Atch 7- QASP- Performance Assessment Report (PAR).pdf
PDF 180 KB Posted
- Attached to
- B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID] Federal contract opportunity
- Solicitation number
- FA485522B0005
About this file
This document contains a template for a Performance Assessment Report (PAR) to be used under a quality assurance surveillance plan (QASP). The PAR template includes blocks for documenting contractor performance issues, obtaining the contractor's validation of deficiencies, and tracking corrective actions. Blocks are provided for the contract/task order number, contractor name, type of services, quality assurance personnel information, performance assessment details, contractor concurrence with assessments, corrective action details, and sign-offs. Instructions are included for completing each block to document performance under the QASP. A continuation sheet may be used to expand responses that do not fit in the numbered blocks.
The related federal contract opportunity is a solicitation to remove and install one toddler and one youth playground structure at Cannon Air Force Base in New Mexico. Work includes operation of heavy machinery, fencing, hazard mitigation, demolition, concrete work, playground installation, grading, rubber mulching, and adherence to policies and procedures. The contractor must furnish all necessary labor, equipment, materials, and incidentals to complete the work in accordance with conceptual drawings, the statement of objectives, and all applicable codes and regulations.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP Attachment 7
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE
5. QAP PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or SOW PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS
CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-
CONCURRENCE OF QAP CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR QAP SIGNATURE AND DATE
15. QAP REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQCP)
PERFORMANCE ASSESSMENT REPORT
Continuation Sheet (Number to correspond with applicable Item Number on reverse)
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQC)
Performance Assessment Report (PAR) Instructions
Block 1. Quality Assurance Personnel (QAP) enters contract or task order number.
Block 2. QAP enters contractor name.
Block 3. QAP enters type of services.
Block 4. QAP signs and dates.
Block 5. QAP enters telephone number.
Block 6. QAP assigns suspense date for Contractor Representative validation if a deficiency box was checked in Block 7.
Part I. Contractor Performance
Block 7. QAP checks all boxes that apply.
Block 8. QAP enters Services Summary or Statement of Work (SOW) paragraph item reviewed.
Block 9. QAP enters brief description of deficiency and tracking number if the deficiency box was checked in Block 7. Detailed description will be on Corrective Action Report (CAR).
Block 10. QAP enters a detailed performance assessment if the deficiency box in Block 7 was not checked.
Parts II and III will be used only if a deficiency was documented in Part I.
Part II. Contractor Validation
Block 11. Contractor Representative checks one box in response to QAP cited deficiency. If Concurrence is indicated, Contractor Representative continues to Block 12. If Non-Concurrence is indicated, continue to Block 13 and state reason(s) for Non-Concurrence with QAP cited deficiency and return PAR to QAP.
Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.
Block 13. Contractor Representative details Corrective Action and the Action Taken to Prevent Recurrence or Reason for Non-Concurrence of QAP cited deficiency.
Part III. Deficiency Corrected
Block 14. QAP checks appropriate block, signs, and dates.
Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to Prevent Recurrence. If Non-Concur was checked, this block should be very detailed to explain why.
Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with Contractor’s Corrective Action and Action Taken to Prevent Recurrence.
Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.
| PERFORMANCE ASSESSMENT REPORT (PAR) |
| 6. SUSPENSE DATE |
| I. PERFORMANCE |
| II. CONTRACTOR VALIDATION |
| III. ACTION CORRECTED |
| 5. QAP PHONE |
| 4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE |
| PERFORMANCE ASSESSMENT REPORT |
| Continuation Sheet |
| Block 4. QAP signs and dates. |
| Part I. Contractor Performance |
| Part II. Contractor Validation |
| Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to |
| Prevent Recurrence. If Non-Concur was checked, this block should be very detailed to explain why. |
| Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with Contractor’s Corrective Action and Action Taken to Prevent Recurrence. |