Att 5 Volume 5 - Fire Suppression_Combined.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--538-21-701 EHRM Infrastructure Upgrades Construction Chillicothe, OH (VA-23-00066755)
- Solicitation number
- 36C77623B0058
About this file
This document contains details of a federal solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation, numbered 36C77623B0058, is for construction services for EHRM Infrastructure Upgrades at the Chillicothe, Ohio VA medical center. The opportunity type is listed as a solicitation. The related file is a 15MB PDF titled "Att 5 Volume 5 - Fire Suppression_Combined" that contains additional specification details for the infrastructure upgrade project. Responses to the solicitation are due based on the standard solicitation timeline and award will be made to the responsible bidder whose proposal follows the solicitation instructions and is most advantageous to the government regarding technical approach and pricing.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
N
CHILLICOTHE VA MEDICAL CENTER
PROJECT NUMBER: 538-21-701
DEPARTMENT OF VETERANS AFFAIRS
273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601
EHRM INFRASTRUCTURE UPGRADES
VOLUME 5 OF 13
G E N E R A L N O T E S
A. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE
EXISTING FACILITY. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS
PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE
EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE
IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF
EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION. MAINTAIN EXIT EGRESS PATHS
TO EXISTING EXIT DOORS DURING CONSTRUCTION.
B. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE
AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF
THE PROJECT.
C. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE
DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
D. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE
SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN
APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT
ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED
SPACES.
E. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND
SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES
WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE
C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR
UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
F. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S
AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR
EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE
CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL
CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
G. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO
PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF
THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
H. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL
STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
I. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING
FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
J. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS
WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER
TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR
AND SUBCONTRACTORS SHALL COORDINATE WITH ALL OTHER DISCIPLINES.
K. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED
AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
L. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND
OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE
EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED
CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED
TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
M. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE
SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO
BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
N. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE
ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE
EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.
DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW
WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
P. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE
SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH
DAY.
Q. NEW HOLES IN EXISTING ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE
EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
R. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING
SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
E X I S T I N G F A C I L I T I E S:
A. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
B. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF
WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S
INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
C. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING
WITH WORK.
D. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR
BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL
WRITTEN CLARIFICATION FROM THE ARCHITECT/ENGINEER IS RECEIVED.
E. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE
PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
F. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR
EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS
ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM
STANDARD OF QUALITY.
G. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION.
H. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING THE ADHERENCE TO
OSHA REGULATIONS.
I. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE
WHERE THIS PROJECT IS LOCATED.
J. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS FOR REMOVAL.
DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER
SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.
COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE
IN OR AROUND THE CONSTRUCTION SITE.
K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, EXACT SIZE AND LOCATION OF ALL
ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE
ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
L. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH
FACE OF CONSTRUCTION.
M. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
N. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND APPLY SEALANT.
O. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH
THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END
OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING
COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION
AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
P. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING
ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, AND C.O.R. PRIOR TO CONSTRUCTION.
Q. REFER TO SHEET AE601 FOR SCHEDULES AND PARTITION TYPES.
N E W W O R K:
SHEET NAMING EXAMPLE:
BUILDING NUMBER
DISCIPLINE
SHEET TYPE
FLOOR NUMBER
ZONE LOCATION ON FLOOR
100-AE101.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e V
A
E H
R M
/F F
E
C h ill ic o th e
E H
R M
C a m p u s rv t
/1
/2
:3
:0
P
M
GI000.5
COVER SHEET - VOL. 5
07/07/2023 PQ JF
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OHIO
BID DOCUMENTS - 100%
CAMPUS
CHILLICOTHE
VAMC
Approved: Veteran's Affairs Medical Center
N.T.S.Scale:
VICINITY MAP
N.T.S.Scale:
CAMPUS MAP
No. Revisions: Date:
BID DOCUMENTS 07/07/2023
SHEET INDEX
FIRE PROTECTION
001-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
001-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
003-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
007-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
009-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
018-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
023-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
024-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
024-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
025-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
026-FX100 FIRE SUPPRESSION PLAN - BASEMENT
026-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
027-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
027-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
028-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
030-FX100 FIRE SUPPRESSION PLAN - BASEMENT
030-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
030-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
031-FX100 FIRE SUPPRESSION PLAN - BASEMENT
031-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
031-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
060-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
210-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
210-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
211-FX100 FIRE SUPPRESSION PLAN - BASEMENT
211-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
211-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
212-FX100 FIRE SUPPRESSION PLAN - BASEMENT
212-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
247-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
259-FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
261-FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
N.T.S.Scale:
VICINITY MAP
SHEET INDEX
GENERAL
GI000.5 COVER SHEET - VOL. 5
DN DNDN
UP UP
Files Storage
TR
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
ORDINARY HAZARD 2
TR
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500 SF 100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
ORDINARY HAZARD GROUP II 0.20 GPM/SF OVER 1500 SF 250 GPM 90 MIN QR; K = 5.6 OR K = 8.0 BASE AREA1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:3
P M
001-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
2 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
BID DOCUMENTS 07/07/2023
07/07/2023
DN
UP
DN
UP
HMR ASSISTANT-1
238-1
Tele Clos
Nurse Training Storage
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
Training Room
TR
284A
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:3
P M
001-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR-1
103-1
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:4
P M
003-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR - OVERALL
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR
108D
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:4
P M
007-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 NO CEILING IN THIS ROOM. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW ROOM LAYOUT.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
DN DN
UP
DN
Volunteer Work Room
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
Closet
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:5
P M
009-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR-2
226-2
Office
OFFICE
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
11 2
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:0
P M
018-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
2 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
DN
DN
UP
UP
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
TR
121A
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:0
P M
023-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM
LAYOUT.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
TR
Conference Room
124A
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:1
P M
024-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH
PIPING UP.
2 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
Tele Clos
ELEC CLOS
002U
ELEC CLOS
002V
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:1
P M
024-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
LIGHT HAZARD
TR
102D
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:5
:3
P M
025-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM
LAYOUT.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
CIO
TR
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:2
P M
026-FX100
FIRE SUPPRESSION PLAN -
BASEMENT
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - BASEMENT - OVERALL
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:2
P M
026-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:3
P M
027-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:3
P M
027-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN BRANCH
PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:4
P M
028-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR - OVERALL
D R A W I N G N O T E S :
1 NO CEILING IN THIS ROOM. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW ROOM LAYOUT.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR
8E
Elect. Room
8F
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:4
P M
030-FX100
FIRE SUPPRESSION PLAN -
BASEMENT
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - BASEMENT
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
Tele Clos
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:4
:5
P M
030-FX101
FIRE SUPPRESSION PLAN - FIRST
FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - FIRST FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM MODIFIED. REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO
ACCOMMODATE NEW CEILING.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
TR-1
226-1
Room
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C h ill ic o th e
V A
E
H R
M /F
F E
C h ill ic o th e
E H
R M
M
E P rv t
/6 /2
:5
:0
P M
030-FX102
FIRE SUPPRESSION PLAN -
SECOND FLOOR
07/07/2023 GP GP
EHRM INFRASTRUCTURE
UPGRADES
538-21-701
CHILLICOTHE, OH
BID DOCUMENTS
CHILLICOTHE
VAMC
Approved: Owner
N
3/32" = 1'-0"
FIRE SUPPRESSION PLAN - SECOND FLOOR
D R A W I N G N O T E S :
1 CEILING IN THIS ROOM REMOVED. REPLACE EXISTING SPRINKLER HEAD(S) AND TURN
BRANCH PIPING UP.
2 REPLACE EXISTING SPRINKLER HEADS AND RELOCATE TO ACCOMMODATE NEW ROOM
LAYOUT.
No. Revisions: Date:
BID DOCUMENTS - 100% SUBMITTAL 05/01/2023
UP
DN
UP
DN
DN
DN
DN
DN
UP
REF.
CT Power Equipment
G-345G
F I R E H A Z A R D L E G E N D :
LIGHT HAZARD
Conference Room
G182
TR
G182A
Tele Clos
G-202
Elect. Room
G-500C
TR
G-500D
G E N E R A L N O T E S :
A. PROVIDE COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL. THE AREA
RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE SPRINKLERS. MODIFY
SPRINKLER HEAD AND PIPING LOCATIONS AS NECESSARY.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS
WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED
TO PROVIDE A COMPLETE INSTALLATION TO ELIMINATE INTERFERENCE WITH OTHER
CONSTRUCTION.
D. PIPE SIZES SHALL BE DETERMINED BY PIPE SCHEDULE METHOD BY CONTRACTOR.
E. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER
TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS OF
IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
F. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES,
SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
FIRE…