S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf
PDF 594 KB Posted
- Attached to
- Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
- Solicitation number
- 36C77623B0058
About this file
This document contains electrical plans for upgrades to the EHRM infrastructure at the Chillicothe VA Medical Center in Chillicothe, Ohio. The plans show new and updated electrical work on the first floor of Building 23, including installing a new busbar grounding electrode and bonding conductor, adding keypads, card readers, door contacts and motion sensors to doors, installing an 8-door access control panel and power supply, and running new electrical lines to indoor and outdoor HVAC units. The related federal contract opportunity is solicitation number 36C77623B0058 for the construction project to complete the EHRM Infrastructure Upgrades at the Chillicothe VAMC, with an estimated value of $538,210. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
DN
UP
UP
AP
CC
K DCES
RX
T
023-EP101
Warehouse #2-2
121-2
TR
121A
(E) (B23) N
(E) (B23) D
C1
C1
SYMMETRY PACS
CONTROLLER
GROUNDING BUS
BAR
IDU-1
(E) (B23) D - 7
(E) (B23) D - 7
(E) (B23) D - 7
(E) (B23) D - 20,22,24 (E) (B23) D - 7
(E) (B23) D - 7
(E) (B23) D - 26,28
(E) (B23) D-13
(E) (B23) D-13
ODU-2
(E) (B23) D - 7
TR
121A
(E) (B23) N - 15,17,19
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/1
/2
:1
:0
P M
023-EP101
ELECTRICAL PLAN - FIRST FLOOR
07/07/2023 JB CLG
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
1/8" = 1'-0"
BLDG 23 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN
1/4" = 1'-0"
BLDG 23 - TR 121B - ELECTRICAL NEW WORK PLAN
D R A W I N G N O T E S :
1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.
2 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM
ITS POINT OF ENTRANCE TO THE BUILDING.
3 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.
4 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.
5 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT
TO CASSETTE UNIT.
6 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM
UNIT MOTOR.
No. Revisions: Date:
BID DOCUMENTS 07/07/2023
2 ADDENDUM #2 12/11/2023
| Sheets |
| 023-EP101 - ELECTRICAL PLAN - FIRST FLOOR |
File details come from the government source that posted it. Updated .