This basement plan drawing depicts the technical infrastructure upgrades for the EHRM project at the Chillicothe VA Medical Center in Chillicothe, Ohio. Key details include: the drawing shows the proposed locations for new telecom rooms, equipment racks, cable pathways between rooms through conduit and cable tray, as well as notes on cable termination and protection. The related federal contract opportunity is a solicitation from the VA Technology Acquisition Center for construction services to implement the infrastructure upgrades depicted in the basement plan drawing. The period of performance and response date are not specified.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offices
4C
Offices
4B
Recreation Clinic
Stair
S1-0
Toilet
4A
Elect. Room
Corridor
32A
Storage
HAC
Linen
Stair
S2-0 Linen Storage
Office
Office
CIO
Elevator Equipment
Mechanical
Equipment
9A
Tele Clos
27A
Electric Switch Gear
Office
Corridor
XXX
Mech.
Office
Office
25A
Toilet
Electrical
EMS
23A
Office
Office
Toilet
28Toilet
HAC
Office
18A
Office
18B
Office
18C
Office
18D
Office
18E
Office
18F
Office
18G
Office
18H
Office
18I
Stair
S3-0
Stair
S4-0
Stair
S5-0
EMS EQUIPMENT
24A
Chapel
Storage
2A
Corridor
Corridor
Office
4D
200L
Room
200M
(2) 4"C - (3) 24-STRAND OS2 OPTICAL FIBER
AND (3) 25-PAIR COPPER CABLES AND (1)
4"C - SPARE
B
HAND HOLE
(1) 4"C - (3) 24-STRAND OS2 OPTICAL
FIBER CABLE AND (1) 4"C - SPARE
(1) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE
(2) 4"C - (1) 24-STRAND OS2
OPTICAL FIBER CABLE AND
25-PAIR COPPER CABLE
HAND HOLE
A
OUTLINE OF TR #200
AT FLOOR ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/T
.0
V A
-C h ill ic o th e B
C
.r v t
/1 /2
:3
:0
P M
026-TN100
BASEMENT PLAN - TECHNOLOGY
07/07/2023 ACA ECW
EHRM INFASTRUCTURE UPGRADES 538-21-701
CHILLICOTHE, OHIO
BID DOCUMENTS
VA STATION NO:
Approved: Client Name
GENERAL NOTES:
1. THE DIAMOND DIAGRAM SHOWN CONSIST OF AN 80 METER LINE
DRAWN TO FLOOR PLAN SCALE IN FOUR DIRECTIONS FROM CENTER
OF TELECOM ROOM (TR) WITH LINES CONNECTING THE FOUR
ENDPOINTS.
2. EACH DIAMOND DIAGRAM REPRESENTS AN OUTLINE OF THE
HORIZONTAL CABLE DISTANCE LIMITATION FROM EACH TR.
1/8" = 1'-0"
BASEMENT PLAN - TECHNOLOGY
KEY NOTES:
1. PROVIDE PENETRATION THRU EXTERIOR WALL OF CRAWL SPACE
AND ROUTE CONDUITS IN CRAWL SPACE BELOW BASEMENT FLOOR
OVER TO LOCATION INDICATED.
2. PROVIDE PENETRATION THRU CEILING OF CRAWL SPACE AND
ROUTE CONDUITS UP TO ABOVE BASEMENT CEILING AND OVER TO
TR.
3. PROVIDE PULLBOX ABOVE CEILING AND ROUTE CONDUITS TO
LOCATIONS INDICATED. PROVIDE PENETRATION THRU CEILING AND
ROUTE CONDUITS TO FLOOR ABOVE.
4. PROVIDE RACK MOUNTED ANALOG PRIMARY CIRCUIT PROTECTION
"SC-SPR-1" AND "PATCH PANEL "SC-MPP-1" FOR TERMINATION OF
NEW COPPER BACKBONE CABLES IN MDF #27. REFER TO "018-TN205"
FOR CABLE CONNECTION REQUIREMENTS.
5. TRANSITION COPPER BACKBONE CONDUIT TO (RMC) FOR ROUTE
THRU BUILDING TO TELECOM ROOM (MDF).
No. Revisions: Date:
BID DOCUMENTS 07/07/2023
1 Addendum 2 12/11/2023
File details come from the government source that posted it. Updated .