618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf

PDF 13 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document summarizes a federal contract solicitation for infrastructure upgrades at the Minneapolis VA Medical Center to support Electronic Health Record Modernization. The solicitation will be a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. It is advertised as a total Service-Disabled Veteran-Owned Small Business set-aside, with offers from other than SDVOSBs not being considered. The work includes construction and commissioning according to design plans and specifications, touching multiple departments across the medical center campus. A new server room will be built on the roof between buildings. The period of performance is approximately 450 calendar days from notice to proceed, with a magnitude of construction between $20-50 million. Questions must be submitted in writing by email to the point of contact by the deadline.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-29-32.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :0

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701B

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA B

LOAD

EST. LENGTH PER

PORT

OUTLET DESIGNATOR -

NEW

PORT QTY-

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

IR-250-AP-A 2 (UNLABELED) CLG TR70-1C-106-1

Data 206'

1R-250-H 5 (70,BD-101E,110)(1S-

128)

WALL TR70-1C-106-1

Data 230'

C1-25-L 2 (70,BD-101E,138)(1S-

128,D1&D2)

WALL TR70-1C-106-1

Data 234'

C1-25-K 2 (70,BD-101E,137)(1S-

128,D1&D2)

WALL TR70-1C-106-1

Data 277'

C1-25-B 2 (70,BD-101E,131)(1S-

128,D1&D2)

WALL TR70-1C-106-1

Data 280'

C1-25-C 2 (70,BD-101E,130)(1S-

128,D1&D2)

WALL TR70-1C-106-1

Data 285'

C1-25-D 2 (70,BD-101E,129)(1S-

128,D1&D2)

WALL TR70-1C-106-1

Data 315'

C1-192-C 2 (70,IT102,19A&B)(1S-

100,D3&4)

WALL TR70-1U-104-4

Data 313'

C1-192-B 2 (2457) WALL TR70-1U-104-4

Data 292'

1S-100-B 4 (70,IT102,62)(1S-100-

V1&2-D3&4)

WALL TR70-1U-104-4

Data 277'

1S-100-A 4 (70,IT102-10)(1S-100-

V1&2-D3&4)

WALL TR70-1U-104-4

Data 298'

1S-102-A 4 (70,IT102-11)(1S102-

V1&2-DA&B)

WALL TR70-1U-104-4

Data 291'

1S-102-B 4 (70,IT102-59)(1S102-

V1&2-D3&4)

WALL TR70-1U-104-4

Data 274'

1S-105-B 4 (70,IT-102,53,AB)(1T-

192,V1&2,D1&2)

WALL TR70-1U-104-4

Data 268'

1S-105-A 4 (70,IT-102,70)(1S-105

,V1&2,D1&2)

WALL TR70-1U-104-4

Data 256'

COAX 4 (UNLABELED) WALL TR70-1U-104-4

Data 254'

1S-105-C 4 (70,IT-102,63)(1S-105

,D1-4)

WALL TR70-1U-104-4

Data 247'

C1-186-AP-B 2 TMO-F01-A40 CLG TR70-1U-104-4

Data 236'

1S-106-A 2 (UNLABELED) WALL TR70-1U-104-4

Data 234'

1S-106-B 2 (UNLABELED) WALL TR70-1U-104-4

Data 238'

1S-106-C 4 (70,1T-102D-17,V-16) (1S106,V16A&B,D17A &B)

WALL TR70-1U-104-4

Data 238'

1S-107-A 2 (UNLABELED) WALL TR70-1U-104-4

Data 247'

1S-107-B 4 (70,IT-102,1)(1S-107,

V1&V,D3&4)

WALL TR70-1U-104-4

Data 252'

1S-107-C 2 (UNLABELED) WALL TR70-1U-104-4

Data 261'

1S-107-D 4 (70,IT-102,67)(1S-107

,V1&V,D3&4)

WALL TR70-1U-104-4

Data 270'

1S-112-A 2 (PHONE) WALL TR70-1U-104-4

Data 265'

1S-112-B (RECEIVER?) WALL TR70-1U-104-4

Data 261'

1S-112-C 2 (UNLABELED) WALL TR70-1U-104-4

Data 260'

1S-112-D 1 (COAX)(S112) WALL TR70-1U-104-4

Data 259'

1S-112-E 4 (70-1T-102,20A&B)(1 S-112,D3&4)

WALL TR70-1U-104-4

Data 286'

1S-112-AP-A 2 MINAP84-70-1A CLG TR70-1U-104-4

Data 314'

C1-196-AP-A 2 MINAP25-70-1A CLG TR70-1U-104-4

Data 329'

C1-196-AP-B 2 TMO-F01-A39 CLG TR70-1U-104-4

Data 344'

C1-196-AP-C 2 MINAP24-70-1A CLG TR70-1U-104-4

Grand total: 87

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA B

LOAD

EST. LENGTH PER

PORT

OUTLET DESIGNATOR -

NEW

PORT QTY-

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

Data 283'

1A-110C-B 2 (70,1A-107,24)(1A-11 0,D 1&2)

WALL TR70-1C-106-1

Data 267'

1A-110C-A 2 (70,1A-107,23)(1A-11 0,D1&2)

WALL TR70-1C-106-1

Data 269'

1A-110C-C 4 (70,1A-107,18)(1A-11 0,V1&2,D3&4)

WALL TR70-1C-106-1

Data 269'

1A-110C-D 4 (70,1A-107,19)(1A-11 0,V1&V2,D3&D4)

WALL TR70-1C-106-1

Data

1A-110C-D 4 (70,1A-107,25)(1A-11 0,V1&V2,D3&D4)

WALL

Data 260'

1B-102-E 3 (UNLABELED) WALL TR70-1C-106-1

Data 258'

1B-102-D 2 (UNLABELED) WALL TR70-1C-106-1

Data

1B-102-C 3 (COAX) WALL

Data 244'

1B-102-B 2 (UNLABELED) WALL TR70-1C-106-1

Data 222'

1B-102-A 4 (COAX) WALL TR70-1C-106-1

Data 237'

1B-102-H 1 (UNLABELED) WALL TR70-1C-106-1

Data 239'

1B-102-G 2 (70,1A-107,28)(1B-10 2,D1&2)

WALL TR70-1C-106-1

Data 226'

1B-102-F 2 (UNLABELED) WALL TR70-1C-106-1

Data 223'

1A-115-A 4 (UNLABELED) WALL TR70-1C-106-1

Data 220'

1A-115-B 1 (UNLABELED) WALL TR70-1C-106-1

Data 213'

1A-115-E 4 (70,1A-107,17)(1A-11 5,V1&V2,D3&D4)

WALL TR70-1C-106-1

Data 210'

1A-115-C 1 (UNLABELED) WALL TR70-1C-106-1

Data 208'

1A-115-D 1 (UNLABELED) WALL TR70-1C-106-1

Data 220'

1A-114-B 1 (UNLABELED) WALL TR70-1C-106-1

Data 224'

1A-114-A 4 (UNLABELED) WALL TR70-1C-106-1

Data 235'

1A-113-C 1 (UNLABELED) WALL TR70-1C-106-1

Data 239'

1A-113-B 4 (70,1A-107,26)(1A-11 5,V1&V2,D1&D2)

WALL TR70-1C-106-1

Data 233'

1A-113-A 4 (1A-113,V1&V2,D3&D 4)

WALL TR70-1C-106-1

Data 262'

1A-110-AP-A 2 TMO-F01-A31 CLG TR70-1C-106-1

Data 271'

1A-110-AP-B 2 MINAP24-70-1B CLG TR70-1C-106-1

Data 304'

1A-110C-F 4 (70,1A-107,21)(1A-11 0,V1&2,D3&4)

WALL TR70-1C-106-1

Data 305'

1A-110C-E 4 (70,1A-107,20)(1A-11 0,V1&2,D3&4)

WALL TR70-1C-106-1

Data 177'

1B-104-A 1 (UNLABELED) WALL TR70-1C-106-1

Data 173'

1B-104-B 4 (70,1C-119,25)(1b-10 5,V1&V2,D3&D4)

WALL TR70-1C-106-1

Data 112'

1B-105-A 1 (VGI-AP70B5-6C1C) CLG TR70-1C-106-1

Data 107'

1B-105-B 1 (UNLABELED) WALL TR70-1C-106-1

Data 190'

1B-104-AP-A 2 MINAP20-70-1B CLG TR70-1C-106-1

Data 343'

1A-106-A 1 (UNLABELED) WALL TR70-1C-106-1

Data 363'

1A-106-B 1 (UNLABELED) WALL TR70-1C-106-1

Data 348'

1A-106A-B 4 (70,1A-107,30)(1A-10 6A,V1&2,D3&4)

WALL TR70-1C-106-1

Data 350'

1A-106A-C 1 (UNLABELED) WALL TR70-1C-106-1

Data 338'

1A-106A-A 4 (70,1A-107,11)(1A-10 6,D1&2)

WALL TR70-1C-106-1

Data 395'

C1-198-AP-B 2 MINAP26-70-1B CLG TR70-1C-106-1

Data 381'

C1-199-AP-B 2 MINAP26-70-1A CLG TR70-1C-106-1

Data 372'

C1-199-AP-A 2 MINAP26-70-1B CLG TR70-1C-106-1

Data 342'

1A-109-AP-A 2 MINAP89-70-1A CLG TR70-1C-106-1

Data 294'

C1-24-AP-F 2 MINAP05-70-1B CLG TR70-1C-106-1

Data 252'

C1-24-AP-E 2 (UNLABELED) CLG TR70-1C-106-1

Data 242'

C1-24-AP-D 2 (UNLABELED) CLG TR70-1C-106-1

Data 181'

C1-25A-J 4 (UNLABELED) WALL TR70-1C-106-1

Data 143'

C1-25A-H 4 (70,BD-101E,119)(1S-

128 V1-V2,D3-D4)

WALL TR70-1C-106-1

Data 154'

C1-25A-G 5 (70,BD-101E,116)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 160'

C1-25A-F 5 (70,BD-101E,115)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 167'

C1-25A-E 5 (70,BD-101E,114)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 184'

C1-25A-D 5 (70,BD-101E,113)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 189'

C1-25A-B 5 (70,BD-101E,112)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 194'

C1-25A-B 5 (70,BD-101E,111)(1S-

128 V1,D2-D4)

WALL TR70-1C-106-1

Data 183'

C1-25A-A 2 (70,BD-101E,121)(1S-

128 D1-D2)

WALL TR70-1C-106-1

Data 181'

05/06/2022 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :0

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701C

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA C

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES -

EXISTING OUTLET DESIGNATOR - EXISTING MOUNTING TYPE RACK ID

1D-116-A 4 (70 1D 120C 06)(1D 116 V1&2 D3&4)

WALL TR70-1C-106-2

Data 234'

1D-116-B 2 (2331) WALL TR70-1C-106-2

Data 238'

1D-116-C 2 (UNLABELED) WALL TR70-1C-106-2

Data 198'

1D-118-B 4 (70 1D 120C 22)(1D 118 V3&4

DA&B)

WALL TR70-1C-106-2

Data 197'

1D-118-A 4 (70 1D 120C 93)(1D 118 V1&2 D3&4)

WALL TR70-1C-106-2

Data 220'

1D-123-A 4 (ASSUMED) WALL TR70-1C-106-2

Data 209'

1D-123-B 4 (ASSUMED) WALL TR70-1C-106-2

Data 200'

1D-123-C 4 (ASSUMED) WALL TR70-1C-106-2

Data 179'

1D-125-B 2 (PHONE)(5302) WALL TR70-1C-106-2

Data 205'

1D-125-A 2 (70 1D 120C 92)(1D 125 D1&2) WALL TR70-1C-106-2

Data 200'

1D-124-A 2 (70 1D 120C 83)(1D 124 D1&2) WALL TR70-1C-106-2

Data 209'

1D-124-B 2 (COAX) WALL TR70-1C-106-2

Data 188'

1D-124-AP-A 2 MINAP09-70-1B CLG TR70-1C-106-2

Data 192'

1D-124-C 2 (4018) WALL TR70-1C-106-2

Data 188'

1D-113-A 5 (70 1D 120C 11)(1D 113 V1&2

DA&B)

WALL TR70-1C-106-2

Data 159'

C1-36-AP-C 2 MINAP11-70-1B CLG TR70-1C-106-2

Data 189'

1D-126-A 6 (70 1D 120C 25)(1D 126 V1&2 D3-6)

WALL TR70-1C-106-2

Data 181'

1D-126-B 2 (70 1D 120C 84)(1D 126 D1&2) WALL TR70-1C-106-2

Data 172'

1D-126-C 2 (COAX) WALL TR70-1C-106-2

Data 173'

1D-127-A 2 (70 1D 120C 85)(1D 127 D1&2) WALL TR70-1C-106-2

Data 182'

1D-127-B 2 (COAX)(1S114-1) WALL TR70-1C-106-2

Data 164'

1D-127-C 2 (4016) WALL TR70-1C-106-2

Data 140'

C1-36-AP-B 2 TMO-F01-A44 CLG TR70-1C-106-2

Data 176'

1D-108-B 4 (70 1D 120C 37)(1D 108 V1&2

DA&B)

WALL TR70-1C-106-2

Data 177'

1D-108-C 4 (70 1D 120C 38)(1D 108 V1&2

DA&B)

WALL TR70-1C-106-2

Data 170'

1D-108-D 4 (70 1D 120C 39)(1D 108 V1&2

DA&B)

WALL TR70-1C-106-2

Data 164'

1D-108-A 4 (70 1D 120C 10)(1D 108 V1&2

DA&B)

WALL TR70-1C-106-2

Data 166'

1D-130-A 2 (PHONE)(F-S401302) WALL TR70-1C-106-2

Data 150'

1D-130-B 2 (COAX) WALL TR70-1C-106-2

Data 143'

1D-130-C 2 (70 1D 120C 86)(1D 130 D1&2) WALL TR70-1C-106-2

Data 162'

1D-106-A 4 (70 1D 120C 09)(1D 106 V1&2

DA&B)

WALL TR70-1C-106-2

Data 149'

1D-106-B 4 (70 1D 120C 34)(1D 106 V1&2

DA&B)

WALL TR70-1C-106-2

Data 123'

1D-133-A 5 (70 1D 120C 74)(1D 133 V1&2

DA&B)

WALL TR70-1C-106-2

Data 145'

1D-132-A 2 (1D 120C 87)(1D 132 D1&2) WALL TR70-1C-106-2

Data 132'

1D-132-B 2 (4014) WALL TR70-1C-106-2

Data 129'

1D-134-A 2 (70 1D 120C 66)(1D 128 D1&2) WALL TR70-1C-106-2

Data 100'

C1-30-AP-A 2 TMO-F01-A36 CLG TR70-1C-106-2

Data 111'

C1-31-AP-A 2 MINAP14-70-1B CLG TR70-1C-106-2

Data 128'

C1-31-H 4 (70 1D 120C 28)(1D 100 V1&2 D3&4)

WALL TR70-1C-106-2

Data 125'

C1-31-G 2 (70 1D 120C 97)(1D 100 D1&2) WALL TR70-1C-106-2

Data 121'

C1-31-AP-B 2 VGI AP70B4 FBEC CLG TR70-1C-106-2

Data 97'

C1-31-F 4 (70 1D 120C 68)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 100'

C1-31-E 6 (70 1D 120C 69) WALL TR70-1C-106-2

Data 108'

C1-31-D 4 (70 1D 120C 60)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 108'

C1-31-C 4 (70 1D 120C 70)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 104'

C1-31-B 4 (70 1D 120C 71)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 100'

C1-31-A 4 (70 1D 120C 73)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 116'

1D-135-A 4 (UNLABELED) WALL TR70-1C-106-2

Data 120'

1D-135-B 2 (4012) WALL TR70-1C-106-2

Data 94'

1C-105-A 3 (70 1D 120C 100)(1D 136 D1-3)

WALL TR70-1C-106-2

Data 91'

1C-105-B 3 (70 1D 120C 101)(1D 136 D1-3)

WALL TR70-1C-106-2

Data 97'

1C-104-B 4 (70 1D 120C 65)(1D 137 V1&2 D1&2)

WALL TR70-1C-106-2

Data 97'

1C-104-A 4 (70 1D 120C 102)(1D 30A D1-3)

WALL TR70-1C-106-2

Data 185'

1D-109-A 2 (PHONE) WALL TR70-1C-106-1

Data 183'

1D-109-B 3 (70 1D 120C 47)(1D 109 V1&2

DA&B)

WALL TR70-1C-106-1

Grand total: 110

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA C

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES -

EXISTING OUTLET DESIGNATOR - EXISTING MOUNTING TYPE RACK ID

Data 115'

1D-101-A 2 (PHONE) WALL TR70-1C-106-1

Data 144'

1D-101-B 4 (70 1D 120C 29)(1D 101 V1&2

DA&B)

WALL TR70-1C-106-1

Data 132'

1D-102-A 4 (7 1D 120C 30)(1D 102 V1&2

DA&B)

WALL TR70-1C-106-1

Data 149'

1D-102-C 2 (4009) WALL TR70-1C-106-1

Data 157'

1D-102-B 2 (70 1D 120C 75)(1D 102 D1&2) WALL TR70-1C-106-1

Data 161'

1D-103-B 2 (70 1D 120C 76)(1D 103 D1&2) WALL TR70-1C-106-1

Data 149'

1D-103-A 2 (4008) WALL TR70-1C-106-1

Data 156'

1D-103-C 4 (70 1D 120C 31)(1D 130 V1&2

DA&B)

WALL TR70-1C-106-1

Data 169'

1D-105-AP-A 2 MINAP13-70-1B CLG TR70-1C-106-1

Data 183'

1D-105-A 4 (70 1D 120C 32)(1D-105 V1&2

DA&B)

WALL TR70-1C-106-1

Data 171'

1D-105-C 4 (70 1D 120C 33)(1D-105 V1&2

DA&B)

WALL TR70-1C-106-1

Data 180'

1D-107-B 2 (70 1D 120C 78)(1D 107 D1&D2)

WALL TR70-1C-106-1

Data 184'

1D-107-C 4 (70 1D 120C 36)(1D 107 V1&2

DA&B)

WALL TR70-1C-106-1

Data 206'

1D-109-F 4 (70 1D 120C 42)(26 27) WALL TR70-1C-106-1

Data 217'

1D-109-E 4 (70 1D 120C 43)(1D 109 V1&2

DA&B)

WALL TR70-1C-106-1

Data 197'

1D-109-D 4 (70 1D 120C 41)(1D 109 V1&2

DA&B)

WALL TR70-1C-106-1

Data 193'

1D-109-C 4 (70 1D 120C 49)(1D 109 V1&2

DA&B)

WALL TR70-1C-106-1

Data 208'

1D-109-AP-A 2 MINAP12-70-1B CLG TR70-1C-106-1

Data 213'

1D-112-E 4 (70 1D 120C 48)(1D 112 V1&2

DA&B)

WALL TR70-1C-106-1

Data 211'

1D-112-D 2 (70 1D 120C 79)(1D 112 D1&2) WALL TR70-1C-106-1

Data 207'

1D-112-C 2 (COAX) WALL TR70-1C-106-1

Data 204'

1D-112-B 2 (COAX) WALL TR70-1C-106-1

Data 179'

1D-105-B 2 (70 1D 120C 77)(1D 105 11&2) WALL TR70-1C-106-1

Data 171'

1D-107-A 4 (70 1D 120C 35)(1D 107 V1&2

DA&B)

WALL TR70-1C-106-1

Data 201'

1D--109-G 4 (70 1D 120C 45)(33 32) WALL TR70-1C-106-1

Data 198'

1D-109-H 4 (70 1D 120C 44)(1D 109 V1&2

DA&B)

WALL TR70-1C-106-1

Data 200'

1D-112-A 4 (70 1D 120C 49)(1D 112 V1&2

DA&B)

WALL TR70-1C-106-1

Data 224'

1D-114-B 5 (70 1D 120C 51)(1D 114 V1&2

DA&B)

WALL TR70-1C-106-1

Data 212'

1D-114-A 4 (70 1D 120C 53)(1D 114 V1&2

DA&B)

WALL TR70-1C-106-1

Data 239'

1D-114-C 4 (70 1D 120C 50)(1D 114 V1&2

DA&B)

WALL TR70-1C-106-1

Data 229'

1D-114-D 4 (70 1D 120C 52)(1D 114 V1&2

DA&B)

WALL TR70-1C-106-1

Data 241'

1D-115-E 4 (70 1D 120C 55)(1D 115 V1&2

DA&B)

WALL TR70-1C-106-1

Data 238'

1D-115-D 2 (70 1D 120C 80)(1D 115 D1&2) WALL TR70-1C-106-1

Data 234'

1D-115-C 2 (COAX) WALL TR70-1C-106-1

Data 232'

1D-115-B 2 (COAX)(1S114-1) WALL TR70-1C-106-1

Data 228'

1D-115-A 4 (70 1D 120C 54)(1D 115 V1&2

DA&B)

WALL TR70-1C-106-1

Data 246'

1D-115-AP-A 2 MINAP01-70-1B CLG TR70-1C-106-1

Data 254'

1D-177-B 4 (70 1D 120C 56)(1D 117 V1&2

DA&B)

WALL TR70-1C-106-1

Data 242'

1D-177-A 4 (70 1D 120C 57)(1D 117 V1&2

DA&B)

WALL TR70-1C-106-1

Data 246'

1D-177-C 2 (PHONE) WALL TR70-1C-106-1

Data 266'

1U-162-C 2 (01 D1&D2)(1D 120C) WALL TR70-1C-106-1

Data 281'

1U-162-A 1 (RAIDO PHONE

ONLY)(CLOSET

1D-120C)(JK-8809)

WALL TR70-1C-106-1

Data 272'

1U-162-B 4 (70 1D 120C 17&18)(1U 162 V1-4)

WALL TR70-1C-106-1

Data 256'

1U-162B-B 2 (PHONE) WALL TR70-1C-106-2

Data 255'

1U-162B-AP-A 2 MINAP01-70-1B CLG TR70-1C-106-2

Data 253'

1U-162B-C 4 (70 1D 120C 20A&B 20)(1U 162B V1&2 D3&4)

WALL TR70-1C-106-2

Data 239'

1U-162B-A 4 (70 1D 120C 5)(IU 162B V1&2

D3&4)

WALL TR70-1C-106-2

Data 243'

C1-34-A 2 (PHONE) WALL TR70-1C-106-2

Data 207'

C1-34-AP-A 2 TMO-F01-A43 CLG TR70-1C-106-2

Data 239'

1D-121-A 4 (70 1D 120C 63)(1D 121 V1&2 D3&4)

WALL TR70-1C-106-2

Data 248'

1D-121-B 2 (UNLABELED) WALL TR70-1C-106-2

Data 230'

1D-121-C 2 (UNLABELED) WALL TR70-1C-106-2

Data 228'

1D-122-A 2 (70 1D 120C 81)(1D 122 D1&2) WALL TR70-1C-106-2

Data 234'

1D-122-B 2 (COAX) WALL TR70-1C-106-2

Data 217'

1D-122-C 2 (4020) WALL TR70-1C-106-2

Data 231' ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

P

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :0

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701D

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA D

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR - NEW

PORT QTY-

EXISTING OUTLET DESIGNATOR - EXISTING MOUNTING TYPE RACK ID

Data 140'

C1-41-H 3 (UNLABELED) WALL TR70-1C-106-4

Data 137'

C1-41-J 3 (UNLABELED) WALL TR70-1C-106-4

Data 136'

C1-41-K 3 (UNLABELED) WALL TR70-1C-106-4

Data 115'

C1-41-O 4 (70,1E-117C,49)(1E-100,D1&2) WALL TR70-1C-106-4

Data 113'

C1-41-N 2 (UNLABELED) WALL TR70-1C-106-4

Data 112'

C1-41-M 4 (1E-100,V1,2DA,B)(70-1E117,4) WALL TR70-1C-106-4

Data 111'

C1-41-L 2 (UNLABELED) WALL TR70-1C-106-4

Data 112'

C1-41-P 2 (70-1E100,47)(1E-117C,D1&D2) WALL TR70-1C-106-4

Data 163'

1E-110A-A 3 (70,IE-111C,56)(1E-112B,D1-D3) WALL TR70-1C-106-4

Data 288'

C1-46-AP-A 2 MINAP86-70-1B CLG TR70-1C-106-4

Data 204'

1E-122A-A 3 (70,IE-111C,79)(1E-122,D1-D3) WALL TR70-1C-106-4

Data 234'

1E-119A-A 3 (70,IE-111C,76)(1E-121B,D1-D3) WALL TR70-1C-106-4

Data 234'

1E-119A-B 3 (70,IE-111C,73)(1E-120B,D1-D3) WALL TR70-1C-106-4

Data 199'

C1-43-AP-B 2 MINAP88-70-1B CLG TR70-1C-106-4

Data 169'

C1-43-AP-A 2 TMO-F01-A68 CLG TR70-1C-106-4

Data 146'

1E-106-A 4 (70-1E117-6)(1E-106,V1,2,DA,B) WALL TR70-1C-106-4

Data 149'

1E-106-B 2 (UNLABELED) WALL TR70-1C-106-4

Data 145'

1E-106-C 2 (UNLABELED) WALL TR70-1C-106-4

Data 132'

1E-104-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 134'

1E-104-B 4 (70-1E117,5)(1E-104,V1,2,DA,B) WALL TR70-1C-106-4

Data 130'

1E-104-C 3 (70-1E117,50)(1E-104,V1,D2&3) WALL TR70-1C-106-4

Data 129'

1E-104-D 2 (UNLABELED) WALL TR70-1C-106-4

Data 55'

1C-107-B 6 (70,1C-119,2)(1C-107,V1&2,D3&4)(

1E-117B/B01 I04)(ALARM)

WALL TR70-1C-106-4

Data 59'

1C-107-C 2 (UNLABELED) WALL TR70-1C-106-4

Data 47'

1C-107-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 59'

1C-107-D 4 (70,1C-119,33)(1C-107,V1&2,D3&4

WALL TR70-1C-106-4

Data 60'

1C-107-E 2 (70,1C-119,37)(1C-107,V1,DA) WALL TR70-1C-106-4

Security 502'

BH-111A-CAM-01 1 NEWLY INSTALLED DEVICE, NOT

EXISTING

WALL TR70-1U-104-2

Data 43'

1C-106-A 1 (UNLABELED) WALL TR70-1C-106-1

Data 46'

1C-106-B 4 (UNLABELED) WALL TR70-1C-106-1

Data 43'

1C-106-C 4 (70,1C-119,7)(1C-106,V1,2,DA,B) WALL TR70-1C-106-1

Data 44'

1C-106-D 4 (70,1C-119,8)(1C-106,V1,2,DA,B) WALL TR70-1C-106-1

Grand total: 64

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA D

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR - NEW

PORT QTY-

EXISTING OUTLET DESIGNATOR - EXISTING MOUNTING TYPE RACK ID

Data 123'

C1-28-AP-A 2 MINAP06-70-1B CLG TR70-1C-106-1

Data 79'

1C-121-A 5 (70,1C-119,1)(1C-121,V1&V2,D3&

D4)(1E-117B/B01 I09 ALARM)

WALL TR70-1C-106-4

Data 76'

1C-121-B 2 (70,1D-120,DSL) WALL TR70-1C-106-4

Data 73'

1C-121-C 2 (70,1D-120C,99)(1C-121,D 1&2) WALL TR70-1C-106-4

Data 107'

C1-49-AP-A 2 MINAP19-70-1B CLG TR70-1C-106-4

Data 126'

C1-49-AP-B 2 MINAP18-70-1B CLG TR70-1C-106-4

Data 99'

1C-112-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 109'

1C-115-AP-A 2 MINAP17-70-1B CLG TR70-1C-106-4

Data 72'

1C-115-A 1 (UNLABELED) CLG TR70-1C-106-4

Data 65'

C1-48-AP-A 2 TMO-F01-A33 CLG TR70-1C-106-4

Data 63'

1C-110-A 6 (70,1C-119,31)(V1&V2,D3&D4)(1E-

117B B01-I07)(ALARM)

WALL TR70-1C-106-4

Data 73'

1C-110-B 6 (70,1C-119,32)(V1&V2,D3&D4)(1E-

117B B01-I08)(ALARM)

WALL TR70-1C-106-4

Data 62'

1C-110-C 4 (70,1C119,10)(1C110,V1,2,DA,B) WALL TR70-1C-106-4

Data 71'

1C-113-A 4 (1C-113,V1&V2,D3&D4) WALL TR70-1C-106-4

Data 79'

1C-113-B 4 (70,1C,119,11)(1C,113,V1,2,DA,B) WALL TR70-1C-106-4

Data 69'

1C-108-A 4 (70,1C-119,3)(1C-108,V1&2,D3&4) WALL TR70-1C-106-4

Data 58'

1C-108-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 75'

1C-108-B 6 (70,1C-119,35)(1C-108,V1,2,3D4,5, 6)

WALL TR70-1C-106-4

Data 72'

1C-109-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 75'

1C-109-B 2 (UNLABELED) WALL TR70-1C-106-4

Data 80'

1C-109-C 4 (70,1C119,9)(1C109,V1,2,DA,B) WALL TR70-1C-106-4

Data 98'

1C-135-A 2 (70,1C119,15)(70,1C109) WALL TR70-1C-106-4

Data 86'

C1-40-AP-A 2 MINAP82-70-1B CLG TR70-1C-106-4

Data 93'

C1-39-AP-A 2 TMO-F01-A34 CLG TR70-1C-106-4

Data 105'

C1-41-A 2 (UNLABELED) WALL TR70-1C-106-4

Data 107'

C1-41-B 2 (UNLABELED) WALL TR70-1C-106-4

Data 118'

C1-41-C 2 (70-1E-117C,14A&B)(1E-100,D3&4

WALL TR70-1C-106-4

Data 120'

C1-41-D 2 (UNLABELED) WALL TR70-1C-106-4

Data 131'

C1-41-E 4 (70,1E-117C,1)(1E-100,V1&2,D3&4

WALL TR70-1C-106-4

Data 122'

C1-41-AP-A 2 TMO-90-70-1B CLG TR70-1C-106-4

Data 143'

C1-41-F 4 (UNLABELED)(1E-100,V1+2,D3+4) WALL TR70-1C-106-4

Data 141'

C1-41-G 4 (49,1E-117C,11)(UNLABELED) WALL TR70-1C-106-4

ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

P

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :1

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701E

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA E

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES -

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

1F-108-A 4 (70-1F-119B,8)(1F-108,V1

,2,DA,B)

WALL TR70-1F-119F-1

Data 238'

1F-108-B 4 (70-1F119B,8)(1F-108,V1, 2,DA,B)

WALL TR70-1F-119F-1

Data 252'

1F-108-C 2 (70-1F119B,31)(1F-108,V 1&2,D3&D4)

WALL TR70-1F-119F-1

Data 251'

1F-108-D 2 (70-1F-119B,31)(1F-108,V 1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 200'

1F-125-A 4 (70-1F-119A,16A&B)(1F-1 25-D3&D4)

WALL TR70-1F-119F-1

Data 224'

1F-113-AP-A 2 MINAP75-70-1B CLG TR70-1F-119F-1

Data 196'

1F-122-A 4 (70-1F-119B,21)(1F-122-2 1,V1&2,D3&4)

WALL TR70-1F-119F-1

Data 179'

C1-55-A 2 (UNLABELED) WALL TR70-1F-119F-1

Data 128'

C1-51-AP-B 2 MINAP78-70-1B CLG TR70-1C-106-1

Grand total: 65

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA E

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES -

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

Data 189'

C1-55-AP-A 2 TMO-F01-A23 CLG TR70-1F-119F-1

Data 165'

C1-56-AP-A 2 WAP73-70-1B CLG TR70-1F-119F-1

Data 313'

1F-102-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 162'

1C-117-A 4 (UNLABELED) WALL TR70-1C-106-4

Data 310'

1F-136-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 283'

C1-52-AP-A 2 TMO-F01-A25 CLG TR70-1F-119F-1

Data 300'

1F-103-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 293'

1F-105-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 272'

1F-107-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 257'

1F-109-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 224'

C1-54-AP-A 2 MINAP79-70-1B CLG TR70-1F-119F-1

Data 228'

C1-54-AP-B 2 ASCOM WAP CLG TR70-1F-119F-1

Data 225'

C1-54-AP-C 2 CISCO WAP CLG TR70-1F-119F-1

Data 242'

1F-112-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 227'

1F-114-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 213'

1F-115-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 198'

1F-116-A 2 (ASSUMED) WALL TR70-1F-119F-1

Data 172'

1F-117-A 2 (70,1F-119B,42)(1F-117,D 1&D2)

WALL TR70-1F-119F-1

Data 185'

1F-118-A 4 (70-1F-119B,10)(1F-118,V

1,2,DA,B)

WALL TR70-1F-119F-1

Data 186'

1F-118-B 4 (70-1F-119B,32)(1F-118,V 1&2,D3&D4)

WALL TR70-1F-119F-1

Data 130'

C1-55A-A 2 (UNLABELED) CLG TR70-1F-119F-1

Data 132'

C1-55A-B 1 VER-RN-L1-80-1F-1190 CLG TR70-1F-119F-1

Data 156'

1F-120-A 4 (70,1F-119B,27)(1F-120,V 1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 161'

1F-120-B 3 (70,1F-119B,59)(1F-120,D 1-D3)

WALL TR70-1F-119F-1

Data 167'

1F-120-C 4 (70,1F-119B,29)(1F-120,V 1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 176'

1F-120-D 4 (70,1F-119B,30)(1F-120,V 1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 178'

1F-120-E 4 (70-1F-119B,17A&B,11)(1 F-120,V1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 166'

1F-120-F 4 (70-1F-119B,18A&B,12)(1 F-120,V1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 163'

1F-120-G 4 (70-1F-119B,28)(1F-120,V 1&V2,D3&D4)

WALL TR70-1F-119F-1

Data 161'

1F-120-H 2 (70,1F-119B,43)(1F-120,D 1&D2)

WALL TR70-1F-119F-1

Data 140'

1F-120A-A 4 (70-1F-119B,10)(1F-118,V

1,2,DA,B)

WALL TR70-1F-119F-1

Data 183'

1F-121-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 198'

1F-123-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 212'

1F-124-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 227'

1F-126-A 4 (70,1F-119B-47)(1F-126-D 1&D2)

WALL TR70-1F-119F-1

Data 242'

1F-127-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 257'

1F-130-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 274'

1F-132-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 286'

1F-134-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 298'

1F-135-A 4 (ASSUMED) WALL TR70-1F-119F-1

Data 275'

C1-52-A 2 (70-1F-119B,13A&B)(1F-1 00,D3&4)

WALL TR70-1F-119F-1

Data 250'

C1-52-B 4 (UNLABELED) CLG TR70-1F-119F-1

Data 257'

C1-52-C 2 (UNLABELED) WALL TR70-1F-119F-1

Data 266'

C1-52-D 2 (UNLABELED) WALL TR70-1F-119F-1

Data 272'

C1-52-E 4 (70-1F-119-19)(1F-100-V1 &2,D3&4)

WALL TR70-1F-119F-1

Data 276'

C1-52-F 2 (UNLABELED) WALL TR70-1F-119F-1

Data 278'

C1-52-G 4 (70,1F-119b,2-V,55-D)(1F- 100,V1&2,D1&2)

WALL TR70-1F-119F-1

Data 280'

C1-52-H 4 (70-1F119B,11)(1F-100,V 1&2,D3&4)

WALL TR70-1F-119F-1

Data 279'

C1-52-J 6 (70-1F119B,3)(1F-100,V1, 2,DA,B)((1F-119A/B03 I01

ALARM)

WALL TR70-1F-119F-1

Data 241'

C1-52-K 4 (UNLABELED) CLG TR70-1F-119F-1

Data 284'

C1-52-L 2 (UNLABELED) WALL TR70-1F-119F-1

Data 285'

C1-52-M 2 (UNLABELED) WALL TR70-1F-119F-1

Data 284'

C1-52-AP-B 2 CISCO WAP CLG TR70-1F-119F-1

Data 273'

C1-52-AP-C 2 MINAP79-70-1B CLG TR70-1F-119F-1

Data 254'

1F-106-A 5 (70-1F-119B,7)(1F-119A/)( B03 I13

ALARM)((1F-106,V1,2,DA,

B)

WALL TR70-1F-119F-1

Data 271'

1F-106-B 2 (70,1F-119B,56)(1F-106,5 6,D A&B)

WALL TR70-1F-119F-1

Data 238' ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

P

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :1

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701F

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA F

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES

- EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

Data 192'

1G-101-B 6 (UNLABELED) WALL TR70-1C-106-1

Data 336'

1G-107-B 4 (70,1A-107,08A&B,7)(1G-108 ,V1&2D &4)

WALL TR70-1C-106-1

Data 340'

1G-107-A 1 (UNLABELED) WALL TR70-1C-106-1

Data 356'

1G-109-A 4 (70,1H-120,16)(1G-109,V1&V 2,D3&D4)

WALL TR70-1C-106-1

Data 170'

1G-101A-B 4 (COAX) WALL TR70-1C-106-1

Data 182'

1G-101A-A 1 (UNLABELED) WALL TR70-1C-106-1

Data 190'

1G-101-AP-B 2 MINAP21-70-1B CLG TR70-1C-106-1

Data 190'

1G-101-AP-A 2 TMO-F01-A32 CLG TR70-1C-106-1

Data 206'

1G-101-D 1 (VGI-AP70B6-E45C) CLG TR70-1C-106-1

Data 211'

1G-101-C 6 (UNLABELED) WALL TR70-1C-106-1

Data 209'

1G-101-A 2 (CANTEEN,V1&D1) WALL TR70-1C-106-1

Data 365'

1G-109-B 4 (70,1H-120,54)(1G-109,V-1& 2,D-A&B)

WALL TR70-1C-106-1

Data 367'

1G-109-C 4 (70,1H-120,1)(1G-109,V1&2, D3&4)

WALL TR70-1C-106-1

Data 368'

1G-109-D 1 (UNLABELED) WALL TR70-1C-106-1

Data 246'

C1-205-AP-A 2 (UNLABELED) CLG TR70-1F-119F-3

Data 249'

C1-204-AP-A 2 (UNLABELED) CLG TR70-1F-119F-3

Data 189'

C1-203-A 1 (UNLABELED) WALL TR70-BH-111A-5

Data 187'

C1-203-B 1 (UNLABELED) WALL TR70-BH-111A-5

Data 229'

1G-121-A 4 (70,1H-120,41)(1G-121,V1&2 ,D1&2)

WALL TR70-BH-111A-6

Data 226'

1G-121-B 4 (70,1H-120,40)(1G-121,V1&2 ,D1&2)

WALL TR70-BH-111A-6

Data 232'

1G-121-C 4 (70,1H-120,39)(1G-121,V1&2 ,D1&2)

WALL TR70-BH-111A-6

Data 232'

1G-121-D 4 (70,1H-120,38)(1G-121,V1&2 ,D1&2)

WALL TR70-BH-111A-6

Data 225'

1G-121-E 4 (70,1H-120,26)(1G-121,V1&2 ,D3&4)

WALL TR70-BH-111A-6

Data 226'

1G-121-F 6 (1G-121,V1&2,D1,2,3,4)(70,1 H-120,44)

WALL TR70-BH-111A-6

Data 238'

1G-121-G 4 (70,1H-120,27)(1G-121,V1&2 ,D3&4)

WALL TR70-BH-111A-6

Data 206'

1G-121A-A 4 (70,1H-120,37)(1G-121,V1&2 ,D1&2)

FLOOR TR70-BH-111A-6

Data 203'

1G-121A-B 4 (70,1H-120,36)(1G-121,V1&2 ,D1&2)

FLOOR TR70-BH-111A-6

Data 224'

1G-121B-A 4 (70,1H-120,42)(1G-121A,V1& 2,D1&2)

WALL TR70-BH-111A-6

Data 209'

1G-121B-B 4 (70,1H-120,43)(1G-121A) WALL TR70-BH-111A-6

Data 225'

1G-122-A 4 (70,1H-120,9)(1G-122,V1&V2 ,D3&D4)

WALL TR70-BH-111A-6

Data 212'

1G-122-B 1 (1J-121B/B05 I10) WALL TR70-BH-111A-6

Data 287'

1G-116-A 3 (70,1H-120,56)(C temp1,V1&2,D3)

WALL TR70-BH-111A-6

Data 270'

1G-116-AP-A 2 MINAP30-70-1B CLG TR70-BH-111A-6

Data 325'

1G-115-A 2 (70,1A-107,27,A&B)(1G-115, D1&2)

WALL TR70-BH-111A-6

Data 302'

1G-115-B 4 (UNLABELED) WALL TR70-BH-111A-6

Data 340'

C1-201-AP-A 2 MINAP27-70-1B CLG TR70-BH-111A-6

Data 302'

1G-106-A 6 (70,1M-120,53)(B-106,V1&2, D2 3& 4)

WALL TR70-BH-111A-6

Data 292'

1G-106-B 1 (COAX) WALL TR70-BH-111A-6

Data 292'

1G-106-C 1 VGI-AP70-B7-E4A4 CLG TR70-BH-111A-6

Data 265'

1G-106-D 1 (UNLABELED) WALL TR70-BH-111A-6

Data 294'

1G-106-AP-A 2 TMO-F01-A19 CLG TR70-BH-111A-6

Data 276'

1G-105-AP-A 2 TMO-F01-A20 CLG TR70-BH-111A-6

Data 293'

1G-105-A 1 (UNLABELED) WALL TR70-BH-111A-6

Data 288'

1G-105-B 5 (1G-105A,V1&V2,D3&D4)(70 ,1H-120,13 1A-107,temp.5,6)

WALL TR70-BH-111A-6

Data 283'

1G-105-C 4 (70,1J-121A,14)(1J-128, V1&2 D3&4)

CLG TR70-1C-106-4

Data 306'

1G-105C-A 1 (UNLABELED) WALL TR70-BH-111A-6

Data 305'

C1-203-AP-A 2 MINAP22-70-1B CLG TR70-1F-119F-4

Grand total: 47 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

P

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :1

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701G

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA G

LOAD

EST. LENGTH PER

PORT

OUTLET DESIGNATOR -

NEW

PORT QTY-

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

1L-118-B 4 (70,1F-119D,17)(1L-1 18,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 138'

1L-119-A 4 (70,1F119D,20)(1L-11 9,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 142'

1L-119-B 1 (UNLABELED) WALL TR70-1F-119F-2

Data 149'

1L-119-C 4 (70,1F119D,14)(1L-12 0,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 147'

1H-114-AP-A 2 TMO-F01-A26 CLG TR70-BH-111A-5

Data 73'

1H-117-D 4 (70,1H-120,8) WALL TR70-BH-111A-5

Data 77'

1H-117-E 2 (UNLABELED) WALL TR70-BH-111A-5

Data 79'

1H-117-F 1 (UNLABELED) WALL TR70-BH-111A-5

Data 86'

1H-117-G 1 (UNLABELED) WALL TR70-BH-111A-5

Data 88'

1H-117-H 2 (UNLABELED) WALL TR70-BH-111A-5

Data 90'

1H-117-J 4 (70,1K-120A,29)(-117, 29,V1&2,D3&4)

WALL TR70-BH-111A-5

Data 73'

1H-117-AP-A 2 MINAP52-70-1B CLG TR70-BH-111A-5

Data 87'

1H-116-A 4 (70-1K-120A,34)(1H-1 16,V1&V2,D3&4)

WALL TR70-BH-111A-5

Data 103'

1H-116-B 4 (70 1K-120A 8)(1H-116 V1&V2 D,A&B)

WALL TR70-BH-111A-5

Data 108'

1H-116-C 2 (UNLABELED) WALL TR70-BH-111A-5

Data 105'

1H-116-D 4 (70,1K-120A,36)(1H-1 16,V1&V2,D3&4)

WALL TR70-BH-111A-5

Data 102'

1H-116-E 2 (UNLABELED) WALL TR70-BH-111A-5

Data 108'

1H-118-AP-A 2 MINAP35-70-1B CLG TR70-BH-111A-5

Data 114'

1L-128C-B 4 (70,1F119D,33)(1L12 8A,V1,2 D3,4)

WALL TR70-1F-119F-2

Security 42'

1F-119F-CAM-01 1 NEWLY INSTALLED

DEVICE, NOT

EXISTING

WALL TR70-1F-119F-2

Grand total: 115

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA G

LOAD

EST. LENGTH PER

PORT

OUTLET DESIGNATOR -

NEW

PORT QTY-

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

1L-129-B 4 (70-1F-119D,025)(1L- 129,V1,V2,D3,D4)

WALL TR70-1F-119F-2

Data 185'

C1-60-AP-A 2 MINAP65-70-1B CLG TR70-1F-119F-2

Data 211'

1L-132-A 4 (1F119D-47)(1L132-V 1&2D3&4)

WALL TR70-1F-119F-2

Data 216'

1L-132-B 4 (70,1F119b-48)(1L132 -V1&2D3&4)

WALL TR70-1F-119F-2

Data 200'

1L-132-C 4 (70,1F119b-49)(1L132 -V1&2D3&4)

WALL TR70-1F-119F-2

Data 84'

1H-117-A 2 (UNLABELED) WALL TR70-BH-111A-5

Data 67'

1H-117-B 1 (70,1H-120,panic)(1H- 117,Panic)

WALL TR70-BH-111A-5

Data 65'

1H-117-C 3 (70,1H-120,59)(1H-11 7,V1,D2&3)

WALL TR70-BH-111A-5

Data 216'

1L-133-A 4 (70,1F119b-49)(1L132 -V1&2D3&4)

WALL TR70-1F-119F-2

Data 201'

1L-133-B 4 (70,1F-119D-26)(1L13 3-V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 285'

1L-102-A 4 (70,1L119D,44)(1L102 V1,2 D3,4)

WALL TR70-1F-119F-2

Data 304'

1L-102-B 4 (70,1L119D,45)(1L-10 2 V1,2 D3,4)

WALL TR70-1F-119F-2

Data 301'

1L-102-C 4 (70,1f-119D,18) WALL TR70-1F-119F-2

Data 298'

1L-102-D 4 (1f,119D-70-v-a,b,51) WALL TR70-1F-119F-2

Data 290'

1L-102-E 2 (70,1f-119D,35)(1L-10 2,d1&2)

WALL TR70-1F-119F-2

Data 159'

C1-61-AP-B 2 TMO-F01-A81 CLG TR70-1F-119F-2

Data 284'

1L-103-A 2 (70,1h-120D,51)(1L-1 03,d1&d2)

WALL TR70-1F-119F-2

Data 291'

1L-103-B 2 (70,1h-120D,50)(1L-1 03,d1&d2)

WALL TR70-1F-119F-2

Data 281'

1L-103-C 4 (70,1f-119D,15)(1L-10 3,v1&v2,d3&d4)

WALL TR70-1F-119F-2

Data 285'

1L-104-A 4 (70,1F-119D-70-V-A,B )(1L-105-4-D-A,B)

WALL TR70-1F-119F-2

Data 275'

1L-105-A 4 (1f-119D-70-V-A,B)(1L -105-4-d-a,b)

WALL TR70-1F-119F-2

Data 256'

1L-108A-A 4 (1F-119D-70-V-A,B)(1 L-108A-5-D-A,B)

WALL TR70-1F-119F-2

Data 259'

1L-108A-B 6 (70,1F119D,32)(1L-10 8-V3&V4,D5&D6)

WALL TR70-1F-119F-2

Data 256'

1L-108A-AP-A 2 MINAP67-70-1B CLG TR70-1F-119F-2

Data 261'

1L-108B-A 6 (70,1F119D-31)(1L-10 8-V3&V4,D5&D6)

WALL TR70-1F-119F-2

Data 250'

1L-108B-B 4 (1F-119D-70-V-A,B)(1 L-108B-6-D-A,B)

WALL TR70-1F-119F-2

Data 243'

1L-109-A 4 (UNLABELED) WALL TR70-1F-119F-2

Data 243'

1L-109-B 2 (1L-109,D1&2)(UNLA

BELED)

WALL TR70-1F-119F-2

Data 241'

1L-109-C 4 (UNLABELED) WALL TR70-1F-119F-2

Data 227'

1L-109-D 4 (70,1F-119D,60)(1L-1 11,V1&V2, D3&D4)

WALL TR70-1F-119F-2

Data 236'

1L-109-E 4 (UNLABELED) WALL TR70-1F-119F-2

Data 196'

1L-112-A 4 (1F-119D-70-V-A,B)(1 L-112-7-D,A&B)

WALL TR70-1F-119F-2

Data 208'

1L-112-B 4 (70,1F119D,21)(70-1L 116)

WALL TR70-1F-119F-2

Data 209'

1L-112-C 6 (70,1F119D,22)(70-1L 116)

WALL TR70-1F-119F-2

Data 204'

1L-113-A 6 (70,1F119D,23)(70-1L 116)(4075)

WALL TR70-1F-119F-2

Data 200'

1L-113-B 4 (70,1F119D-70-V-A,B) (1L-113-9-D-A,B)

WALL TR70-1F-119F-2

Data 190'

C1-61C-A 4 (1F-119D-70-V-A,B)(1 L-112A-8-D-A,B)

WALL TR70-1F-119F-2

Data 175'

1L-114-A 4 (70,1F-119D,70-V-A,B )(1L-114-10-D-A,B)

WALL TR70-1F-119F-2

Data 172'

1L-114-B 4 (70,1F-119D,27)(1L-1 14,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 179'

1L-115-A 4 (1F-119D-70-V-A,B)(1 L-115-11-D-A,B)

WALL TR70-1F-119F-2

Data 183'

1L-115-B 4 (7,1F119D,25)(70-1L- 118)

WALL TR70-1F-119F-2

Data 185'

1L-115-C 6 (70,1F119D,24)(70-1L -118)

WALL TR70-1F-119F-2

Data 182'

1L-115-AP-A 2 MINAP72-70-1B CLG TR70-1F-119F-2

Data 187'

1L-116-A 4 (70,1F-119D,29)(70-1 L119)

WALL TR70-1F-119F-2

Data 179'

1L-116-B 4 (1F-119D-70-V-A,B)(1 L-116-12-D-A,B)

WALL TR70-1F-119F-2

Data 168'

1L-117-A 4 (1F-119D-70-V-A,B)(1 L-117-13-D-A,B)

WALL TR70-1F-119F-2

Data 163'

1L-118-A 4 (1L-118-14-D-A,B)(1F- 119D-70-V-A,B)

WALL TR70-1F-119F-2

Data 135'

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA G

LOAD

EST. LENGTH PER

PORT

OUTLET DESIGNATOR -

NEW

PORT QTY-

EXISTING

OUTLET DESIGNATOR -

EXISTING MOUNTING TYPE RACK ID

Data 101'

1F-119-AP-A 2 (UNLABELED) CLG TR70-1F-119F-2

Data 126'

C1-56A-A 2 (70,1F-119B,58)(1F-1 18A,D 1&2)

WALL TR70-1F-119F-1

Data 106'

C1-57-AP-A 2 MINAP70-70-1B CLG TR70-1F-119F-1

Data 115'

6-AP-A 2 MINAP95-70-1B CLG TR70-1F-119F-1

Data 111'

1L-124-A 4 (70,1F-119D,19)(1L-1 24,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 110'

1L-125-A 4 (UNLABELED) WALL TR70-1F-119F-2

Data 99'

1L-125-B 4 (UNLABELED) WALL TR70-1F-119F-2

Data 97'

1L-126-A 4 (70,1F-119d,8)(1L-126 , V1&2, D3&4)

WALL TR70-1F-119F-2

Data 131'

1L-127-A 4 (70,1F119d,17)(70,1L 27)

WALL TR70-1F-119F-2

Data 143'

1L-127-B 4 (70,1F119d,18)(70,1L 127)

WALL TR70-1F-119F-2

Data 135'

1L-127-AP-A 2 MINAP69-70-1B CLG TR70-1F-119F-2

Data 142'

1L-128C-A 4 (70,1F119d,19)(70,1L 28,)

WALL TR70-1F-119F-2

Data 155'

1L-128B-A 4 (70,1F119D,34)(1L28 B V1,2 D3,4)

WALL TR70-1F-119F-2

Data 171'

1L-128B-B 4 (70,1F119d,20)(70,1L 128,)

WALL TR70-1F-119F-2

Data 204'

1L-130-A 4 (70-1F-119D,16A&B)( 1L-130,V1&2,D3&4)

WALL TR70-1F-119F-2

Data 192'

1L-130-AP-A 2 MINAP68-70-1B CLG TR70-1F-119F-2

Data 205'

1L-134B-A 4 (70,1L119D,35)(1L131 B V1,2 D3,4)

WALL TR70-1F-119F-2

Data 208'

1L-134C-A 4 (70,1L119D,36)(1L131 C V1,2D3,4)

WALL TR70-1F-119F-2

Data 236'

1L-135-A 4 (70,1L119D,37)(1L134 V1,2D3,4)

WALL TR70-1F-119F-2

Data 245'

1L-136-A 4 (70,1L119D,38)(1L135 V1,2D3,4)

WALL TR70-1F-119F-2

Data 260'

1L-137-A 4 (UNLABELED)(1L136

V1,2D3,4)

WALL TR70-1F-119F-2

Data 271'

1L-138-A 4 (70,1L119D,40)(1L137 B V1,2D3,4)

WALL TR70-1F-119F-2

Data 232'

1L-139-A 4 (1L137A V1,2D3,4)(70,1L119D, 41)

WALL TR70-1F-119F-2

Data 241'

1L-140-A 4 (1L-138, V1&2, D3&4)(70, 1F-119d,10)

WALL TR70-1F-119F-2

Data 256'

1L-140-B 4 (70,1L119D,42)(1L38 V1,2 D3,4)

WALL TR70-1F-119F-2

Data 259'

KEYPAD 1 (KEYPAD) WALL TR70-1F-119F-2

Data 274'

1L-141-A 4 (70,1F-119D,59)(1L-1 41,V1&V2,D3&D4)

WALL TR70-1F-119F-2

Data 279'

1L-141-B 4 (70 1F119D 13)(1L-141,V1&V2,D3 &D4)

WALL TR70-1F-119F-2

Data 269'

1L-141-C 4 (70,1L-119D,43)(1L10 1 V1,2 D3,4)

WALL TR70-1F-119F-2

Data 277'

C1-61-AP-A 2 TMO-F01-A16 CLG TR70-1F-119F-2

Data 236'

1L-107-A 4 (70,1f-119D,22)(L-107 ,v1&v2,d3&d4)

WALL TR70-1F-119F-2

Data 245'

1L-107-B 4 (70,1f-119D,3)(1L-107 ,v1&v2,d3&d4)

WALL TR70-1F-119F-2

Data 255'

1L-107-C 4 (70,1f-119D,24)(L-107 ,v1&v2,d3&d4)

WALL TR70-1F-119F-2

Data 223'

1L-113-A 4 (70-1F-119D-51)(1L-1 13,V1&2,D3&4)

WALL TR70-1F-119F-2

Data 194'

1L-110-A 4 (70,1f-119,4)(L-115,v1 &2,d3&4)

WALL TR70-1F-119F-2

Data 179'

1L-111-A 2 (70,1F-119D,30)(1L-1 11,D,A&B)

WALL TR70-1F-119F-2

Data 161'

1L-121-A 2 (2612) WALL TR70-1F-119F-2

Data 157'

1L-121-B 4 (70,1F-119D,5)(1L-12 1,V1&V2, D3&D4)

WALL TR70-1F-119F-2

Data 153'

1L-121-C 2 (2613) WALL TR70-1F-119F-2

Data 147'

1L-122-A 2 (5489) WALL TR70-1F-119F-2

Data 155'

1L-122-B 2 (2611) WALL TR70-1F-119F-2

Data 155'

1L-122-C 4 (70,1F-119D,6)(1L-12 2,V1&V2, D3&D4)

WALL TR70-1F-119F-2

Data 148'

1L-122-AP-A 2 MINAP71--70-1B CLG TR70-1F-119F-2

Data 132'

1L-123-A 4 (70,1F-119D,7)(1L/12 3,V1&2,D3&4)

WALL TR70-1F-119F-2

Data 130'

1L-123-B 2 (6117) WALL TR70-1F-119F-2

Data 128'

1L-123-C 1 (PANIC

ALARM)(BH105)

WALL TR70-1F-119F-2

Data 117'

C1-59-AP-A 2 TMO-F01-A15 CLG TR70-1F-119F-2

Data 163'

1L-129-A 4 (70-1F-119D,001)(1L- 129,V1,V2,D3,D4)

WALL TR70-1F-119F-2

Data 169' ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

P

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :2

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70T-701H

TELECOMMUNICATION SCHEDULES

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CABLING COMMENTS:

1. MAXIMUM ALLOWABLE CABLE LENGTH SHALL NOT EXCEED 100 METERS / 328 FEET.

2. WHEREVER POSSIBLE A MAXIMUM OF 260 FEET HAS BEEN UTILIZED TO ALLOW FOR FUTURE EXPANSION/SLACK LOOP.

DATA DEVICE AND CIRCUIT SCHEDULE - FIRST LEVEL AREA H

LOAD EST. LENGTH PER PORT

OUTLET DESIGNATOR -

NEW

PORT QUANTITIES -

EXISTING OUTLET DESIGNATOR - EXISTING MOUNTING TYPE RACK ID

Data 294'

1K-124-B 1 (UNLABELED) WALL TR70-BH-111A-7

Data 269'

1K-120-A 2 (UNLABELED) WALL TR70-BH-111A-7

Data 270'

1K-123-A 4 (70,1K120A 14)(1K123, V1&2, D3&4)

WALL TR70-BH-111A-7

Data 283'

1K-123-B 2 (UNLABELED) WALL TR70-BH-111A-7

Data 290'

1K-123-C 1 (UNLABELED) WALL TR70-BH-111A-7

Data 292'

1K-124-A 4 (70,1K-120A, 37)(1K-124, V1&2, D3&4)

WALL TR70-BH-111A-7

Data 288'

1K-124-C 4 (70,1K:120A, 25)(1K-124, V1&2, D3&4)

WALL TR70-BH-111A-7

Data 272'

1K-119-A 4 (70,1K-120A 13)(1K119, V1&2, DA&B)

WALL TR70-BH-111A-7

Data 261'

1K-119-B 4 (70,1K-120A, 25)(1K-119, V1&2, D3&4)

WALL TR70-BH-111A-7

Data 283'

1K-118-A 4 (70,1K-120A, 18)(1K-117, V1, PANIC, DA&B)

WALL TR70-BH-111A-7

Data 261'

1K-122-A 4 (UNLABELED) WALL TR70-BH-111A-7

Data 259'

1K-122-B CORNING M1M-1 CLG TR70-BH-111A-7

Data 245'

1K-121-A 2 (UNLABELED) WALL TR70-BH-111A-7

Data 234'

1K-121-B 4 (70,1K-120A, 3)(1K-121, V1&2, D3&4)

WALL TR70-BH-111A-7

Data 237'

1K-121-C 2 (UNLABELED) WALL TR70-BH-111A-7

Data 239'

1K-121-D 1 (UNLABELED) WALL TR70-BH-111A-7

Data 228'

1K-127-A 4 (70,1K-120A, 33)(1K-127, V1, D2&3)

WALL TR70-BH-111A-7

Data 222'

1K-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .