This document is a solicitation for construction services for the EHRM Infrastructure Upgrades Project at the Minneapolis VA Medical Center. The solicitation will be issued as a Request for Proposal to be evaluated in accordance with the procedures outlined. It is advertised as a total Service-Disabled Veteran-Owned Small Business set-aside with a NAICS code of 236220 and size standard of $39.5 million. The period of performance is approximately 450 calendar days from notice to proceed. The project scope includes construction and commissioning in accordance with provided drawings and specifications to build new server room infrastructure throughout the hospital campus, with an estimated value between $20-50 million. Questions must be submitted in writing by the specified date.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C77622R0045
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1-73
36C77622R0045
X 05-12-2022
618-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131 Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490
Independence OH 44131 Jason Schultz 216-447-8300 In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.
The contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as required by drawings and specifications to complete the scope of work for the EHRM Infrastructure Upgrades Construction.
The location of the project is:
Minneapolis VA Medical Center 1 Veterans Drive Minneapolis, MN 55417
This project must be completed in accordance with specifications, drawings and supporting attachments included in the solicitation package.
NAICS Code: 236220 ($39.5M) This project must be completed in accordance with specifications, drawings and supporting attachments included in the solicitation package. The magnitude of construction is between $20,000,000.00 and $50,000,000.00 Note: that the VAAR magnitude of construction is closer to the high end of this range.
X X
52.211-10 X
10 (TEN)
2:00 PM
EDT
07-07-2022 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
See Price Schedule
00076 Department of Veterans Affairs Department of Veterans Affairs
6150 Oak Tree Blvd, Suite 300 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Donald A. Marsh III
PCAC15L3-1697
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 10 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 11 |
| 2.16 52.216-1 TYPE OF CONTRACT (APR 1984) | 19 |
| 2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 19 |
| 2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 19 |
| 2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) | 20 |
| 2.20 52.228-1 BID GUARANTEE (SEP 1996) | 22 |
| 2.21 52.233-2 SERVICE OF PROTEST (SEP 2006) | 22 |
| 2.22 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 23 |
| 2.23 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 23 |
| 2.24 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 24 |
| 2.25 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 26 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) | 26 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 29 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 32 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 34 |
| GENERAL CONDITIONS | 36 |
| 4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) | 36 |
| 4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 37 |
| 4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 38 |
| 4.4 52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 (JAN 2022) | 41 |
| 4.5 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 45 |
| 4.6 52.223-20 AEROSOLS (JUN 2016) | 46 |
| 4.7 52.223-21 FOAMS (JUN 2016) | 46 |
| 4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (JAN 2021) (JUL 2020) (DEVIATION) | 47 |
| 4.9 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) | 52 |
| 4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS | 53 |
| 4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 53 |
| 4.12 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 56 |
| 4.13 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 57 |
| 4.14 852.219-10DEV VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (NOV 2020) (DEVIATION) | 57 |
| 4.15 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 60 |
| 4.16 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 60 |
| 4.17 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 62 |
| 4.18 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 62 |
| 4.19 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 62 |
| 4.20 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 63 |
| 4.21 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 66 |
| 4.22 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 68 |
| 4.23 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 69 |
| 4.24 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019) | 69 |
| 4.25 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019) | 70 |
| 4.26 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 70 |
| 4.27 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 72 |
| 4.28 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 72 |
| 4.29 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 73 |
| 4.30 LIST OF ATTACHMENTS | 73 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 01: All work for Bid Items I, II and III as identified by the drawings and specifications for Building 9.
POP is stated in the solicitation.
Contract Period: Base POP Begin:
POP End:
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 02: All work for Bid Items I, II and III as identified by the drawings and specifications for Building 10.
POP is stated in the solicitation.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0003 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 49.
POP is stated in the solicitation.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0004 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 68.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0005 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 69.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0006 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 70.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0007 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 72.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0008 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 73.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0009 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 74.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0010 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 75.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0011 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 76.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0012 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 78.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0013 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 89.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0014 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building 222.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0015 - All work for Bid Items I, II and III as identified by the drawings and specifications for Building Site Work.
Contract Period: Base
| 1.00 |
| JB |
| __________________ |
| __________________ |
Line Item 0016 - All work for Bid Items I, II and III as identified by the drawings and specifications for UPS/Electrical Scope in B70, RM #2B-105 Main Computer Room.
Contract Period: Base
| GRAND TOTAL |
| __________________ |
NOTICE
1. Offerors must provide a lump sum price for Line Items 0001 through 0016, as these line items contain all of the work for the project. Failure to do so may render the offeror as unacceptable and ineligible for award.
1. Award will be made based on the total of Line Items 0001 through 0016 and in accordance with the instructions in the solicitation
1. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.
1. Contractor is required to fill in the Unique Entity ID (UEI) in Block No. 14 on Standard Form (SF) 1442.
1. Line Item 0017 no longer applies to this project. All references to Line 0017 in the Specs and Drawings shall be disregarded.
1. All references in the Specs, Drawings and other related documents to CLIN shall be replaced with the term Line Item.
1. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 PROPOSAL MATERIAL:
Proposal materials consisting of the specifications, other attachments, and contract forms are included and/or attached as part of this Request For Proposal. The VA will not provide printed copies of the specifications or solicitation documents. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, Standard Form (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid (proposal) guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the rejection of the proposal. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction, which can be located under FAR 52.252-2 Clauses Incorporated by Reference. Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:
All solicitation related documents will be published to Contract Opportunities https://sam.gov/.
2.2 REQUEST FOR PROPOSAL:
This is a Request for Proposal (RFP) in accordance with FAR Part 15. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. A responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
The Government reserves the right to award without discussions based upon the initial evaluation of the proposals but reserves the right to open discussions if determined to be necessary. All proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the content provided in the solicitation. Using the tradeoff process under best value, it may be in the Government's best interest to consider award to other than the lowest price Offeror or other than highest Technical rated Offeror. The intent is to award to the Offeror that offers the best value to the Government. The Past Performance and Technical factors when combined, are approximately equal to price. The evaluation factors are listed in descending order of importance.
1. Past Performance
2. Key Personnel of Prime and Subs (Technical)
3. Technical Approach (Technical)
4. Price
2.3 SDVOSB SET-ASIDE:
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as “verified” by the VA’s Center for Veterans Enterprises (CVE) http://www.vetbiz.gov. Offerors must be verified by CVE and visible in the Vendor Information Pages (VIP) database at TIME OF SUBMISSION OF PROPOSALS AND TIME OF AWARD. Failure to be BOTH visible and verified at the time of proposal submission and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
2.4 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Jason Schultz. Questions shall be submitted only via e-mail to: jason.schultz@va.gov. The subject line must read: Minneapolis EHRM Infrastructure Upgrades - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS June 14, 2022 at 4:00 PM ET.
*The VA recognizes that this is a large project and there may be technical questions submitted after deadline, but the VA does not guarantee that late questions will be answered. Please submit questions as soon as possible, to ensure the most accurate answers from the VA.
**If possible, the prime GCs should try to submit all the questions from their team. This will prevent unnecessary duplicate questions.
2.5 PRE-PROPOSAL SITE VISIT:
See FAR 52.236-7 for information regarding the site visit.
Please RSVP to Jason.schultz@va.gov by June 3, 2022, with the names of who is attending from your firm. This will help the VA better coordinate for the site visit, as the room capacity is limited.
NOTE: Contractor shall be responsible for attending the Pre-Proposal Site Visit prior to submissions in order to verify all existing conditions and take any necessary measurements required to adequately propose on the project. If the Contractor chooses not to attend the Pre-Proposal Site Visit, the Contractor may submit their proposal at their own risk.
2.6 AMENDMENTS:
Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.
2.7 PREPARATION OF PROPOSALS:
The Government will not pay for any costs incurred in preparation and submission of proposals.
2.8 PROPOSAL REQUIREMENTS:
A. General:
1. Proposal Submission: Offerors shall submit their proposals via email to jason.schultz@va.gov. Proposals shall be based on solicitation document issued for RFP number 36C77622R0045. Proposals will be in the format stipulated in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
B. Proposal Format:
1. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in three (3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative. In order that the Volume I Technical may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I. Offeror shall separate Volumes I, II and III. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. The volumes shall be submitted in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed three (3) emails (one email for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page.
2. Volume I Technical: Offerors shall format the Volume I Technical proposal as listed below. The specific evaluation criteria and methodology for Volume I is contained in Sections C (1), (2), (3) and Section D.
a. The offer, including title page, detailed table of contents, preface shall be submitted in one (1) PDF document for Volume I Technical and shall not exceed a total of FORTY (40) pages (title page, table of contents and preface are excluded from the page limits) in Microsoft Times New Roman 12 font. The Offeror shall not include any price or price related material in the Phase I proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins around the page perimeter containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines will be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12 point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Times New Roman are permissible in the presentation of graphic material only.
c. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.
3. Volume II Price: Offerors shall format the Volume II Price proposal as listed below. The specific evaluation criteria and methodology for Volume II is contained in Sections D and E.
a. Volume II Price shall not exceed a total of TWENTY (20) pages in Times New Roman size 12 font.
b. Offerors shall complete the Price Schedule in part A of this solicitation.
c. Offerors shall ensure the Signed Standard Form (SF) 1442 is provided. Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
d. The Offeror shall submit their price information on the Price Schedule provided in this Solicitation. The Offeror shall submit a bid guarantee as stipulated in the solicitation. The prices shall be Firm Fixed Price.
e. In addition to the Pricing Schedule, Offerors shall submit completed 01 00 00 Appendix A - Bid Form Template (see attached). Please provide this as an Excel Pile. This file will not count as part of the page limitations. *IMPORTANT NOTE: Ensure that the cost estimate breakdown in 01 00 00 Appendix A - Bid Form Template matches the Line Item amounts provided in the Price Schedule. 01 00 00 Appendix A - Bid Form Template will be used to determine price reasonableness. The Government also reserves the right to use 01 00 00 Appendix A - Bid Form Template as part of discussions during the competitive range, if a competitive range is established.
f. The Offeror’s signature on the SF 1442 must be a hand signature and not an electronic signature.
g. Bid Bond: The bid bond shall be submitted as part of the electronic submission. Failure to provide electronic copy of the bid bond with your proposals at the time of submittal may deem the proposal Unacceptable. An original hard copy of the bid bond will be requested by the VA from the during the responsibility determination. Failure to furnish the required bid guarantee on the proper form and for the proper amount by the time specified in Block 13 of SF 1442, may result in rejection of the proposal. See FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation.
4. Volume III Administrative Information: Offerors shall include the following in Volume III. All of the below information must be provided. An Offeror may be considered unacceptable if these items are not provided in the proposal
a. Representations & Certifications:
The offeror shall provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.
b. Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
Offeror shall provide their response to FAR 52.204-24 (d) Representation.
c. Information Regarding Responsibility Matters:
Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
d. Violation of Arms Controls Treaties or Agreements:
Offeror shall provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.
e. Post Award Small Business Program Representations:
Offeror shall provide their response to FAR 52.219-28 items (h)(1), (h)(6), and (h)(7).
f. Limitations on Subcontracting:
In accordance with FAR 852.219-77, offeror shall complete VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction and return with their proposal submission. Completed form will become part of the official award documentation.
g. Experience Modification Rate:
The Offeror shall include the Safety of Environmental Violations and Experience Modification Rating (EMR) Information, including filling out Contractor Safety and Environmental Record Evaluation Form.
(1) Provide offeror’s information pertaining to their past Safety and Environmental record. The information must contain a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
(2) Provide offeror’s information regarding their current EMR. This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
(3) Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
(4) If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.
(5) The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
(6) This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
(7) Failure to provide the above EMR documentation, may result in a determination that an Offerors proposal is unacceptable.
C. Technical Proposal Requirements: The proposal shall address the following submission requirements for Factor 1, Past Performance, Factor 2 Key Personnel of Prime and Subs (Technical) and Technical Approach (Technical).
1. Factor 1, Past Performance: The contractor shall provide current and relevant information regarding an Offeror’s actions under previously awarded contracts. This shall include a maximum of four (4) construction projects for the Offeror that best demonstrate their past performance on relevant projects in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as “construction in an active campus or related environment involving work involving progression of an IT infrastructure or low voltage upgrades/renovations or other projects similar in size, scope, and complexity to this project.” Projects shall have a minimum value of $4,000,000.00 and be at least 50% completed. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP. If the Offeror is a Joint Venture (JV), past performance can be submitted for projects performed by the individual entity, or by the Joint Venture itself.
If a completed past performance evaluation is available in Contractor Performance Assessment Rating System (CPARS), it shall be submitted with the proposal for each project identified. If there is not a completed past performance evaluation available in CPARS, then the Offeror shall submit Past Performance Questionnaires (PPQ) (reference Attachment in the solicitation) for each project. The Offeror shall notify their client that they PPQ shall be submitted back to the Offeror and incorporated into the proposal submission. If the Offeror is unable to obtain a completed PPQ from a client for a project before the proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.
2. Factor 2, Key Personnel of Prime and Subs (Technical): The Offeror shall provide team members experience and how this interacts with any of the projects listed for Factor 1 Past Performance, if applicable. The Offeror shall provide a resume for each of the following key personnel members that make up the General Contractor team and their subcontractors, to include: Overall Project Manager, QC Manager, Safety Manager, Project Manager, Project Site Superintendent, MEP and Low Voltage Subcontractors. Identify all other know subcontractors. It is recognized that not all subcontractors may be identified at the time of proposal submission. For each resume, include name of company, name of individual, IT or related experience, qualifications for each person such as specialized training, education, experience. Each resume shall be one page.
| 3. | Factor 3, Technical Approach (Technical): The offeror shall provide a detailed technical approach (thought process) to accomplishing the construction of the EHRM project (based on the solicitation documents and the site visit). The narrative shall detail how the contractor intends to prepare the site, handle phasing, remodel portions of the existing hospital and campus structures, construction of the new telecommunication rooms, and complete the project within the specified time limits. The narrative shall be no more than fifteen pages. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. Simply restating the requirements (copying and pasting from the solicitation) is not considered to be a demonstration of complete understanding of the project requirements. The following information is required for the Technical Approach: |
| 1. | Approach for Quality Control from the NTP through Completion/As-Builts. |
| 2. | Plan for safety to include compliance with OSHA. |
| 3. | Address how Interim Life Safety Measures/ICRA will be followed for this project. |
| 4. | Explain the plan to prevent construction from impacting Patient Safety. |
| 5. | Provide detailed explanation on procedures to complete all MEP work. This is to include all procedures from submittal, purchasing (long lead items) storage, installation, and commissioning. |
D. Volume II – Price Proposal Requirements
a. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard Form (SF) 1442 Solicitation Offer and Award (Construction, Alteration, or Repair) and the Pricing Schedule located on PAGE 6 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation.
b. In addition to the Pricing Schedule, Offerors shall submit 01 00 00 Appendix A - Bid Form Template. *IMPORTANT NOTE: Ensure that the cost estimate breakdown in 01 00 00 Appendix A - Bid Form Template matches the Line Item amounts provided in the Price Schedule. 01 00 00 Appendix A - Bid Form Template will be used to determine price reasonableness. The Government also reserves the right to use 01 00 00 Appendix A - Bid Form Template as part of discussions during the competitive range, if a competitive range is established.
c. The Offeror shall take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices, the Contracting Officer may reject the proposal and exclude the Offeror from further consideration for award.
E. Evaluation Methodology:
The Technical proposal shall address the following evaluation factors, which are cited below. The Past Performance and Technical factors when combined, are approximately equal to price. The following factors are in descending order of importance.
1. Factor 1, Past Performance: Will be evaluated on the relevancy, recency and quality of the projects submitted and on the quality of the Offeror’s past performance within the last five (5) years with respect to the construction projects submitted. When evaluating quality; some aspects that may be considered are as follows: the timeliness of contract completion, adherence to contract schedules and timely submission of deliverables; the contractor’s ability to comply with the terms and conditions of the contract; the overall quality of the work performed on the contract; the Offeror’s managerial performance’ and whether or not the reference would enter into a contract with the contractor again.
Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. Past performance evaluations may also be conducted using information obtained from CPARS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
2. Factor 2, Key Personnel of Prime and Subs (Technical): Will be evaluated on relevant management personnel, technical personnel, and subcontractor capabilities and qualifications to provide the required planning, implementation and completion of the project. *The standard for what is relevant is contained in Factor 1.
3. Factor 3, Technical Approach (Technical): Will be evaluated and used as an aid to help determine that the Offeror understands the complexity and risks performing the required elements. The Technical Approach will be evaluated for inclusion of the technical areas listed in the criteria. The VA will evaluate the Offeror’s specific detail in each of the technical areas regarding their approach for construction. The Offeror’s narrative should provide enough detail to demonstrate the scope and complexity of the project requirements are understood and will be successfully completed.
4. Factor 4, Price: The total evaluated price will be determined by the Offeror’s price for Line Items 0001 through 0016. Note: The VA will look at the total evaluated price, Past Performance and Technical factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements.
Note: If none of the offerors are within the available funding limitation or is otherwise determined to be other than fair and reasonable, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range.
2.9 USE OF ADVISORS:
Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide specific technical advice on specialized matters or on particular problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained as a result of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of an Offeror.
2.10 DETERMINATION OF RESPONSIBILITY:
A Determination of Responsibility will be conducted for the apparent successful offeror prior to award of the project The Contracting Officer will determine if the successful offeror is responsible using the general standards of responsibility for this procurement. Past performance will be evaluated as part of the general responsibility determination. In accordance with VAAM 809.105-1 Obtaining Information, past performance evaluations may be conducted using information obtained from CPARS and any other sources deemed appropriate by the Contracting Officer. Other sources may include, but are not limited to, inquiries of owner representatives, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.
2.11 VETS 4212:
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).
2.13 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR
PERFORMANCE ASSESSMENT SYSTEM (CPARS):
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.14 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
2.15 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
2.16 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 2.9 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Minneapolis, Minnesota - Hennepin County
(End of Provision)
2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .