618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77622R0045
About this file
This document provides details for a federal contract opportunity to conduct construction and commissioning work for the Electronic Health Record Modernization infrastructure upgrades project at the Minneapolis VA Medical Center. The solicitation will be issued as a Request for Proposal to SDVOSB concerns only, with a size standard of $39.5 million, for a period of performance of approximately 450 calendar days from notice to proceed. The construction magnitude is expected to be between $20-50 million. Work includes building a new server room on the roof and upgrades throughout the hospital. Limited on-site storage will require off-site material storage planning. Phased structural and civil work will require early coordination. The majority of work will likely need to be done on off-hours and weekends to minimize hospital disruptions. All questions must be submitted in writing to the identified point of contact.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSE
SCR
DCRX
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
70E-422
B6
TELECOM
ROOM
(ORANGE-STACK)
2H-1122H-112
2F-1492F-149 2F-1472F-147
2F-1462F-146
2F-1442F-144 2F-1422F-142
2F-1412F-141 2F-1532F-153
2F-141A2F-141A
2L-1012L-101
2L-1022L-102
2L-1032L-103 2L-1042L-104 2L-1052L-105
2L-1062L-106
2L-1072L-107
2L-1082L-108 2L-1092L-109
2L-1102L-110
2L-1112L-111
2L-1122L-112
2L-1132L-113
2L-1142L-114
2L-1152L-115
2L-1162L-116
2L-118A2L-118A
2L-1182L-118
2L-1192L-119
2L-1202L-120 2L-1212L-121
2L-1222L-122
2L-1232L-123
2L-1242L-124
2L-1252L-125
2L-1262L-126
2L-1272L-127
2L-1282L-1282L-1292L-129
2L-1302L-130
2L-1312L-131
2L-1322L-1322L-1332L-1332L-1342L-1342L-1352L-135
2L-1362L-136
2H-1102H-110
2H-1112H-111
2H-1132H-113
2H-1142H-114
C-6C-6
2H-1092H-109
2C-482C-48
2C-492C-49
2C-502C-50
2C-512C-51
C2-52C2-52
C2-53C2-53 C2-54C2-54
C2-55C2-55
C2-56C2-56
C2-57C2-57
2C-582C-58
C2-60C2-60
C2-54AC2-54A
C2-50AC2-50A
MECHANICAL
2F-1212F-121
ELECTRICAL
ROOM
2F-121A2F-121A
TELECOM
ROOM
2F-121B2F-121B
ELECTRICAL
ROOM
2F-121C2F-121C
TELECOM
ROOM
2F-121D2F-121D
M-5M-5
2H-111A2H-111A2H-111B2H-111B
2H-111C2H-111C
2L-135A2L-135A
2L-102A2L-102A
2L-103A2L-103A
2L-103B2L-103B
2L-104A2L-104A
2L-104B2L-104B
2L-105A2L-105A
2L-109A2L-109A
2L-115A2L-115A 2L-120A2L-120A
2L-121A2L-121A
2L-123A2L-123A
2L-124A2L-124A2L-126A2L-126A
2L-127A2L-127A
2L-128A2L-128A2L-129A2L-129A
2L-132A2L-132A
2L-133A2L-133A
2L-119A2L-119A
2K-1012K-101
2K-103A2K-103A
70E-422
B3
70E-422
D6 on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/7
/2
:3
:4
A
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102G
ELECTRICAL PLAN - SECOND LEVEL AREA G
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 30A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-30R RECEPTACLE.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. REMOVE EXISTING RECEPTACLE.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
ELECTRICAL PLAN - SECOND LEVEL
AREA G
1 Revision 1 Date 1
05/06/2022
ADDENDUM #1 07/07/2022
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
2L-1352L-135
2H-111A2H-111A2H-111B2H-111B
2H-111C2H-111C
2L-135A2L-135A
2J-1532J-153
C2-73C2-73
2H-106A2H-106A
2K-1012K-101
2K-1032K-103
2K-106A2K-106A
2K-1322K-132
2K-109A2K-109A
2K-1102K-110 2K-1112K-111
2K-1122K-112
2K-1132K-113
2K-1142K-114 2K-115A2K-115A
2K-119A2K-119A
2K-1172K-117
2K-1202K-120
2K-120A2K-120A
2K-1222K-122
2K-123A2K-123A
2K-1242K-124
2K-1262K-126
2K-1252K-125
2K-1282K-128
2K-129A2K-129A
2K-1302K-130
2K-1332K-133
2K-1352K-135
C2-62C2-62
C2-68C2-68
C2-67C2-67
2K-137A2K-137A
2K-1042K-104
2K-1092K-109
2K-1152K-115
2K-1182K-118
2K-1172K-117
C2-68AC2-68A
TELE COM
ROOM
2K-122A2K-122A
2K-1222K-122
2K-1272K-127
2K-1292K-129
2K-1212K-121
2K-104A2K-104A
2K-103A2K-103A
2K-108A2K-108A
2K-1192K-119
2K-118A2K-118A
2K-125A2K-125A
2K-127A2K-127A
2K-124A2K-124A
2K-128A2K-128A
2K-133A2K-133A
2K-131A2K-131A
2K-134A2K-134A
2K-135A2K-135A
2K-1002K-100
C2-65C2-65
C2-69C2-69
2K-123B2K-123B
2K-1232K-123
2K-1072K-107 2K-1312K-131
2K-1062K-106
2K-1082K-108
2K-1342K-134 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :0
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102H
ELECTRICAL PLAN - SECOND LEVEL AREA H
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F6
ELECTRICAL PLAN - SECOND LEVEL
AREA H
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
2J-1002J-100
2J-1012J-101 2J-1022J-102
2J-1032J-103
2J-1052J-105 2J-1062J-106
2J-1072J-107
2J-1082J-108
2J-1092J-1092J-1102J-1102J-1112J-111 2J-1122J-112
2J-1142J-114
2J -1
2J
-1
2J-1162J-116
2J-1172J-117
2J-1192J-119 2J-1202J-1202J-1212J-121
2J-1222J-122
2J-1232J-123
2J-1242J-124
2J-1252J-125
2J-1262J-126
2J-1272J-127 2J-1282J-128
2J-1292J-129
2J-1302J-130
2J-1312J-131
2J-1322J-132
2J-1332J-133
2J-1342J-134
2J-1352J-135
2J-1362J-136
2J-1372J-137
2J-1382J-138
2J-1392J-139
2J-1402J-140
2J-1412J-141
2J-1422J-142
2J-1432J-143
2J-1442J-144
2J-1452J-145
2J-1462J-146
2J-1472J-147
2J-1482J-148
2J-1492J-149 2J-1502J-150
2J-1512J-151
2J-1522J-152
2J-1532J-153
2J-1542J-154
2J-1552J-155
2H-1012H-101
2H-1022H-102
2H-1032H-103
2H-1042H-104
2H-1052H-105
2H-1062H-106
2H-1082H-108
C2-72C2-72
C2-73C2-73
C2-74C2-74
C2-75C2-75
C2-77C2-77
C2-79C2-79
C2-80C2-80
C2-81C2-81C2-82C2-82C2-83C2-83
C2-84C2-84
C2-85C2-85
C2-61C2-61
2H-103A2H-103A
C2-71BC2-71B
C2-71CC2-71C
C2-75AC2-75A
C2-75BC2-75B
C2-75CC2-75C
C2-75DC2-75D
C2-77AC2-77A
C2-77BC2-77B
2J-154A2J-154A
2H-106A2H-106A
2J-152A2J-152A2J-146A2J-146A
2J-144A2J-144A
2J-144B2J-144B
2J-143A2J-143A
2J-143B2J-143B
2J-140A2J-140A
TELECOM
ROOM
2J-132A2J-132A
ELECTRICAL
ROOM
2J-132B2J-132B
ELECTRICAL
ROOM
2J-132C2J-132C
TELECOM
ROOM
2J-132D2J-132D
2J-130A2J-130A
2J-131A2J-131A 2J-131B2J-131B
C-8C-8
C2-71C2-71
2K-137A2K-137A
2K-135A2K-135A on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :1
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102J
ELECTRICAL PLAN - SECOND LEVEL AREA J
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
ELECTRICAL PLAN - SECOND LEVEL
AREA J
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
2S-72S-7
C-10C-10
ELECTRICAL
ROOM
2M-1152M-115
TELECOM
ROOM
2M-1162M-116
2A-1012A-101
2A-1022A-102
2A-1032A-103 2M-1012M-101
2M-1022M-102 2M-1032M-103
2M-1042M-104
2M-1052M-105
2M-1062M-106
2M-1072M-107
2M-1082M-108
2M-1092M-109
2M-1102M-110
2M-1112M-111
2M-1122M-112
2M-1132M-113 2P-1022P-102
2P-1032P-103
2P-1042P-104
2P-1052P-105
2P-1062P-106
2P-1072P-107
2P-1082P-108 2P-1092P-109
TELECOM
ROOM
(BLUE
STACK -
ALTERNATE)
2P-1102P-110
2P-1012P-101
2P-1112P-111
2P-1122P-112
2P-1132P-113
2P-1142P-114
2P-1152P-115
2P-1162P-116
2P-1172P-117
2P-1182P-118
2P-1192P-119
2P-1202P-120 2P-1212P-121
2P-1222P-122
2P-1232P-123
2P-1242P-124
C2-87C2-87
C2-88C2-88
C2-89C2-89
2P-125B2P-125B
2P-125C2P-125C
2P-125D2P-125D
2P-125E2P-125E
2P-125F2P-125F
2P-125G2P-125G
C2-96C2-96
C2-98C2-98
2P-125H2P-125H 2P-125I2P-125I 2P-125J2P-125J
C2-102C2-102
C2-103C2-103
C2-104C2-104
C2-105C2-105
C2-106C2-106
C2-107C2-107
C2-108C2-108
C2-109C2-109
C2-110C2-110
C2-111C2-111
C2-112C2-112
2M-1142M-114
2P-106A2P-106A
2P-106B2P-106B
C2-102AC2-102A
2S-82S-8FF
2P-112A2P-112A
2P-123A2P-123A
2P-123B2P-123B
2P-123C2P-123C
2P-122A2P-122A
2P-119A2P-119A 2P-120A2P-120A
C2-86C2-86
C2-76C2-76
C2-102BC2-102B
2R-1622R-162
2Q-1042Q-1042Q-1042Q-1042Q-1042Q-1042Q-1042Q-104 2R-149A2R-149A
2R-1002R-100 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :3
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102K
ELECTRICAL PLAN - SECOND LEVEL AREA K
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F3
ELECTRICAL PLAN - SECOND LEVEL
AREA K
C R
ES D
CR
X O
S
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
70E-422
F6
TELECOM
ROOM
2T-1022T-102
C2-126C2-126
C2-127C2-127
C2-153C2-153
2A-1052A-105
AATELECOM
ROOM
2M-1162M-116
C2-108C2-108
C2-109C2-109
2T-1342T-134
2R-1082R-108 2R-1092R-109
2R-1132R-113
2R-1142R-114
2R-1152R-115
2R-1162R-116
2R-1162R-116
2R-1192R-119
2R-1202R-120
2R-1202R-120
2R-1222R-122
2R-1532R-1532R-1542R-154
2R-1552R-155
2R-1562R-156
2R-1572R-157
2R-1582R-158
2R-1592R-159
2R-1602R-160
2R-1612R-161
2R-1622R-162
ELECTRICAL
ROOM
2Q-1022Q-102
TELECOM
ROOM
2Q-1032Q-103
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1072Q-107 2Q-1072Q-107
2Q-1092Q-109
2Q-1042Q-104
2Q-1112Q-111
2Q-1122Q-112 2Q-1042Q-104
2Q-1042Q-104
2Q-1152Q-115
2Q-1162Q-116
2Q-1172Q-117
2Q-1182Q-118
2Q-1042Q-1042Q-1042Q-104
2Q-1212Q-121
2Q-1222Q-122
2Q-1232Q-123
2Q-1242Q-124
2Q-1242Q-124
2Q-1262Q-126
2Q-1272Q-127
2Q-1282Q-128
2Q-1282Q-128
2Q-1282Q-128
2Q-1282Q-128
2Q-1322Q-132
2Q-1332Q-133
2Q-1342Q-134
2Q-1352Q-135
2R-1162R-116
2R-1162R-116
C2-173C2-173 C2-173C2-173
C2-173C2-173
C2-173C2-173
C2-173C2-173
C2-178C2-178
C2-178C2-178
2Q-1322Q-132
C2-191AC2-191A
C2-191AC2-191A
C2-183C2-183
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104
2Q-1042Q-104 C2-183C2-183
C2-183C2-183
C2-183C2-183
2Q-1042Q-104
C2-180AC2-180A
2R-160B2R-160B
BB
ELECTRICAL
ROOM
2T-1032T-103
2S-22S-2
2R-1162R-116
2R-1602R-160
2R-149A2R-149A
2R-149A2R-149A
2Q-135A2Q-135A
2Q-132A2Q-132A
2Q-121a2Q-121a
2Q-1072Q-107
2T-1282T-128
2T-1292T-129 2T-1302T-130
2T-1312T-131
2T-1422T-142 2T-1412T-141 2T-1402T-140
2T-1392T-139
2T-1352T-135
2T-1362T-136
2T-1372T-137
2T-1382T-1382T-1462T-146
2T-1452T-145
2T-1542T-154 2T-1532T-153 2T-1522T-152 2T-1512T-151
2T-1482T-148
2T-1492T-149
2T-1502T-150
2T-1552T-155 2T-1562T-156 2T-1572T-157 2T-1582T-158
2T-1592T-159
2T-1612T-161
2T-1602T-160 2R-1072R-107
2R-1062R-106
2R-1052R-105
2R-104A2R-104A
2R-1032R-103
2R-103B2R-103B
2R-1002R-100
2T-1012T-101
2R-1102R-110
2T-0042T-004
2T-0052T-005
2T-0062T-006
2T-0072T-007
2T-0082T-008
2R-1162R-116
C2-151C2-151
2V-1202V-120
2V-1312V-131
2V-1472V-147
2V-1542V-154
2V-146A2V-146A
2V-146B2V-146BC2-198C2-198
2T-1332T-1332T-0032T-003
2T-1472T-1472T-1442T-144
70E-422
F3 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :4
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102L
ELECTRICAL PLAN - SECOND LEVEL AREA L
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F3
ELECTRICAL PLAN - SECOND LEVEL
AREA L
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
70E-422
F6
2T-1282T-128
2T-1292T-129 2T-1302T-130
2T-1312T-131
C2-209C2-209
2T-1112T-111
2V-1202V-120
2V-1212V-121
2V-1222V-122
2V-1232V-123
2V-1242V-124
2V-1252V-125
2V-1262V-126
2V-1272V-127
2V-1292V-129
2V-1302V-130
2V-1312V-131
2V-1322V-132
2V-1332V-133
2V-1342V-134 2V-1352V-135
2V-1362V-136
2V-1372V-137
2V-1382V-138
2V -1
2V
-1
2V-1402V-1402V-1412V-141
2V-1432V-143
2V-1442V-144
2V-1452V-145
2V-1462V-146
2V-1472V-147
2V-1482V-148
2V-1492V-149
2V-1502V-150
2V-1512V-151
2V-1522V-152
2V-1542V-154
C2-200C2-200
C2-201C2-201
C2-202C2-202
C2-203C2-203
C2-204C2-204
C2-205C2-205
2T-1102T-110
C2-199C2-199
2T-1082T-108
2T-1092T-109
2V-127A2V-127A
2V-145A2V-145A
2V-146A2V-146A
2V-146B2V-146B
ELECTRICAL
ROOM
2V-153A2V-153A
TELECOM
ROOM
2V-153B2V-153B
ELECTRICAL
ROOM
2V-153C2V-153C
TELECOM
ROOM
2V-153D2V-153D
ELECTRICAL
ROOM
2V-153E2V-153E
TELECOM
ROOM
2V-153F2V-153F
C2-200AC2-200A
2S-12S-1
C2-198C2-198
2V-1422V-142
2T-1122T-112
M-SM-S
2T-110A2T-110A
2T-110B2T-110B
2T-1132T-113
2T-1182T-118
2T-1172T-117
2T-1162T-116
2T-1142T-114
2T-1152T-115
2T-1222T-1222T-1212T-121 2T-1202T-120
2T-0012T-001
2T-0092T-009
2T-1232T-123 2T-1072T-107
ELECTRICAL
ROOM
2T-1062T-1062T-1242T-124
2T-1322T-132
2T-1332T-133
2T-1272T-127
2T-1262T-126 2T-1252T-125
2T-0022T-002
2T-0032T-003
TELECOM
ROOM
2T-1052T-105
70E-422
F4
TELECOM
ROOM
2V-153G2V-153G on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/7
/2
:3
:5
A
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-102M
ELECTRICAL PLAN - SECOND LEVEL AREA M
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 30A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-30R RECEPTACLE.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. REMOVE EXISTING RECEPTACLE.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .