This document contains details of a federal solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation, numbered 36C77623B0058, is for construction services for EHRM Infrastructure Upgrades at the Chillicothe, Ohio VA medical center. The opportunity type is listed as a solicitation. The related file is a 15MB PDF titled "Att 5 Volume 5 - Fire Suppression_Combined" that contains additional specification details for the infrastructure upgrade project. Responses to the solicitation are due based on the standard solicitation timeline and award will be made to the responsible bidder whose proposal follows the solicitation instructions and is most advantageous to the government regarding technical approach and pricing.

View the file

Other files

File Type Posted
Abstract of offers - Chillicothe Bid Opening 01172024 signed.pdf PDF
S06 - Amendment 0009 Bid Opening.pdf PDF
S06 - Amendment 0008 Extend due date to 01172024.pdf PDF
S06 - 36C77623B0058 0007.pdf PDF
S06 - Amendment 0007 Att 10 - 14.063_024-EP100 - ELECTRICAL PLAN - BASEMENT FLOOR.pdf PDF
S06 - Amendment 0007 Att 13 - 14.116_E616.31 - PANELBOARD SCHEDULES.pdf PDF
S06 - Amendment 0007 Att 4 - Chiillicothe VA Lead Paint Survey Report.pdf PDF
S06 - Amendment 0007 Att 7 - 000-TS100 - CAMPUS TECHNOLOGY SITE PLAN.pdf PDF
S06 - Amendment 0007 Att 6 - 000-TN500 - TECHNOLOGY DETAILS.pdf PDF
S06 - Amendment 0007 Att 3 - 2023-01 AHERA.pdf PDF
S06 - Amendment 0007 Att 11 - 14.077_031-EP100 - ELECTRICAL PLAN - GROUND FLOOR.pdf PDF
S06 - Amendment 0007 Att 16 - 026-TN100 - BASEMENT PLAN -TECHNOLOGY.pdf PDF
S06 - Amendment 0007 Att 14 - 018-TN209 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 8 - 13.038_030-MD101 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR.pdf PDF
S06 - Amendment 0007 Att 12 - 14.080_035-EP100 - ELECTRICAL PLAN - BASEMENT.pdf PDF
S06 - Amendment 0007 Att 1 Technical questions Round 2 responses.pdf PDF
S06 - Amendment 0007 Att 2 - Final SWP3.pdf PDF
S06 - Amendment 0007 Att 15 - 018-TN210 - TECHNOLOGY ENLARGEMENT.pdf PDF
S06 - Amendment 0007 Att 5 - 000-TN400 - TECHNOLOGY RISER DIAGRAMS.pdf PDF
S06 - Amendment 0007 Att 9 - 14.062_023-EP101 - ELECTRICAL PLAN - FIRST FLOOR.pdf PDF
Amendment 0006 36C77623B0058.pdf PDF
Amendment 0005 36C77623B0058.pdf PDF
Amendment 0005 - Attachment Addendum 1.zip ZIP file
Amendment 0005 - Attachment - Vendor Questions_Responses final.pdf PDF
Amendment 0004 36C77623B0058.pdf PDF
Amendment 0003 36C77623B0058.docx DOCX document
Att 10 Volume 10 - Technology_Combined.pdf PDF
Att 8 Volume 8 - Electrical_Combined.pdf PDF
Att 6 Volume 6 - Mechanical_Combined.pdf PDF
Att 9 Volume 9 - Electrical_Combined.pdf PDF
Att 13 Volume 13 - Fiber_Combined.pdf PDF
Att 4 Volume 4 - Architectural_Combined.pdf PDF
Att 14 S04 - Site Visit sign in 10-11-2023.pdf PDF
Att 7 Volume 7 - Mechanical_Combined.pdf PDF
Att 12 Volume 12 - Fiber_Combined.pdf PDF
Att 11 Volume 11 - Technology_Combined.pdf PDF
Att 3 Volume 3 - Architectural_Combined.pdf PDF
Att 2 Volume 2 - Civil_Combined (1).pdf PDF
36C77623B0058 0002.docx DOCX document
Att 1 Volume 1 - General and Civil_Combined.pdf PDF
DBA Wage Rates Construction - Ross Cty.pdf PDF
36C77623B0058 0001.docx DOCX document
Attachment 04 - DBA Wage Determination.pdf PDF
Updated _Specifications_Combined.pdf PDF
Attachment 08 - SOW attach Volume 1 Part 3.pdf PDF
Attachment 09 - SOW attach Volume 1 Part 4.pdf PDF
Attachment 04 - Wage Rate Determination - Chillicothe.pdf PDF
Attachment 11 - SOW attach Volume 1 Part 6.pdf PDF
Attachment 19 - SOW attach Volume 3 Part 4.pdf PDF
Attachment 17 - SOW attach Volume 3 Part 2.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

N

CHILLICOTHE VA MEDICAL CENTER

PROJECT NUMBER: 538-21-701

DEPARTMENT OF VETERANS AFFAIRS

273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601

EHRM INFRASTRUCTURE UPGRADES

VOLUME 5 OF 13

G E N E R A L N O T E S

A. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE

EXISTING FACILITY. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS

PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE

EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE

IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF

EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION. MAINTAIN EXIT EGRESS PATHS

TO EXISTING EXIT DOORS DURING CONSTRUCTION.

B. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE

AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF

THE PROJECT.

C. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE

DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.

D. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE

SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN

APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT

ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED

SPACES.

E. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND

SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES

WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE

C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR

UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.

F. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S

AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR

EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE

CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL

CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.

G. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO

PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF

THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

H. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL

STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.

I. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING

FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.

J. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS

WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER

TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR

AND SUBCONTRACTORS SHALL COORDINATE WITH ALL OTHER DISCIPLINES.

K. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED

AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.

L. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND

OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE

EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED

CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED

TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

M. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE

SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO

BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE

PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

N. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE

ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE

EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.

O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.

DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW

WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.

P. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE

SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH

DAY.

Q. NEW HOLES IN EXISTING ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE

EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.

R. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.

E X I S T I N G F A C I L I T I E S:

A. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.

B. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF

WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S

INSTALLATION INSTRUCTIONS WILL SUPERSEDE.

C. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING

WITH WORK.

D. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR

BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE

IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL

WRITTEN CLARIFICATION FROM THE ARCHITECT/ENGINEER IS RECEIVED.

E. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE

PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.

F. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR

EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS

ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM

STANDARD OF QUALITY.

G. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR

CONSTRUCTION.

H. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING THE ADHERENCE TO

OSHA REGULATIONS.

I. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE

WHERE THIS PROJECT IS LOCATED.

J. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS FOR REMOVAL.

DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER

SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.

COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE

IN OR AROUND THE CONSTRUCTION SITE.

K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, EXACT SIZE AND LOCATION OF ALL

ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE

ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.

L. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH

FACE OF CONSTRUCTION.

M. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

N. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND APPLY SEALANT.

O. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH

THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END

OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING

COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION

AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

P. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING

ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, AND C.O.R. PRIOR TO CONSTRUCTION.

Q. REFER TO SHEET AE601 FOR SCHEDULES AND PARTITION TYPES.

N E W W O R K:

SHEET NAMING EXAMPLE:

BUILDING NUMBER

DISCIPLINE

SHEET TYPE

FLOOR NUMBER

ZONE LOCATION ON FLOOR

100-AE101.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e V

A

E H

R M

/F F

E

C h ill ic o th e

E H

R M

C a m p u s rv t

/1

/2

:3

:0

P

M

GI000.5

COVER SHEET - VOL. 5

07/07/2023 PQ JF

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OHIO

BID DOCUMENTS - 100%

CAMPUS

CHILLICOTHE

VAMC

Approved: Veteran's Affairs Medical Center

N.T.S.Scale:

VICINITY MAP

N.T.S.Scale:

CAMPUS MAP

No. Revisions: Date:

BID DOCUMENTS 07/07/2023

SHEET INDEX

FIRE PROTECTION

001-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

001-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

003-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

007-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

009-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

018-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

023-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

024-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

024-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

025-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

026-FX100 FIRE SUPPRESSION PLAN - BASEMENT

026-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

027-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

027-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

028-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

030-FX100 FIRE SUPPRESSION PLAN - BASEMENT

030-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

030-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

031-FX100 FIRE SUPPRESSION PLAN - BASEMENT

031-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

031-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

060-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

210-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

210-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

211-FX100 FIRE SUPPRESSION PLAN - BASEMENT

211-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

211-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

212-FX100 FIRE SUPPRESSION PLAN - BASEMENT

212-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

247-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

259-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

261-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

N.T.S.Scale:

VICINITY MAP

SHEET INDEX

GENERAL

GI000.5 COVER SHEET - VOL. 5

DN DNDN

UP UP

Files Storage

TR

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

ORDINARY HAZARD 2

TR

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500 SF 100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

ORDINARY HAZARD GROUP II 0.20 GPM/SF OVER 1500 SF 250 GPM 90 MIN QR; K = 5.6 OR K = 8.0 BASE AREA1 SPRINKLER PER 130 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:3

P M

001-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

2 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

BID DOCUMENTS 07/07/2023

07/07/2023

DN

UP

DN

UP

HMR ASSISTANT-1

238-1

Tele Clos

Nurse Training Storage

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Training Room

TR

284A

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:3

P M

001-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR-1

103-1

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:4

P M

003-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR

108D

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:4

P M

007-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 NO CEILING IN THIS ROOM. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW ROOM LAYOUT.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

DN DN

UP

DN

Volunteer Work Room

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Closet

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:5

P M

009-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR-2

226-2

Office

OFFICE

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

11 2

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:0

P M

018-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

DN

DN

UP

UP

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

TR

121A

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:0

P M

023-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

TR

Conference Room

124A

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:1

P M

024-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH

PIPING UP.

2 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

Tele Clos

ELEC CLOS

002U

ELEC CLOS

002V

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:1

P M

024-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

LIGHT HAZARD

TR

102D

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:5

:3

P M

025-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

CIO

TR

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:2

P M

026-FX100

FIRE SUPPRESSION PLAN -

BASEMENT

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - BASEMENT - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:2

P M

026-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:3

P M

027-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:3

P M

027-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH

PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:4

P M

028-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL

D R A W I N G N O T E S :

1 NO CEILING IN THIS ROOM. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW ROOM LAYOUT.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR

8E

Elect. Room

8F

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:4

P M

030-FX100

FIRE SUPPRESSION PLAN -

BASEMENT

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - BASEMENT

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

Tele Clos

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:4

:5

P M

030-FX101

FIRE SUPPRESSION PLAN - FIRST

FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - FIRST FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO

ACCOMMODATE NEW CEILING.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

TR-1

226-1

Room

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /C h ill ic o th e

V A

E

H R

M /F

F E

C h ill ic o th e

E H

R M

M

E P rv t

/6 /2

:5

:0

P M

030-FX102

FIRE SUPPRESSION PLAN -

SECOND FLOOR

07/07/2023 GP GP

EHRM INFRASTRUCTURE

UPGRADES

538-21-701

CHILLICOTHE, OH

BID DOCUMENTS

CHILLICOTHE

VAMC

Approved: Owner

N

3/32" = 1'-0"

FIRE SUPPRESSION PLAN - SECOND FLOOR

D R A W I N G N O T E S :

1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN

BRANCH PIPING UP.

2 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM

LAYOUT.

No. Revisions: Date:

BID DOCUMENTS - 100% SUBMITTAL 05/01/2023

UP

DN

UP

DN

DN

DN

DN

DN

UP

REF.

CT Power Equipment

G-345G

F I R E H A Z A R D L E G E N D :

LIGHT HAZARD

Conference Room

G182

TR

G182A

Tele Clos

G-202

Elect. Room

G-500C

TR

G-500D

G E N E R A L N O T E S :

A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA

RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY

SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.

B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS

WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER

DISCHARGE PATTERN AND COVERAGE.

C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED

TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER

CONSTRUCTION.

D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.

E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER

TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF

IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,

SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

FIRE…