Atch 33 Temporary Fencing Guidelines for Desert Tortoise Projects (2022).pdf

PDF 426 KB Posted

Attached to
IDIQ Paving Federal contract opportunity
Solicitation number
FA486122R0011
Issued by
Department of the Air Force

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ Paving, newest first.
File Type Posted
Atch 37 Wage Determination Number NV24.pdf PDF
Atch 31 Progress Report Template_AF3065.pdf PDF
Atch 29 NTTR Visit Request.pdf PDF
Atch 27 APPENDIX 21 National_Manual_Uniform Traffic Control Devices.pdf PDF
Atch 25 APPENDIX 19 T10_1-Bollards Fixed- Type 2.pdf PDF
Atch 23 APPENDIX 18 Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 19 APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 09 APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 08 APPENDIX 4 A Curb Detail.pdf PDF
Atch 06 APPENDIX 2 Mooring Detail.pdf PDF
Atch 00-Paving IDIQ List of Attachments.pdf PDF
Atch 44- Sample Client Authorization Letter.pdf PDF
Atch 42 Past Performance Information Sheet.pdf PDF
Atch 39 Nellis Single Pass 1 Year Request Template.docx DOCX document
Atch 38 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 36 Wage Determination Number Number NV1.pdf PDF
Atch 30 Progress Schedule.xlsx XLSX spreadsheet
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
Atch 26 APPENDIX 20 Environmental Permit Guidance Mar 2022.pdf PDF
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf PDF
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx DOCX document
Atch 16 APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 15 APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11 APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 32 Plan 32-7086 Hazardous Material Management Plan.pdf PDF
Atch 24 APPENDIX 18 Nuclear Gauge Request Form 2.pdf PDF
Atch 17 APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 14 APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10 APPENDIX 6 Sidewalk Detail.pdf PDF
Atch 05 APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 01 Paving SOW.pdf PDF
Atch 40 (DBIDS) Installation Pass Request_Creech Template.pdf PDF
Atch 43 Past Performance Questionnaire.pdf PDF
Atch 41 Subcontractor or Teaming Partner Consent Form.pdf PDF
Atch 35 Request for Authorization for Radioactive Materials.pdf PDF
Atch 28 APPENDIX 22 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 20 Appendix 16 Nellis_Creech_IFS_Final.pdf PDF
Atch 18 APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13 APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 12 APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 07 APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 02 Paving IDIQ Bid Schedule.xlsx XLSX spreadsheet
Solicitation - FA486122R0011.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Temporary Fencing for Desert Tortoise Projects

The requirements for temporary fencing for a construction project are less stringent than permanent tortoise proof fencing, and are as follows:

The fencing should be flush with the ground (no gaps) or up to 4 inches deep, and height of fence 18-24 inches above the ground.

The fencing can be staked with rebar or other stakes, with the stakes sunk 6-12 inches into the ground.

The fencing can be fabric cloth fencing or plastic mesh fencing provided the gaps in the mesh are 2X2 inches or less in size.

Place the fencing around the area to be trenched, include enough area within fencing to allow for needed work space, equipment, etc.

Enclosed area may have an opening for a gate (section that opens) to let people and equipment in and out, but gate should remained closed when not in use.

A clearance survey the first day of the work prior to placing the fencing is needed.

If a clearance survey were to identify an active tortoise burrow immediately adjacent to the work site, fencing can be placed around the burrow for the few days duration of work at that work site, and then removed when the work moves down the line.

If a project is going to be completed in phases, then fencing can be placed in the section being worked.

Trenches need to be fenced the entire length of exposed trench.

The Nellis Natural Resource Program can provide clearance surveys for short duration/small scale projects. We need to know the time work to be executed with a couple weeks’ notice, or as much as possible to schedule ‘Authorized Biologist’. The biologist shall provide contractor with Awareness

Training at the site (~10 min); (required under the Nellis AFB Programmatic Biological Opinion, File No.

1-5-07-F-497).

Nellis Natural Resource Program points of contact:

Olivia Baez Anna Johnson olivia.baez@us.af.mil anna.johnson.18@us.af.mil 702-652-7606 702-652-4354

Note: An electronic copy of the Nellis AFB Programmatic Biological Opinion, File No. 1-5-07-F-497, can be provided upon request.

mailto:olivia.baez@us.af.mil mailto:anna.johnson.18@us.af.mil

File details come from the government source that posted it. Updated .