S06 - Amendment 0007 Att 12 - 14.080_035-EP100 - ELECTRICAL PLAN - BASEMENT.pdf

PDF 680 KB Posted

Attached to
Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
Solicitation number
36C77623B0058
Issued by

About this file

This electrical plan drawing package is for infrastructure upgrades to the Edward Hines, Jr. VA Hospital in Chillicothe, Ohio. The scope of work includes installing new electrical systems in the basement of Building 35 to support upgraded IT and mechanical equipment. Specific systems to be installed include emergency receptacles, power for new data racks, a split system air conditioning unit, access control and security devices at the building entrance. The project number is 538-21-701 and the bid documents were issued on July 7, 2023.

The related federal contract opportunity is a solicitation posted by the Department of Veterans Affairs Technology Acquisition Center Austin seeking bids for the construction work described in the electrical plan drawings. The solicitation number is 36C77623B0058 and bids are due by the date listed on the FedBizOpps website under opportunity VA-23-00066755. The award date is not specified.

View the file

Other files

File Type Posted
Abstract of offers - Chillicothe Bid Opening 01172024 signed.pdf PDF
S06 - Amendment 0009 Bid Opening.pdf PDF
S06 - Amendment 0008 Extend due date to 01172024.pdf PDF
S06 - 36C77623B0058 0007.pdf PDF
S06 - Amendment 0007 Att 10 - 14.063_024-EP100 - ELECTRICAL PLAN - BASEMENT FLOOR.pdf PDF
S06 - Amendment 0007 Att 13 - 14.116_E616.31 - PANELBOARD SCHEDULES.pdf PDF
S06 - Amendment 0007 Att 4 - Chiillicothe VA Lead Paint Survey Report.pdf PDF
S06 - Amendment 0007 Att 7 - 000-TS100 - CAMPUS TECHNOLOGY SITE PLAN.pdf PDF
S06 - Amendment 0007 Att 6 - 000-TN500 - TECHNOLOGY DETAILS.pdf PDF
S06 - Amendment 0007 Att 3 - 2023-01 AHERA.pdf PDF
S06 - Amendment 0007 Att 11 - 14.077_031-EP100 - ELECTRICAL PLAN - GROUND FLOOR.pdf PDF
S06 - Amendment 0007 Att 16 - 026-TN100 - BASEMENT PLAN -TECHNOLOGY.pdf PDF
S06 - Amendment 0007 Att 14 - 018-TN209 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 8 - 13.038_030-MD101 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR.pdf PDF
S06 - Amendment 0007 Att 1 Technical questions Round 2 responses.pdf PDF
S06 - Amendment 0007 Att 2 - Final SWP3.pdf PDF
S06 - Amendment 0007 Att 15 - 018-TN210 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 5 - 000-TN400 - TECHNOLOGY RISER DIAGRAMS.pdf PDF
S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf PDF
Amendment 0006 36C77623B0058.pdf PDF
Amendment 0005 36C77623B0058.pdf PDF
Amendment 0005 - Attachment Addendum 1.zip ZIP file
Amendment 0005 - Attachment - Vendor Questions_Responses final.pdf PDF
Amendment 0004 36C77623B0058.pdf PDF
Amendment 0003 36C77623B0058.docx DOCX document
Att 10 Volume 10 - Technology_Combined.pdf PDF
Att 8 Volume 8 - Electrical_Combined.pdf PDF
Att 6 Volume 6 - Mechanical_Combined.pdf PDF
Att 9 Volume 9 - Electrical_Combined.pdf PDF
Att 13 Volume 13 - Fiber_Combined.pdf PDF
Att 4 Volume 4 - Architectural_Combined.pdf PDF
Att 5 Volume 5 - Fire Suppression_Combined.pdf PDF
Att 14 S04 - Site Visit sign in 10-11-2023.pdf PDF
Att 7 Volume 7 - Mechanical_Combined.pdf PDF
Att 12 Volume 12 - Fiber_Combined.pdf PDF
Att 11 Volume 11 - Technology_Combined.pdf PDF
Att 3 Volume 3 - Architectural_Combined.pdf PDF
Att 2 Volume 2 - Civil_Combined (1).pdf PDF
36C77623B0058 0002.docx DOCX document
Att 1 Volume 1 - General and Civil_Combined.pdf PDF
DBA Wage Rates Construction - Ross Cty.pdf PDF
36C77623B0058 0001.docx DOCX document
Attachment 04 - DBA Wage Determination.pdf PDF
Updated _Specifications_Combined.pdf PDF
Attachment 08 - SOW attach Volume 1 Part 3.pdf PDF
Attachment 09 - SOW attach Volume 1 Part 4.pdf PDF
Attachment 04 - Wage Rate Determination - Chillicothe.pdf PDF
Attachment 11 - SOW attach Volume 1 Part 6.pdf PDF
Attachment 19 - SOW attach Volume 3 Part 4.pdf PDF
Attachment 17 - SOW attach Volume 3 Part 2.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

AP

AP

1D 3D 2D/1V3D 3D

2D/1V

2D/1V

1D

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V2D/1V

AP

3D3D

3D2D/1V3D

3D

2D/1V

2D/1V 3D

3D

3D

2D/1V

3D 3D2D/1V 3D

AP

AP

AP

AP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

W

2D/1V

2D/1V

2D/1V

2D/1V 2V

AP

AP

AP

AP

W 2D/1V

W

3D 3D

3D

3D 3D 3D

2D/1V 2D/1V

AP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V2D/1V

2D/1V

AP

AP

AP

3D3D3D3D

2D /1

V 2D

/1 V

2D /1

V

2D /1

V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

3D

3D

2D/1V

CC

EM (E)

E M

E M

CC

E M

E M

E M

K

ESDC

RX

035-EP100

(E) (B35) NB (E) (B35) ENB

ODU-2 ODU-2 ODU-2

(B35) E1N-2 - 19,21

(B35) E1N-2 - 20,22

(B35) E1N-2 - 23,25

(E) (B35) MDP

(E) (B35) 35EDP-1

C1

C1

C1

(B35) 1N-2 - 2,4,6 (B35) E1N-2 - 12,14,16

IDU-2 5

(B35) E1N-2 - 15,17

(B35) E1N-2-18

(B35) E1N-2-18

(B35) E1N-2-18

ODU-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/1

/2

:1

:0

P M

035-EP100

ELECTRICAL PLAN - BASEMENT

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 35 - OVERALL BASEMENT - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 35 - TR BC102 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

2 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

3 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

4 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

5 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

No. Revisions: Date:

BID DOCUMENTS 07/07/2023

2 ADDENDUM #2 12/11/2023

Sheets
035-EP100 - ELECTRICAL PLAN - BASEMENT

File details come from the government source that posted it. Updated .