This document provides details on a federal contract opportunity for construction design and infrastructure upgrades at the Minneapolis VA Medical Center. The project scope involves construction and commissioning of infrastructure needed for the VA's Electronic Health Record Modernization initiative, including building a new server room. Work will take place across multiple departments and is expected to be completed within 450 calendar days of the notice to proceed. The total magnitude of construction is estimated between $20-50 million. The solicitation will be issued as a request for proposal evaluated according to FAR Parts 15, 19, and 36 and will be set aside specifically for Service-Disabled Veteran-Owned Small Businesses. All questions must be submitted in writing by the deadline to the identified point of contact.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
C3-123C3-123
C3-160C3-160
C3-161C3-161
C3-164C3-164
C3-171C3-171
3S-63S-6
C3-65C3-65
3A-1233A-123
3A-1273A-1273A-1293A-1293A-1303A-130
3A-1313A-131
3A-1323A-132
3A-1333A-133
3A-1343A-134
3A-1353A-135
3A-1253A-125
3A-1283A-128
3A-1243A-124
3A-1263A-126
3F-131O3F-131O
3H-1013H-101
3G-1153G-115
3G-1163G-116
3G-1173G-117
3G-1183G-118 3G-1193G-119
3G-1203G-1203G-1213G-1213G-1223G-122
3G-1013G-101
3G-1043G-104
3G-104A3G-104A 3G-104B3G-104B
3G-104C3G-104C
3G-1063G-106 3G-1083G-108
3G-1123G-112
3G-110A3G-110A
3G-1003G-100
3G-101A3G-101A
3G-1023G-102
3G-1033G-103
3G-1053G-105
3G-1073G-107
3G-1093G-109 3G-109A3G-109A
3G-1103G-110
3H-1233H-123
3G-1243G-124
3H-1003H-100
3H-105B3H-105B
3H-1223H-122
3G-1133G-113 3G-1143G-1143G-1233G-123
3G-1113G-111
3H-100A3H-100A 3H-100B3H-100B
3H-105A3H-105A
3L-1033L-103EE
C-6C-6 on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :5
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403F
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA F
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA F
NOT USED
/06
/20
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
TELECOM
ROOM
(ORANGE-STACK)
3H-114
ACTUAL: 242 SF
PROG: 170 SF
PRIMARY
TELECOM
ROOM
(PINK-STACK)
3F-122E
ACTUAL: 222 SF
PROG: 170 SF
PROGRAM
3F-1213F-121 3F-127-143F-127-143F-127-133F-127-133F-127-123F-127-123F-127-113F-127-113F-127-103F-127-10
3F-127-93F-127-93H-105B3H-105B 3H-105A3H-105A
TELECOM
ROOM
3F-122A3F-122A
ELECTRICAL
ROOM
3F-122B3F-122B
ELECTRICAL
ROOM
3F-122C3F-122C
TELECOM
ROOM
3F-122D3F-122D
3L-123A3L-123A
3L-1223L-122
3L-119A3L-119A
3L-1193L-119
3L-1253L-125
3L-1273L-127
C5C5
3L-1133L-113
3L-1143L-114
3L-1023L-102
3L-1033L-103 3L-1043L-104 3L-1053L-105
3L-1063L-106
3L-1073L-107
3L-1083L-108 3L-1093L-109
3L-1103L-110
3L-1113L-111
3L-1123L-112
3L-1153L-115
3L-1163L-116 3L-1183L-118
3L-1203L-120
3L-1213L-121
3L-1173L-117
3L-120A3L-120A3L-127A3L-127A 3L-105A3L-105A
3L-109A3L-109A
3L-115A3L-115A3L-103A3L-103A
3L-103B3L-103B
3L-104A3L-104A
3L-104B3L-104B
3L-121A3L-121A
3L-124A3L-124A3L-126A3L-126A 3L-128A3L-128A3L-129A3L-129A
3L-132A3L-132A3L-133A3L-133A 3L-135A3L-135A
3L-102A3L-102A
3H-1193H-119
3L-1013L-101
3H-1173H-117
3H-1123H-112
3H-1133H-113 3H-1163H-116
3H-1183H-118
3H-1213H-121
3H-117B3H-117B
3H-117A3H-117A
3H-117D3H-117D
3L-1303L-130
3L-1313L-131
3F-1223F-122
3L-1233L-123
3L-1243L-1243L-1263L-126
3L-1283L-1283L-1293L-1293L-1323L-1323L-1333L-1333L-1343L-1343L-1353L-135
3H-117C3H-117C
3H-1203H-120 3H-1093H-109
M-8M-8
EE
C3-66C3-66
C3-63C3-63
C3-64C3-64
C-6C-6
C3-62C3-62
C3-61AC3-61A
C3-57C3-57
C3-58C3-58 C3-56AC3-56A
C3-61C3-61
C3-59C3-59
C3-60C3-60
C3-56C3-56
C3-55C3-55
C3-54C3-54
3K-1383K-138 3K-1013K-101 3K-1023K-102
3K-102A3K-102A
3K-1373K-137
3K-137A3K-137A
C3-73C3-73
3J-1063J-106
3H-1113H-111
3J-143A3J-143A
3H-1043H-104
3H-1053H-105
C3-173C3-173
C3-68C3-68
3H-1103H-110
3H-105C3H-105C
3J-1433J-143
70A-403G
C2
70A-403G
C4
70A-403G
B2
70A-403G
B4
TELECOM
ROOM
(ORANGE-STACK)
3H-114
ACTUAL: 242 SF
PROG: 170 SF
PRIMARY
B
B
B
B
3H -1
A
70A-100
D8
TYP ALL
TR WALLS
8 8
TELECOM
ROOM
(ORANGE-STACK)
3H-114
ACTUAL: 242 SF
PROG: 170 SF
PRIMARY
'-1
0"
TELECOM
ROOM
(PINK-STACK)
3F-122E
ACTUAL: 222 SF
PROG: 170 SF
PROGRAM
B
B
B
A4
A
3F -1
E
ALIGN
'-6
/8
TELECOM
ROOM
(PINK-STACK)
3F-122E
ACTUAL: 222 SF
PROG: 170 SF
PROGRAM
3F-1223F-122
HOSPITALIST
3H-1143H-114
GOLD
MEDICINE
3H-1153H-115
HOSPITALIST
3H-1143H-114
GOLD
MEDICINE
3H-1153H-115
3F-1223F-122 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :0
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403G
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA G
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F2
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA G
1/4" = 1'-0" C2
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3H-114 - DEMO
1/4" = 1'-0"
C4
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3H-114 - NEW
1/4" = 1'-0"
C6
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3H-114 - DEMO
1/4" = 1'-0"
C8
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3H-114 - NEW
1/4" = 1'-0" B2
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3F-122E - DEMO
1/4" = 1'-0"
B4
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3F-122E - NEW
1/4" = 1'-0"
B8
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3F-122E - NEW
1/4" = 1'-0"
B6
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3F-122E - DEMO
1 REMOVE EXISTING WALL AND FRAMING.
2 REMOVE EXISTING DOOR AND FRAME. INFILL OPENING TO MATCH
ADJACENT CONSTRUCTION AND FINISH FOR CONTINUOUS SURFACE.
3 REMOVE FLOORING AND WALL BASE IN ROOM.
4 NEW 45 MIN SMOKE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE
DOOR AND FRAME WITH ACCESS CONTROL HARDWARE.
5 EXISTING WALLS TO BECOME 1HR FIRE AND SMOKE-RATED. EXTEND
TO DECK AS REQUIRED. PATCH AND SEAL ALL PENETRATIONS AS
NECESSARY.
6 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75
FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE
NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW FEC
FOR EACH TR IN THE SCOP
7 REMOVE EXISTING DOOR AND FRAME.
8 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY
AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR
EXISTING CEILING ITEMS TO REMAIN.
9 EXISTING OPEN TO DECK CEILING TO REMAIN.
10 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
11 PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST – TYPICAL.
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
3H-117D3H-117D3K-1383K-138 3K-1013K-101 3K-1023K-102
3K-102A3K-102A
3K-103A3K-103A
3K-103B3K-103B
3K-104A3K-104A
3K-104B3K-104B
3K-105A3K-105A
3K-109A3K-109A
3K-1063K-106
3K-1313K-131
3K-1113K-111 3K-1123K-112
3K-1133K-113
3K-1143K-114 3K-1153K-115
3K-1163K-116
3K-1173K-117
3K-1183K-118
3K-1193K-119
3K-1203K-120
3K-1213K-121
3K-1223K-122
3K-1233K-123
3K-1243K-124
3K-1253K-125
3K-1263K-126
3K-1273K-127
3K-1283K-128
3K-1293K-129
3K-1303K-130
3K-1323K-132
3K-1343K-134
3K-1353K-135
3K-1363K-136
3K-1373K-137
3K-1033K-103
3K-1043K-104
3K-1053K-105
3K-1083K-108
3K-1093K-109
3K-128A3K-128A
3K-115A3K-115A
3K-117A3K-117A
3K-120A3K-120A
3K-121A3K-121A
TELECOM
ROOM
3K-122A3K-122A
ELECTRICAL
ROOM
3K-122B3K-122B
3K-124A3K-124A
3K-125A3K-125A
3K-127A3K-127A
3K-129A3K-129A
3K-132A3K-132A
3K-135A3K-135A
3K-137A3K-137A
3K-130A3K-130A
3K-1073K-107
3K-1103K-110
C3-76C3-76
C3-75C3-75 C3-74C3-74
3K-1333K-133
C3-78C3-78
C7C7
C3-77C3-77
C3-73C3-73
C3-81C3-81
C3-80C3-80
C3-79C3-79 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :0
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403H
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA H
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F6
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA H
NOT USED
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
3H-105B3H-105B
3K-137A3K-137A
ELECTRICAL
ROOM
3J-124C3J-124C
TELECOM
ROOM
3J-124D3J-124D
TELECOM
ROOM
3J-124A3J-124A
3J-1013J-101
3J-1023J-1023J-1033J-103
3J-1043J-104 3J-1053J-105
3J-1063J-106
3J-1073J-107
3J-1083J-108
3J-1093J-109
3J-1103J-1103J-1113J-111
3J-1123J-1123J-1133J-113
3J-1143J-1143J-1153J-1153J-1163J-116
3J-1173J-1173J-1183J-118
3J-1193J-1193J-1203J-120
3J-1213J-121
3J-1223J-1223J-1233J-123
3J-107A3J-107A
3J-1253J-125
3J-1263J-126
3J-1273J-127
3J-1283J-128
3J-1323J-132
3J-1313J-131
3J-1303J-130 3J-1373J-137
3J-1413J-141
3H-1043H-104
3J-1243J-124
ELECTRICAL
ROOM
3J-124B3J-124B
3J-141A3J-141A
3J-142A3J-142A
C3-93C3-93
3J-126A3J-126A
C3-98C3-98
C3-97C3-97
C3-173C3-173
C3-68C3-68
C3-100C3-100
C3-99C3-99
C3-92C3-92C3-95C3-95
C3-96C3-96
3J-1423J-142
C3-90C3-90
3J-1333J-133 3J-1343J-134 3J-138B3J-138B
3J-1363J-136
3J-1353J-135 C8C8
3J-1383J-138
3J-138A3J-138A
3J-1393J-139
3J-139A3J-139A
C3-84C3-84
3J-1403J-140
3J-140A3J-140A
3H-105C3H-105C
3J-1433J-143 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :1
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403J
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA J
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F2
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA J
NOT USED
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
TELECOM
ROOM
(BLUE-STACK)
3N-101A
ACTUAL: 170 SF
PROG: 170 SF
PRIMARY
3P-1033P-103
3P-1053P-105
3P-1063P-106
3P-1293P-129
3P-1073P-107
3P-1083P-1083P-1103P-110
3P-1123P-112
3P-1133P-113
3P-1153P-115
3P-1173P-117 3P-1183P-118
3P-1193P-1193P-1203P-120
3P-1213P-121
3P-1223P-122 3P-1233P-123
3P-1243P-124
3P-1253P-125
3P-1263P-126
3P-1273P-127
3P-1283P-128
3N-1013N-101
3P-1023P-102
3P-1043P-104
3P-1093P-109
3P-1113P-111
3P-1143P-114
3P-1163P-116
C3-105C3-105
C3-103C3-103
C3-102C3-102
C3-104C3-104 C3-101C3-101
3A-1033A-103
3M-1033M-103
3M-1063M-106
3M-1073M-107
3M-1083M-108
3M-1093M-109
3M-1123M-112 3M-1143M-114
3M-1153M-115
3M-1163M-116
3M-1173M-117
3M-117A3M-117A
3P-1303P-1303P-1013P-101
3N-1023N-102
3N-1033N-103
3M-112A3M-112A
C3-106C3-106
C3-127C3-127 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :1
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403K
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA K
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA K
NOT USED
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
TELECOM
ROOM
(BLUE-STACK)
3N-101A
ACTUAL: 170 SF
PROG: 170 SF
PRIMARY
M-4M-4
C3-125C3-125
C3-117C3-117
BB
C3-126C3-126
3A-1043A-104
3A-1363A-136
3A-1373A-137
3N-1013N-101
C3-105C3-105
3S-23S-2
3Q-1023Q-102
3Q-1033Q-103
3Q-1053Q-105
3Q-1073Q-107
3Q-1083Q-108
3Q-1113Q-111 3Q-1123Q-112
3Q-1133Q-113 3Q-1143Q-114
3Q-1223Q-122
3Q-1233Q-123
3Q-1243Q-124
3Q-1253Q-125
3Q-1263Q-126
3Q-1273Q-127
3Q-1283Q-128
3N-1073N-107
TELECOM
ROOM
3N-1083N-108
3M-1233M-123
3A-1013A-101
3A-1023A-102
3A-1033A-103
TELECOM
ROOM
3M-1013M-101
ELECTRICAL
ROOM
3M-1023M-102
3M-1033M-103
3M-1043M-104
3M-1053M-105
3M-1063M-106
3M-1073M-107
3M-1083M-108
3M-1093M-109
3S-73S-7
3M-1123M-112
3M-1133M-113
3M-1143M-114
3M-1153M-115
3M-1163M-116
3M-1173M-117
3M-1203M-120
3M-1213M-121
3M-117A3M-117A
3P-1303P-1303P-1013P-101
3N-1023N-102
3N-1033N-103
3N-1043N-104
3N-1053N-105
3S-83S-8
3Q-1013Q-101
3Q-1043Q-104
3Q-1103Q-110
3S-103S-10
3N-1063N-106
FF
GG
M2M2
3M-1183M-118
3M-1193M-119
ELECTRICAL
ROOM
3N-1093N-109
3Q-1063Q-106
3Q-1093Q-109
C3-113C3-113
C3-114C3-114
3M-112A3M-112A
3M-1703M-170
C3-107C3-107
C3-106C3-106
C3-108C3-108
C3-109C3-109
C3-110C3-110 C3-112C3-112
C3-127C3-127
C9C9
C10C10
M-3M-3
M-10M-10
3R-106D3R-106D3R-106F3R-106F3R-106H3R-106H3R-106K3R-106K
3R-121E3R-121E
3R-121D3R-121D
3R-121C3R-121C
3R-121B3R-121B 3R-106J3R-106J 3R-106I3R-106I 3R-106G3R-106G 3R-106B3R-106B
3R-106C3R-106C
3R-1033R-1033R-106A3R-106A 3R-1093R-1093R-121A3R-121A
3R-1063R-106
3R-121M3R-121M
3R-121F3R-121F
3R-121G3R-121G3R-121H3R-121H3R-121I3R-121I
3R-121J3R-121J
3R-121K3R-121K
3R-122A3R-122A
3R-122B3R-122B
3R-122C3R-122C
3R-122D3R-122D 3R-122e3R-122e 3R-122f3R-122f
3R-122g3R-122g
3R-122h3R-122h
3R-1223R-122
3R-1233R-123 3R-126A3R-126A 3R-126B3R-126B 3R-1193R-119
3R-1243R-124
3R-1253R-125
3R-126f3R-126f
3R-126e3R-126e
3R-1283R-128
3R-1293R-129
3R-126d3R-126d 3R-126c3R-126c
3R-1103R-110
3R-1113R-111
3R-1123R-112
3R-1143R-114
3R-1163R-116
3R-1183R-118
3R-1263R-126
3R-107A3R-107A
3R-107B3R-107B
3R-1133R-113
3R-1153R-115
3R-1173R-117
3R-117A3R-117A 3R-117B3R-117B
3R-117C3R-117C
3R-117D3R-117D
3R-102A3R-102A
3R-1073R-107
3R-1023R-102
3R-1013R-101
C3R152C3R152
C3R150C3R150C3R130C3R130
C3R128C3R128
3R-1213R-121
3R-100b3R-100b
3R-121n3R-121n
3R-1003R-100
ELECTRICAL
ROOM
3T-1053T-105
3V-1113V-111
3V-1123V-1123V-112a3V-112a3V-112b3V-112b
70A-403L
B4
70A-403L
B3
TELECOM
ROOM
(BLUE-STACK)
3N-101A
ACTUAL: 170 SF
PROG: 170 SF
PRIMARY
B
B A
B
B
A4
3N-101A
ALIGN
'-5
/8
70A-100
D8
TYP ALL
TR WALLS
2 4
TELECOM
ROOM
(BLUE-STACK)
3N-101A
ACTUAL: 170 SF
PROG: 170 SF
PRIMARY
3N-1013N-101
3N-1013N-101 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :2
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403L
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA L
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA L
1 REMOVE FLOORING AND WALL BASE IN AREA.
2 REMOVE EXISTING RAMP TRANSITION. REPLACE WITH MODULAR
ADA COMPLIANT RAMP - FIELD VERIFY DIMENSIONS REQUIRED
AND SUBMIT FOR APPROVAL PRIOR TO ORDERING. BASIS OF
DESIGN - EZ ACCESS TRANSITIONS MODULAR ENTRY RAMP,
https://handiramp.com/product/ez-access-transitions-modular-entry-ramps/
OR EQUAL
3 NEW 45 MIN SMOKE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE
DOOR AND FRAME WITH ACCESS CONTROL HARDWARE.
4 EXISTING OPEN TO DECK CEILING TO REMAIN.
5 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
6 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN
75 FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE
THE NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A
NEW FEC FOR EACH TR IN THE SCOP
7 EXISTING EXTERIOR WALLS NO RATING REQUIRED
8 PROVIDE TRANSLUSCENT FILM ON INSIDE OF WINDOWS
1/4" = 1'-0" B3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3N-101A - DEMO
1/4" = 1'-0"
B4
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3N-101A - NEW
1/4" = 1'-0"
B6
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3N-101A - DEMO
1/4" = 1'-0"
B7
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3N-101A - NEW
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW IT CLOSETS SHALL BE SMOKE RATED AND COMPLY WITH THE
LATEST VA PHYSICAL SECURITY STANDARDS, AND CAMPUS
STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
TELECOM
ROOM
(YELLOW-STACK)
3Q-118G
ACTUAL: 128 SF
PROG: 170 SF
PRIMARY
3Q-1133Q-113 3Q-1143Q-114
3Q-1223Q-122
3Q-1103Q-110 C3-113C3-113 3R-106D3R-106D3R-106F3R-106F3R-106H3R-106H3R-106K3R-106K
3R-121E3R-121E
3R-121D3R-121D
3R-121F3R-121F
3R-121G3R-121G3R-121H3R-121H3R-121I3R-121I
3S-13S-1
3V-1043V-104
3V-104A3V-104A
3V-1063V-106
3V-1083V-108
3V-1103V-110
ELECTRICAL
ROOM
3T-1053T-105
3V-1113V-111
TELECOM
ROOM
3T-1063T-106
3T-1073T-107
TELECOM
ROOM
3T-1083T-108
3T-1103T-110
3V-1093V-1093V-1133V-113
3V-1153V-115 3V-1073V-107
3V-1053V-105 3V-1173V-117
3V-1213V-121
3V-1193V-119
3V-1033V-103
3V-1143V-114 3V-1293V-129
3V-1283V-128
3V-1273V-127 3V-1183V-118
3V-1163V-116
3V-1123V-1123V-112a3V-112a3V-112b3V-112b
3V-1223V-122
3V-1203V-1203V-1253V-125
3V-124E3V-124E
3V-134b3V-134b 3V-1243V-124 3V-1233V-123
3V-124b3V-124b
3V-124c3V-124c
3V-1303V-130
3V-130a3V-130a 3V-131a3V-131a
3V-1263V-126
3V-1313V-131
3V-1673V-167
3V-1473V-147 3V-1333V-133
3V-133a3V-133a3V-132a3V-132a 3V-149a3V-149a3V-147a3V-147a
3V-1493V-149 3V-1323V-132
3V-101O3V-101O3V-101N3V-101N
3V-137b3V-137b 3V-1373V-137
3V-137a3V-137a
3V-134a3V-134a
3V-1343V-1343V-1353V-1353V-1363V-136
ELECTRICAL
ROOM
3Q-118D3Q-118D
TELECOM
ROOM
3Q-118F3Q-118F
ELECTRICAL
ROOM
3Q-118E3Q-118E
TELECOM
ROOM
3Q-118A3Q-118A
TELECOM
ROOM
3Q-118C3Q-118C
3V-1433V-143
3V-1443V-144
3V-1453V-145
3V-1463V-146
3V-1483V-148
3V-1503V-150
3V-1513V-151
3V-1523V-152
3V-1533V-153
3V-1543V-154 3V-1583V-158
3V-1603V-160
3V-1613V-161 3V-1633V-163
3V-1643V-164
3V-1553V-155
3V-1563V-156 3V-1573V-157 3V-1593V-159 3V-1623V-162 3V-1653V-165 3V-1663V-166
3Q-1153Q-115
3Q-1193Q-1193Q-1203Q-120
3Q-1213Q-121
3Q-1183Q-118
ELECTRICAL
ROOM
3Q-118B3Q-118B
3Q-1163Q-116
3Q-1173Q-117
3V-1383V-1383V-1393V-1393V-1403V-1403V-1413V-141
3V-1423V-142
M-5M-5
3V-1023V-102
3V-1013V-101
3V-101A3V-101A
3V-101B3V-101B
3V-101C3V-101C
3V-101D3V-101D
3V-101E3V-101E
3V-101F3V-101F
3V-101G3V-101G 3V-101H3V-101H 3V-101I3V-101I
3V-101J3V-101J
3V-101K3V-101K
3V-101M3V-101M
C3-187C3-187
C3-189C3-189
C3-186C3-186
C3-185C3-185
C3-184C3-184
C3-138C3-138
3V-160A3V-160A
C3-135C3-135
C3-133C3-133
3V-1003V-100
3V-100A3V-100A
3V-1683V-168
ELECTRICAL
ROOM
3T-1093T-109
C3-182C3-182 C3-181C3-181
C3-180C3-180
C3-183C3-183
C3-179C3-179
3V-1753V-175
3V-102A3V-102A
3V-117A3V-117A
3V-118A3V-118A
C3-111C3-111
C3-110C3-110 C3-112C3-112
3V-124A3V-124A
70A-403M
B3
70A-403M
B4
3" 3'
-4 "7
TELECOM
ROOM
(YELLOW-STACK)
3Q-118G
ACTUAL: 128 SF
PROG: 170 SF
PRIMARY
B
B
B
B
3Q-118G ALIGN
16'-3 5/8"
A
A4
9D
T Y
P A
L L
T R
W A
L L S
TELECOM
ROOM
(YELLOW-STACK)
3Q-118G
ACTUAL: 128 SF
PROG: 170 SF
PRIMARY
3Q-1183Q-118 3Q-1183Q-118 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
NOT FOR CONSTRUCTION
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:4 :3
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-403M
ARCHITECTURAL ENLARGED VIEWS - THIRD
LEVEL AREA M
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL AREA M
1/4" = 1'-0" B3
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3Q-118G - DEMO
1/4" = 1'-0"
B4
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL
- ROOM 3Q-118G - NEW
1/4" = 1'-0"
B8
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3Q-118G - NEW
1/4" = 1'-0"
B6
ARCHITECTURAL RCP - THIRD LEVEL - ROOM
3Q-118G - DEMO
1 REMOVE FLOORING AND WALL BASE IN AREA.
2 NEW SMOKE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE
DOOR AND FRAME WITH ACCESS CONTROL HARDWARE.
3 EXISTING WALLS TO BECOME 1HR FIRE AND SMOKE-RATED. EXTEND
TO DECK AS REQUIRED. PATCH AND SEAL ALL PENETRATIONS AS
NECESSARY.
4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75
FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE
NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW
FEC FOR EACH TR IN THE SCOPE OF WORK. SEE SPECIFICATION 10
44 13.
5 EXISTING OPEN TO DECK CEILING TO REMAIN.
6 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
7 REMOVE PORTION OF WALL FOR NEW DOOR.
8 PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST – TYPICAL.
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW TELECOM ROOMS SHALL BE 1 HR FIRE AND SMOKE RATED AND
COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS, AND
CAMPUS STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
HHJJKKLLMMNNPPQQRRSSTTUUVV
70A-404A
B3
70A-404A
B2
TELECOM
ROOM
4U-1014U-101
TELECOM
ROOM
4U-100A4U-100A
4D-1224D-122
TELECOM
ROOM
4D-122A4D-122A
ELECTRICAL
ROOM
4D-122B4D-122B
4S-94S-9
4U-1034U-103
4U-104A4U-104A 4U-1044U-104
4U-1054U-105
4U-1064U-106
ELECTRICAL
ROOM
4U-1074U-107
TELECOM
ROOM
4U-1084U-108
4S-130A4S-130A
4S-130B4S-130B
4S-130C4S-130C
4S-130D4S-130D
4S-130E4S-130E
4S-130F4S-130F
4S-130G4S-130G4S-130H4S-130H
4S-1324S-132
4S-1354S-135
4S-1364S-136
4S-1374S-137
4S-1384S-138
4S-1394S-139
4S-1404S-140
4S-1414S-141
4S-1424S-142
4S-1434S-143
4S-1444S-144
4S-1454S-145
4S-1334S-133
4U-1004U-100
4T-1054T-105
C4-197C4-197
C4-4C4-4
C4-23C4-23 4U-1094U-109 C4-41C4-41
C4-22C4-22
4S-1304S-130
4S-1314S-131
4S-1344S-134
C4-1C4-1
C4-2C4-2
C4-6C4-6 C4-7C4-7 C4-8C4-8
C4-9C4-9
4U-104C4U-104C
C4-11C4-11
C4-12C4-12
C4-13C4-13
C4-14C4-14
C4-15C4-15
C4-16C4-16
C4-8AC4-8A
4U-104D4U-104D4U-104B4U-104B
4E-1534E-153
4S-1294S-129
4D-1474D-147 4D-1484D-148 4D-1494D-149 4D-1504D-150 4D-1514D-151 4D-1524D-152
4D-1464D-146 4D-1454D-145 4D-1444D-144
4D-1374D-137
4D-1344D-134 4D-1354D-135 4D-1364D-136
4D-137A4D-137A
4D-1384D-138
4D-1434D-143
4D-1424D-142
4D-1394D-139
4D-1414D-141
4D-1404D-140
4D-1334D-133 4D-132A4D-132A 4D-1324D-132
4D-1214D-121 4D-1234D-123 4D-1244D-124
4D-1254D-125
4D-1314D-131
4D-1264D-126 4D-1274D-127
4D-1304D-130 4D-1294D-129
4D-1284D-128
C4D-036C4D-036
C4D-037C4D-037
4S-1294S-129
4D-1264D-126 4D-1274D-127 4D-1284D-128
B
B
A3
A
B B
A
B
B
TELECOM
ROOM
4U-100A4U-100A
94U-100A
12'-11"
'-3
/4
V .I.
F
'-0
4' -0
1'
-0
TELECOM
ROOM
4U-100A4U-100A on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
E F
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s
M P
L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:2 :4
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-404A
ARCHITECTURAL ENLARGED VIEWS -
FOURTH LEVEL AREA A
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1 NEW 45 MIN SMOKE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE
DOOR AND FRAME WITH ACCESS CONTROL HARDWARE.
2 EXISTING WALLS TO BECOME 1 HR FIRE AND SMOKE-RATED.
EXTEND UP TO DECK AS REQUIRED. PATCH AND SEAL ALL
PENETRATIONS AS NECESSARY.
3 REMOVE ALL FLOORING AND MILLWORK IN THIS ROOM.
4 REMOVE EXISTING DROP CEILING. MODIFY AND/OR PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING
ITEMS TO REMAIN (GRILLES, FIRE ALARMS, SENSORS, ETC.)
5 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
6 MODIFY EXISTING ACOUSTICAL CEILING AS REQUIRED FOR NEW
WALLS.
7 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75
FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE
THE NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A
NEW FEC FOR EACH TR IN THE SCOPE OF WORK. SEE
SPECIFICATION 10 44 13.
8 EXISTING CONSTRUCTION TO BE DEMOLISHED FROM THIS
LOCATION
9 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.
MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND
NEW STUDS. MODIFY / REMOVE INTERIOR WINDOW TRIM AS
REQUIRED.
10 REMOVE PORTION OF WALL FOR NEW DOOR.
11 PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST – TYPICAL.
SCALE: 1" = 10'-0"
F2
ARCHITECTURAL FLOOR PLAN -
FOURTH LEVEL AREA A
SCALE: 1/4" = 1'-0"
B3
ARCHITECTURAL FLOOR PLAN -
FOURTH LEVEL - RM 4U-100A - NEW
SCALE: 1/4" = 1'-0"
B2
ARCHITECTURAL FLOOR PLAN -
FOURTH LEVEL - RM 4U-100A - DEMO
SCALE: 1/4" = 1'-0"
B5
ARCHITECTURAL RCP - FOURTH
LEVEL - RM 4U-100A - DEMO
SCALE: 1/4" = 1'-0"
B7
ARCHITECTURAL RCP - FOURTH
LEVEL - RM 4U-100A - NEW
SCALE: 1" = 200'-0"
B8
BUILDING 70 - DIAMOND ANALYSIS
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW TELECOM ROOMS SHALL BE 1 HR FIRE AND SMOKE RATED AND
COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS, AND
CAMPUS STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
MMNNPPQQRRSSTTUUVVWWXX
4S-130G4S-130G4S-130H4S-130H4T-1054T-105
4S-1014S-101
4S-1024S-102
4S-1034S-103
4S-1044S-104
4S-1054S-105
4S-1184S-118
4S-1234S-123
4S-1244S-124
4S-1254S-125
4S-1264S-126
4S-1274S-127 4S-1284S-128
4S-1294S-129
4S-24S-2
4T-1024T-102
4T-102A4T-102A
4T-102C4T-102C
M-4M-4
TELECOM
ROOM
4T-1014T-101
AA
BB
4A-1054A-105
ELECTRICAL
ROOM
4A-1064A-106
4A-1074A-107
4A-1084A-108
ELECTRICAL
ROOM
4A-1094A-109
4A-1104A-110
4S-54S-5
4A-110A4A-110A
4A-107A4A-107A
4S-34S-3
C4-89C4-89
4B-1014B-101
4B-1024B-102
4B-1034B-103
4B-1044B-104
4B-1054B-105 4B-1064B-106 4B-1074B-107
4B-1084B-108
4B-1094B-109 4B-1104B-110
4B-1114B-111 4B-108B4B-108B
4B-1134B-113
4B-1144B-114
4B-1154B-115
4B-1164B-116
4B-1174B-117
4B-1184B-118
TELECOM
ROOM
4B-1194B-119
ELECTRICAL
ROOM
4B-1204B-120
4B-1214B-1214B-1224B-1224B-1234B-123
4B-1244B-124
4B-1254B-125
4B-1264B-126
4B-1274B-127
4B-1284B-128
4B-1294B-1294B-1304B-130
4B-1314B-131
4B-1324B-1324B-1334B-133
4B-1344B-134
4B-1354B-135
4B-1364B-136
4B-1374B-137
4B-1404B-140
4B-1414B-141
4B-1424B-1424B-1434B-143 4B-1444B-144
4B-1454B-145
4B-1464B-146
4B-1474B-147TELECOM
ROOM
4B-1494B-149
4B-1504B-150
4B-1514B-151 4B-1524B-1524B-1534B-1534B-1544B-154
4B-1554B-155 4B-1564B-156
4B-1574B-157
4B-101B4B-101B
4B-101C4B-101C
4B-108A4B-108A
4B-1584B-158 4B-1594B-159 4B-1604B-160
4S-44S-4
C4-181C4-181
C4-32C4-32
C4-86C4-86
4S-1214S-121
4S-1224S-122
4T-102B4T-102B
C4-76C4-76
C4-80C4-80
C4-82C4-82
C4-79C4-79
C4-84C4-84
C4-73C4-73
C4-72C4-72
C4-72AC4-72A
C4-74C4-74
C4-28C4-28 C4-29C4-29
C4-30C4-30
C4-183C4-183
C4-184C4-184
C4-185C4-185
C4-20C4-20
4B-1394B-139
C4-88C4-88
C4-182C4-182
C4-31C4-31
4S-1004S-100
4B-1004B-100
4B-108C4B-108C
4D-1214D-121
4D-1204D-120
4D-1084D-108
4C-1174C-117
C-10C-10 4A-1014A-101
4A-1024A-102
4A-1034A-103
M2M2
C9C9
4M-1054M-105
C4-90C4-90
C4-179C4-179 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
E F
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s
M P
L S
V A
M C
/6 -2
-7
.M
E H
R M
.A R
C H
.B .L
.r v t
/5
/2
:2 :5
A
M
05/06/2022 M. Perkins K. McDermott
618-21-700
1383 - 70A-404B
ARCHITECTURAL ENLARGED VIEWS -
FOURTH LEVEL AREA B
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1" = 10'-0" F3
ARCHITECTURAL FLOOR PLAN - FOURTH LEVEL AREA B
NOT USED
/06
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW TELECOM ROOMS SHALL BE 1 HR FIRE AND SMOKE RATED AND
COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS, AND
CAMPUS STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1 HR FIRE & SMOKE BARRIER
HHJJKKLLMM
TELECOM
ROOM
4C-1024C-102
C4-41C4-414E-1534E-153
4D-1014D-101
4D-1474D-147 4D-1484D-148 4D-1494D-149 4D-1504D-150 4D-1514D-151 4D-1524D-152
4D-1464D-146 4D-1454D-145 4D-1444D-144
4D-1374D-137
4D-1344D-134 4D-1354D-135…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .