Atch 2- QASP- Surveillance Checklist.pdf

PDF 164 KB Posted

Attached to
B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID] Federal contract opportunity
Solicitation number
FA485522B0005
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a Quality Assurance Surveillance Plan checklist for a construction contract along with details of the related federal contract opportunity. The construction contract is for removal and installation of two playground structures at Cannon Air Force Base in New Mexico. The contract requires operation of heavy machinery, fencing of workspaces, demolition, concrete work, playground installation, grading, rubber mulching, and adherence to current policies and procedures. The Department of the Air Force Special Operations Command is the contracting agency, and the scope of work involves furnishing all necessary labor, equipment, materials and other requirements to provide the playground installation according to conceptual drawings, a statement of objectives, and applicable codes and standards.

View the file

Other files for this federal contract opportunity

Other files attached to B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID], newest first.
File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 06 - CAFB CAD Standards.pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 3- QASP- Corrective Action Report (CAR).pdf PDF
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Public Playground Safety Handbook.pdf PDF
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
B9992 Playgrounds SOO.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Plan (CZQZ22-0024).pdf PDF
Site Photos.pdf PDF
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP Attachment 2

Surveillance Checklist

COR Smart Form - Construction COR Name:

FIRST LAST

Contract Number:

FA4855

Delivery Order:

FA4855

Report for Month Ending:

MM/YYYY

Contract Period Of Performance:

DD/MM/YYYY - DD/MM/YYYY

1. QUALITY

Response: Comments:

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

Example:

Contractor poured concrete for the foundation for bldg. 123 this month.

Only 1 discrepancy was observed.

Week 1: Contractor turned in Submittals and began hiring and prepping site.

Week 2: Contractor received sign submittals from CO and ordered supplies. Site prep ready for pouring 50% complete.

Week 3: Site prep ready for pouring 100% complete and supplies were received and inspected against submittal paperwork.

Week 4: Concrete foundation completed.

1a. Is the Contractor conforming to contract requirements?

Yes

No

N/A

1b. Is the contractor conforming to specifications?

1c. Is the Contractor practicing standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards)

2. SCHEDULE

2a. Is the contract progressing on schedule?

Schedule & Delivery Example: Progress Schedule is set at 15% as of 31 Mar 2018. Actual Progress is at 20%.

Note: Recommend uploading the actual Progress Schedule under Misc Document > Surveillance Schedule > Titled “Progress Schedule, month/year”

2b. Is the Contractor timely on Administrative Requirements (e.g. efforts that contribute to or affect the schedule variance).

2c. Are there any significant issues to report?

• Were any rain delays observed? If yes how many days?

• Were any differing site conditions reported that may delay progress? If yes, by how many days?

• Were there any issues that results in a Suspension of Work? If yes, what was the issue, how many days of suspension and was due to Government or contractor delay?

• If fault was determined by the contractor, were liquidated damages assessed?

Examples: Construction was delayed 5 days in the month of March due to rain.

3. MANAGEMENT

3a. Is the Contractor successfully coordinating timeliness, completeness and quality of problem identification, corrective action plans and proposal submittals?

3b. Does the contractor have a reasonable and cooperative behavior?

3c. Has the contractor conducted management of subcontractors in a timely and effective manner per the critical path?

3d. Has the customer expressed satisfaction with the work completed?

4. REGULATRY COMPLIANCE

4a. Are there any discrepancies to report with regards to all terms and conditions in the contract/order relating to applicable regulations and codes?

• Do work sites have the required postings?

• Any issues discovered between payroll and onsite interviews?

• Were any materials or workmanship deficiencies observed?

• Any safety issues observed/reported?

• Any security issues observed/reported?

• Any Environmental (HAZMAT) issues observed/reported?

Example: This is where you would list out the number of Corrective Action Report submitted, the date submitted, the issue, and when it was resolved. Copies of the CAR should be uploaded in CORT under Misc Doc > Discrepancy Reports > Title “Corrective Action. Month/date”

5. OTHER

5a. Are there any customer complaints this month regarding housekeeping or disorder, and if so how many? Response:

5b. Are there any issues for the Contracting officer to be aware of?

5c. Date the final contract goods or services were accepted? (YYYY/MM/DD)

Check N/A unless Final Inspection and Acceptance was complete.