This document describes a federal contract opportunity for construction design and infrastructure upgrades at the Minneapolis VA Medical Center. The project involves building infrastructure to support the nationwide Electronic Health Record Modernization initiative, including constructing a new server room on the hospital roof. The solicitation will be issued as a request for proposal evaluated according to FAR Parts 15, 19, and 36. It is set aside for Service-Disabled Veteran-Owned Small Businesses only, with a North American Industry Classification System code of 236220 and size standard of $39.5 million. The period of performance is approximately 450 calendar days from notice to proceed. The magnitude of construction is estimated between $20-50 million. All questions must be submitted in writing to the issuing office by the specified date.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CR
E
SDCRXOS
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
CB32BCB32B
BG-101BG-101
BM-131BM-131
BM-123BBM-123B
BM-123CBM-123C
BM-123EBM-123E
BM-123GBM-123G BM-123HBM-123H
BM-123BM-123
BH-111CBH-111C
BP-123LBP-123L
BM-101BM-101
BM-102BM-102
BM-103BM-103
BM-104BM-104
BM-105BM-105
BM-107BM-107
BM-108BM-108
BM-108ABM-108A
BM-109BM-109
BM-110BM-110
BM-111BM-111
BM-112BM-112BM-113BM-113
BM-114BM-114
BM-115BM-115
BM-116BM-116
BM-117BM-117
BM-118BM-118
BM-119BM-119
BM-120BM-120
BM-121BM-121
BM-122BM-122
TELECOM
ROOM
(BLUE-STACK)
BM-122ABM-122A
BA-101BA-101
BA-102BA-102
TELECOM
ROOM
BA-103BA-103
ELECTRICAL
ROOM
BA-104BA-104
BA-105BA-105
BA-106BA-106
BA-107BA-107
BM-116ABM-116ABM-116BBM-116B
BM-116CBM-116CBM-116DBM-116D
BM-124BM-124
BM-125BM-125
BM-126BM-126
BM-127BM-127
FF
CB-86CB-86
BM-111ABM-111A
BM-111BBM-111B
BM-111CBM-111C
BM-111DBM-111D
BM-111EBM-111E
BM-119ABM-119A
BM-119BBM-119B BM-119CBM-119C
BM-119DBM-119D
BM-119EBM-119E
BS-7BS-7
M3M3
M2M2
BM-107ABM-107A
BM-107BBM-107B
BM-107CBM-107C
BM-107DBM-107D
C10C10
M9M9
CB-87CB-87
CB-88CB-88
CB-89CB-89CB-90CB-90
CB-92ACB-92A
BH-111DBH-111D
CB31CB31GG
BH-111EBH-111E
BN-101BN-101
BN-105BN-105
BN-106BN-106 BN-107BN-107
AA
CB-101CB-101
BP-105BP-105
ELECTRICAL
ROOM
BP-107BP-107
BP-105ABP-105A
TELECOM
ROOM
BP-107ABP-107A
70E-402
F4
70E-402
F7 on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :2
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-100K
ELECTRICAL PLAN - BASEMENT LEVEL AREA
K
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
ELECTRICAL PLAN - BASEMENT
LEVEL AREA K
05/06/2022
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
CB-3CB-3
BB-122BB-122
BB-128BB-128
BB-129BB-129
BB-130BB-130
BB-131BB-131
BB-132BB-132
ELECTRICAL
ROOM
BT-101BT-101
TELECOM
ROOM
BT-102BT-102
BA-119BA-119 BA-119ABA-119A
BA-110BA-110
BF-123BF-123
TELECOM
ROOM
BA-111BA-111
ELECTRICAL
ROOM
BA-112BA-112
BA-109BA-109
CB32BCB32B
BM-101BM-101
BM-117BM-117
BM-118BM-118
BM-119BM-119
BM-120BM-120
BM-121BM-121
BM-122BM-122
BA-101BA-101
BA-102BA-102
TELECOM
ROOM
BA-103BA-103
ELECTRICAL
ROOM
BA-104BA-104
BA-105BA-105
BA-106BA-106
BA-107BA-107
FF
CB-86CB-86
BM-119BBM-119B BM-119CBM-119C
BM-119DBM-119D
BM-119EBM-119E
BS-7BS-7
M2M2
BM-107ABM-107A
C10C10
M9M9
CB32ACB32A
BH-111DBH-111D
CB31CB31
GG
BH-111EBH-111E
CB-79CB-79
BN-101BN-101
TELECOM
ROOM
BN-102BN-102
BN-104BN-104
BN-105BN-105
BN-106BN-106 BN-107BN-107
CB-86ACB-86A
CB-85CB-85
BS-10BS-10
CB-81CB-81
BQ-101BQ-101
BQ-102BQ-102
BQ-103BQ-103
BQ-104BQ-104
BQ-105BQ-105
BQ-106BQ-106
BQ-107BQ-107
BQ-108BQ-108
BQ-109BQ-109
BQ-111BQ-111
BQ-112BQ-112
BQ-113BQ-113
BQ-114BQ-114
BQ-111ABQ-111A
BR-101HBR-101H
BR-101EBR-101E
BR-101FBR-101F
BR-105BR-105
BR-106BR-106
BR-107BR-107
BR-108BR-108
BR-109BR-109
BR-110BR-110
BR-111BR-111
BR-113BR-113
BR-114BR-114BR-115BR-115 BR-116BR-116
BR-118BR-118
BR-118BBR-118B
BR-101BBR-101B
BR-101CBR-101C
BR-101BR-101
BR-101DBR-101D
BR-118ABR-118A
BR-119ABR-119A
BR-120BR-120
BR-126BR-126
BR-125BR-125
BR-126BR-126 BR-130BR-130
BR-131BR-131
BR-132BR-132BR-133BR-133
BR-134BR-134
BR-135BR-135
BR-136BR-136
BR-137BR-137
BR-138BR-138
BR-139BR-139
BR-140BR-140
BR-141BR-141
BR-142BR-142
BR-143BR-143
BR-144BR-144
BR-145BR-145
BR-146BR-146
BR-147BR-147
BR-145BBR-145B
BR-140ABR-140A
BR-140BBR-140B
BR-140CBR-140C
BR-148BR-148
BR-135ABR-135A
BR-135BBR-135B
BR-136ABR-136A
ELECTRICAL
ROOM
BT-103BT-103
TELECOM
ROOM
BT-104BT-104
BR-118BBR-118B BA-108BA-108
CB-71CB-71
CB-72CB-72CB-73CB-73
CB-74CB-74
CB-75CB-75
CB-76CB-76
CB-16CB-16
BB
AA
BH-111FBH-111F
M-4M-4
BH-111GBH-111G
CB-79CB-79
ELECTRICAL
ROOM
BN-103BN-103
CB-86ACB-86A CB-81CB-81
BQ-101BQ-101
BQ-102BQ-102
BR-108BR-108
BR-125BR-125
BR-145BR-145
BR-146BR-146
BR-148BR-148
CB-75CB-75
BV-103BV-103
BV-104BV-104
BV-105BV-105
BV-106BV-106
BV-124BV-124
BV-125BV-125
BV-126BV-126
BV-127BV-127
BV-106ABV-106A
BV-104ABV-104A
BV-104BBV-104B
BV-105CBV-105C
CB-57CB-57
CB-58CB-58
CB-61CB-61
CB-67CB-67
CB-69CB-69
CB-70CB-70
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :4
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-100L
ELECTRICAL PLAN - BASEMENT LEVEL AREA
L
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
ELECTRICAL PLAN - BASEMENT
LEVEL AREA L
C R
ES R
X
D
CO
S
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
BU-102BU-102
CB-2CB-2
BB-128BB-128
BB-129BB-129
BB-130BB-130
BB-131BB-131
BB-132BB-132
BQ-105BQ-105
BQ-106BQ-106
BQ-107BQ-107
BQ-108BQ-108
BQ-109BQ-109
BQ-111BQ-111
BQ-112BQ-112
BQ-113BQ-113
BQ-114BQ-114
BQ-111ABQ-111A
BR-105BR-105
BR-106BR-106
BR-107BR-107
BR-108BR-108
BR-109BR-109
BR-110BR-110
BR-111BR-111
BR-126BR-126 BR-130BR-130
BR-131BR-131
BR-132BR-132BR-133BR-133
BR-134BR-134
BR-135BR-135
BR-136BR-136
BR-147BR-147
BR-135ABR-135A
BR-135BBR-135B
BR-136ABR-136A
ELECTRICAL
ROOM
BT-103BT-103
TELECOM
ROOM
BT-104BT-104
BR-108BR-108
BQ-110BQ-110
BQ-110ABQ-110A
TELECOM
ROOM
BQ-110BBQ-110B
ELECTRICAL
ROOM
BQ-110CBQ-110C
TELECOM
ROOM
BQ-110DBQ-110D
ELECTRICAL
ROOM
BQ-110EBQ-110E
TELECOM
ROOM
BQ-110FBQ-110F
ELECTRICAL
ROOM
BQ-110GBQ-110G
BV-101BV-101
BV-103BV-103
BV-104BV-104
BV-105BV-105
BV-106BV-106
BV-107BV-107
BV-108ABV-108A
BV-109BV-109
BV-112BV-112
BV-113BV-113
BV-114BV-114
BV-115BV-115
BV-116BV-116
BV-117BV-117
BV-118BV-118
BV-119BV-119
BV-120BV-120BV-121BV-121BV-122BV-122
BV-123BV-123
BV-124BV-124
BV-125BV-125
BV-126BV-126
BV-127BV-127
BV-128BV-128
BV-129BV-129
BV-130BV-130
BV-131BV-131
BV-132BV-132
M-5M-5
TELECOM
ROOM
BT-105BT-105
ELECTRICAL
ROOM
BT-106BT-106
BT-107BT-107
BT-108BT-108
BV-101ABV-101A
BV-101BBV-101BBV-101CBV-101C
BV-101DBV-101DBV-101EBV-101E
BV-101FBV-101F
BV-101GBV-101G
BV-101HBV-101H
BV-101IBV-101I
BV-101JBV-101J
BW-100BW-100
BV-111BV-111
BV-106ABV-106A
BV-106BBV-106B
BV-106CBV-106C
BV-106DBV-106D
BV-104ABV-104A
BV-104BBV-104B
BV-104CBV-104C
BV-104DBV-104D
BV-105ABV-105A BV-105BBV-105B
BV-105CBV-105C
BV-107ABV-107A
BV-107BBV-107B
BV-108BBV-108B
BV-124ABV-124A
BV-114ABV-114A
CB-57CB-57
CB-58CB-58
CB-60CB-60
CB-61CB-61
CB-62CB-62
CB-64CB-64
CB-65CB-65
CB-66CB-66
CB-67CB-67
CB-68CB-68
CB-69CB-69
CB-70CB-70
TELECOM
ROOM
(YELLOW-STACK)
BQ-110HBQ-110H
70E-402
C4
70E-402
C7 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :5
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-100M
ELECTRICAL PLAN - BASEMENT LEVEL AREA
M
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
ELECTRICAL PLAN - BASEMENT
LEVEL AREA M
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
BM-128BM-128
BP-123LBP-123L
BN-105BN-105
CB-101CB-101
CB-102CB-102
BP-101BP-101
BP-102BP-102
BP-103BP-103
BP-104BP-104
BP-105BP-105BP-106BP-106
ELECTRICAL
ROOM
BP-107BP-107
BP-108BP-108
BP-109BP-109
BP-110BP-110
BP-111BP-111
BP-112ABP-112A
BP-112BP-112
BP-113BP-113
BP-114BP-114
BP-115BP-115
BP-116BP-116
BP-105ABP-105ABP-106ABP-106A
BP-104ABP-104A
BS-11BS-11
BP-118BP-118
TELECOM
ROOM
BP-107ABP-107A
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :1
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-100N
ELECTRICAL PLAN - BASEMENT LEVEL AREA
N
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F6
ELECTRICAL PLAN - BASEMENT
LEVEL AREA N
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
TELECOM
ROOM
BQ-110BBQ-110B
ELECTRICAL
ROOM
BQ-110CBQ-110C
BV-112BV-112BV-114BV-114BV-116BV-116BV-130BV-130
BV-132BV-132
BV-101FBV-101F
BV-101GBV-101G
BV-101HBV-101H
BW-100BW-100
BV-114ABV-114A
CB-62CB-62
CB-64CB-64
CB-68ACB-68A
BW-101BW-101
BW-102BW-102
BW-103BW-103
BW-103ABW-103A
BW-103BBW-103B
BW-106BW-106 BW-107BW-107
BW-108BW-108
BW-109BW-109
BW-110BW-110
BW-114BW-114BW-115BW-115
BW-116BW-116
BW-117BW-117BW-118BW-118
BW-119BW-119
BW-120BW-120
BW-121BW-121
BW-122BW-122
BW-123BW-123
BW-124BW-124
BW-125BW-125
BW-126BW-126
BW-127BW-127
BW-129BW-129
BW-128BBW-128B
BW-135BW-135 BW-136BW-136
BW-137BW-137
BW-138BW-138
BW-139BW-139
BW-140BW-140
BW-141BW-141
CB-68BCB-68B CB-62ACB-62A
CB-68CCB-68CCB-68DCB-68D
BW-118ABW-118A
BW-118DBW-118D
BW-117ABW-117A
BW-117BBW-117B
BW-138ABW-138A
BW-139ABW-139A
CB-62BCB-62B
BW-101ABW-101A
BW-101BBW-101B
BW-101CBW-101C
BW-101DBW-101D
BW-101EBW-101E
BW-101FBW-101F
BW-101GBW-101G
BW-101HBW-101H
BW-142BW-142
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :2
P
M
05/06/2022 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-100P
ELECTRICAL PLAN - BASEMENT LEVEL AREA
P
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. SUB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
20. ELECTRICAL GUTTER. REFER TO SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
21. PROVIDE NEW EMERGENCY AND NORMAL POWER JUNCTION BOX FOR 60A
120/208 TPST CIRCUIT BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW
CONDUIT, CONDUCTORS AND DEVICES.
22. NEW PSX-75-E1 POWER SOLUTIONS BACKUP POWER SUPPLY FOR iSTAR DOOR
CONTROLLERS. PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS
RECOMMENDATIONS.
23. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE.
24. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH
EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
25. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION
WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS
FOR ADDITIONAL INFORMATION.
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-501.
G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
M. REFER TO E-901 FOR CUTSHEETS.
N. COMPLY WITH NEC 220.81 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS. SUBMIT LOAD MEASUREMENT REPORTS TO EEOR
PRIOR TO BEGINNING OF CONSTRUCTION.
O. LOCATED DISCONNECT SWITCHES TO MAINTAIN WORKING
CLEARANCES PER NEC 110.26.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F5
ELECTRICAL PLAN - BASEMENT
LEVEL AREA P
O
SES
C R
R
XD
C
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
C1-3C1-3
C1-2C1-2
C1-1C1-1
CC
C1-4C1-4
1U-1001U-100
1U-100A1U-100A
C1-6C1-6
1S-1341S-134
C1-186C1-186
C1-2AC1-2A
1U-1051U-105
1U-1061U-106 1U-1071U-107 1U-1081U-108 1U-1101U-110
C1-12C1-12
1U-1011U-101
TELECOM
ROOM
(GREEN-STACK)
1U-1041U-104
1U-100B1U-100B 1U-101A1U-101A
1C-71C-7
1U-1331U-133
C1-14C1-14
1U-1321U-132
1U-1311U-131 1U-1291U-129 1U-1281U-128 1U-1271U-127 1U-1261U-126
1U-1221U-122 1U-1301U-130
1U-1201U-120
1U-130A1U-130A
1U-109A1U-109A
1U-1091U-109 1U-1131U-1131U-1121U-112
1U-1191U-119
C1-13C1-13
1U-1111U-111
1U-1141U-114
1U-1151U-115
1U-1161U-116
C1-12AC1-12A
1U-1171U-117 1U-1441U-144
1U-1421U-142
1U-1181U-118
1U-1211U-121 1U-1381U-138
1U-1371U-137
1U-1231U-123
1U-1241U-124 1U-1361U-136
1U-1251U-125
1U-1351U-135
C1-15C1-15
1S-1361S-136
C1-5aC1-5a 1S-1381S-138 1S-1291S-129
1S-1301S-130 1S-1311S-131 1616 1S-1331S-133
1S-126A1S-126A
1S-1321S-132
1S-1261S-126
1S-1251S-125
1S-1271S-127
1S-127A1S-127A
1S-127B1S-127B
1S-121A1S-121A
C1-187C1-187
1S-1211S-121
1S-114A1S-114A
1S-125A1S-125A
1S-1201S-120
1S-1191S-119
1S-1181S-1181S-1171S-1171S-1161S-1161S-1151S-115
1S-1351S-135 1S-1371S-137
C1-5C1-5 M-6M-6
1U-1461U-146
1U-1471U-147 1U-1491U-149
1U-1511U-151
1S-127H1S-127H
1S-91S-9
C1-20AC1-20A
C1-20C1-20
1U-1431U-143 1U-1481U-148 1U-1501U-150
C1-21C1-21
1U-1551U-1551U-1401U-140
C1-19C1-19
1U -1
1U
-1
1U-1591U-159 1U-1581U-158
1U-1571U-157
1U-1561U-156 ELECTRIC
ROOM
1U-1531U-153
TELECOM
ROOM
1U-1521U-152
C1-23C1-23C1-17C1-17
C1-16C1-16
C1-24C1-24
1D-1201D-120
C1-22C1-22
1D-120A1D-120A
ELECTRIC
ROOM
1D-120B1D-120B
TELECOM
ROOM
1D-120C1D-120C
C1-35C1-35
C1-167C1-167
1R-2501R-250
1S-1281S-128
C1-192C1-192
1S-1121S-112
1S-1001S-100
1S -1
1S
-1
1S-1071S-107
1S-1091S-109
C1-191C1-191
1S-1231S-123
1S-1101S-110
1S-1061S-106
C1-193C1-193
C1-193AC1-193A
1U-1621U-162
1U-162A1U-162A
1U-162B1U-162B C1-34AC1-34A
1D-121A1D-121A
1D-1211D-121
1D-1221D-122C1-34C1-34
1D-1171D-117
1D-1151D-115
1D-1141D-114
1D-1161D-116
1D-1181D-118
1D-1231D-123
1D-122A1D-122A 1D-115A1D-115A
C1-36C1-36
C1-32C1-32
1D-116A1D-116A
1D-1251D-125
1D-1241D-124
1D-124A1D-124A
1D-125A1D-125A
1D-112A1D-112A
1D-1131D-113
1D-113A1D-113A
1D-1111D-111
1D-1121D-112
1D-1091D-109
C1-38C1-38
1D -1
1D
-1
1D-1261D-126
1D-1271D-127
1D-1301D-130
1D-1321D-132
1D-127A1D-127A
1D-1281D-128
1D-1081D-108
1D-1291D-129
1D-1061D-106 1D-1311D-131
1D-1331D-133 1D-135A1D-135A
1D-1051D-105
1D-1071D-107
1D-107A1D-107A
1T-1051T-105
ELECTRIC
ROOM
1T-1031T-103
TELECOM
ROOM
1T-1041T-104
1R-1091R-109
1R-1081R-108
1S-1431S-143
1S-1441S-144
1S-21S-2
C1-194C1-194
C1-181C1-181
1V-1461V-146
1S-11S-1
ELECTRIC
ROOM
1T-1081T-108
TELECOM
ROOM
1T-1071T-107
M-5M-5
C1-185AC1-185A
C1-3AC1-3A
1V-1511V-151
C1-183AC1-183A
1V-152A1V-152A
1V-1521V-152
1V-151A1V-151A
1V-1501V-150 1V-1471V-147
70E-411
F7
70E-411
F4 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:2 :0
P
M
11/05/2021 M. Perkins K.Hutchinson
618-21-700
1383 - 70E-101A
ELECTRICAL PLAN - FIRST LEVEL AREA A
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
1. UNLESS OTHERWISE NOTED, REMOVE ALL EXISTING ELECTRICAL DEVICES
ASSOCIATED WITH THE AREA OF WORK FROM ENDPOINT DEVICE TO
ASSOCIATED SOURCE PANEL TO PREPARE THE SPACE FOR RENOVATION. ALL
DEVICES / CIRCUITS NOT ASSOCIATED WITH THE LOCAL DEMOLITION SHALL BE
PROTECTED AND ENSURE THAT CIRCUITS REMAIN IN SERVICE AS PER
CONDITIONS PRIOR TO DEMOLITION. ALL DEMOLITION / PHASING SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE NEW 20"x4" PRIMARY BONDING BUSBAR (PBB) ON GROUND LEVEL AND 12"x4" SECONDARY BONDING BUSBAR (SBB) FOR ALL OTHER LEVELS. PROVIDE
SET OF INSULATORS STAND-OFF BRACKETS AND STAINLESS STEEL SCREWS.
PROVIDE ALL GROUNDING CABLE AND CONNECTORS AND INSTALL PER TYPICAL
DETAIL ON T-500 SERIES SHEETS.
3. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V CIRCUIT AND
RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS.
4. PROVIDE NEW EMERGENCY AND NORMAL BRANCH 20A 120/208 TPST CIRCUIT
BREAKER FOR EACH RACK UPS CIRCUIT. PROVIDE NEW CONDUIT,
CONDUCTORS AND DEVICES TO SUPPLY EACH NEW L21-20R RECEPTACLE.
5. WIRE NEW LUMINAIRES TYPE L1 TO THE EXISTING LIGHTING CIRCUIT. WIRE
LIGHTS TO THE NEW WALL MOUNTED OCCUPANCY SENSOR AT THE CLOSET
ENTRANCE. PROVIDE AUTO ON/ AUTO OFF LIGHTING CONTROL SCHEME.
COORDINATE FIXTURES WITH OVERHEAD CABLE TRAY. REFERENCE
CUTSHEETS ON 70E-901.
6. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 COMPLIANT,
CARD READER WITH PINPAD CARD, PIV READY. REFERENCE CUTSHEETS ON
70E-901.
7. PROVIDE NEW MECHANICAL INDOOR UNIT WITH NEW DISCONNECT SWITCHES
SIZED PER MANUFACTURERS REQUIREMENTS. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8. 8UB-METERING OF NEW DEDICATED ROOM AIR CONDITIONING, NON-IT LOAD
ONLY. PANEL SERVING UNIT SHALL BE EQUIPPED WITH NEW MONITORED
POWER METER. BASIS OF DESIGN: E-MON D-MON.
9. SUB-METERING OF NEW DEDICATED TR, IT LOAD ONLY. PANEL SERVING TR
SHALL BE EQUIPPED WITH NEW MONITORED POWER METER. BASIS OF DESIGN:
E-MON D-MON.
10. NOT USED.
11. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE.
12. REMOVE EXISTING ACCESS CONTROLS.
13. NOT USED.
14. REMOVE EXISTING LIGHT FIXTURES.
15. NOT USED.
16. NOT USED.
17. NOT USED.
18. NOT USED.
19. PROVIDE A 30 DAY LOAD…