
GI Procedure
GI Wake Up Area/Recovery
Recovery
GI Work Room
Crash Cart
Bronchoscopy Procedure
Clean Utility & Storage
Medivator Room
Soiled Utility
222Decon Area
Clean Linen
Toilet
Exam Room 1
Exam Room 2
Exam Room 3
Exam Room 4
Physician Office
Nursing Office
Linen Chute
GI Clinic Lounge
Tele Clos
235 Storage
PBS Kitchenette
Toilet
Exam Room
Pain Management Storage
Conference Room
Psychologist
Clinical Pharmacist
Physician
Physician Extender
Physician Extender
Conference Room
RN Consult Coordinator
Quality Improvement Facilitator
Physician Extender
Physician Extender
Toilet
Toilet
Break Room
C & P Coordinator
Program Support Assist
Secretary
Storage
MSCL Manager
Administrative Assistant
C & P Program Manager
Office Supplies/Copier
Physician
HAC
Elect. Room
Storage
Physician
Physician
Staff Neurologist
VISN 10 Homeless Coordinator
Corridor
200A
Corridor
200C
Corridor
200B
Corridor
200D
Corridor
200B1
Corridor
200F
Corridor
200E
Corridor
200G
Corridor
200H
Corridor
200B2
Toilet
234A
Toilet
260A Toilet
215A
Stairs
002C
Stair Access
246A
Stairs
002B
Stairs
002A
Stair Access
224A
Storage
221A
Room
(2) 4"C - (1) 24-STRAND OS2 OPTICAL
FIBER AND 25-PAIR COPPER CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:1
P
M
027-TN102
LEVEL 02 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 27
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
ATTIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:1
P
M
027-TN103
LEVEL 03 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 27
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
Tank Room
Toilet
Canteen Storage
Elevator Machine Room
Canteen Storage
HAC
Toilet
Operations Clerk Canteen Chief
Vesitbule
Chief Canteen
Storage
Canteen Retail Store
HAC
14A
Storage
13A
Storage
13B
Elect. Room
13C
Mechanical
2A
Money Room
9A
Corridor
10A
Storage
13D
Stairs
Stairs
Elevator Lobby
Stairs
B
HAND HOLE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE AND
(1) 4"C - SPARE
A
HAND HOLE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES AND
(1) 4"C - SPARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:1
P
M
028-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 28
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
KEY NOTES:
1. PROVIDE PULL BOX MOUNTED ON EXTERIOR WALL AT
HEIGHT ABOVE BASEMENT FINISHED CEILING. ROUTE
COUNDUITS UP ALONG EXTERIOR WALL INTO PULLBOX.
PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE
CONDUITS UP TO FLOOR ABOVE.
2. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE
CONDUITS INTO TANK ROOM TO LOCATION INDICATED.
3. PROVIDE PENETRATION THRU CEILING TO ROUTE CONDUITS
UP TO FIRST FLOOR.
4. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR
Dining
102Serving Line
Kitchen
Kitchen
Freezer
Pot/Pan Room
Storage
Dining
102A
Food Service Super
102B
Dining
102C
Corridor
103A
Stairs
Elevator Lobby
Stairs
Stairs
Closet
102D
OUTLINE OF MDF #201
AT FLOOR ABOVE 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:1
P
M
028-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 28
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE CONDUIT CHASE AT LOCATIONS INDICATED TO
ROUTE CONDUITS UP TO FLOOR ABOVE.
Tele Clos
Canteen Salon
CRC Office
Social Worker
Social Worker Supervisor
Canteen Storage
Toilet
Social Work Supervisor
Copy/File Room
Waiting
MHICM Case Manager
Toilet
Conference Room
MHICM Case Manager
MHICM Case Manager
MHCIM Case Manager
CRC/MHICM Program Manager
Medical Foster Home Coordinator
Closet
210A
Secretary Social Work Service
210B
Chief, Social Worker Service
210C
CRC/MHICM Program Support Assistant
210D
Closet
201A
Closet
202A
Closet
203A
Closet
204A
Closet
205A
Closet
205B
HAC
207A
Closet
208A
Closet
208B
Closet
209A
Closet
209B Closet
2011A
Closet
2011B
HAC
212A
Closet
214A
Closet
215A
Closet
216A
Closet
217A
Closet
218A
Corridor
Corridor
200A Stairs
Stairs
Elevator Lobby
Stairs
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:1
P
M
028-TN102
LEVEL 02 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 28
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
LEVEL 02 PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE CONDUIT CHASE AT LOCATIONS INDICATED TO
ROUTE CONDUITS ABOVE CEILING AND OVER TO TR.
2. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1" FOR
TERMINATION OF NEW COPPER BACKBONE CABLE IN MDF
#201. REFER TO "018-TN205" FOR CABLE CONNECTION
PCT Program
4D PCT Program
4E
Corridor
PCT Program
4F
PCT Program
4C
PCT Program
4B
PCT Program
4G PCT Program
4A
Electric Switchgear
Corridor
0B
Corridor
0E
Stair
S7-0
PTSD
VSO Office
1A
VSO Office
1C
Storage
1D
Copy Room
2B
Tele Clos
14A
Mechanical
Elevator Equipment
SCI&D Nurse
13A
Elect. Room
Skin Integrity Ostomy Care Coordinator
13B
PT/Spinal Cord Clinic
PT/Spinal Cord
13C
Dieticians Office
Decedent Affairs
10A
Corridor
0C
Toilet
10F
HAC
10G
Stair
S6-0
Oxygen Storage
9B
PT & Prosthetics Orthotic Clinic
Soiled Linen
8B
Diabetes Education
8C
Patient Ed Class Rm
8D
Patient Ed Storage
8G
Diabetic Educator
8E
Elect. Room
8F
Toilet
8A
Corridor
Morgue Cart Storage
10D Storage
10C
Viewing Affairs
10B
Storage
10E
PCT Waiting
Storage
2A Corridor
0A
Stair
S3-0
Corridor
0D Elevator Equipment
4J
Office
8H Corridor
10H
PT/Spinal Chord
13E
Stair
S2-0
Stair
S4-0
Mechanical
Canteen Vending
0F
PT/Spinal Cord Clinic
Storage
0G
HAND HOLE HAND HOLE
A B
1 1
(2) 4"C - (3) 24-STRAND OS2 OPTICAL
FIBER AND (3) 25-PAIR COPPER
CABLES AND (1) 4"C - SPARE
(1) 4"C - (3) 24-STRAND OS2 OPTICAL
FIBER CABLES AND (1) 4"C - SPARE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
OUTLINE OF TR #127
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:4
P
M
030-TN100
BASEMENT PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 30
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH
TR.
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENETRATION THRU EXTERIOR WALL AND ROUTE
CONDUITS THRU CRAWL SPACE.
2. PROVIDE PENETRATION THRU INTERIOR WALL AND ROUTE
CONDUITS ABOVE CEILING AS INDICATED.
3. ROUTE CONDUITS UP TO CEILING AND PROVIDE PULLBOX
TO EXTEND CONDUITS UP TO FLOOR ABOVE.
4. PROVIDE PENETRATION THRU CEILING TO ROUTE
CONDUITS UP INTO TR.
5. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"
FOR TERMNATION OF NEW COPPER BACKBONE CABLES IN
MDF #8E. REFER TO "018-TN205" FOR CABLE CONNECTION
REQUIREMENTS.
6. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR
Patient Room 1
Patient Room 2
Patient Room 3
Patient Room 4
Patient Room 5
Patient Room 6
Med. Room
112C Toilet
104A
MOD
Cardio-Pulminary Supervisor
Office
Social Worker
Corridor
Physician
Corridor
100A Waiting
Storage
Med Room
157B
Toilet
157A
Reception
Minor OR
Sleep Lab
Toilet
155A Storage
155B
Exam Room
Toilet
Chief Surgery
Exam Room
Exam Room
Exam Room
Toilet
149A
Clean Supplies
Minor OR Stor
156A
Cystoscopy Procedure
OR Nurse
144A
OR Nurse
Corridor
144B
Kitchenette
HAC
Sterile Supply
Exam/Treatment
Exam/ Treatment
Exam/ Treatment
Exam Room
Toilet
Exam Room
Soiled Utility
Tele Surgery
Procedure Room
Laundry Chute
Break Room
Storage
Lab
Lab
Storage
128A
Tele Clos
Family Waiting Room
Toilet
Corridor
100C
Storage
Nurse Mgr
122HAC
HAC
120A
Patient Room 7
Patient Room 8
Patient Room 9
Toilet
Clean Utility
Clean Supplies
Soiled Utility
Patient Room 10
Clean Supplies
112A
Kitchen
112B
Lockers
112E
Toilet
112F
Kitchen/Break Room
112D
Corridor
100E
Storage
Corridor
Corridor
Stair
S6-1
Tele Clos
Respiratory Therapy Pulminary Function
Stair
S7-1
Stair
S5-1
Stair
S2-1
Stair
S3-1
Stair
S4-1
Stair
S1-1
Closet
100B
Corridor
101C
Storage
112G
Room
8K
Room
8M
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
OUTLINE OF TR #226
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:4
P
M
030-TN101
LEVEL 01 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 30
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH
TR.
KEY NOTES:
1. ROUTE CONDUITS UP TO CEILING AND PROVIDE PULLBOX
TO EXTEND CONDUITS UP TO FLOOR ABOVE.
2. PROVIDE PENETRATION THRU CEILING TO ROUTE
CONDUITS UP INTO TR.
Office
Education/Training
Toilet
209A
Provider Offices
Sterile Supplies
207 Toilet
208A
Corridor
2C4
Toilet
205A
Clean Linen
Day Room
Storage
211 Bed Room
Stair
S7-2
Sleep Lab Control Room
213A
Elect. Room
212A
Corridor
2C3
Corridor
2C2
Bed Room
Toilet
221A
Soiled Utility
Toilet
Toilet
202A
Bed Room
Bed Room
Toilet
201A
MIT Work Room
Corridor
2C1
Medical Clerks
Sleep Lab
Sleep Lab
Toilet
219A Toilet
214A
Toilet
216A
Toilet
217A
Sleep Lab
Sleep Lab
Storage
Storage
Bedroom
Corridor
2C7
Bedroom
Toilet
228A
Bedroom
Corridor
2C6
Nourishment
Storage
Corridor
2C5
Med. Room
232A
Laundry Chute
Nurse Station
Clean Utility
Corridor
2C8
Bed Room
Toilet
250A
Bed Room
Stair
S6-2
Soiled Utility
Isolation
Toilet
235A
Toilet
237A
Bed Room
Corridor
2C9
Isolation
Toilet
239A
Toilet
238A
Isolation
Storage
Tub Room
Elect. Room
242A
HAC
Shower Room
241A
Employee Lounge
Bed Room
Toilet
249A
Corridor
2C10
SPD Supplies
Clean Linen
Toilet
246A
Bedroom
Toilet
245A
Bed Room
Wheel Chair Storage
Storage
213B
HAC
212 Elect. Room
Tele Clos
223A
Toilet
227A
Toilet
230A
Omni Cell
Toilet
Storage
Stair
S5-2
Stair
S1-2
Stair
S2-2 Stair
S3-2
Stair
S4-2
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER AND 25-PAIR
COPPER CABLES
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:4
P
M
030-TN102
LEVEL 02 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 30
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH
TR.
1/8" = 1'-0"
Attic
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:1
:4
P
M
030-TN103
LEVEL 03 PLAN - TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 30
VA STATION NO:
Approved: Client Name
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/8" = 1'-0"
DNDN
Medical Records
B-303
Elect. Room
B-301
Stair
B-304
Mechanical Room
B-303A
Storage
B-302
Entry
B-303C
Storage
B-303B
Audio-Control
B-113
Audio-Exam
B-112
Audio-Control
B-111
Audio-Exam
B-110
Mech Room
B-109
Corridor
SB-017
Corridor
SB-013
Corridor
SB-018
Reception
B-101
Elevator Equipment
Room
B-101A
Storage
B-103
Hearing Aid
B-105
Toilet/ Shower
B-107
Group Therapy
B-108
Electron-Stagmography
B-106
Electro-Physilogy
B-104
Chief, Audiology
B-102
Speech Pathology
B-116
Postiography
B-114
Therapy/ Audio
B-115
Entry
B0100
Stair
B101
Audiology Waiting
SB001
Corridor
SB019
Entry
B-300
Stair
B-S01
OUTLINE OF TR #G-202
AT FLOOR ABOVE
OUTLINE OF TR #G-182
AT FLOOR ABOVE
OUTLINE OF TR #G-345G
AT FLOOR ABOVE
OUTLINE OF TR #G-500D
AT FLOOR ABOVE
A
B
HAND HOLE
HAND HOLE
(2) 4"C - (7) 24-STRAND OS2 OPTICAL
FIBER AND (7) 25-PAIR COPPER
CABLES AND (1) 4"C - SPARE
(1) 4"C - (7) 24-STRAND OS2 OPTICAL
FIBER CABLES AND (1) 4"C - SPARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:2
:0
P
M
031-TN100
OVERALL BASEMENT FLOOR PLAN
- TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 31
VA STATION NO:
Approved: Veteran's Affairs Medical Center
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
1/16" = 1'-0"
OVERALL BASEMENT FLOOR PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENETRATIONS THRU EXTERIOR WALL AND
ROUTE CONDUITS IN CRAWL SPACE TO BELOW TRs AT
FLOOR ABOVE.
2. PROVIDE PENETRATIONS THRU WALLS OF CRAWL SPACE.
3. PROVIDE PULLBOX AND PEETRATION THRU CEILING TO
ROUTE CONDUITS UP INTO TR.
4. ROUTE CONDUITS INTO CONDUIT CHASE AND EXTEND TO
FLOOR ABOVE.
ROUTE TO TELECOM ROOM (MDF).
UP
MRI
Scanning
Room Zone
IV
G-347G
Control Room
G-347H
Equipment Room
G-347F
Interview
G-347-A Office
G-347-B
Corridor Zone III
G-347K
Corridor Zone II
G-347
Public Restroom
G-343E
Staff Restroom
G-343F
Clean Linen
G-343C
Patient Toilet
G-347E
Reception
G-344
Office
G-324
Office
G-323
Office
G-322
Tech.
Room
G-322A
Corridor
Toilet Room
G-321B
Waiting
G-310
Staff Breakroom
Lockers
G-326
Office
G-327
Existing Radiograph Flouroscopic
Room
G-321
Clean Supply
G-319A
Light/ Dark Room
G-319 Existing
Radiograph Flouroscopic
Room
G-317
Control
G-315
Lockers
G-313
Toilet
G-314
Chest X-Ray
G-311
Stair #8
S-08
Existing Ultrasound
G-320
Ultrasound 2
G-318
Copier Storage
G-312
Elec. Clos.
G-328
Office
G-330
Stair #3
S-03
Toilet
G-310C
Corridor
Dressing
G-313A
Vestibule
Clean Linen
G-352
Toilet
G-345D
Dressing
G-345C CT Scan Room
G-345F
HAC
G-345A
CT Power Equipment
G-345G
Corridor
Wheelchair Storage
G-343D
Cardiac Stress Testing
G-350B
Corridor
Hot Lab
G-348B
Nuclear Tech Office
G-348E
Cardiac Stress Testing
G-350A
Patient Toilet
G-348F
Nuclear Med Scanning
Room
G-348D
Vestibule
Thyroid Uptake Patient Dosing
G-348A
Dressing
G-349
Main Elec.
Room
G-345B
Exam
G-118
ER-Life Support
G-116
ER-Life Support
G-115
Exam
G-119
Nurse Perches
G-101E
Equipment
G-114 Isolation Room
G-113
Toilet
G-112
Toilet
G-113A
Exam
G-110
Com. Closet
G-111 Ambulance Vestibule
G-114B
Storage
G-109
Staff Toilet
G-107
Soiled Utility
G-108
Break Room
G-104
Clean Utility Room
G-102
Clean Supply
G-103
Office
G-101J
Exam
G-121
Waiting
G-101
Toilet
G-101G
Engr.
G-101A
Exam
G-117
Exam
G-120
Storage
G-105
Work Room
G-101D
Triage
G-101C
Meds
G-114A
Nuclear Med Scanning
Room
G-348C
Sub-Waiting
G-348G
Waiting
G-343B
Corridor
Waiting
G-343A
Stretcher/ Holding
G-347J
Dress.
G-347-D
Dress.
G-347-C
Control
G-345E
Office
G-325
Corridor
Corridor
116 Exam Room
G-316
G-329
Corridor
Reception
G-310A
Stair #2
S-02
Corridor
BC009
MH Med Room
G-300A
Mental Hygiene
Waiting & Group
G-300
Corridor
BC000Clinic Nurse
G-309
Clinic Nurse
G-308
Physician
G-307 Toilet
G-306
Physician
G-305
Phsician
G-304
Nurse Assist
G-303
Nurse Assist
G-302
MH
Receptionist
G-301
MH Break Room
G-301A
HAC
G317
Psychologist
G-216
Corridor
BC013Tele Clos
G-217A
Elec. Clos.
G-217B
Mech Equipment
Room
G-215
Physician
G-211A
Psychologist
G-214
Psychology Intern
G-211B
Flu Clinic
G-212
MH Clinic
G-209
MH Clinic
G-208
MH Clinic
G-207
MH Exam
G-210
MH Storage
G-205
MH Clinic
G-206
Social Worker
G-204
Nuclear/ Stress Waiting
G-211
Psychology Intern
G-211C
Nuclear Med Office
G-211D Nuclear Medicine
G-213 Isotope Stor
G-213A
Stair #4
S-04
Corridor
BC010
Female Toilet
G-203
Tele Clos
G-202
MH
Conference
Room
G-200
Male Toilet
G-201
Stair #5
S-05
Building Security
G-141A
Closet
G-141B Elec Clos
G-147 Patient
Advocate
G-145
POD Suite Living/
Bedroom
G-144B
POD Suite Kitchen
G-144POD Toilet/ Shower
G-144A
Corridor
BC008
Patient Advocate
G-143
HAC
G-142
Building Security
G-141
Male Locker
G-140
Female Shower
G-139A
Male Toilet
G-139B
Female Locker
G-139
MCCR
G-138
Corridor
BC007
Patient Funds/ Travel
G-137
Agent Cashier
G-136
Corridor
BC006
Nurse Manager
G-135
Eligibility
G-133
Equipment Storage
G-134
Elec Clos
G-122
Tele Clos
G-132
Corridor
BC005
Eligibility
G-131
Corridor
BC003
Physician
G-130
Means Testing
G-123
Physician Assistant
G-129
RN
G-128
Pain Clinic
G-126
Equipment Storage
G-127
Patient Education
G-125
Stair #6
S-06
Ice
G-106
Stair #3
G-340
G-332
Program Clerk
G-331
TR #G500
TR #G182
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
OUTLINE OF TR #1-210
AT FLOOR ABOVE
OUTLINE OF TR #1-210
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:2
:0
P
M
031-TN101
OVERALL GROUND FLOOR PLAN -
TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 31
VA STATION NO:
Approved: Veteran's Affairs Medical Center
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM
EACH TR.
1/16" = 1'-0"
OVERALL GROUND FLOOR PLAN - TECHNOLOGY
KEY NOTES:
1. ROUTE CONDUITS UP AND PROVIDE PULLBOX TO EXTEND
CONDUITS TO LOCATION OF NEW TRs.
2. PROVIDE PENETRATION T HRU CEILING TO ROUTE
CONDUITS UP INTO TR.
3. PROVIDE PENETRATION THRU CHASE WALL TO ROUTE
CONDUITS UP THRU FLOOR OF TR.
4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT
PROTECTION "SC-SPR-1" AND PATCH PANEL "SC-MPP-1"
FOR NEW COPPER BACKBONE CABLES. REFER TO "018-
TN205" FOR CABLE CONNECTION REQUIREMENTS.
Exam Room
1-111
Toilet
1-103
Stair #3
S-103
Microbiology Lab
1-318
Vista Imaging Storage
1-317 Elec. Clos.
1-316
Media Prep
1-315
Storage
1-313
Corridor
1C8
Corridor
1C6 Glassware Washer
1-314
Male Toilet
1-312 Female Toilet
1-310
Glassware Washroom
1-311
Elec Closet
1-309A
Blood Bank
1-309
Chemistry
1-301A
Main Laboratory
1-301 Corridor
1C5
Storage
1-300
Lab Chief
1-305
Hematology
1-307 Lab Safety
Officer
1-308
Lab Manager
1-306
Corridor
1C7
Conf/ Training
1-302
Stair #2
S-102
Lab Secretary
1-212
HAC
1-213 Tele Clos
1-215
Elec Clos
1-214
Elev Equip
1-216
Corridor
1C2
Am Vets
1-217
Female Toilet
1-218 Corridor
1C4
Corridor
1C3
HAC
1-219 Male Toilet
1-220
Stair #4
S-104
Blood Draw
1-211
Tele Clos
1-210
Vacant
1-209
Storage
1-211A
Corridor
1C1
Clinical Pharmacists
1-207
Procedure Room
1-206
Medical Clerk
1-204
Pharmacist
1-205
Corridor
GG132
Clinic Nurse
1-203
Exam Room
1-202
Exam Room
1-201
Stair #5
S-105
Exam Room
1-200
Exam Room
1-157
Corridor
GG133
Social Worker
1-159
Dietician
1-161
Dietician
1-163
Social Worker
1-165
Social Worker
1-164
Social Worker
1-162
Social Worker
1-160
Pharmacist
1-158
Exam Room
1-156
Corridor
GG113
Storage
1-154A
Conference/ Class Room
1-154
Break Room
1-150
Exam Room
1-148
Soiled Utility
1-146Exam Room
1-149
Tele Clos
1-147
Exam Room
1-144
Office
1-145
Corridor
GG107
Corridor
GG108
Elec. Clos
1-143
Toilet
1-141-A
Exam Room
1-141
Clinic Nurse
1-142
Clinic Nurse
1-139
Exam
1-137
Exam
1-140
Exam Room
1-138
Conference Room
1-119
Stair #6
S-106
Exam Room
1-123
Corridor
G112
Toilet
1-118
Exam Room
1-124
Nurse
1-125
Exam Room
1-117
Exam Room
1-116
Office
1-114
Exam Room
1-113
Exam Room
1-112
Elect. Room
1-102
Vending
1-105
Toilet
1-106 Triage Room
1-131
Triage Room
1-132
Office
1-133
Exam Room
1-134
Toilet
1-135
Nurse Supplies
1-136
Procedures
1-130
Oxygen Storage
1-128
Toilet
1-138A
Toilet
1-127
HAC
1-126
Soiled Utility
1-110A
Storage
1-129
Clean Utility
1-110C
Tele Clos
1-110B
Corridor
G136
Reception
G137
Corridor
G131
Nurse Station
1-110
Nurse Station
1-110F
Elevator Lobby
1-100
Stair #7
S-107
Mechanical
Covered Porch
S1
1-306A
1C4A
Corridor
GG114
Entry
1C1A
Stair S-3
TR #F-204
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
(2) 4"C - (1) 24 OS2 OPTICAL
FIBER AND 25-PAIR COPPER
CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
OUTLINE OF TR #2-207A
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:2
:0
P
M
031-TN102
OVERALL FIRST FLOOR PLAN -
TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 31
VA STATION NO:
Approved: Veteran's Affairs Medical Center
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE FOUR ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF
THE HORIZONTAL CABLE DISTANCE LIMITATION FROM
EACH TR.
1/16" = 1'-0"
LEVEL 01 PLAN - TECHNOLOGY
KEY NOTES:
1. ROUTE CONDUITS UP AND PROVIDE PULLBOX TO EXTEND
CONDUITS TO LOCATION OF NEW TRs.
2. PROVIDE PENETRATION T HRU CEILING TO ROUTE
TR #2-207A
(2) 4"C - (1) 24 OS2
OPTICAL FIBER
AND 25-PAIR
COPPER CABLES
(1) 4"C - (1) 24-STRAND
OS2 OPTICAL FIBER
CABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1
/2
:2
:1
P
M
031-TN103
OVERALL SECOND FLOOR PLAN -
TECHNOLOGY
04/14/2023 ACA ECW
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
95% CONSTRUCTION
DOCUMENTS 31
VA STATION NO:
Approved: Veteran's Affairs Medical Center
1/16" = 1'-0"
LEVEL 02 PLAN - TECHNOLOGY
No. Revisions: Date:
CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER
LINE DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS
FROM CENTER OF TELECOM ROOM (TR) WITH LINES
CONNECTING THE…