618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf
PDF 10 MB Posted
- Solicitation number
- 36C77622R0045
About this file
This document summarizes a federal solicitation for construction design and infrastructure upgrades at the Minneapolis VA Medical Center to support the Electronic Health Record Modernization project. The solicitation will be issued as a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. It is advertised as a total Service-Disabled Veteran-Owned Small Business set-aside, with offers from other than SDVOSBs not being considered. The work includes building a new server room on the hospital roof and other infrastructure upgrades spread throughout the facility. The period of performance is approximately 450 calendar days from notice to proceed, with a magnitude of construction expected between $20-50 million. All questions must be submitted in writing to the issuing office by the specified date.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: 618-21-700
Minneapolis VA Health Care System
EHRM Infrastructure Upgrades Issued For Construction
05/06/2022
PROJECT MANUAL
Prepared For:
Minneapolis VA Health Care
System
1 Veterans Drive
Minneapolis, MN 55417
Prepared By:
Triple C - The A/E Group
2509 29th Avenue NE
Minneaplois, MN 55418
Project Team:
Mat Perkins, AIA, PMP, NCARB
Kevin Luke, PE
Triple C - The A&E Group
/06
/20
05/06/2022
EHRM Infrastructure Upgrades
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 1
SECTION 07 81 00
APPLIED FIREPROOFING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies spray-applied mineral fiber and cementitious coverings to provide fire resistance to interior structural steel members shown.
1.2 RELATED WORK:
A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE CONSTRUCTION
REQUIREMENTS.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Sustainable Design Submittals, as described below:
1. Volatile organic compounds per volume as specified in PART 2 - PRODUCTS.
C. Installer qualifications.
D. Testing laboratory accreditations.
E. Manufacturer's Literature and Data:
1. Manufacturer's complete and detailed application instructions and specifications.
2. Manufacturer's repair and patching instructions.
F. Certificates:
1. Certificate from testing laboratory attesting fireproofing material and application method meet the specified fire ratings.
a. List thickness and density of material required to meet fire ratings.
b. Accompanied by complete test report and test record.
2. Manufacturer's certificate indicating sprayed-on fireproofing material supplied under the Contract is same within manufacturing tolerance as fireproofing material tested.
G. Miscellaneous:
1. Manufacturer's written approval of surfaces to receive sprayed-on fireproofing.
2. Manufacturer's written approval of completed installation.
3. Manufacturer's written approval of the applicators of fireproofing material.
1.4 PRODUCT DELIVERY, STORAGE AND HANDLING:
A. Deliver to job-site in sealed containers marked and labeled to show manufacturer's name and brand and UL certification markings of compliance with the specified requirements.
B. Remove damaged or opened containers from the site.
C. Store the materials off the ground, under cover, away from damp surfaces.
D. Keep dry until ready for use.
E. Remove materials that have been exposed to water before installation from the site.
1.5 FIELD CONDITIONS:
A. Temperature: Do not apply fireproofing when substrate or ambient temperature is below 4 degrees C (40 degrees F) unless temporary protection and heat are provided to maintain temperature at or above stated value during application and for 24 hours before and after application.
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 2
B. Humidity: Maintain relative humidity levels within limits recommended by fireproofing manufacturer.
C. Ventilation: Provide ventilation to properly dry the fireproofing after application. Provide a minimum of four (4) air exchanges per hour by forced air circulation. When permitted by Contracting Officer Representative (COR), ventilate by natural circulation.
1.6 QUALITY ASSURANCE:
A. Installer Qualifications: A firm or individual certified, licensed, or otherwise qualified by fireproofing manufacturer as experienced and with sufficient trained staff to install manufacturer’s products according to specified requirements. Submit manufacturer’s certification that each installer is trained and qualified to install the specified fireproofing. Submit evidence that each installer has a minimum of three (3) years’ experience and a minimum of four (4) installations using the specified fireproofing.
B. Testing Laboratory Accreditation Requirements: Construction materials testing laboratories must be accredited by a laboratory accreditation authority. Submit a copy of the Certificate of Accreditation and Scope of Accreditation.
C. Test for fire endurance in accordance with ASTM E119, for fire rating specified, in a nationally recognized laboratory.
D. Manufacturer's inspection and approval of surfaces to receive fireproofing.
E. Manufacturer's approval of fireproofing applications.
F. Manufacturer's approval of completed installation.
G. Manufacturer's representative is to observe and advise at the commencement of application, and is required to visit the site as required thereafter for the purpose of ascertaining proper application.
H. Pre-Application Test Area.
1. Apply a test area consisting of a typical overhead fireproofing installation, including not less than 4.5 m (15 feet) of beam and deck.
a. Apply to one (1) column.
b. Apply for the hourly ratings required in the construction documents.
2. Install in location selected by the COR, for approval by the representative of the fireproofing material manufacturer and the COR.
3. Perform Bond test for cohesive and adhesive strength in accordance with ASTM E736 for each applied fireproofing design used.
4. Perform density test in accordance with ASTM E736 for each applied fireproofing design used.
5. Do not proceed in other areas until installation of test area has been completed and approved.
6. Keep approved installation area open for observation as criteria for sprayed-on fireproofing.
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
C841-03(R2013)....................Installation of Interior Lathing and Furring
C847-14.................................Metal Lath
E84-14...................................Surface Burning Characteristics of Building Materials
E119-12a...............................Fire Tests of Building Construction and Materials
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 3
E605-93(R2011)....................Thickness and Density of Sprayed Fire-Resistive Materials Applied to Structural Members
E736-00(R2011)....................Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
E759-92(R2011)....................The Effect of Deflection on Sprayed Fire-Resistive Material Applied to Structural Members
E760-92(R2011)....................Impact on Bonding of Sprayed Fire-Resistive Material Applied to Structural Members
E761-92(R2011)....................Compressive Strength of Fire-Resistive Material Applied to Structural Members
E859-93(R2011)....................Air Erosion of Sprayed Fire-Resistive Materials Applied to Structural Members
E937-93(R2011)....................Corrosion of Steel by Sprayed Fire-Resistive Material Applied to Structural Members
E1042-02(R2014)..................Acoustically, Absorptive Materials Applied by Trowel or Spray.
G21-13 ..................................Determining Resistance of Synthetic Polymeric Materials to Fungi
C. Underwriters Laboratories, Inc. (UL):
Fire Resistance Directory...Latest Edition including Supplements
D. Warnock Hersey (WH):
Certification Listings ..............Latest Edition
E. Factory Mutual System (FM):
Approval Guide......................Latest Edition including Supplements
F. Environmental Protection Agency (EPA):
40 CFR 59(2014)...................National Volatile Organic Compound Emission Standards for
Consumer and Commercial Products
PART 2 - PRODUCTS
2.1 SPRAYED-ON FIREPROOFING:
A. ASTM E1042, Class (a), Category A.
1. Type I, factory mixed cementitious materials with approved aggregate.
2. Type II, factory mixed mineral fiber with integral inorganic binders minimum 240 kg per cubic meter (15 lb. per cubic feet) density per ASTM E605 test unless specified otherwise. Use in areas that are completely encased.
B. Materials containing asbestos are not permitted.
C. Fireproofing characteristics when applied in the thickness and density required to achieve the fire-rating specified.
Characteristic Test Results
1. Deflection ASTM E759 No cracking, spalling, or delamination when backing to which it is applied has a deflection up to 1/120 in 3 m (10 ft.)
2. Corrosion-Resistance ASTM E937 No promotion of corrosion of steel.
3. Bond Impact ASTM E760 No cracking, spalling, or delamination.
4. Cohesion/Adhesion ASTM E736 Minimum cohesive/adhesive strength of 9.57
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 4
Characteristic Test Results
(Bond Strength) kPa (200 lbf per sq. ft.) for protected areas.
19.15 kPa (400 lbf per sq. ft.) for exposed areas.
5. Air Erosion ASTM E859 Maximum gain weight of the collecting filter
0.27 gm per sq. meter (0.025 gm per sq. ft.).
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 5
6. Compressive Strength ASTM E761 Minimum compressive strength 48 kPa (1000 psf).
7. Surface Burning Characteristics with adhesive and sealer to be used
ASTM E84 Flame spread 25 or less smoke developed 50 or less
8. Fungi Resistance ASTM G21 Resistance to mold growth when inoculated with aspergillus niger (28 days for general application)
2.2 ADHESIVE:
A. Bonding adhesive for Type II (fibrous) materials as recommended and supplied by the fireproofing material manufacturer.
B. Adhesive may be an integral part of the material or applied separately to surface receiving fireproofing material.
2.3 SEALER:
A. Sealer for Type II (fibrous) material as recommended and supplied by the fireproofing material manufacturer.
B. Surface burning characteristics as specified for fireproofing material.
C. Fungus resistant.
D. Sealer may be an integral part of the material or applied separately to the exposed surface.
When applied separately use contrasting color pigmented sealer, white preferred.
E. VOC content: Product to comply with VOC content limits of authorities having jurisdiction and the following VOC limits when calculated according to 40 CFR 59, (EPA Method 24):
1. Flat Paints and Coatings: 50 g/L.
2. Nonflat Paints and Coatings: 150 g/L.
3. Primers, Sealers, and Undercoaters: 200 g/L.
2.4 WATER:
A. Clean, fresh, and free from organic and mineral impurities.
B. pH of 6.9 to 7.1.
2.5 MECHANICAL BOND MATERIAL:
A. Expanded Metal Lath: ASTM C847, minimum weight of 0.92 kg per square meter (1.7 pounds per square yard) or as required, according to fire-resistance designs indicated and fire proofing manufacturer’s written instructions.
B. Fasteners: ASTM C841.
C. Reinforcing Fabric: Glass- or carbon-fiber fabric of type, weight, and form required to comply with fire-resistance designs indicated; approved and provided by fireproofing manufacturer.
D. Reinforcing Mesh: Metallic mesh reinforcement of type, weight, and form required to comply with fire-resistance design indicated; approved and provided by fireproofing manufacturer.
Include pins and attachments.
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 6
PART 3 - EXECUTION
3.1 EXAMINATION:
A. Verify surfaces to receive fireproofing are clean and free of dust, soot, oil, grease, water soluble materials or any foreign substance which would prevent adhesion of the fireproofing material.
B. Verify hangers, inserts and clips are installed before the application of fireproofing material.
C. Verify ductwork, piping, and other obstructing material and equipment is not installed that will interfere with fireproofing installation.
D. Verify concrete work on steel decking and concrete encased steel is completed.
E. When applied in conjunction with roof structures or roof decks, verify that roofing, installation of rooftop HVAC equipment, and other related work are complete.
F. Verify temperature and enclosure conditions required by fire-proofing material manufacturer.
G. Conduct tests according to fireproofing manufacturer’s written instructions to verify that substrates are free of substances capable of interfering with bond. Submit test report.
3.2 APPLICATION:
A. Do not start application until written approval has been obtained from manufacturer of fireproofing materials that surfaces have been inspected by the manufacturer or his representative, and are suitable to receive sprayed-on fireproofing.
B. Coordinate application of fireproofing material with other trades.
C. Cover other work and exterior openings subject to damage from fallout or overspray of fireproofing materials during application.
D. Application of Metal Lath:
1. Apply to beam and columns having painted surfaces which fail ASTM E736 Bond Test requirements in pre-application test area.
2. Apply to beam flanges 305 mm (12-inches) or more in width.
3. Apply to column flanges 406 mm (16-inches) or more in width.
4. Apply to beam or column web 406 mm (16-inches) or more in depth.
5. Tack weld or mechanically fasten on maximum of 305 mm (12-inch) center.
6. Lap and tie lath member in accordance with ASTM C841.
E. Mix and apply in accordance with manufacturer's instructions.
1. Mechanically control material and water ratios.
2. Apply adhesive and sealer, when not an integral part of the materials, in accordance with the manufacturer's instructions.
3. Apply to density and thickness indicated in UL Fire Resistance Directory, FM Approval
Guide, or WH Certification Listings unless specified otherwise. Test in accordance with
ASTM E119.
4. Minimum ASTM E605 applied dry density per cubic meter (cubic foot) for the underside of the walk on deck (interstitial) hung purlin or beam and steel deck, columns in interstitial spaces and mechanical equipment rooms to be as follows:
a. Type I - 350 kg per cubic meter (22 lb. per cubic ft.).
b. Type II - 240 kg per cubic meter (15 lb. per cubic ft.).
F. Complete application is to be completed in one area. Inspection and approval by COR is required before removal of application equipment and proceeding with further work.
3.3 FIELD TESTS:
A. The applied fireproofing to be tested by a COR approved independent testing laboratory and paid for by the Contractor. Submit test reports documenting results of tests on the applied material in the project.
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 7
B. COR will select area to be tested in specific bays on each floor using a geometric grid pattern.
Apply test sample every 929 square meters (10,000 square feet) of floor area or two (2) for each floor, whichever produces the greatest number of test areas.
C. Test for thickness and density in accordance with ASTM E605. Areas showing thickness less than that required as a result of fire endurance test are not acceptable.
D. Areas showing less than required fireproofing characteristics are not suitable for the following field tests.
1. Test for cohesion/adhesion: ASTM E736.
2. Test for bond impact strength: ASTM E760.
3.4 PATCHING AND REPAIRING:
A. Inspect after mechanical, electrical and other trades have completed work in contact with fireproofing material, but before sprayed material is covered by subsequent construction.
B. Perform corrective measures in accordance with fireproofing material manufacturer's recommendations.
1. Respray areas requiring additional fireproofing material to provide the required thickness, and replace dislodged or removed material.
2. Spray material for patching by machine directly on point to be patched, or into a container and then hand apply.
3. Do not hand mix material.
C. Repair:
1. Respray test and rejected areas.
2. Patch fireproofing material which is removed or disturbed after approval.
D. Perform final inspection of sprayed areas after patching and repair.
3.5 SCHEDULE:
A. Apply fireproofing material in interior structural steel members and on underside of interior steel floor and roof decks, except on following surfaces:
1. Structural steel and underside of steel decks in elevator or dumbwaiter machine rooms.
2. Steel members in elevator hoist ways.
3. Areas used as air handling plenums.
4. Steel to be encased in concrete or designated to receive other type of fireproofing.
Fire Rating Schedule
Type Element Hourly Rating UL Design Reference
N/A Columns supporting one floor 2 Existing
N/A Columns supporting more than one floor (Continous thru Interstitial)
2 Existing
II Columns supporting roof 1 X701
N/A Floor decks (Service Bay)* 2 Existing
N/A Floor supports (Service Bay)* 2 Existing
N/A Floor decks (Function Floors)* 0 Existing
N/A Floor supports (Function Floors)* 0 Existing
N/A Interstitial decks 2 Existing
N/A Interstitial supports 2 Existing
II Roof decks 1 P710
Project #: 618-21-700
Applied Fireproofing
07 81 00 - 8
Fire Rating Schedule
Type Element Hourly Rating UL Design Reference
II Roof supports 1 P710
5. * Per VA Fire Protection Manual 7th Edition, December 2015 Section 2.3
- - - E N D - - -
Project #: 618-21-700
Firestopping
07 84 00 - 1
SECTION 07 84 00
FIRESTOPPING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. Provide UL or equivalent approved firestopping system for the closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.
B. Provide UL or equivalent approved firestopping system for the closure of openings in walls against penetration of gases or smoke in smoke partitions. In addition to sealing all new penetrations, Contractor is responsible for providing fire stopping for all existing, unprotected penetrations in the Area of Work. Contractor shall bid (100) penetrations and a deductive change order will be issued if the actual number is less than the estimated number.
1.2 RELATED WORK:
A. Sealants and application: Section 07 92 00, JOINT SEALANTS.
1.3 SUBMITTALS:
Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
A. Installer qualifications.
B. Inspector qualifications.
C. Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.
D. List of FM, UL, or WH classification number of systems installed.
E. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.
F. Submit certificates from manufacturer attesting that firestopping materials comply with the specified requirements.
1.4 DELIVERY AND STORAGE:
A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.
B. Store in a location providing protection from damage and exposure to the elements.
1.5 QUALITY ASSURANCE:
A. FM, UL, or WH or other approved laboratory tested products will be acceptable.
B. Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991 or been evaluated by UL and found to comply with UL’s “Qualified Firestop Contractor Program Requirements.” Submit qualification data.
C. Inspector Qualifications: Contractor to engage a qualified inspector to perform inspections and final reports. The inspector to meet the criteria contained in ASTM E699 for agencies involved in quality assurance and to have a minimum of two years’ experience in construction field inspections of firestopping systems, products, and assemblies. The inspector to be completely independent of, and divested from, the Contractor, the installer, the manufacturer, and the supplier of material or item being inspected. Submit inspector qualifications.
Project #: 618-21-700
Firestopping
07 84 00 - 2
1.6 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
E84-14...................................Surface Burning Characteristics of Building Materials
E699-09.................................Standard Practice for Evaluation of Agencies Involved in Testing, Quality Assurance, and Evaluating of Building Components
E814-13a...............................Fire Tests of Through-Penetration Fire Stops
E2174-14...............................Standard Practice for On-Site Inspection of Installed Firestops
E2393-10a.............................Standard Practice for On-Site Inspection of Installed Fire Resistive Joint Systems and Perimeter Fire Barriers
C. FM Global (FM):
D. Annual Issue Approval Guide Building Materials 4991-13 .................................Approval of Firestop Contractors
E. Underwriters Laboratories, Inc. (UL):
F. Annual Issue Building Materials Directory
G. Annual Issue Fire Resistance Directory 723-10(2008).........................Standard for Test for Surface Burning Characteristics of Building
Materials
1479-04(R2014) ....................Fire Tests of Through-Penetration Firestops
H. Intertek Testing Services - Warnock Hersey (ITS-WH):
I. Annual Issue Certification Listings
J. Environmental Protection Agency (EPA):
40 CFR 59(2014)...................National Volatile Organic Compound Emission Standards for
Consumer and Commercial Products
PART 2 - PRODUCTS
2.1 FIRESTOP SYSTEMS:
A. Provide either factory built (Firestop Devices) or field erected (through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke. Firestop systems to accommodate building movements without impairing their integrity.
B. Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 101 mm (4 in.) nominal pipe or 0.01 sq. m (16 sq. in.) in overall cross sectional area.
C. Firestop sealants used for firestopping or smoke sealing to have the following properties:
1. Contain no flammable or toxic solvents.
2. Release no dangerous or flammable out gassing during the drying or curing of products.
3. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.
4. When installed in exposed areas, capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
D. Firestopping system or devices used for penetrations by glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials to have following properties:
Project #: 618-21-700
Firestopping
07 84 00 - 3
1. Classified for use with the particular type of penetrating material used.
2. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.
E. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84 or UL 723. Material to be an approved firestopping material as listed in UL Fire Resistance Directory or by a nationally recognized testing laboratory.
F. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.
G. Materials to be nontoxic and noncarcinogen at all stages of application or during fire conditions and to not contain hazardous chemicals. Provide firestop material that is free from Ethylene Glycol, PCB, MEK, and asbestos.
H. For firestopping exposed to view, traffic, moisture, and physical damage, provide products that do not deteriorate when exposed to these conditions.
1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide moisture-resistant through-penetration firestop systems.
2. For floor penetrations with annular spaces exceeding 101 mm (4 in.) or more in width and exposed to possible loading and traffic, provide firestop systems capable of supporting the floor loads involved either by installing floor plates or by other means acceptable to the firestop manufacturer.
3. For penetrations involving insulated piping, provide through-penetration firestop systems not requiring removal of insulation.
4. Firestopping systems shall be Hilti or Approved Equal, red in color to easily identify it in the field.
2.2 SMOKE STOPPING IN SMOKE PARTITIONS:
A. Provide silicone sealant in smoke partitions as specified in Section 07 92 00, JOINT
SEALANTS.
B. Provide mineral fiber filler and bond breaker behind sealant.
C. Sealants to have a maximum flame spread of 25 and smoke developed of 50 when tested in accordance with ASTM E84.
D. When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
E. Smoke stopping systems shall not be red in color to easily distinguish it from Firestopping systems.
PART 3 - EXECUTION
3.1 EXAMINATION:
A. Submit product data and installation instructions, as required by article, submittals, after an on-site examination of areas to receive firestopping.
B. Examine substrates and conditions with installer present for compliance with requirements for opening configuration, penetrating items, substrates, and other conditions affecting performance of firestopping. Do not proceed with installation until unsatisfactory conditions have been corrected.
3.2 PREPARATION:
A. Remove dirt, grease, oil, laitance and form-release agents from concrete, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.
Project #: 618-21-700
Firestopping
07 84 00 - 4
B. Remove insulation on insulated pipe for a distance of 150 mm (6 inches) on each side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.
C. Prime substrates where required by joint firestopping system manufacturer using that manufacturer’s recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.
D. Masking Tape: Apply masking tape to prevent firestopping from contacting adjoining surfaces that will remain exposed upon completion of work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove smears from firestopping materials. Remove tape as soon as it is possible to do so without disturbing seal of firestopping with substrates.
3.3 INSTALLATION:
A. Do not begin firestopping work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.
B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.
C. Provide engraved nameplate at each location identifying the firestopping system and system # for future documentation of the specific system installed.
D. Install smoke stopping seals in smoke partitions.
3.4 CLEAN-UP:
A. As work on each floor is completed, remove materials, litter, and debris.
B. Clean up spills of liquid type materials.
C. Clean off excess fill materials and sealants adjacent to openings and joints as work progresses by methods and with cleaning materials approved by manufacturers of firestopping products and of products in which opening and joints occur.
D. Protect firestopping during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated firestopping immediately and install new materials to provide firestopping complying with specified requirements.
3.5 INSPECTIONS AND ACCEPTANCE OF WORK:
A. Do not conceal or enclose firestop assemblies until inspection is complete and approved by the Contracting Officer Representative (COR).
B. Furnish service of approved inspector to inspect firestopping in accordance with ASTM E2393 and ASTM E2174 for firestop inspection, and document inspection results. Submit written reports indicating locations of and types of penetrations and type of firestopping used at each location; type is to be recorded by UL listed printed numbers.
Project #: 618-21-700
Joint Sealants
07 92 00 - 1
SECTION 07 92 00
JOINT SEALANTS
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section covers interior and exterior sealant and their application, wherever required for complete installation of building materials or systems.
1.2 RELATED WORK (INCLUDING BUT NOT LIMITED TO THE FOLLOWING):
A. Firestopping Penetrations: Section 07 84 00, FIRESTOPPING.
B. Sound Rated Gypsum Partitions/Sound Sealants: Section 09 29 00, GYPSUM BOARD.
C. Mechanical Work: Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING, Section 23
05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION.
1.3 QUALITY ASSURANCE:
A. Installer Qualifications: An experienced installer with a minimum of three (3) years’ experience and who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-service performance. Submit qualification.
B. Source Limitations: Obtain each type of joint sealant through one (1) source from a single manufacturer..
1. Product Testing: Obtain test results from a qualified testing agency based on testing current sealant formulations within a 12-month period.
2. Testing Agency Qualifications: An independent testing agency qualified according to
ASTM C1021.
3. Test elastomeric joint sealants for compliance with requirements specified by reference to
ASTM C920, and where applicable, to other standard test methods.
4. Test other joint sealants for compliance with requirements indicated by referencing standard specifications and test methods.
C. Preconstruction Field-Adhesion Testing: Before installing elastomeric sealants, field test their adhesion to joint substrates according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1.1 in ASTM C1193 or Method A, Tail Procedure, in ASTM C1521
1. Locate test joints where indicated in construction documents as directed by COR.
2. Conduct field tests for each application indicated below:
a. Each type of elastomeric sealant and joint substrate indicated.
b. Each type of non-elastomeric sealant and joint substrate indicated.
3. Notify COR seven (7) days in advance of dates and times when test joints will be erected.
1.4 CERTIFICATION:
A. Contractor is to submit to the COR written certification that joints are of the proper size and design, that the materials supplied are compatible with adjacent materials and backing, that the materials will properly perform to provide permanent watertight, airtight or vapor tight seals (as applicable), and that materials supplied meet specified performance requirements.
1.5 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Installer qualifications.
C. Contractor certification.
D. Manufacturer's installation instructions for each product used.
Project #: 618-21-700
Joint Sealants
07 92 00 - 2
E. Cured samples of exposed sealants for each color.
F. Manufacturer's Literature and Data:
1. Primers
2. Sealing compound, each type, including compatibility when different sealants are in contact with each other.
G. Manufacturer warranty.
1.6 PROJECT CONDITIONS:
A. Environmental Limitations:
1. Do not proceed with installation of joint sealants under following conditions:
a. When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below 4.4 degrees C (40 degrees F).
b. When joint substrates are wet.
B. Joint-Width Conditions:
1. Do not proceed with installation of joint sealants where joint widths are less than those allowed by joint sealant manufacturer for applications indicated.
C. Joint-Substrate Conditions:
1. Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates.
1.7 DELIVERY, HANDLING, AND STORAGE:
A. Deliver materials in manufacturers' original unopened containers, with brand names, date of manufacture, shelf life, and material designation clearly marked thereon.
B. Carefully handle and store to prevent inclusion of foreign materials.
C. Do not subject to sustained temperatures exceeding 32 degrees C (90 degrees F) or less than 5 degrees C (40 degrees F).
1.8 DEFINITIONS:
A. Definitions of terms in accordance with ASTM C717 and as specified.
B. Backing Rod: A type of sealant backing.
C. Bond Breakers: A type of sealant backing.
D. Filler: A sealant backing used behind a back-up rod.
1.9 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21 "Warranty of Construction".
B. Manufacturer Warranty: Manufacturer shall warranty their sealant for a minimum of five (5) years from the date of installation and final acceptance by the Government. Submit manufacturer warranty.
1.10 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. ASTM International (ASTM):
C509-06.................................Elastomeric Cellular Preformed Gasket and Sealing Material
C612-14.................................Mineral Fiber Block and Board Thermal Insulation
C717-14a...............................Standard Terminology of Building Seals and Sealants
C734-06(R2012)....................Test Method for Low-Temperature Flexibility of Latex Sealants after Artificial Weathering
Project #: 618-21-700
Joint Sealants
07 92 00 - 3
C794-10.................................Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants
C919-12.................................Use of Sealants in Acoustical Applications.
C920-14a...............................Elastomeric Joint Sealants.
C1021-08(R2014)..................Laboratories Engaged in Testing of Building Sealants
C1193-13...............................Standard Guide for Use of Joint Sealants.
C1248-08(R2012)..................Test Method for Staining of Porous Substrate by Joint Sealants
C1330-02(R2013)..................Cylindrical Sealant Backing for Use with Cold Liquid Applied Sealants
C1521-13...............................Standard Practice for Evaluating Adhesion of Installed Weatherproofing Sealant Joints
D217-10.................................Test Methods for Cone Penetration of Lubricating Grease
D412-06a(R2013)..................Test Methods for Vulcanized Rubber and Thermoplastic Elastomers-Tension
D1056-14...............................Specification for Flexible Cellular Materials—Sponge or Expanded Rubber
E84-09...................................Surface Burning Characteristics of Building Materials
C. Sealant, Waterproofing and Restoration Institute (SWRI).
The Professionals’ Guide
D. Environmental Protection Agency (EPA):
40 CFR 59(2014)...................National Volatile Organic Compound Emission Standards for
Consumer and Commercial Products
PART 2 - PRODUCTS
2.1 SEALANTS:
A. Floor Joint Sealant:
1. ASTM C920, Type S or M, Grade P, Class 25, Use T. S-#2
2. S-#2 Provide location(s) of floor joint sealant as follows.
a. Seats of metal thresholds exterior doors.
b. Control and expansion joints in floors, slabs, ceramic tile, and walkways.
B. Interior Sealants:
1. S-#2 Vertical and Horizontal Surfaces: ASTM C920, Type S or M, Grade NS, Class 25, Use NT.
2. Provide location(s) of interior sealant as follows:
a. Typical narrow joint 6 mm, (1/4 inch) or less at walls and adjacent components.
b. Perimeter of doors, windows, access panels which adjoin concrete or masonry surfaces.
c. Interior surfaces of exterior wall penetrations.
d. Joints at masonry walls and columns, piers, concrete walls or exterior walls.
e. Perimeter of lead faced control windows and plaster or gypsum wallboard walls.
f. Exposed isolation joints at top of full height walls.
g. Joints between bathtubs and ceramic tile; joints between shower receptors and ceramic tile; joints formed where nonplanar tile surfaces meet.
h. Joints formed between tile floors and tile base cove; joints between tile and dissimilar materials; joints occurring where substrates change.
i. Behind escutcheon plates at valve pipe penetrations and showerheads in showers.
C. Acoustical Sealant:
Project #: 618-21-700
Joint Sealants
07 92 00 - 4
1. Conforming to ASTM C919; flame spread of 25 or less; and a smoke developed rating of 50 or less when tested in accordance with ASTM E84. Acoustical sealant have a consistency of 250 to 310 when tested in accordance with ASTM D217; remain flexible and adhesive after 500 hours of accelerated weathering as specified in ASTM C734; and be non-staining.
2. Provide location(s) of acoustical sealant as follows:
a. Exposed acoustical joint at sound rated partitions.
b. Concealed acoustic joints at sound rated partitions.
c. Joints where item pass-through sound rated partitions.
2.2 COLOR:
A. Sealants used with exposed masonry are to match color of mortar joints.
B. Sealants used with unpainted concrete are to match color of adjacent concrete.
C. Color of sealants for other locations to be light gray or aluminum, unless otherwise indicated in construction documents.
2.3 JOINT SEALANT BACKING:
A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C1330, of type indicated below and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance:
1. Type C: Closed-cell material with a surface skin.
C. Elastomeric Tubing Sealant Backings: Neoprene, butyl, EPDM, or silicone tubing complying with ASTM D1056 or synthetic rubber (ASTM C509), nonabsorbent to water and gas, and capable of remaining resilient at temperatures down to minus 32 degrees C (minus 26 degrees F). Provide products with low compression set and of size and shape to provide a secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance.
D. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable.
2.4 FILLER:
A. Mineral fiberboard: ASTM C612, Class 1.
B. Thickness same as joint width.
C. Depth to fill void completely behind back-up rod.
2.5 PRIMER:
A. As recommended by manufacturer of caulking or sealant material.
B. Stain free type.
2.6 CLEANERS-NON POROUS SURFACES:
A. Chemical cleaners compatible with sealant and acceptable to manufacturer of sealants and sealant backing material. Cleaners to be free of oily residues and other substances capable of staining or harming joint substrates and adjacent non-porous surfaces and formulated to promote adhesion of sealant and substrates.
Project #: 618-21-700
Joint Sealants
07 92 00 - 5
PART 3 - EXECUTION
3.1 INSPECTION:
A. Inspect substrate surface for bond breaker contamination and unsound materials at adherent faces of sealant.
B. Coordinate for repair and resolution of unsound substrate materials.
C. Inspect for uniform joint widths and that dimensions are within tolerance established by sealant manufacturer.
3.2 3.2 PREPARATIONS:
A. Prepare joints in accordance with manufacturer's instructions and SWRI (The Professionals’ Guide).
B. Clean surfaces of joint to receive caulking or sealants leaving joint dry to the touch, free from frost, moisture, grease, oil, wax, lacquer paint, or other foreign matter that would tend to destroy or impair adhesion.
1. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants.
2. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air. Porous joint surfaces include but are not limited to the following:
a. Concrete.
b. Masonry.
c. Unglazed surfaces of ceramic tile.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.
Nonporous surfaces include but are not limited to the following:
a. Metal.
b. Glass.
c. Porcelain enamel.
d. Glazed surfaces of ceramic tile.
C. Do not cut or damage joint edges.
D. Apply non-staining masking tape to face of surfaces adjacent to joints before applying primers, caulking, or sealing compounds.
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.
E. Apply primer to sides of joints wherever required by compound manufacturer's printed instructions or as indicated by pre-construction joint sealant substrate test.
1. Apply primer prior to installation of back-up rod or bond breaker tape.
2. Use brush or other approved means that will reach all parts of joints. Avoid application to or spillage onto adjacent substrate surfaces.
3.3 BACKING INSTALLATION:
A. Install backing material, to form joints enclosed on three sides as required for specified depth of sealant.
B. Where deep joints occur, install filler to fill space behind the backing rod and position the rod at proper depth.
C. Cut fillers installed by others to proper depth for installation of backing rod and sealants.
Project #: 618-21-700
Joint Sealants
07 92 00 - 6
D. Install backing rod, without puncturing the material, to a uniform depth, within plus or minus 3 mm (1/8 inch) for sealant depths specified.
E. Where space for backing rod does not exist, install bond breaker tape strip at bottom (or back) of joint so sealant bonds only to two opposing surfaces.
3.4 SEALANT DEPTHS AND GEOMETRY:
A. At widths up to 6 mm (1/4 inch), sealant depth equal to width.
B. At widths over 6 mm (1/4 inch), sealant depth 1/2 of width up to 13 mm (1/2 inch) maximum depth at center of joint with sealant thickness at center of joint approximately 1/2 of depth at adhesion surface.
3.5 INSTALLATION:
A. General:
1. Apply sealants and caulking only when ambient temperature is between
2. 5 degrees C and 38 degrees C (40 degrees and 100 degrees F).
3. Do not install polysulfide base sealants where sealant may be exposed to fumes from bituminous materials, or where water vapor in continuous contact with cementitious materials may be present.
4. Do not install sealant type listed by manufacture as not suitable for use in locations specified.
5. Apply caulking and sealing compound in accordance with manufacturer's printed instructions.
6. Avoid dropping or smearing compound on adjacent surfaces.
7. Fill joints solidly with compound and finish compound smooth.
8. Tool exposed joints to form smooth and uniform beds, with slightly concave surface conforming to joint configuration per Figure 5A in ASTM C1193 unless shown or specified otherwise in construction documents. Remove masking tape immediately after tooling of sealant and before sealant face starts to “skin” over. Remove any excess sealant from adjacent surfaces of joint, leaving the working in a clean finished condition.
9. Finish paving or floor joints flush unless joint is otherwise detailed.
10. Apply compounds with nozzle size to fit joint width.
11. Test sealants for compatibility with each other and substrate. Use only compatible sealant. Submit test reports.
12. Replace sealant which is damaged during construction process.
B. For application of sealants, follow requirements of ASTM C1193 unless specified otherwise.
Take all necessary steps to prevent three-sided adhesion of sealants.
C. Interior Sealants: Where gypsum board partitions are of sound rated, fire rated, or smoke barrier construction, follow requirements of ASTM C919 only to seal all cut-outs and intersections with the adjoining construction unless specified otherwise.
1. Apply a 6 mm (1/4 inch) minimum bead of sealant each side of runners (tracks), including those used at partition intersections with dissimilar wall construction.
2. Coordinate with application of gypsum board to install sealant immediately prior to application of gypsum board.
3. Partition intersections: Seal edges of face layer of gypsum board abutting intersecting partitions, before taping and finishing or application of veneer plaster-joint reinforcing.
4. Openings: Apply a 6 mm (1/4 inch) bead of sealant around all cutouts to seal openings of electrical boxes, ducts, pipes and similar penetrations. To seal electrical boxes, seal sides and backs.
5. Control Joints: Before control joints are installed, apply sealant in back of control joint to reduce flanking path for sound through control joint.
Project #: 618-21-700
Joint Sealants
07 92 00 - 7
3.6 FIELD QUALITY CONTROL:
A. Field-Adhesion Testing: Field-test joint-sealant adhesion to joint substrates according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1 in ASTM C1193 or Method A, Tail Procedure, in ASTM C1521.
1. Extent of Testing: Test completed elastomeric sealant joints as follows:
a. Perform 10 tests for first 305 m (1000 feet) of joint length for each type of elastomeric sealant and joint substrate.
B. Inspect joints for complete fill, for absence of voids, and for joint configuration complying with specified requirements. Record results in a field adhesion test log.
C. Inspect tested joints and report on following:
1. Whether sealants in joints connected to pulled-out portion failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each type of product and joint substrate.
2. Compare these results to determine if adhesion passes sealant manufacturer’s field-adhesion hand-pull test criteria.
3. Whether sealants filled joint cavities and are free from voids.
4. Whether sealant dimensions and configurations comply with specified requirements.
D. Repair sealants pulled from test area by applying new sealants following same procedures used to originally seal joints. Ensure that original sealant surfaces are clean and new sealant contacts original sealant.
E. Evaluation of Field-Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements, will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements.
3.7 CLEANING:
A. Fresh compound accidentally smeared on adjoining surfaces: Scrape off immediately and rub clean with a solvent as recommended by manufacturer of the adjacent material or if not otherwise indicated by the caulking or sealant manufacturer.
B. Leave adjacent surfaces in a clean and unstained condition.
This page intentionally left blank.
Project #: 618-21-700
Hollow Metal Doors and Frames
08 11 13 - 1
SECTION 08 11 13
HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Hollow metal doors hung in hollow metal frames at interior locations.
2. Hollow metal door frames for wood doors and borrowed lights at interior locations.
3. Glazed openings in hollow metal doors.
1.2 RELATED REQUIREMENTS
A. Frames fabricated of structural steel: Section 05 50 00, METAL FABRICATIONS.
B. Door Hardware: Section 08 71 00, DOOR HARDWARE.
C. Card Readers and Biometric Devices: Section 28 13 00, PHYSICAL ACCESS CONTROL
SYSTEM.
D. Security Monitors: Section 28 23 00, VIDEO SURVEILLANCE.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standard Institute (ANSI):
A250.8-2014 - .......................Standard Steel Doors and Frames.
C. ASTM International (ASTM):
A240/A240M-15b - ...............Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications.
A653/A653M-15 - .................Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip.
A1008/A1008M-15 - .............Steel, Sheet, Cold-Rolled, Carbon, Structural, High Strength Low Alloy and High Strength Low Alloy with Improved Formability, Solution Hardened, and Bake Hardenable.
B209-14 - ..............................Aluminum and Aluminum-Alloy Sheet and Plate.
B209M-14 -............................ Aluminum and Aluminum-Alloy Sheet and Plate (Metric).
B221-14 - ..............................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
B221M-13 - ...........................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric).
D3656/D3656M-13 - .............Insect Screening and Louver Cloth Woven from Vinyl Coated Glass Yarns.
E90-09 - ................................Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements.
D. Federal Specifications (Fed. Spec.):
L-S-125B - ............................Screening, Insect, Nonmetallic.
E. Master Painters Institute (MPI):
No. 18 - .................................Primer, Zinc Rich, Organic.
F. National Association of Architectural Metal Manufacturers (NAAMM):
Project #: 618-21-700
Hollow Metal Doors and Frames
08 11 13 - 2
AMP 500-06 - .......................Metal Finishes Manual.
G. National Fire Protection Association (NFPA):
80-16 - ..................................Fire Doors and Other Opening Protectives.
H. UL LLC (UL):
10C-09 - ...............................Positive Pressure Fire Tests of Door Assemblies.
1784-15 - ..............................Air Leakage Tests of Door Assemblies and Other Opening Protectives.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Include schedule showing each door and frame requirements fire label and smoke control label for openings.
3. Installation instructions.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
E. Test reports: Certify each product complies with specifications.
1. Sound rated door.
F.…