Atch 3- QASP- Corrective Action Report (CAR).pdf

PDF 210 KB Posted

Attached to
B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID] Federal contract opportunity
Solicitation number
FA485522B0005
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a Corrective Action Report (CAR) template and instructions for its use. The CAR template is used to document deficiencies in contractor performance on a federal contract. It includes blocks for identifying the contractor, contract number, type of services, functional area, a suspense date for the contractor to provide a response, a control number, classification of deficiencies as major or minor, a description of the finding and impact, and signature lines for the Contracting Officer Representative and Issuing Authority. The instructions provide definitions of major and minor findings and guidance for completing the blocks, including having the contractor respond within 10 days unless a longer time is needed, and obtaining concurrence from the Issuing Authority before closing out the CAR.

The related federal contract opportunity is a solicitation to remove and install one toddler and one youth playground structure at Cannon Air Force Base in New Mexico. The scope of work includes heavy machinery operation, fencing workspaces, safety mitigation, demolition, concrete work, playground installation, grading, rubber mulching, and adherence to current policies and procedures. The solicitation is for the 27th Special Operations Civil Engineer Squadron.

View the file

Other files for this federal contract opportunity

Other files attached to B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID], newest first.
File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 06 - CAFB CAD Standards.pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Public Playground Safety Handbook.pdf PDF
Atch 2- QASP- Surveillance Checklist.pdf PDF
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
B9992 Playgrounds SOO.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Plan (CZQZ22-0024).pdf PDF
Site Photos.pdf PDF
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP Attachment 3

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY MAJOR MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. CONTRACTING OFFICER REPRESENTATIVE (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

ACCEPTED REJECTED

12. CLOSE DATE

CORRECTIVE ACTION REPORT (CAR)

Continuation Sheet (Number to correspond with applicable Item Number on reverse)

Corrective Action Report (CAR) Instructions

Block 1. Enter Contractor Name.

Block 2. Enter Contract Number.

Block 3. Enter Contract Name or Type of Services.

Block 4. Enter Functional Area of the Contract.

Block 5. Enter the assigned suspense date given the contractor to provide a response to the CAR. A date must be entered for a Major CAR. A date is optional at the discretion of the Contracting Officer Representative (COR) initiating the CAR if the finding is Minor.

Block 6. All CARs will be tracked with a Control Number. The functional commander/functional director is the Issuing Authority for his/her contract Contracting Officer Representative (CORs) generating CARs. By providing the control number to the COR originating the CAR, the Issuing Authority demonstrates concurrence with the finding. The control number will be made up of the first two letters of the name of the site or contract, the last two digits of the calendar year, and a three digit number starting with 001 and progressing upward throughout the calendar year (e.g., WP04-001).

Block 7.

1. Check the block that indicates whether the identified deficiency is assigned as a Major or Minor finding. See QASP, paragraph 7.5.3.1, for the definitions of Major and Minor findings and associated explanations.

2. Finding: Clearly state the details of the finding followed by a reference to the stated contractual requirement. The reference must state the portion of the contract, part, section, paragraph and subparagraph and must make a complete brief quotation of the contract reference.

3. State the impact that the finding has or could have on the accomplishment of the mission that the contract provides.

4. When determining how long to give the contractor to respond to the identified finding, the normal is 10 working days.

The suspense date should reflect this unless the finding requires a greater amount of time to come to solution. Major findings require a contractor response. Minor findings may require a contractor response at the discretion of the COR initiating the CAR and/or the Issuing Authority.

Blocks 8 and 9. Contract CORs initiating a CAR must sign in Block 8 and the Issuing Authority signs in Block 9. Each annotates the date at the time of signature.

Block 10. Upon review of the contractor’s reply, the originator of the CAR will enter comments regarding acceptance or rejection of the contractor’s response. This block may also contain any comments regarding follow-on inspections conducted or needed at a later date to validate that the finding has not reoccurred.

Block 11. The COR selects Accept or Reject after reviewing the contractor’s response.

Block 12. The COR enters a close date after advising the Issuing Authority that the contractor’s response is acceptable and the Issuing Authority concurs. The Issuing Authority will then forward the closed CAR to the contractor and report accordingly in the monthly Certificate Of Service (COS) or other applicable contracting officer services report. This routing remains the same if the contractor response is unacceptable and the CAR remains open until an acceptable response is received except that the Issuing Authority forwards the open CAR back to the contractor for additional information.

Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.

CORRECTIVE ACTION REPORT (CAR)
8. CONTRACTING OFFICER REPRESENTATIVE (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
CORRECTIVE ACTION REPORT (CAR)
Continuation Sheet

Corrective Action Report (CAR) Instructions