Attachment 11 - SOW attach Volume 1 Part 6.pdf

PDF 10 MB Posted

Attached to
Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
Solicitation number
36C77623B0058
Issued by

About this file

This attachment is a statement of work for infrastructure upgrades to construction facilities at the Chillicothe VA Medical Center in Ohio. The related federal contract opportunity is solicitation number 36C77623B0058 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks proposals for upgrading the EHRM infrastructure including installing new network switches, servers, storage, and related equipment. The construction work must be completed within 365 calendar days of the award date. Offerors must submit proposals by July 15, 2021. The contract is set aside for verified service-disabled veteran-owned small businesses. The awarded contractor will be responsible for project management, site assessments, procurement, installation, configuration, testing and training activities to modernize the medical center's IT infrastructure and ensure compliance with VA and OSHA standards.

View the file

Other files

File Type Posted
Abstract of offers - Chillicothe Bid Opening 01172024 signed.pdf PDF
S06 - Amendment 0009 Bid Opening.pdf PDF
S06 - Amendment 0008 Extend due date to 01172024.pdf PDF
S06 - 36C77623B0058 0007.pdf PDF
S06 - Amendment 0007 Att 10 - 14.063_024-EP100 - ELECTRICAL PLAN - BASEMENT FLOOR.pdf PDF
S06 - Amendment 0007 Att 13 - 14.116_E616.31 - PANELBOARD SCHEDULES.pdf PDF
S06 - Amendment 0007 Att 4 - Chiillicothe VA Lead Paint Survey Report.pdf PDF
S06 - Amendment 0007 Att 7 - 000-TS100 - CAMPUS TECHNOLOGY SITE PLAN.pdf PDF
S06 - Amendment 0007 Att 6 - 000-TN500 - TECHNOLOGY DETAILS.pdf PDF
S06 - Amendment 0007 Att 3 - 2023-01 AHERA.pdf PDF
S06 - Amendment 0007 Att 11 - 14.077_031-EP100 - ELECTRICAL PLAN - GROUND FLOOR.pdf PDF
S06 - Amendment 0007 Att 16 - 026-TN100 - BASEMENT PLAN -TECHNOLOGY.pdf PDF
S06 - Amendment 0007 Att 14 - 018-TN209 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 8 - 13.038_030-MD101 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR.pdf PDF
S06 - Amendment 0007 Att 12 - 14.080_035-EP100 - ELECTRICAL PLAN - BASEMENT.pdf PDF
S06 - Amendment 0007 Att 1 Technical questions Round 2 responses.pdf PDF
S06 - Amendment 0007 Att 2 - Final SWP3.pdf PDF
S06 - Amendment 0007 Att 15 - 018-TN210 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 5 - 000-TN400 - TECHNOLOGY RISER DIAGRAMS.pdf PDF
S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf PDF
Amendment 0006 36C77623B0058.pdf PDF
Amendment 0005 36C77623B0058.pdf PDF
Amendment 0005 - Attachment Addendum 1.zip ZIP file
Amendment 0005 - Attachment - Vendor Questions_Responses final.pdf PDF
Amendment 0004 36C77623B0058.pdf PDF
Amendment 0003 36C77623B0058.docx DOCX document
Att 10 Volume 10 - Technology_Combined.pdf PDF
Att 8 Volume 8 - Electrical_Combined.pdf PDF
Att 6 Volume 6 - Mechanical_Combined.pdf PDF
Att 9 Volume 9 - Electrical_Combined.pdf PDF
Att 13 Volume 13 - Fiber_Combined.pdf PDF
Att 4 Volume 4 - Architectural_Combined.pdf PDF
Att 5 Volume 5 - Fire Suppression_Combined.pdf PDF
Att 14 S04 - Site Visit sign in 10-11-2023.pdf PDF
Att 7 Volume 7 - Mechanical_Combined.pdf PDF
Att 12 Volume 12 - Fiber_Combined.pdf PDF
Att 11 Volume 11 - Technology_Combined.pdf PDF
Att 3 Volume 3 - Architectural_Combined.pdf PDF
Att 2 Volume 2 - Civil_Combined (1).pdf PDF
36C77623B0058 0002.docx DOCX document
Att 1 Volume 1 - General and Civil_Combined.pdf PDF
DBA Wage Rates Construction - Ross Cty.pdf PDF
36C77623B0058 0001.docx DOCX document
Attachment 04 - DBA Wage Determination.pdf PDF
Updated _Specifications_Combined.pdf PDF
Attachment 08 - SOW attach Volume 1 Part 3.pdf PDF
Attachment 09 - SOW attach Volume 1 Part 4.pdf PDF
Attachment 04 - Wage Rate Determination - Chillicothe.pdf PDF
Attachment 19 - SOW attach Volume 3 Part 4.pdf PDF
Attachment 17 - SOW attach Volume 3 Part 2.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

DN

UP

HMR ASSISTANT

Tele Clos

Nurse Training Storage

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Training Room

TR

284B

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:1

A

M

001-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 001

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

CONSTRUCTION DOCUMENTS - 95% SUBMITTAL 03/17/2023

CONSTRUCTION DOCUMENTS - 95% 04/14/2023

TR

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:0

A

M

003-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 003

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

Tele Clos

108D

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:2

A

M

007-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 007

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

DN DN

UP

DN

Volunteer Work Room

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Closet

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:4

A

M

009-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 009

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

TR

Office

OFFICE

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

11 2

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

018-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 018

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DN

DN

UP

UP

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

TR

121A

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:3

A

M

023-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 023

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Tele Clos

Conference Room

124A

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

024-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 024

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH

PIPING UP.

2 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

Tele Clos

ELEC CLOS

002U

ELEC CLOS

002V

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:0

A

M

024-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 024

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

LIGHT HAZARD

TR

102D

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:3

A

M

025-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 025

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

CIO

TR

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

026-FX100

FIRE SUPPRESSION PLAN -

BASEMENT

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 026

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - BASEMENT - OVERALL

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

200A

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

026-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 026

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:1

A

M

027-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 027

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:3

A

M

027-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 027

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH

PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:1

A

M

028-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 028

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

TR

8E

Elect. Room

8F

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

030-FX100

FIRE SUPPRESSION PLAN -

BASEMENT

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 030

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - BASEMENT

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

Tele Clos

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

030-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 030

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

Room

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:0

A

M

030-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 030

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

2 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

UP

DN

UP

DN

DN

DN

DN

DN

UP

REF.

CT Power Equipment

G-345G

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Conference Room

G182

TR

G182A

Tele Clos

G-202

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:4

:5

A

M

031-FX100

FIRE SUPPRESSION PLAN -

BASEMENT

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 031

CHILLICOTHE

VAMC

Approved: Owner

N

1/16" = 1'-0"

ELECTRICAL DEMOLITION PLAN - GROUND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

3 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

TR

1-210

TR

F204

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:5

:0

A

M

031-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 031

CHILLICOTHE

VAMC

Approved: Owner

N

1/16" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH

PIPING UP.

2 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

2-207A

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:5

:1

A

M

031-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 031

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

TR

3-210

TR

3-210

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

1 1

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:5

:2

A

M

031-FX103

FIRE SUPPRESSION PLAN - THIRD

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 031

CHILLICOTHE

VAMC

Approved: Owner

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - THIRD FLOOR - OVERALL

No. Revisions: Date:

B60 First Floor

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

G. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND

SPRINKLER DESIGN.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:5

:1

A

M

060-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

05/01/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

95% CONSTRUCTION

DOCUMENTS 060

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

DESIGN DEVELOPMENT - 65% SUBMITTAL 10/14/2022

DESIGN DEVELOPMENT - 65% SUBMITTAL REV 1 12/16/2022

ORDINARY HAZARD 2

Equipment Storage

TR

102A

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .