618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf

PDF 11 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document describes a federal contract opportunity for construction design and infrastructure upgrades at the Minneapolis VA Medical Center. The project involves building infrastructure to support the nationwide Electronic Health Record Modernization initiative, including constructing a new server room on the hospital roof. Work will take place across multiple departments and is estimated to cost between $20-50 million. The solicitation will be a Request for Proposal evaluated according to FAR Parts 15, 19, and 36, and is set aside only for Service-Disabled Veteran-Owned Small Businesses. The period of performance is approximately 450 calendar days from notice to proceed. All questions must be submitted in writing to the designated email address by the specified deadline, with no phone calls accepted. The Department of Veterans Affairs Office of Information Service Center is the issuing agency.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-29-32.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .S

IT

E

.r v t

/6

/2

:2

:0

A

M

05/06/2022 M. Perkins K. Mcdermott

618-21-700

1383 - G-000

COVER SHEET

1 Veterans Drive, Minneapolis, MN 55417

SITE

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

FINAL BID DOCUMENTS

05/06/2022

EHRM INFRASTRUCTURE UPGRADES - SITE

MINNEAPOLIS VA HEALTH CARE SYSTEM

COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND

WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL

CONTRACTOR).

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY

INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS

SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND

PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE

VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS.

VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND

DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

GENERAL NOTES:

1. ALL EXISTING PORTS ARE BEING REPLACED LIKE FOR LIKE ON THIS PROJECT. DEMO SHEETS HAVE NOT

BEEN PROVIDED UNLESS WALL REVISIONS ARE REQUIRED.

2. WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS ARE REQUIRED TO PROVIDE A 20% ALLOWANCE FOR NEW DATA PORTS. ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 120 DATA DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT BUILDING.

DURING THE COURSE OF THE INSTALLATION THE CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS CAPTURED IN THE

RECORD DRAWINGS AND THE OWNER HAS AN ACCURATE COUNT AT THE END OF THE PROJECT.

DRAWING INDEX

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

ISSUED FOR

CONSTRUCTION

GENERAL

G-000 COVER SHEET Yes Yes Yes Yes

G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes

G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes

G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ELECTRICAL

ES100 ELECTRICAL SITE PLANS No No Yes Yes

09ES100 ELECTRICAL SITE PLAN - BUILDING 09/10/72 No No Yes Yes

68ES100 ELECTRICAL SITE PLAN - BUILDING 68 No No No Yes

70ES100 ELECTRICAL SITE PLAN - BUILDING 70 No No No Yes

73ES100 ELECTRICAL SITE PLAN - BUILDING 73 No No No Yes

75ES100 ELECTRICAL SITE PLAN - BUILDING 75 No No No Yes

78ES100 ELECTRICAL SITE PLAN - BUILDING 78 No No No Yes

89ES100 ELECTRICAL SITE PLAN - BUILDING 89 No No No Yes

E-501 ELECTRICAL DETAILS No No No Yes

TELECOMMUNICATION

TS100 TELECOMMUNICATION SITE PLAN Yes Yes Yes Yes

TS101 TELECOMMUNICATION SITE PLAN - EXISTING SERVICE PROVIDER No Yes Yes Yes

T-601 TELECOMMUNICATIONS SITE ONE-LINE DIAGRAM - EXISTING Yes Yes Yes Yes

REFERENCE

R-900 PHOTO REFERENCES Yes Yes Yes Yes

R-901 PHOTO REFERENCES Yes Yes Yes Yes

R-902 PHOTO REFERENCES Yes Yes Yes Yes

PROJECT SCOPE OF WORK:

THIRD-PARTY INSPECTIONS:

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE DATE: 11/05/2021

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

CO:

Rosella Torcaso Rosella.Torcaso@va.gov Contracting Officer Department of Veterans Affairs

COR:

Robert C. Malecha Minneapolis VA Health Care System 1 Veterans Drive Minneapolis, MN 55417

USER:

Zende Wisdom, CAPM, CSM Operations Manager Minneapolis (MIN) Area, Territory 1, District 3 Midwest End-User Operations (EUO) IT Operations and Services (ITOPS)

Office of Information and Technology (OIT) Office: (612) 467-6728 M-F 7:30am – 4:00pm CST

SERVICE PROVIDERS:

Meagan (Kellagher) North Associate Director, Program Management Global Public Sector Solutions, Operations & Wholesale Global Operations & Services m 703-362-7243 Take the WWIT Pledge

SERVICE PROVIDERS:

Frederick Kraft (Rick) VA National LEC Program Manager CenturyLink Federal Solutions 4250 N Fairfax Dr, Arlington VA 22203 Office: 703-363-8745 Mobile: 301-509-3952 frederick.kraft@centurylink.com

Aaron Lesmeister Local Network Implementation 301 65th St W, Richfield, MN, 55423 tel: 763-326-2525 | cell: 651-272-6580 aaron.lesmeister1@lumen.com

ELECTRONIC HEALTH RECORDS MODERNIZATION

LOCATION MAP

VICINITY MAP

CAMPUS MAP

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

STORM

S T

OR

M

S T

ORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

T

H A

V E

S

O U

T H

54TH STREET

L

IG

H T

R A

IL

S

T A

T

IO

N

M

IN

N E

H A

H A

A V

E . S

O U

T H

T .H

. 5

SRO

SOUTH

SRO

EAST

SRO

NORTH

CREDIT

UNION

LOADING

DOCK

The purpose of this project is to provide complete recabling within multiple buildings at the Minneapolis VA Medical Center Campus.

Multiple buildings on campus including Buildings 9, 10, 49, 68, 69, 70, 72, 73, 74, 75, 76, 78, 89, 222, and also site infrastructure upgrades.

See main project cover sheet for building priority.

This project will include all materials and labor to replace all telecommunications cable, outlets, and associated equipment for buildings in this project. The scope also includes replacement of all fiber optic cabling, conduit and providing new conduit, fiber and manholes serving the buildings' Telecommunications Rooms (TR) in accordance with the drawings and specifications.

Un-terminated "future capacity" cables are not permitted. All installed cables shall be terminated at each end with documentation, labeling, and (where applicable) test results provided. This applies to all permanently installed cable types.

In addition to replacing all of the communications cabling and additional 20% capacity shall be provided as shown on the drawings and specifications.

All Copper replacement will be CAT 6A. The contractor shall utilize Electrical Metal Tubing (EMT) conduit or cable tray in all locations where the cable may touch the interstitial floor. Any conduit used will be marked appropriately with “low-voltage/data” at regular intervals to be visible in interstitial spaces with minimal effort.

CAT6A cabling installed for end user devices (terminated at wall plates) will follow the jacket color standards as outlined in Specification 27 15 00. The facility has a required 1 Gbe connectivity to desktops, and other EUD, and this will include the replacement of wall jacks at EUDs to become CAT6A compliant. All in-building copper cabling will be terminated and labeled in accordance with the drawings and specifications and will be terminated to CAT6A modular jacks capable of accepting and functioning with other modular (i.e.: RJ11) plugs without damage to the jack.

For every TR in the SOW, Contractor shall provide and install new patch panels conforming to EIA/ECA 310-3 dimensions and suitable for mounting in standard equipment racks, with 48 RJ45 jacks aligned in two horizontal rows per patch panel and Labeled in accordance with the drawings and specifications. Contractor shall also supply and label all new CAT6A patch cables for every device in the telecom room, (NOT at the end user device) to be sized and labeled appropriately in accordance with 27 15 00. Each TR shall also be provided with new four-post racks with minimum 40% spare capacity for future expansion. All racks and patch panels will be labeled in accordance with Specification 27 15 00.

Contractor shall provide and install and utilize a series of welded cabling support structures (“ladder racks”) around the perimeter of the telecom room and above all new racks to support the weight of the cable. Cable tray "wire basket style" shall be used in corridor spaces.

No wireless access points will be replaced and will be protected-in-place, only the cabling will be replaced. All cabling for wireless access points will be labeled in accordance with the specifications and shall be checked against facility color standards.

The project scope also includes addition of new Computer Room Air- Conditioning split systems with temperature and humidity monitoring station for all TR's and the electrical circuits as indicated.

This project utilizes new construction and renovations to meet all EHRM requirements as a stand alone project. Where a TR does not occur on every floor, or the TR does not meet the size specified in the EHRM Standard, it is due to the fact that a compliant TR will be built on that floor with a future project. When that occurs, the future project is referenced but in no way diminishes the effectiveness of the designed solution.

THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE

PROJECT CANNOT DEPEND ON ANOTHER PROJECT OR OTHER

FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE

AND USABLE.

05/06/2022 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

SITE

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/6

/2

:2

:0

A

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - G-010

GENERAL PROJECT NOTES

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS

AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN

CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND

COR IMMEDIATELY.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS

NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF

WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S

WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION

IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH

FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER

MATERIAL AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL

AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED WITH COR.

SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

18. AN AIR QUALITY PERMIT WILL BE REQUIRED FOR THE GENERATOR FOR THIS PROJECT. THE

CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH THE MINNEAPOLIS VA AND AIR

QUALITY AUTHORITY HAVING JURISDICTION.

FIRE LIFE SAFETY NOTES

1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING

CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.

2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE

ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY

CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.

3. VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017,

REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS, SECTION 01

35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED CONSTRUCTION

WORK.

FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION

1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES

PER LOCAL FIRE DEPARTMENT.

2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL

TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.

3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE

NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE

MARSHAL OR LOCAL FIRE DEPARTMENT.

4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.

5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE CODES.

6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL

FIRE CODES.

7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.

TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE LOCAL

FIRE DEPARTMENT.

8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.

9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAMERETARDANT.

10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN

REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS

MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.

11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE

ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND

DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL

FIRE DEPARTMENT IN THE FIELD.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR

TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM

DIMENSIONS WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE

THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS

CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS

REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR

ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS. MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN

DIMENSIONAL INFORMATION RELATED TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD

MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE

FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM

OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY

SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR

MAKES THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH"

OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL

DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES

AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR

WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS

(2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE

FACES OF FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION

REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE

DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A

FIXED WALL AND LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS

BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND

ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE

ARCHITECT AND COR PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF

DECKING OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN

LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS).

HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO.

EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL

PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION

(FFE) NEXT TO IT.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE

PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION

MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,

SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND

REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER

TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND

FACTORY PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED

TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS

(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,

UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS

MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL

NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR

EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL

SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN

ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE

PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS

COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE

INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS

LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE

ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED

FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT

PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND

EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET

PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM

OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,

BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED

AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY

IF PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE

EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.

PROPER PRIMING MUST BE USED WITH SEALANTS.

2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER

PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS

AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS.

IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE

USED, CONTACT THE ARCHITECT.

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL

BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT

UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED

EQUIPMENT FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL

MATERIALS (TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

GENERAL DEMOLITION AND PHASING NOTES

1. HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL

AND/OR ROOF.

5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

7. CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY MEMORANDUM 111-40, SUBJ: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017. SUBMIT TO COR PRIOR

TO START OF WORK.

FIRE ALARM

1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH THE VA FIRE PROTECTION

DESIGN MANUAL, 2021 AND NFPA 72, 2022.

2. SUBMIT FOUR SETS OF PLANS TO VA (AHJ) FOR APPROVAL PRIOR TO THE INSTALLATION.

3. SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE SUPERVISION & POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING LOCATION OF ALL COMPONENTS AND

METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT.

4. THE FIRE ALARM SYSTEM SHALL CONFORM TO IFC 2012 STANDARDS AND APPLICABLE NFPA STANDARDS.

FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO STATE MARSHAL FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE ENFORCING AGENCY.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.

CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED

AND SHALL BE DRY CHEMICAL TYPE.

2. FOR TELECOMMUNICATION ROOMS (TR), THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET

AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE NEW LOCATION WITH THE COR.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRINKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED. CONTRACTOR TO

VERIFY THE EXACT SIZE AND LOCATION IN FIELD.

2. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2022 NFPA 13.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE

PERMISSIBLE.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

2. NEW FIRE AND SMOKE DAMPERS WILL BE PROVIDED FOR EACH TR ON ALL EXISTING DUCT PENETRATIONS.

3. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM AND FIRE SPRINKLER SYSTEM.

EXIT AND EMERGENCY LIGHTING

1. WHERE APPLICABLE, EXISTING AND/OR NEW EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.

EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.

2. WHERE APPLICABLE, EXISTING AND/OR NEW EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE

LOCAL AND CURRENT NEC GUIDELINES.

RATED DOOR AND WINDOW ASSEMBLIES

1. THE BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED.

NEW RATED DOORS SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED IN ALL FLOOR PENETRATIONS AND IN ALL PENETRATIONS OF RATED WALLS.

2. TEMPORARY FIRESTOPPING: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION

AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

GENERAL

1. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES NORMALLY

APPLIED.

2. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO EXCEED 50

WHEN TESTED IN ACCORDANCE WITH ASTM E 84.

3. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.

4. COMPLY WITH NFPA REQUIREMENT FOR NEW AND EXISTING DOORS. MAXIMUM EFFORT TO OPERATE DOORS

SHALL NOT EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

5. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH

A UL APPROVED METHOD AND MATERIAL APPROVED BY BUILDING.

6. IF MULTIPLE CEILING TILES MUST BE REMOVED IN THE CORRIDOR SYSTEM AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER MIGHT NEED TO BE CONSTRUCTED; THE

ALTERNATIVE IS TO INSTALL TEMPORARY UPRIGHT SPRINKLER.

TEMPORARY WALL, STARC

SYSTEMS OR EQUAL

FLOOR LINE

CEILING SYSTEM AS SCHEDULED, IF MULTIPLE

CEILING TILES MUST BE REMOVED IN THE

CORRIDOR SYSTEM AND CANNOT BE REPLACED AT

THE END OF THE WORK SHIFT, A 1-HOUR FIRE

BARRIER MIGHT NEED TO BE CONSTRUCTED.

EXISTING STRUCTURE

FIRE RATED PLASTIC TO PREVENT DUST

INSTALL PRIOR TO CONSTRUCTION

/1

F

IN

IS

H E

D F

L O

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

L O

O R

T O

F L O

O R

H E

IG

H

T

SPRINKLER SYSTEM TO

REMAIN

PROVIDE 1-HOUR RATED TEMPORARY

BARRIER OR TEMPORARY UPRIGHT

SPRINKLER HEADS, AS REQUIRED.

COORDINATE WITH OWNER FOR EACH

LOCATION

PROVIDE 1-HOUR RATED TEMPORARY

BARRIER/ TEMPORARY UPRIGHT SPRINKLER

HEADS, AS REQUIRED. COORDINATE WITH

OWNER FOR EACH LOCATION

WEEKLY

CHANGED

OR MORE AS

NEEDED

PRE-FILTER

FLEX

DUCT

MONTHLY

CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT

PROVIDE STICKY MATS (CHANGED

END OF EVERY SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

INDICATOR SHALL BE AT -0.03" W.G.

OR GREATER (VERIFY DAILY).

VERIFY ALL OPENING SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUR

NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT.

A

V

O

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PROVIDE TEMPORARY

ENCLOSURE AT AREAS

TO REMAIN

OPERATIONAL, SEE

DETAIL (STARC SYSTEMS

OR EQUAL)

EXISTING RACK TO

BE REPLACED

NEW RACK IN TEMPORARY

LOCATION LOCATED

ADJACENT TO EXISTING RACK

OR IN ADJACENT CORRIDOR.

IF CORRIDOR IS USED,

PROVIDE INFECTION

CONTROLS FOR THAT AREA.

PROVIDE NEW

HEPA FILTER AT

THE BEGINNING OF

CONSTRUCTION

PROVIDE 1-HOUR RATED

TEMPORARY BARRIER/ TEMPORARY

UPRIGHT SPRINKLER HEADS, AS

REQUIRED. COORDINATE WITH

OWNER FOR EACH LOCATION

INFECTION CONTROL / DUST

CONTROL PARTITION /

BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-

SHEETED ADHESIVE FLOOR

PADS

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

STICKY

MAT

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

SITE

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/6

/2

:2

:0

A

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - G-011

GENERAL INFECTION CONTROL NOTES AND

SYMBOLS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT

(ICRA) PROCEDURES AS PER THE MINNEAPOLIS VA

HEALTHCARE SYSTEM ICRA PLAN AND AS DIRECTED BY

THE CONTRACTING OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD

TO THE CONSTRUCTION SITE SHALL BE POSTED AS PER

THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO

BEGINNING WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL

CONSTRUCTION PERSONNEL TO PASS THROUGH THIS

ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER

PRIOR TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION

AREAS; REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM

THE OTHER AREAS OF THE MEDICAL CENTER; NO

RETURN AIR OR EXHAUST SHALL PASS INTO THE AREAS

OUTSIDE THE CONSTRUCTION AREA. ISOLATE HVAC

SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS

AND KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO

MAKE SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS

FROM PIPES AND CONDUITS APPROPRIATELY AND

IMMEDIATELY TO MAINTAIN DUST PROTECTION AND

NEGATIVE AIR PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN

WIPING RAGS FOR CLEANING FINE DUST FROM FLOORS

AND ADJACENT OCCUPIED AREAS. ANY DUST TRACKED

OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED

IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS

(UPON APPROVAL). PATCH OR REPAIR ANY DAMAGE

FROM CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF VAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING

MATRIX, TO FIND THE CLASS OF PRECAUTIONS (I, II,

III OR IV) OR LEVEL OF INFECTION CONTROL

ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW N/A N/A LOW LOW N/A

STEP 5: MECHANICAL ROOM

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE,

PATIENT ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6: IDENTIFY ISSUES RELATED TO: VENTILATION,

PLUMBING, AND ELECTRICAL IN TERMS OF THE

OCCURRENCE OF PROBABLE OUTAGES.

STEP 7. IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8. CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS

THERE A RISK DUE TO COMPROMISING STRUCTURAL

INTEGRITY (FOR EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9. WORK HOURS: CAN OR WILL THE WORK BE DONE

DURING NON-PATIENT-CARE HOURS?

STEP 10. DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11. DO THE PLANS ALLOW FOR THE REQUIRED NUMBER

AND TYPE OF HAND-WASHING SINKS?

STEP 12. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE MINIMUM NUMBER OF SINKS FOR

THIS PROJECT? (VERIFY AGAINST FACILITY GUIDELINES

INSTITUTE (FGI) DESIGN AND CONSTRUCTION GUIDELINES

FOR TYPES AND AREA.)

STEP 13. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE PLANS RELATIVE TO CLEAN AND

SOILED UTILITY ROOMS?

STEP 14. PLAN TO DISCUSS THE FOLLOWING CONTAINMENT

ISSUES WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC

FLOW, HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

CLASS I - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUCT.

2. IMMEDIATELY REPLACE CEILING TILE IF DISPLACED.

CLASS I - PRECAUTIONS UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. REMOVE ALL VISIBLE DEBRIS WITH A WET TOWEL AND/OR

MOP.

3. ENVIRONMENTAL MANAGEMENT SERVICE TO WIPE WORK

SURFACES AND FLOORS WITH DISINFECTANT.

CLASS II - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTO ATMOSPHERE

2. WATER-MIST WORK SURFACES TO CONTROL DUST WITH

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. PLACE STICKY MAT AT ENTRANCE AND EXIT OF WORK

AREA.

5. REMOVE AND ISOLATE HVAC SYSTEM IN AREAS WHERE

WORK ID BEING PERFORMED.

6. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS II - PRECAUTIONS UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS

3. WET MOP AND/OR VACUUM WITH HEPA FILTER BEFORE

LEAVING WORK AREA.

4. RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. ENVIRONMENTAL MANAGEMENT SERVICE SHALL WIPE

WORK SURFACES AND FLOORS WITH DISINFECTANT.

CLASS III - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION OF DUCT

SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA

OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORK SITE AND READINGS

SHOULD BE DOCUMENTED AT LEAST DAILY.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS III - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND CONTROL

AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

CLASS IV - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. INSTALL AND MAINTAIN CONSTRUCTION CRITICAL

BARRIERS AND CEILING PROTECTION.

2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

3. SEAL DOORS OPENING TO ADJACENT AREAS WITH

DUCT TAPE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

5. BLOCK OFF AND SEAL HVAC REGISTERS, GRILLES AND

ANY OPENINGS IN DUCTWORK TO REMAIN

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

7. NEGATIVE PRESSURE MONITORING DEVICES SHOULD

BE VISIBLE FROM OUTSIDE THE WORK SITE AND

READINGS SHOULD BE DOCUMENTED AT LEAST DAILY.

8. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

9. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT

OF WORK AREA.

10. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

11. PROVIDE MONITORING AND CLEARANCE SAMPLES FOR

MOLD/ASBESTOS.

12. CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR

CLOTH OR PAPER COVERALLS THAT ARE REMOVED

EACH TIME THEY LEAVE WORK SITE.

13. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED

TO WEAR SHOE COVERS. SHOE COVERS MUST BE

CHANGED EACH TIME THE WORKER EXITS THE WORK

AREAS.

CLASS IV - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND

CONTROL AND THOROUGHLY CLEANED BY THE

ENVIRONMENTAL MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

6. WET MOP AREA WITH CLEANER/DISINFECTANT.

7. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE

WORK WAS PERFORMED.

INFECTION CONTROL RISK

ASSESSMENT:

1. PROJECT SPECIFIC PLANS ARE REQUIRED FOR THIS PROJECT. CONTRACTOR TO SUBMIT

INFECTIOUS CONTROL PLAN, SAFETY PLAN AND QUALITY CONTROL PLAN PRIOR TO

CONSTRUCTION. THE CONTRACTOR SHALL MEET AND DISCUSS EXTENT OF ABATEMENT WITH

ALL PARTIES TO COORDINATE WITH THE FACILITY INFECTION CONTROL TO CONDUCT AN

INFECTION CONTROL RISK ASSESSMENT PRIOR TO BEGINNING ANY ABATEMENT, REMOVAL,

AND / OR REPAIRS PER MCM 111-40.

2. THE CONTRACTOR SHALL WRITE THE ASBESTOS HAZARD ABATEMENT PLAN (AHAP) AND

DEVELOP A SCHEDULE FOR APPROVAL BY THE VETERANS PROFESSIONAL INDUSTRIAL

HYGIENIST (VPIH).

3. THE CONTRACTOR SHALL PERFORM NEGATIVE EXPOSURE ASSESSMENTS (NEA) AND

MONITORING PER OSHA 1926.1101(f) FOE EACH REMOVAL WORK OPERATION IN EACH WORK

AREA.

4. THE CONTRACTOR SHALL MONITOR…