Atch 11- SOMs.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID] Federal contract opportunity
Solicitation number
FA485522B0005
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a schedule of materials submittals (SOMS) for a federal contract to repair a playground at Cannon Air Force Base in New Mexico. The contract requires the submission of various plans and documentation to the Air Force at different stages of the project, including an accident prevention plan, quality control plan, environmental and waste management plans, safety data sheets for hazardous materials, as-built drawings, and operation and maintenance manuals. Key due dates include submitting the work clearance request and preliminary construction schedule with the proposal, as well as the project schedule, health and safety plan, and environmental protection plan no later than 14 days prior to starting work. The contractor must also submit hazardous materials worksheets before bringing any such materials on base and monthly during the contract period. All test reports and sealed plans require hard copy submission.

View the file

Other files for this federal contract opportunity

Other files attached to B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID], newest first.
File Type Posted
B9992-Playgrounds AMENDED.zip ZIP file
Solicitation Amendment FA485522B00050001 SF 30.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 3- QASP- Corrective Action Report (CAR).pdf PDF
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Public Playground Safety Handbook.pdf PDF
Atch 2- QASP- Surveillance Checklist.pdf PDF
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
B9992 Playgrounds SOO.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).pdf PDF
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 03 - Temp Laydown Area.doc.pdf PDF
Playground Assessment 2.pptx PPTX presentation
Site Plan (CZQZ22-0024).pdf PDF
Site Photos.pdf PDF
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
SOLICITATION.zip ZIP file
Atch 5- QASP- Customer Complaint Record (CCR).pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 06 - CAFB CAD Standards.pdf PDF
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALSPROJECT #PROJECT TITLESOLICITATION/CONTRACT NO.
CZQZ22-0024Repair Playground, B9992
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERREFERENCE, ITEMNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEFOLLOW-UPCONTRACTOR NOTIFIED: Approval DateCONTRACTOR NOTIFIED: DisApproval DateCONTRACTOR RE-SUBMITTALFINAL APPROVALREMARKS
101 01 00 AF Form 103 - Work Clearance Request1NLT 14 days prior to work start
201 33 00 Surety Bonds15 days after NTP
301 33 00 Certificates of Insurance15 days after NTP
401 33 00 Project Schedule1NLT 14 days prior to work start
501 33 00 Health and Safety Plan1NLT 14 days prior to work start
601 35 26 Accident Prevention Plan1NLT 14 days prior to work start
701 35 26 Accident Notification1As incident occurs
801 35 26 Accident Report1As incident occurs
901 45 00 Quality Control Plan1NLT 14 days prior to work start
1001 57 19 Environmental Protection Plan1NLT 14 days prior to work start
1101 74 19 Waste Management Plan1NLT 14 days prior to work start
1201 74 19 CAFB/MAFR Contractor HAZMAT Worksheet*NLT 14 days prior to bringing HAZMAT on base
1301 74 19 CAFB/MAFR Contractor Usage HAZMAT Worksheet**NLT the 5th day of each month and at the completion of work
1401 74 19 Safety Data Sheet (SDS)*NLT 14 days prior to bringing HAZMAT on base
15As-BuiltPackage (with AutoCAD drawings)1NLT 7 days after completion of work
16Base Access Request Form1NLT 7 days prior to base access
17Construction Schedule (preliminary - AF3064)1With proposal
18O&M Manuals1NLT 7 days after completion of work
19Warranty Certification1NLT 7 days after completion of work

* Quantity to submit depends on number of HAZMAT items used. Each HAZMAT item requires a separate [CAFB/MAFR Contractor HAZMAT Worksheet] and [Safety Data Sheet].

** Quantity of [CAFB/MAFR Contractor Usage HAZMAT Worksheet] to submit is dependent on the length of the contract.

Note: The contractor is still responsbile for providing the Construction SOMS; this list is for reference only.

Note: All test reports and sealed plans need to be submitted as hard copies.

File details come from the government source that posted it. Updated .