Atch 31 Progress Report Template_AF3065.pdf

PDF 94 KB Posted

Attached to
IDIQ Paving Federal contract opportunity
Solicitation number
FA486122R0011
Issued by
Department of the Air Force

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ Paving, newest first.
File Type Posted
Atch 32 Plan 32-7086 Hazardous Material Management Plan.pdf PDF
Atch 24 APPENDIX 18 Nuclear Gauge Request Form 2.pdf PDF
Atch 17 APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 14 APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10 APPENDIX 6 Sidewalk Detail.pdf PDF
Atch 05 APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 01 Paving SOW.pdf PDF
Atch 40 (DBIDS) Installation Pass Request_Creech Template.pdf PDF
Atch 44- Sample Client Authorization Letter.pdf PDF
Atch 42 Past Performance Information Sheet.pdf PDF
Atch 39 Nellis Single Pass 1 Year Request Template.docx DOCX document
Atch 38 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 36 Wage Determination Number Number NV1.pdf PDF
Atch 30 Progress Schedule.xlsx XLSX spreadsheet
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
Atch 33 Temporary Fencing Guidelines for Desert Tortoise Projects (2022).pdf PDF
Atch 26 APPENDIX 20 Environmental Permit Guidance Mar 2022.pdf PDF
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf PDF
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx DOCX document
Atch 16 APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 15 APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11 APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 37 Wage Determination Number NV24.pdf PDF
Atch 29 NTTR Visit Request.pdf PDF
Atch 27 APPENDIX 21 National_Manual_Uniform Traffic Control Devices.pdf PDF
Atch 25 APPENDIX 19 T10_1-Bollards Fixed- Type 2.pdf PDF
Atch 23 APPENDIX 18 Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 19 APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 09 APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 08 APPENDIX 4 A Curb Detail.pdf PDF
Atch 06 APPENDIX 2 Mooring Detail.pdf PDF
Atch 00-Paving IDIQ List of Attachments.pdf PDF
Atch 43 Past Performance Questionnaire.pdf PDF
Atch 41 Subcontractor or Teaming Partner Consent Form.pdf PDF
Atch 35 Request for Authorization for Radioactive Materials.pdf PDF
Atch 28 APPENDIX 22 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 20 Appendix 16 Nellis_Creech_IFS_Final.pdf PDF
Atch 18 APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13 APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 12 APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 07 APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 02 Paving IDIQ Bid Schedule.xlsx XLSX spreadsheet
Solicitation - FA486122R0011.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB NO. 0704-0188CONTRACT PROGRESS REPORT

Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.

CONTRACTOR ADDRESS

REPORT NO. PERIOD COVERED

FROM:

PROJECT NO. CONTRACT NO. COMPLETION DATE

TO:

LINE

NO.

% OF

TOTAL JOB

% COMPLETED

THIS PERIOD

% COMPLETED

CUMULATIVE

WORK ELEMENT

TOTAL

REMARKS

At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.

PROGRESS OR COMPLETION CERTIFICATE

I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.

SUBMITTED BY OR FOR

CONTRACTOR BASE CIVIL ENGINEER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

CONTRACTOR:
ADDRESS:
REPORT NO:
FROM:
TO:
PROJECT NO:
CONTRACT NO:
COMPLETION DATE:
LINE NORow1:
WORK ELEMENTRow1:
OF TOTAL JOBRow1:
COMPLETED THIS PERIODRow1:
COMPLETED CUMULATIVERow1:
LINE NORow2:
WORK ELEMENTRow2:
OF TOTAL JOBRow2:
COMPLETED THIS PERIODRow2:
COMPLETED CUMULATIVERow2:
LINE NORow3:
WORK ELEMENTRow3:
OF TOTAL JOBRow3:
COMPLETED THIS PERIODRow3:
COMPLETED CUMULATIVERow3:
LINE NORow4:
WORK ELEMENTRow4:
OF TOTAL JOBRow4:
COMPLETED THIS PERIODRow4:
COMPLETED CUMULATIVERow4:
LINE NORow5:
WORK ELEMENTRow5:
OF TOTAL JOBRow5:
COMPLETED THIS PERIODRow5:
COMPLETED CUMULATIVERow5:
LINE NORow6:
WORK ELEMENTRow6:
OF TOTAL JOBRow6:
COMPLETED THIS PERIODRow6:
COMPLETED CUMULATIVERow6:
LINE NORow7:
WORK ELEMENTRow7:
OF TOTAL JOBRow7:
COMPLETED THIS PERIODRow7:
COMPLETED CUMULATIVERow7:
LINE NORow8:
WORK ELEMENTRow8:
OF TOTAL JOBRow8:
COMPLETED THIS PERIODRow8:
COMPLETED CUMULATIVERow8:
LINE NORow9:
WORK ELEMENTRow9:
OF TOTAL JOBRow9:
COMPLETED THIS PERIODRow9:
COMPLETED CUMULATIVERow9:
LINE NORow10:
WORK ELEMENTRow10:
OF TOTAL JOBRow10:
COMPLETED THIS PERIODRow10:
COMPLETED CUMULATIVERow10:
LINE NORow11:
WORK ELEMENTRow11:
OF TOTAL JOBRow11:
COMPLETED THIS PERIODRow11:
COMPLETED CUMULATIVERow11:
LINE NORow12:
WORK ELEMENTRow12:
OF TOTAL JOBRow12:
COMPLETED THIS PERIODRow12:
COMPLETED CUMULATIVERow12:
LINE NORow13:
WORK ELEMENTRow13:
OF TOTAL JOBRow13:
COMPLETED THIS PERIODRow13:
COMPLETED CUMULATIVERow13:
LINE NORow14:
WORK ELEMENTRow14:
OF TOTAL JOBRow14:
COMPLETED THIS PERIODRow14:
COMPLETED CUMULATIVERow14:
LINE NORow15:
WORK ELEMENTRow15:
OF TOTAL JOBRow15:
COMPLETED THIS PERIODRow15:
COMPLETED CUMULATIVERow15:
OF TOTAL JOBTOTAL:
COMPLETED THIS PERIODTOTAL:
COMPLETED CUMULATIVETOTAL:
REMARKS: ACTUAL %: _____

SCHEDULED %: _______

undefined:
BASE CIVIL ENGINEER: Off
TYPE OR PRINT NAME AND TITLE:
DATE:
TYPE OR PRINT NAME AND TITLE_2:
DATE_2: