Atch 13 - HAZMAT Worksheet.pdf

PDF 3 MB Posted

Attached to
B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID] Federal contract opportunity
Solicitation number
FA485522B0005
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a contractor HAZMAT worksheet and details for a federal contract opportunity for playground installations at Cannon Air Force Base in New Mexico. The contractor HAZMAT worksheet requires information on materials, processes, locations, and waste management for hazardous materials to be used on site. The related federal contract opportunity is a solicitation from the Department of the Air Force Special Operations Command to remove and install one toddler and one youth playground structure. The scope of work includes demolition, concrete work, playground installation, grading, rubber mulching, and adherence to all applicable codes and regulations.

View the file

Other files for this federal contract opportunity

Other files attached to B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID], newest first.
File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 3- QASP- Corrective Action Report (CAR).pdf PDF
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Public Playground Safety Handbook.pdf PDF
Atch 2- QASP- Surveillance Checklist.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
B9992 Playgrounds SOO.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Plan (CZQZ22-0024).pdf PDF
Site Photos.pdf PDF
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 06 - CAFB CAD Standards.pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

CAFB & MAFR Contractor

HAZMAT Worksheet

1. Contractor Information

Contractor Name:

Contract Number:

Project Number:

Estimated Start Date:

Estimated Completion Date:

Assigned Shop Code, if known:

2. Material Information

Material Name (from SDS):

Material Stock No. (MSN), or National Stock No.

(NSN), or Local Stock No. (LSN), enter if known:

Container Type (check one):

Box

Bag Tube

Bottle Can

Drum

Container Volume or Weight (check one):

Weight Oz. GramsPounds Tons

Quarts

Gallons

Other(Specify):

Total No. of Containers: Container Size: Total HAZMAT

Quantity:

3. Process Information

Process Type:

Process Description:

4. Engine ering

Describe process engineering controls:

5. Personal Protective Equipment (PPE)

Describe process PPE:

6. Location Information

Process will be performed on/at (check all that apply):

Existing Facility Aircraft Outdoors

E quipment New Facility

Other (Specify):

Physical location of process:

Staging location of HAZMAT:

Other (Specify)

Kilograms Fluid Oz Pints

Cartridge

ATTACHMENT A-1

Cannon AFB & Melrose AFR

Contractor HAZMAT

IAW FAR 52.223-3/AFI 32-7086 3.4.1; All HAZMAT brought onto an installation for use shall be authorized via the process described in this section.

NOTE: Manufacturer’s Safety Data Sheet (SDS) is required for every worksheet

The information submitted is complete. The HAZMAT noted above may enter Cannon AFB and/or Melrose AFR

The information submitted is incomplete and/or erroneous. Please follow the instruction below and resubmit.

7. Additional Information

Will a hazardous waste be generated (circle one)?

Yes No TBD Describe method(s) of waste management, transport, and disposal:

8. Contractor Signature Block

Title Phone Number

Printed Name Date

Signature

9. Environmental Approval Signature Block

Title Phone Number

Printed Name Date

Signature

Contractor Name:
Contract Number:
Project Number:
Estimated Start Date:
Estimated Completion Date:
Assigned Shop Code if known:
Material Name from SDS:
Material Stock No MSN or National Stock No NSN or Local Stock No LSN enter if known:
Weight Oz Pounds Tons Grams Kilograms Fluid Oz Pints Quarts Gallons Other SpecifyTotal No of Containers:
Container Size:
Total HAZMAT Quantity:
Process Type:
Process Description:
Describe process engineering controls:
Describe process PPE:
Other Specify:
Describe methods of waste management transport and disposal:
Title:
Phone Number:
Printed Name:
Date:
Title_2:
Phone Number_2:
Printed Name_2:
Date_2:
Specify:
Location:
Staging location of HAZMAT:
Group11: Off
Group12: Off
Group13: Off
Clear Form:
Group4: Off
Check Box1: Off
Dropdown9: [N/A]
Text10:
Check Box11: Off

File details come from the government source that posted it. Updated .