Att 9 Volume 9 - Electrical_Combined.pdf

PDF 13 MB Posted

Attached to
Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
Solicitation number
36C77623B0058
Issued by

About this file

This document provides details on a federal contract opportunity for infrastructure upgrades at a Veterans Affairs medical center in Chillicothe, Ohio. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0058 for construction services to upgrade electrical and HVAC systems at the Chillicothe VA medical center. Proposals are due by July 15, 2021 and the contract is slated for award in September 2021. The opportunity involves replacing switchgear, upgrading electrical distribution systems, and modernizing HVAC equipment to improve the reliability and efficiency of infrastructure supporting healthcare facilities. The attached Appendix provides technical specifications and drawings related to the required electrical system upgrades.

View the file

Other files

File Type Posted
Abstract of offers - Chillicothe Bid Opening 01172024 signed.pdf PDF
S06 - Amendment 0009 Bid Opening.pdf PDF
S06 - Amendment 0008 Extend due date to 01172024.pdf PDF
S06 - 36C77623B0058 0007.pdf PDF
S06 - Amendment 0007 Att 10 - 14.063_024-EP100 - ELECTRICAL PLAN - BASEMENT FLOOR.pdf PDF
S06 - Amendment 0007 Att 13 - 14.116_E616.31 - PANELBOARD SCHEDULES.pdf PDF
S06 - Amendment 0007 Att 4 - Chiillicothe VA Lead Paint Survey Report.pdf PDF
S06 - Amendment 0007 Att 7 - 000-TS100 - CAMPUS TECHNOLOGY SITE PLAN.pdf PDF
S06 - Amendment 0007 Att 6 - 000-TN500 - TECHNOLOGY DETAILS.pdf PDF
S06 - Amendment 0007 Att 3 - 2023-01 AHERA.pdf PDF
S06 - Amendment 0007 Att 11 - 14.077_031-EP100 - ELECTRICAL PLAN - GROUND FLOOR.pdf PDF
S06 - Amendment 0007 Att 16 - 026-TN100 - BASEMENT PLAN -TECHNOLOGY.pdf PDF
S06 - Amendment 0007 Att 14 - 018-TN209 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 8 - 13.038_030-MD101 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR.pdf PDF
S06 - Amendment 0007 Att 12 - 14.080_035-EP100 - ELECTRICAL PLAN - BASEMENT.pdf PDF
S06 - Amendment 0007 Att 1 Technical questions Round 2 responses.pdf PDF
S06 - Amendment 0007 Att 2 - Final SWP3.pdf PDF
S06 - Amendment 0007 Att 15 - 018-TN210 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 5 - 000-TN400 - TECHNOLOGY RISER DIAGRAMS.pdf PDF
S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf PDF
Amendment 0006 36C77623B0058.pdf PDF
Amendment 0005 36C77623B0058.pdf PDF
Amendment 0005 - Attachment Addendum 1.zip ZIP file
Amendment 0005 - Attachment - Vendor Questions_Responses final.pdf PDF
Amendment 0004 36C77623B0058.pdf PDF
Amendment 0003 36C77623B0058.docx DOCX document
Att 10 Volume 10 - Technology_Combined.pdf PDF
Att 8 Volume 8 - Electrical_Combined.pdf PDF
Att 6 Volume 6 - Mechanical_Combined.pdf PDF
Att 13 Volume 13 - Fiber_Combined.pdf PDF
Att 4 Volume 4 - Architectural_Combined.pdf PDF
Att 5 Volume 5 - Fire Suppression_Combined.pdf PDF
Att 14 S04 - Site Visit sign in 10-11-2023.pdf PDF
Att 7 Volume 7 - Mechanical_Combined.pdf PDF
Att 12 Volume 12 - Fiber_Combined.pdf PDF
Att 11 Volume 11 - Technology_Combined.pdf PDF
Att 3 Volume 3 - Architectural_Combined.pdf PDF
Att 2 Volume 2 - Civil_Combined (1).pdf PDF
36C77623B0058 0002.docx DOCX document
Att 1 Volume 1 - General and Civil_Combined.pdf PDF
DBA Wage Rates Construction - Ross Cty.pdf PDF
36C77623B0058 0001.docx DOCX document
Attachment 04 - DBA Wage Determination.pdf PDF
Updated _Specifications_Combined.pdf PDF
Attachment 08 - SOW attach Volume 1 Part 3.pdf PDF
Attachment 09 - SOW attach Volume 1 Part 4.pdf PDF
Attachment 04 - Wage Rate Determination - Chillicothe.pdf PDF
Attachment 11 - SOW attach Volume 1 Part 6.pdf PDF
Attachment 19 - SOW attach Volume 3 Part 4.pdf PDF
Attachment 17 - SOW attach Volume 3 Part 2.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

N

CHILLICOTHE VA MEDICAL CENTER

PROJECT NUMBER: 538-21-701

DEPARTMENT OF VETERANS AFFAIRS

273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601

EHRM INFRASTRUCTURE UPGRADES

SHEET NAMING EXAMPLE:

BUILDING NUMBER

DISCIPLINE

SHEET TYPE

FLOOR NUMBER

ZONE LOCATION ON FLOOR

100-AE101.1

G E N E R A L N O T E S

A. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE

EXISTING FACILITY. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS

PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE

EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE

IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF

EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION. MAINTAIN EXIT EGRESS PATHS

TO EXISTING EXIT DOORS DURING CONSTRUCTION.

B. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE

AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF

THE PROJECT.

C. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE

DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.

D. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE

SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN

APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT

ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED

SPACES.

E. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND

SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES

WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE

C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR

UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.

F. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S

AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR

EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE

CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL

CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.

G. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO

PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF

THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

H. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL

STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.

I. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING

FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.

J. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS

WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER

TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR

AND SUBCONTRACTORS SHALL COORDINATE WITH ALL OTHER DISCIPLINES.

K. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED

AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.

L. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND

OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE

EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED

CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED

TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

M. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE

SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO

BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE

PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

N. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE

ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE

EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.

O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.

DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW

WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.

P. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE

SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH

DAY.

Q. NEW HOLES IN EXISTING ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE

EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.

R. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.

E X I S T I N G F A C I L I T I E S:

A. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.

B. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF

WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S

INSTALLATION INSTRUCTIONS WILL SUPERSEDE.

C. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING

WITH WORK.

D. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR

BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE

IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL

WRITTEN CLARIFICATION FROM THE ARCHITECT/ENGINEER IS RECEIVED.

E. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE

PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.

F. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR

EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS

ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM

STANDARD OF QUALITY.

G. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR

CONSTRUCTION.

H. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING THE ADHERENCE TO

OSHA REGULATIONS.

I. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE

WHERE THIS PROJECT IS LOCATED.

J. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS FOR REMOVAL.

DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER

SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.

COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE

IN OR AROUND THE CONSTRUCTION SITE.

K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, EXACT SIZE AND LOCATION OF ALL

ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE

ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.

L. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH

FACE OF CONSTRUCTION.

M. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

N. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND APPLY SEALANT.

O. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH

THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END

OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING

COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION

AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

P. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING

ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, AND C.O.R. PRIOR TO CONSTRUCTION.

Q. REFER TO SHEET AE601 FOR SCHEDULES AND PARTITION TYPES.

N E W W O R K:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/F F

E

C h ill ic o th e

E H

R M

C a m p u s rv t

/1

/2

:3

:1

P

M

GI000.9

COVER SHEET - VOL. 9

07/07/2023 PQ JF

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

BID DOCUMENTS - 100%

CAMPUS

CHILLICOTHE

VAMC

Approved: Veteran's Affairs Medical Center

No. Revisions: Date:

BID DOCUMENTS 07/07/2023

SHEET INDEX

ELECTRICAL

031-EP100 ELECTRICAL PLAN - GROUND FLOOR

031-EP101 ELECTRICAL PLAN - FIRST FLOOR

031-EP102 ELECTRICAL PLAN - SECOND FLOOR

035-EP100 ELECTRICAL PLAN - BASEMENT

035-EP101 ELECTRICAL PLAN - FIRST FLOOR

035-EP102 ELECTRICAL PLAN - SECOND FLOOR

035-EP103 ELECTRICAL PLAN - THIRD FLOOR

036-EP101 ELECTRICAL PLAN - FIRST FLOOR

060-EP101 ELECTRICAL PLAN - FIRST FLOOR

210-EP100 ELECTRICAL PLAN - BASEMENT

210-EP101 ELECTRICAL PLAN - FIRST FLOOR

210-EP102 ELECTRICAL PLAN - SECOND FLOOR

211-EP100 ELECTRICAL PLAN - BASEMENT

211-EP101 ELECTRICAL PLAN - FIRST FLOOR

211-EP102 ELECTRICAL PLAN - SECOND FLOOR

212-EP100 ELECTRICAL PLAN - BASEMENT FLOOR

212-EP101 ELECTRICAL PLAN - FIRST FLOOR

212-EP102 ELECTRICAL PLAN - SECOND FLOOR

247-EP101 ELECTRICAL PLAN - FIRST FLOOR

252-EP101 ELECTRICAL PLAN - FIRST FLOOR

259-EP102 ELECTRICAL PLAN - SECOND FLOOR

261-EP101 ELECTRICAL PLAN - FIRST FLOOR

EE500 ELECTRICAL DETAILS

E600.1 PANELBOARD SCHEDULES

E601.3 PANELBOARD SCHEDULES

E602.7 PANELBOARD SCHEDULES

E603.9 PANELBOARD SCHEDULES

E604.18 PANELBOARD SCHEDULES

E605.20 PANELBOARD SCHEDULES

E606.21 PANELBOARD SCHEDULES

E607.23 PANELBOARD SCHEDULES

E608.24 PANELBOARD SCHEDULES

E609.24 PANELBOARD SCHEDULES

E610.25 PANELBOARD SCHEDULES

E611.26 PANELBOARD SCHEDULES

E612.27 PANELBOARD SCHEDULES

E613.28 PANELBOARD SCHEDULES

E614.30 PANELBOARD SCHEDULES

E615.31 PANELBOARD SCHEDULES

E616.31 PANELBOARD SCHEDULES

E617.35 PANELBOARD SCHEDULES

E618.36 PANELBOARD SCHEDULES

E619.60 PANELBOARD SCHEDULES

E620.210 PANELBOARD SCHEDULES

E621.211 PANELBOARD SCHEDULES

E622.211 PANELBOARD SCHEDULES

E623.247 PANELBOARD SCHEDULES

E624.259 PANELBOARD SCHEDULES

E625.261 PANELBOARD SCHEDULES

E626.212 PANELBOARD SCHEDULES

VOLUME 9 OF 13

N.T.S.Scale:

CAMPUS MAP

N.T.S.Scale:

VICINITY MAP

SHEET INDEX

GENERAL

GI000.9 COVER SHEET - VOL. 9

UP

DN

UP

DN

UP

DN

DN

DN

DN

DN

UP

REF.

AP

AP

2D/1V 6D

AP

AP

AP

AP

AP

AP

M H

W

W

2D/1V

2D/1V

2D/1V

2D /1

V

2D/1V

6D

AP

2D/1V

AP

2D/1V

AP

2D/1V 2D/1V

2D/1V

2D/1V 2D/1V 2D/1V

2D/1V

2D/1V2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

AP

2D/1V

2D/1V

AP

2D/1V

2D/1V 2D/1V

2D/1V

AP

AP

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D /1

V

2D/1V

AP

AP

2D/1V

2D/1V2D/1V

2D/1V2D/1VAP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

APAP 2D/1V

2D /1

V

AP

2D/1V

AP

2D/1V

1D

2D/1V 2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V 2D /1

V

2D/1V

AP

AP

2D/1V

2D/1V

2D/1V2D/1V

AP

AP

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V2D/1V

2D/1V

2D/1V

1V1V

2D/1V

2D /1

V

2D /1

V

1V 2D/1V 1V

2D/1V

2D/1V2D/1V

2D/1V

2D/1V 2D/1V

2D/1V2D/1V

2D/1V 2D/1V

AP

2D/1V

AP

2D/1V2D/1V 1V 1V

2D/1V

1V 1V

2D/1V

AP

AP

AP

AP

2D/1V2D/1V

1V 2D/1V

2D /1

V

2D/1V

AP

AP2D/1V

2D/1V

AP

2D/1V2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

2D/1V

AP

1V

2D /1

V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

AP

2D /1

V

2D/1V

1V

2D/1V

2D/1V

2D/1V

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

AP

AP

1D

AP

2D/1V 2D/1V

2D/1V

2D/1V

1V 1V

AP

2D/1V

2D/1V

2D/1V 2D/1V1V

1V2D/1V

2D/1V

AP

2D/1V

AP

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V AP

2D/1V

2D /1

V

2D/1V

1V

2D/1V

2D/1V

AP

2D/1V

2D/1V

AP

2D/1V

2D/1V

2D/1V 2D/1V2D/1V

2D/1V

2D/1V

2D/1V

1V

AP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

CC

CC

CC

CC

E M

E

E M

E

(E)

(E)

K

AP

CC

EM

T

2D/1V

2D/1V 2D/1V1V

2D/1V

CC

E M

E M

EM

EM

E M

E M

EM

RX

DCEL

K

K

EM (E)

EM (E)

EM (E) AP

CC

E M

E M

E M

EM

T

2D/1V

CCD

C

E S

R X

K

EM

E M

EM

E M

E M

E M

031-EP100

031-EP100

031-EP100

031-EP100

ELECT. ROOM

G-500C

TR

G-500D

MAIN ELECT. ROOM

242G

TR

G-328

ELECT ROOM

G-217B

TELE CLOS

G-217A

TR

G-202

ELECT. ROOM

G-147

TELE CLOSET

G-132

ELECT. ROOM

G-122

ELECT. ROOM

G160G

(E) (B31) GB

(E) GA

(E) GIS

(E) (B31) GCRA

(E) (B31) EPBB

(E) PBA

(E) EPBA

(E) RBA

(E) RBB(E) BX

(E) BX2

(E) BR

(E) EBN

(E) 1F(E) 1G

(E) (B31) BW SEC

ODU-2

ODU-1

ODU-1

(B31) 1CR1A - 6,8

(B31) 1CR1A - 7,9

(E) (B31) EPBB - 12,14

ODU-1

(E) (B31) GCRA - 24,26

C1 C1

IDU-2TR

G-500D

Elect. Room

G-500C

(E) (B31) GEQ2

(E) (B31) GC

(E) (B31) GD

(E) (B31) 31PDP1

(E) (B31) GEQ2 - 42,44,46 (E) (B31)

GEQ2-43(E) (B31)

GEQ2-43

ODU-2

(E) (B31) GEQ2 - 45,47

(E) (B31) GD - 21,23,25

C1

C1

C1

C1

CT Power Equipment

G-345G

(E) (B31)

GEQ2-43

(E) (B31)

GEQ2-43

(E) (B31)

GEQ2-43

(E) (B31)

GEQ2-43

(E) (B31) GEQ2 - 48,50,52

(E) (B31) GD - 22,24,26

(E) (B31) GEQ2 - 49

(E) (B31) GEQ2 - 49

(E) (B31) GEQ2 - 49

(E) (B31) GEQ2 - 49

(E) (B31) GEQ2 - 49(E) (B31) GEQ2 - 49

IDU-2 9

ODU-2

(E) (B31) GEQ2 - 51,53

C1

C1

(E) (B31) BW SEC 2 - 17,19,21 (E) (B31) EPBB - 2,4,6

IDU-2

ODU-2

(E) (B31) EPBB - 8,10

C1

C1

(E) (B31) GB (E) GA

(E) GIS (E) (B31) GCRA

(E) (B31) GB - 23,25,27

(E) (B31) GCRA - 29,31,33

(E) (B31) GCRA - 13 (E) (B31) GCRA - 13

(E) (B31) GCRA - 13

(E) (B31) GCRA - 13

(E) (B31) GCRA - 13

IDU-2

C1

C1

(E) (B31)

GCRA-15

(E) (B31)

GCRA-15

(E) (B31)

GCRA-15

(E) (B31)

GCRA-15

11 11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:3

P

M

031-EP100

ELECTRICAL PLAN - GROUND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/16" = 1'-0"

BLDG 31 - OVERALL GROUND - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG - TR G500D - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 31 - TR G345G - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG - TR G202 / G204 - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG - TR G182B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

3 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

4 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

5 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

6 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

7 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

8 CIRCUIT INDOOR UNIT TO ASSOCIATED CONDENSING UNIT LOCATED OUTSIDE, BEYOND OUTSIDE WALL OF BUILDING ON

GROUND LEVEL.

9 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

10 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

11 CIRCUIT TO LOCAL RECEPTACLE CIRCUIT IN THIS ROOM.

No. Revisions: Date:

BID DOCUMENTS 07/07/2023

EM

EM

KF

AP

3D 1D

2D /1

V

3D 3D

CC

E M

E M

EM

EM

T

CC

D C

E S

R X

E M

EM

E M

K

EM

E M

E M

E M

031-EP101

031-EP101

(E) 1A

(E) E1A

(E) (B31) 1E

(E) (B31) R1A

C1

C1

(E) (B31) EPBB - 9,11,13

C1 C1

TR

F204

(E) (B31) 1A

(E) (B31) 1A - 19,21,23

(B31) 1CR1A

(B31) 1CR1A - 2 (B31) 1CR1A - 2

(B31) 1CR1A - 2(B31) 1CR1A - 2

(B31) 1CR1A - 2

(B31) 1CR1A - 1,3,5

(B31) 1CR1A - 4

(E) BUSBAR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:4

P

M

031-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/16" = 1'-0"

BLDG 31 - OVERALL FIRST FLOOR - ELECTRICAL DEMOLITION PLAN

1/4" = 1'-0"

BLDG 31 - TR 1-210 - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 31 - TR 1-129 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

2 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

3 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

4 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

5 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

6 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

7 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2D/1V

46" MH

2D/1V

2D/1V

1V

1V

2D /1

V

CC

E M

E M

E M

EM

EM

E M

K

ES

DC

RX

E M

T

031-EP102

(E) (B31) 2W

(E) (B31) E2W (E) (B31) 2E SEC 2

5 6

C1 C1

C1C1

TR-1

2-207A-1

(E) (B31) 2E SEC 2 - 36,38,40

IDU-1

IDU-1

(B31) 1CR1A - 10,12,14

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:5

P

M

031-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 31 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 31 - TR 2-207A - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

2 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

3 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

4 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

5 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

6 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

7 CIRCUIT INDOOR UNIT TO ASSOCIATED CONDENSING UNIT LOCATED OUTSIDE, BEYOND OUTSIDE WALL OF BUILDING ON

GROUND LEVEL.

AP

AP

1D 3D 2D/1V3D 3D

2D/1V

2D/1V

1D

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V2D/1V

AP

3D3D

3D2D/1V3D

3D

2D/1V

2D/1V 3D

3D

3D

2D/1V

3D 3D2D/1V 3D

AP

AP

AP

AP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

W

2D/1V

2D/1V

2D/1V

2D/1V 2V

AP

AP

AP

AP

W 2D/1V

W

3D 3D

3D

3D 3D 3D

2D/1V 2D/1V

AP

AP

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V2D/1V

2D/1V

AP

AP

AP

3D3D3D3D

2D /1

V 2D

/1 V

2D /1

V

2D /1

V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

3D

3D

2D/1V

CC

EM (E)

E M

E M

CC

E M

E M

E M

K

ESDC

RX

035-EP100

(E) (B35) NB (E) (B35) ENB

ODU-2 ODU-2 ODU-2

(B35) E1N-2 - 19,21

(B35) E1N-2 - 20,22

(B35) E1N-2 - 23,25

C1

C1

C1

(B35) 1N-2 - 2,4,6 (B35) E1N-2 - 12,14,16

IDU-2 5

(B35) E1N-2 - 15,17

(B35) E1N-2-18

(B35) E1N-2-18

(B35) E1N-2-18

ODU-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:0

P

M

035-EP100

ELECTRICAL PLAN - BASEMENT

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 35 - OVERALL BASEMENT - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 35 - TR BC102 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

2 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

3 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

4 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

5 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

D W

EM

EM

2D/1V

CC

K

E M

EM

E M

035-EP101

C1

C1

(B35) E1N-2

TR

1A109

(B35) E1N-2 - 1,3,5(B35) 1N-2 - 1,3,5

(B35) 1N-2

(B35) E1N-2-10

(B35) E1N-2-10 IDU-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:0

P

M

035-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 35 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 35 - TR 1A109 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

2 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

3 CIRCUIT INDOOR UNIT TO ASSOCIATED CONDENSING UNIT LOCATED OUTSIDE, BEYOND OUTSIDE WALL OF BUILDING ON

GROUND LEVEL.

D W

R E

F

EM

2D/1V

2D/1V

K

E M

EM

E M E

M

035-EP102

C1

C1

(B35) E1N-2 - 7

(B35) E1N-2 - 7

(B35) E1N-2 - 7

(B35) E1N-2 - 2,4,6(B35) 1N-2 - 7,9,11

IDU-2

(B35) E1N-2-10

(B35) E1N-2-10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:1

P

M

035-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 35 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 35 - TR 2A109 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

3 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

EM

CC

K

E M

EM

EM

E M

E M

035-EP103

C1

C1

(B35) E1N-2 - 8

(B35) E1N-2 - 8

(B35) E1N-2 - 8

(B35) E1N-2 - 8

(B35) E1N-2 - 9,11,13(B35) 1N-2 - 8,10,12

IDU-2

TR

3A109

(B35) E1N-2-10

(B35) E1N-2-10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:2

P

M

035-EP103

ELECTRICAL PLAN - THIRD FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 35 - OVERALL THIRD FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 35 - TR 3A109 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

2 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

3 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

036-EP101

(E) (B36) LP

(E) (B36) LP - 37

(E) (B36) LP - 37

(E) (B36) LP - 39

(E) (B36) LP - 41

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:3

P

M

036-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 36 - TR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 36 - TR B36B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

2 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

3 PROVIDE (2) 120V-30A (L5-30) RECEPTACLES MOUNTED ON WALL BEHIND TE.

(E)

46"

(E) (B60) EB

(E) (B60) EB - 28

(E) (B60) EB - 28

2 (E) (B60) EB - 30

(E) (B60) EB - 31

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:3

P

M

060-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/4" = 1'-0"

BLDG 60 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

2 PROVIDE (2) 120V-30A (L5-30) RECEPTACLES MOUNTED ON WALL BEHIND TE.

S C

S C

S C

S C

2D/1V

2D/1V

2D/1V 2D /1

V

2D /1

V

AP

AP

2D/1V

2D/1V

AP

AP

2D/1V

2D /1

V

2D/1V

2D/1V

AP

1D

AP

AP

AP

AP

AP

1D

2D/1V

APAP

AP

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

AP

AP

AP

AP

AP

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

AP

AP

46" MH2D/1V

2D/1V

2D/1V 2D/1V 2D/1V

2D/1V

2D/1V

AP AP

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

AP

AP

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V2D/1V

2D/1V2D/1V

AP

AP

AP

CC

E M

E M

CC

K

ES

RX

DC

E M

EM

E M

EM

EM

210-EP100

(E) (B210) NGB

(E)(B210) 210

EDP1

(E) LSG

(E) (B210) EGB

ODU-2 ODU-2

ODU-1 ODU-1

(E) (B210) EGB - 18,20

(E) (B210) EGB - 29,31

(E) (B210) EGB - 33,35

(E) (B210) EGB - 34,36

(E) (B210) EGB - 37,39 (E) (B210) EGB - 38,40

C1

C1

(E) (B210) EGB - 25

(E) (B210) EGB - 25

(E) (B210) EGB - 25

(E) (B210) EGB - 25

(E) (B210) EGB - 28,30,32

(E) (B210) NGB - 38,40,42

TR

G023

IDU-1

IDU-1

(E) (B210)

EGB-27

(E) (B210)

EGB-27

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:4

P

M

210-EP100

ELECTRICAL PLAN - BASEMENT

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 210 - OVERALL BASEMENT - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 210 - TR G023 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

2 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

3 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

4 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

5 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

CC

K

DC

RX

ES

E M

E M

EM

E M

EM

EM

EM

210-EP101

(E) (B210) E1A

(E) N1A

(E) N1B

(E) (B210) E1B

(E) N1G

(E) (B210) N1D

(E) N1C

(E) LS1

C1

C1

(E) (B210) E1B - 23

(E) (B210) E1B - 23

(E) (B210) E1B - 23

(E) (B210) E1B - 23

(E) (B210) E1B - 23

(E) (B210) E1B - 35,37,39

(E) (B210) E1B - 23

(E) (B210) N1D - 22,24,26

IDU-2 7

(E) (B210) E1B-24

(E) (B210) E1B-24

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:0

P

M

210-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 210 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 210 - TR 102B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

2 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

3 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

4 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

5 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

6 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

7 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

CC

DCES

RX

K

EM

EM

E M

EM

E M

EM

OS

210-EP102

(E) (B210) E2B

(E) 210-N2D

(E) (B210) N2G (E) N2C

C1

C1

(E) (B210) E2B - 23

(E) (B210) E2B - 23

(E) (B210) E2B - 32,34,36

(E) (B210) E2B - 23

(E) (B210) E2B - 23

(E) (B210) E2B - 23

(E) (B210) N2G - 7,9,11

IDU-2 6

(E) (B210) E2B-26

(E) (B210) E2B-26

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:1

P

M

210-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 210 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 210 - TR 202B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

2 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

3 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

4 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

5 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

6 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

1V 1V

1V 1V

1V 1V

1V 1V

1V 1V

2D/1V

2D/1V

2D/1V2D/1V 2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

1D

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

W W

2D/1V

2D/1V

W

46" MH2D/1V

46" MH

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V 2D/1V

2D/1V

2D/1V2D/1V

2D/1V

W

1D

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V2D/1V

2D/1V

2D/1V

2D/1V

2D/1V 2D/1V 2D/1V

2D/1V 2D/1V

2D/1V 2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

1V

46"

2D/1V

2D/1V

E M

K

E M

EM

EM

E M

K

(E)

E M

(E

EM

E M

EM

211-EP100

211-EP100

ODU-2

ODU-2

ODU-2

ODU-2

ODU-1 ODU-1 ODU-2

Elect. Room

G009

Mechanical

G028

(E) (B211) EGB

(E) (B211) EGB - 27,29

(E) (B211) EGB - 31,33

(E) (B211) EGB - 32,34

(E) (B211) EGB - 35,37

(E) (B211) E1A - 33,35

(E) (B211) E1A - 34,36

(E) (B211) E1D - 33,35

(E) (B211) NGB

C1

C1

(E) SYMMETRY

PACS

CONTROLLER

(E) (B211) EGB - 36,38,40

(E) (B211) NGB - 31,33,35

IDU-2 8

C1

C1

IDU-2

(E) (B211) EGB - 17,19,21 (E) (B211) NGB - 25,27,29

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:3

P

M

211-EP100

ELECTRICAL PLAN - BASEMENT

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 211 - OVERALL BASEMENT - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR G007 - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR G018 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

3 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

4 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

5 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

6 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

7 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

8 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

E M

EM K

DC

RX

ES

E M

E M

EM

T

F

AP

46" MH2D/1VW

RX

K

DCES

EM

EM

E M

EM

EM

F

211-EP101

211-EP101

(E) (B211) E1A

(E) N1A

(E) N1B

(E) 211-N1H

(E) (B211) N1G

(E) (B211) E1D

(E) (B211) N1C

(B211) N1D

(E) (B211) E1B

C1

C1

(E) (B211) E1D - 25

(E) (B211) E1D - 25

(E) (B211) E1D - 25

(E) (B211) E1D - 25

(E) (B211) E1D - 38,40,42

(E) (B211) N1G - 46,48,50

3 5

(E) (B211) E1D - 25

(E) (B211) E1B-21

(E) (B211) E1B-21

2 3

(E) (B211) E1B - 19

(E) (B211) E1B - 19 (E) (B211) E1B - 19

(E) (B211) E1B - 19

(E) (B211) E1B - 20,22,24

(E) (B211) N1C - 43,45,47

C1

C1

IDU-2

(E) (B211) E1B-21

(E) (B211) E1B-21

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:5

P

M

211-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 211 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR 189B - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR 108B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

2 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

3 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

4 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

5 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

6 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

EM

E M

E M

K

DC

ES

RX

E M

T

1V

EM

EM

E M

E M

K

DC ES

RX

EM

EM

F

211-EP102

211-EP102

(E) E2A

(E) N2A

(E) N2B

(E) 211-N2H

(E) 211-N2G

(E) (B211) E2D

(E) 211-LS2

(E) 211-N2D

(E) (B211) N2C

(E) (B211) E2B

12 34

C1 C1

(E) (B211) E2B - 20

(E) (B211) E2B - 20

(E) (B211) E2B - 20

(E) (B211) E2B - 37,39,41

(E) (B211) N2C - 43,45,47

(E) (B211) E2B - 20

(E) (B211) E2B - 20

(E) (B211) E2B-22

(E) (B211) E2B-22

IDU-2

C1

C1

(E) (B211) E2B - 21

(E) (B211) E2B - 21

(E) (B211) E2B - 21

(E) (B211) E2B - 21

(E) (B211) E2B - 21

(E) (B211) E2B - 38,40,42(E) (B211) N2C - 37,39,41

IDU-2

(E) (B211) E2B-22

(E) (B211) E2B-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:1

P

M

211-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

3/32" = 1'-0"

BLDG 211 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR 289B - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 211 - TR 208B - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

3 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

4 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

5 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

6 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

(E

(E)

2D/1V

W

CC

E M

EM

E M

EM

K

DC

ES

RX

E M

212-EP100

(E) 212-E

SYMMETRY PACS

CONTROLLER

C1 C1TR

15A

ODU-2 ODU-2

(E) (B212) EM-2 - 13,15,17

(E) (B212) C - 38,40,42

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:2

P

M

212-EP100

ELECTRICAL PLAN - BASEMENT

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 212 - OVERALL BASEMENT - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 212 - TR 15A - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

3 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

4 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

5 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

6 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

7 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

REF.

CC

EM

E M

E M

E

ME

M

212-EP101

(E) (B212) E

(E) (B212) EQ

(E) (B212) EM-2

(E) (B212) B

C1 C1

IDU-2

(E) (B212) EM-2 - 7,9,11

(E) (B212) E - 3,5,7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:2

P

M

212-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 212 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 212 - TR 125 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-30R RECEPTACLES. MOUNT ON TOP OF NEW DATA RACK.

2 CIRCUIT NEW RECEPTACLES TO EMERGENCY PANEL.

3 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

EM

EM

E M

CR

CC

212-EP102

(E) (B212) F

(E) (B212) C

C1

C1

(E)

(E) BUSBAR

IDU-2

(E) (B212) EM-2 - 8,10,12(E) (B212) F - 38,40,42

STAIRS STAIRS

TR LOCATION

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:3

P

M

212-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 212 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

2 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

3 CIRCUIT INDOOR UNIT TO ASSOCIATED CONDENSING UNIT LOCATED OUTSIDE, BEYOND OUTSIDE WALL OF BUILDING ON

GROUND LEVEL.

4 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

1/4" = 1'-0"

BLDG 212 - TR 225 - NEW WORK PLAN

D W

CC

(E)

OS

46"

46"

247-EP101

(E) (B247) L1

(E) L2

(E) (B247) L1

(E) (B247) L1 - 28 (E) (B247) L1 - 28

2(E) (B247) L1 - 27

(E) (B247) L3 - 35

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:4

P

M

247-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 247 - TR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 247 - TR 109 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

2 PROVIDE (2) 120V-30A (L5-30) RECEPTACLES MOUNTED ON WALL BEHIND TE.

AP

AP

AP

2D/1V

2D/1V 2D/1V

2D/1V 3D/1V

2D/1V

2D/1V

AP

2D/1V

CC

46"

(E)

(E) (B252) B (E) (B252) A

(E) (B252) B - 5(E) (B252) B - 5

(E) (B252) B - 6

(E) (B252) B - 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:4

P

M

252-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB IA

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/4" = 1'-0"

BLDG 252 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

2 PROVIDE (2) 120V-30A (L5-30) RECEPTACLES MOUNTED ON WALL BEHIND TE.

2D/1V 2D/1V

2D/1V

AP

2D/1V

2D/1V

46" MH2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

AP

AP

CC

E M

EM

R X

D C

E S

K

E M

AP

46" MH2D/1V 2D/1V

2D/1V

SYMMETRY PACS

CONTROLLER

C1 C1

(E) (B259) B - 5,7,9

(E) (B259) B - 11,13,15

IDU-2

(E) (B259) B

(E) 45 XFMR

(E) 45 XFMR

(E) A(E) P(E) H

ODU-2

(E) (B259) B - 2,4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:5

P

M

259-EP102

ELECTRICAL PLAN - SECOND

FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/4" = 1'-0"

BLDG 259 - OVERALL SECOND FLOOR - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 INSTALL NEW KEY PAD / CARD READER, DOOR CONTACT, ELECTRIC STRIKE, AND MOTION SENSOR TO DOOR.

2 INSTALL NEW 120V 30A HEAVY DUTY NON-FUSED DISCONNECT AND FEED (2)#12, #12 GROUND, 3/4"C TO SPLIT SYSTEM

UNIT MOTOR.

3 INSTALL NEW 8 DOOR SYMMETRY PACS PANEL CONTROLLER AND POWER SUPPLY.

4 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

5 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

6 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

7 CIRCUIT INDOOR CASSETTE UNIT TO OUTDOOR CONDENSER. PROVIDE DISCONNECT SWITCH MOUNTED UP HIGH NEXT

TO CASSETTE UNIT.

8 CIRCUIT TO LOCAL EMERGENCY RECEPTACLE CIRCUIT

1/8" = 1'-0"

BLDG 259 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

No. Revisions: Date:

BID DOCUMENTS 07/07/2023

1/8" = 1'-0"

BLDG 259 - OVERALL ROOF PLAN - ELECTRICAL NEW WORK PLAN

UP

AP

22D/1V

2D/1V

AP

2V

1V1D/1V

CC

2D/1V

CC

OS

(E)

(E)

(E)

(E)

K

RX

ESDC

E M

E M

261-EP101

(E) (B261) 20:1

208 VOLT (E) (B261) 48:1

480 VOLT

ODU-2

(E) (B261) 20:1 208 VOLT - 2,4

20:3 208 VOLT

(E) SYMMETRY

PACS

CONTROLLER

(E) PACS POWER

SUPPLY

(E) PACS POWER

SUPPLY

(E) SYMMETRY

PACS

CONTROLLER

GROUNDING BUS

BAR

(E) (B261) 20:1 208 VOLT - 5,7,9

C2

C2

IDU-2

(E) (B261) 20:1 208 VOLT - 11,13,15

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/9 /2

:4

:0

P

M

261-EP101

ELECTRICAL PLAN - FIRST FLOOR

07/07/2023 JB CLG

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

1/8" = 1'-0"

BLDG 261 - OVERALL FIRST FLOOR - ELECTRICAL NEW WORK PLAN

1/4" = 1'-0"

BLDG 261 - TR 103 - ELECTRICAL NEW WORK PLAN

D R A W I N G N O T E S :

1 CIRCUIT NEW TR LIGHTING FIXTURES TO LOCAL LIGHTING CIRCUIT MAINTAINED DURING DEMOLITION.

2 INSTALL NEW BUSBAR GROUNDING ELECTRODE. (TGB) THE BONDING CONDUCTOR SHALL BE COPPER, STRANDED OR SOLID IN CONDUIT AND SHALL BE RUN IN AS STRAIGHT A LINE AS PRACTICABLE. (1/0 CU). THE BONDING CONDUCTOR SHALL BE CONNECTED TO THE INTERSYSTEM BONDING TERMINATION. (1/0 CU). IF NO INTERSYSTEM BONDING TERMINATION EXISTS, CONNECT TO THE GROUNDED INTERIOR METAL WATER PIPING SYSTEM, WITHIN 1.5 M (5 FT) FROM

ITS POINT OF ENTRANCE TO THE BUILDING.

3 CIRCUIT TO EXISTING EMERGENCY RECEPTACLE CIRCUIT IN THIS ROOM.

4 PROVIDE (2) L21-20R RECEPTACLES. MOUNT ABOVE DATA RACK ON SIDE OF CABLE TRAY.

5 CIRCUIT INDOOR…

This is the start of the file's text. The full file is on GovTribe.