This document summarizes a federal solicitation for construction services. The solicitation is being issued by the Department of Veterans Affairs to upgrade infrastructure at the Minneapolis VA Medical Center in support of an Electronic Health Record Modernization project. The solicitation will be a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. The opportunity is set aside solely for Service-Disabled Veteran-Owned Small Businesses. The construction work includes building a new server room and infrastructure throughout the medical center to support the EHR modernization. The period of performance is approximately 450 calendar days with a magnitude of construction estimated between $20-50 million. Questions regarding the solicitation must be submitted in writing to the point of contact by the specified date.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-29-32.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

PARTITION RATING GRAPHICS:

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

C1-196C1-196

C1-199C1-199

C1-200C1-200

1A-1051A-105

1A-1041A-104

AA

1G-1131G-113

1G-1121G-112

C1-136C1-136 C1-138C1-138

1R-1131R-113

1R-1111R-111

1T-1051T-105

ELECTRIC

ROOM

1T-1031T-103

1R-1091R-109

1R-1081R-108

1S-1431S-143

1S-1421S-142

1S-1441S-144

1S-1411S-141

1S-1401S-140

1S-141A1S-141A

1R-105C1R-105C1R-1061R-106

1R-1031R-103 1R-1041R-104

M-4M-4

1R-105B1R-105B

1R-105A1R-105A

1R-1051R-105

CAGE

1R-1091R-109

1R-1071R-107

C1-147C1-147

1R-1021R-102

1S-21S-2

C1-139C1-139

C1-143C1-143C1-142C1-142C1-141C1-141CA-140CA-140

1R-1251R-125

1R-125A1R-125A

1R-1261R-126

1R-1321R-1321R-1341R-134

1R-1361R-136 1R-1391R-139

1R-141A1R-141A1R-1411R-141

1R-1421R-142

1R-1581R-158

1R-1401R-140

1Q-1121Q-112

1Q-1111Q-111

1Q-1101Q-110

1Q-1091Q-109

1Q-1071Q-107

1Q-1051Q-105

1Q-1061Q-106

C1-129AC1-129A

C1-129BC1-129B

1Q-1031Q-103

1Q-1041Q-104

1Q-108A1Q-108A

1Q-1081Q-108

1Q-1021Q-102

1Q-1011Q-101

1R-143A1R-143A

1R-146A1R-146A

TOILET

1R-1431R-143

1R-1451R-145

1R-1461R-146

C1-133C1-133

1R-1381R-138

C1-129C1-129

C1-132C1-132 1R-1331R-133

1R-1311R-131

C1-131C1-131

1R-1271R-127

C1-130C1-1301R-1351R-135

1R-128A1R-128A

1R-1281R-128

C1-146AC1-146A

C1-144C1-144

1R-1171R-117

1R-1181R-118

1R-1191R-119

1R-1201R-120

1R-1211R-121

1R-1221R-122

1R-1231R-123

1R-1241R-124

C1-145C1-145

C1-117C1-117

ELECTRIC

ROOM

1N-1031N-103

TELECOM

ROOM

1N-1021N-102

2727 1S-101S-10

1N-1011N-101

C1-115C1-115

1S-81S-8FF

TELECOM

ROOM

(BLUE-STACK)

C1-111C1-111

C1-116C1-116

C1-118C1-118

1M-1251M-125

1M-1221M-122

1M-1211M-121

1M-120A1M-120A

TOILET

1M-1201M-120 C1-124C1-124

1M-1191M-119

1M-1231M-123

C1-120C1-120

1M-124A1M-124A 1M-124B1M-124B 1M-124C1M-124C 1M-124D1M-124D 1M-1261M-126 1M-1271M-127 1M-1061M-106

C1-127C1-127

1M-1051M-105

1M-1071M-107

C1-125AC1-125A1M-112A1M-112A

1M-1121M-112

1M-1141M-114

1M-114A1M-114A

1M-1031M-103

1M-1041M-104

1M-1081M-108

1M-1091M-109

1M-1101M-110

1M-1111M-111

C1-148C1-148

C1-149C1-149

1M-1131M-113

1M-1151M-1151M-1161M-116

1M-1171M-117

1M-116A1M-116A 1M-115A1M-115A

1M-1181M-118

1M-123A1M-123A

C1-126C1-126

C1-126AC1-126A

1M-118B1M-118B

1M-118A1M-118A

1M-124E1M-124E

1M-124F1M-124F 1M-124G1M-124G

1M-1241M-124 1M-106A1M-106A

M-9M-9

1M-119A1M-119A

C1-123C1-123

C1-125C1-125

1M-111A1M-111A

1S-71S-7

ELECTRIC

ROOM

1M-1021M-102 1A-1021A-102

1A-1031A-103

M-3M-3

M-2M-2

TELECOM

ROOM

1M-1011M-101

C-10C-10 1A-1011A-101

C-9C-9

C1-112C1-112

C1-194C1-194

C1-194AC1-194A

M-10M-10

GG

1Q-100F1Q-100F

1Q-100G1Q-100G

1Q-100E1Q-100E

1Q-100D1Q-100D

1Q-100H1Q-100H

1Q-100A1Q-100A

1Q-100B1Q-100B

1Q-1001Q-100

1Q-100C1Q-100C

1R-1301R-130

1R-137B1R-137B

C1-134C1-134

1R-137C1R-137C

1R-1371R-137

1J-1561J-156

1R-1291R-129

1R-1121R-112

1R-1101R-110

1Q-1151Q-115

1Q-1141Q-114

1Q-1131Q-113

C1-135C1-135

1Q-1191Q-119

1Q-1201Q-120

1Q-1221Q-122

1V-1071V-107

1V-1121V-112

1V-1281V-128 1V-1271V-127

1V-1111V-111 1V-1101V-110

1V-1091V-109 1V-1081V-108

1V-1301V-130

C1-184C1-184

1V-1291V-129

1Q-1211Q-121

1V-1261V-126

1V-1251V-125

1V-112A1V-112A

C1-155C1-155

1V-1131V-113

1V-112B1V-112B

C1-174C1-174

1Q-122A1Q-122A

1Q-122B1Q-122B

C1-117AC1-117A

TYP.

3 4

7'-6" 10'-5" 7'-6"

7' -6 on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :5

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 -

70FX101L

FIRE PROTECTION PLAN - FIRST LEVEL

AREA L

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

3. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

4. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES AND EXISTING CONDITIONS. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1" = 10'-0"

F3

FIRE PROTECTION PLAN - FIRST

LEVEL AREA L

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

05/06/2022

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

C1-136C1-136 C1-138C1-138

1R-1131R-113

1R-1111R-111

1T-1051T-105

1R-1091R-109

C1-139C1-139

1R-1121R-112

1R-1101R-110

1Q-1181Q-118

1Q-1171Q-117

ELECTRICAL

ROOM

1Q-117D1Q-117D TELECOM

ROOM

1Q-1161Q-116

C1-137C1-137

1Q-1151Q-115

1Q-1141Q-114

1Q-1131Q-113

C1-135C1-135

1Q-1191Q-119

1Q-1201Q-120

1Q-1221Q-122

ELECTRICAL

ROOM

1Q-117B1Q-117B

ELECTRICAL

ROOM

1Q-117C1Q-117C

C1-153C1-153

C1-154C1-154

C1-152C1-152

1Q-1251Q-125

1V-1011V-101

1V-100C1V-100C

1V-1021V-102

1V-1031V-103

1V-1181V-118

1V-116B1V-116B

1V-1041V-104

1V-1051V-105

1V-1061V-106

1V-1071V-107

1V-1121V-112

1V-1141V-114

1V-1241V-124

1V-1171V-117

1V-1161V-116

1V-1191V-119 1V-1331V-133 1V-1551V-155 1V-1371V-137

C1-176AC1-176A

1V-1541V-154

1V-1531V-153

1V-1231V-123

1V-1201V-120

1V-1281V-128 1V-1271V-127

1V-1111V-1111V-1101V-110 1V-1091V-109

1V-1081V-108

1V-1321V-132

1V-1301V-130

C1-184AC1-184A

C1-184C1-184

1V-1291V-129

C1-181C1-181

1V-1441V-1441V-1431V-143

1V-1451V-145

1V-1461V-146

1S-11S-1

ELECTRIC

ROOM

1T-1081T-108

TELECOM

ROOM

1T-1071T-107

M-5M-5

C1-184AC1-184A C1-185AC1-185A

TELECOM

ROOM

1Q-1241Q-124

1Q-1211Q-121

C1-3AC1-3A

1V-1511V-151

C1-183AC1-183A

1V-152A1V-152A

1V-1521V-152

1V-151A1V-151AC1-180C1-180

C1-179C1-179

1V-1421V-142

1V-1411V-141

1V-140A1V-140A

1V-1401V-140

1V-140B1V-140B

1V-1391V-139

1V-1491V-149 1V-149A1V-149A 1V-1501V-150 1V-1471V-147

1V-1381V-138

1V-1361V-136

1V-1261V-126

1V-1251V-125

1V-112A1V-112A

1V-1211V-121

1V-116A1V-116A

1V-100A1V-100A 1V-1351V-135

1V-1001V-100

C1-156C1-156

C1-155C1-155

1V-1131V-113

1V-112B1V-112B

1V-1151V-115 C1-157C1-157

C1-158C1-158

C1-175C1-175 C1-176C1-176

1V-1311V-131

C1-174C1-174

1V-1341V-134

C1-177C1-177

C1-178C1-178

C1-159C1-159

1V-100B1V-100BC1-165C1-165

1V-V011V-V01

C1-182C1-182

1Q-122A1Q-122A

1Q-122B1Q-122B

TYP.

3 4

7'-6" 9'-0"

5' -0

TELECOM

ROOM

(YELLOW-STACK)

1Q-117A1Q-117A on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

N

C

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :0

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 -

70FX101M

FIRE PROTECTION PLAN - FIRST LEVEL

AREA M

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

3. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

4. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES AND EXISTING CONDITIONS. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1" = 10'-0"

F3

FIRE PROTECTION PLAN - FIRST

LEVEL AREA M

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

2U-1012U-101

2U-1022U-102

2U-1032U-103

2U-1042U-104 2U-1062U-106 2U-1082U-108

2U-1092U-109

2U-1102U-110 2U-1112U-111

2U-1122U-112

2U-1132U-113

2U-1142U-114

2U-1152U-115

2U-1192U-119

2U-1182U-118

2U-1162U-116

2U-1202U-120

2U-1212U-1212U-1222U-122

2U-1232U-123

2U-1242U-124 2U-1252U-125

2U-126A2U-126A

2U-1272U-127

2U-1292U-129 2U-1312U-131 2U-1332U-133

2U-1342U-134 2U-1342U-134 2U-1342U-134

2U-1382U-138

2U-1392U-139

2U-1402U-140

2U-1412U-141

2U-1422U-142

2U-1432U-143

2U-1442U-144

2U-144B2U-144B

2U-144C2U-144C

2U-1472U-147

2U-1482U-148

2U-1492U-149 2U-1502U-150

2U-115A2U-115A2U-115B2U-115B

2U-115C2U-115C2U-115D2U-115D2U-115E2U-115E

2U-126B2U-126B 2U-126C2U-126C 2U-126D2U-126D

2U-126E2U-126E

TELECOM

ROOM

(GREEN-STACK)

2U-1172U-117

2U-118A2U-118A

2U-120A2U-120A

2U-108A2U-108A

2U-108B2U-108B

2U-108C2U-108C

2U-108D2U-108D

2U-140B2U-140B

2U-100A2U-100A

C2-3C2-3

C2-4C2-4 C2-5C2-5

C2-6C2-6

2U-1342U-134

C2-8C2-8

C2-9C2-9

C2-10C2-10

C2-11C2-11 C2-12C2-12

2U-149A2U-149A

C2-9AC2-9A

2D-1222D-122

2U-1542U-154

ELECTRICAL

ROOM

2U-1562U-156

TELECOM

ROOM

2U-1552U-155

2S-92S-9

2S-1012S-101 2S-1022S-102 2S-1032S-103

2S-1052S-105

2S-1062S-106

2S-1072S-107

C2-143C2-143

C2-144C2-144

C2-145C2-145

C2-146C2-146

C2-147C2-147

2S-1182S-118

C2-149C2-149

2S-1172S-117

2S-1162S-116

2S-1152S-115

C2-142C2-142 2S-1142S-114

C2-151AC2-151A

CC

C2-2C2-2

C2-1C2-1

C2-147AC2-147A

2V-1282V-128

2S-1042S-104

2U-1342U-1342U-1322U-132

2U-1052U-105 2U-1072U-107 2U-144A2U-144A

2U-1302U-130

2U-131A2U-131A

TELECOM

ROOM

2D-122A2D-122A

ELECTRICAL

ROOM

2D-122B2D-122B

2S-1082S-108

2S-1092S-109

2S-1102S-110

2S-1112S-111

2S-1122S-112

2S-1132S-113

C2-141AC2-141A

2S-112A2S-112ATELECOM

ROOM

2T-1022T-102

ELECTRICAL

ROOM

2A-1092A-109

2S-32S-3

C2-128C2-128 C2-152C2-152

2A-1082A-108

2B-1432B-143

2D-1012D-101

2D-102A2D-102A

2D-1022D-102

2D-109A2D-109A 2D-1382D-138

2D-1042D-104

2D-1062D-106

2D-1082D-108

2D-1302D-130 2D-1312D-131

2D-1292D-129

2D-1102D-110

2D-1072D-107

2D-112A2D-112A

2D-1112D-111

2D-1142D-114

2D-1152D-115

2D-1162D-116

2D-1172D-117

2D-1192D-119

2D-1202D-120

2D-1232D-123

2D-1262D-126

2D-1332D-133

2D-1362D-136

2D-1342D-134

2D-1372D-137

2D-1392D-139

2D-1402D-140

2D-1422D-142

2D-1432D-143

C2-15C2-15

C2-16C2-16

C2-17C2-17

C2-18C2-18

C2-19C2-19

C2-20C2-20

C2-21C2-21

C1C1

2C-1012C-101

2C-1042C-104 2C-1052C-105

C2-18AC2-18A

2D-102B2D-102B

2D-1032D-103

2D-1052D-105

2D-1092D-109

2D-1122D-112

2D-1132D-113

2D-126A2D-126A

2D-115A2D-115A

2D-116A2D-116A 2D-1182D-118

2D-1212D-121

2D-1242D-124

2D-1252D-125

2D-125A2D-125A

2D-1272D-127

2D-1282D-128

2D-1322D-132

2D-1352D-135

2D-1412D-141

2D-1442D-144

C2-14C2-14

2D-118A2D-118A

2C-1032C-103

2C-1062C-106C2-22C2-22

C2-23C2-23

2T-1342T-134

ELECTRICAL

ROOM

2T-1032T-103

TELECOM

ROOM

2T-1042T-104

2S-22S-2

2T-1362T-136

2T-1372T-137

2T-1612T-161

2T-1012T-101

C2-151C2-151

2T-1082T-108

2T-1092T-109

2S-12S-1

M-SM-S

2T-1072T-107

2T-1332T-133

TELECOM

ROOM

2T-1052T-105

TYP.

6'-4" 7'-5"

7' -6

6'

-2 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :0

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 -

70FX102AC

FIRE PROTECTION PLAN - SECOND LEVEL

AREA A AND C

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

3. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

4. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES AND EXISTING CONDITIONS. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1" = 10'-0"

F2

FIRE PROTECTION PLAN - SECOND

LEVEL AREA A AND C

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

TELECOM

ROOM

(CYAN-STACK)

2C-107A2C-107A

2B-1382B-138

2S-42S-4

ELECTRICAL

ROOM

2C-1192C-119

2C-1202C-120

TELECOM

ROOM

2C-1212C-121

2B-138A2B-138A

C2-39C2-39

2B-1432B-143

2D-1012D-101 2D-1432D-143

2C-1012C-101

2C-1042C-104 2C-1052C-105

2D-1442D-144

DD

M7M7

2C-1022C-102

2C-1032C-103

2C-1062C-106

2C-1072C-107

2C-1082C-108

2C-1092C-109

2C-1102C-110

2C-1112C-111

2C-1122C-112

2C-1132C-113

2C-1142C-114

2C-1152C-115

2C-1162C-116

2C-1182C-118

C2-22C2-22

C2-23C2-23

C2-24C2-24

C2-25C2-25

C2-26C2-26

C2-36C2-36

C2-37C2-37

C2-38C2-38

C2-40C2-40

2C-111A2C-111A

2C-114A2C-114A

2C-114B2C-114B 2C-114C2C-114C

2E-1042E-104 2E-1062E-106 2E-1102E-110 2E-1122E-112

2E-1212E-121 2E-1242E-124 2E-1262E-126

2E-1272E-127

2E-1092E-109

2E-1142E-114

2E-1202E-120

2E-1152E-115

2E-1502E-150 2E-1482E-148 2E-1452E-145 2E-1392E-139

2E-1252E-125

2E-1282E-128

2E-1432E-143 2E-1412E-141

2E-1232E-1232E-1222E-122

2E-1332E-133

2E-1322E-132

2E-1292E-129

2E-1302E-130

2E-1312E-131

2E-1172E-1172E-1162E-116

2E-1602E-160

2E-1592E-159

2E-1522E-1522E-1542E-1542E-1562E-156

2E-1072E-107

2E-107A2E-107A

2E-1052E-105 2E-1082E-108

2E-1422E-1422E-1442E-144 2E-1462E-146

2E-1382E-138

2E-1572E-157 2E-1532E-153 2E-1512E-151 2E-1472E-147

2E-1492E-1492E-1552E-155

2E-1002E-100

2E-1582E-158

2E-1402E-140

2E-1192E-119

2E-107B2E-107B

2E-1112E-111

C2-31C2-31

C2-32C2-32

C2-30C2-30

C2-35C2-35 ELECTRICAL

ROOM

2E-136A2E-136A

TELECOM

ROOM

2E-122B2E-122B

2E-1362E-136

C2-29C2-29

2E-1182E-118

2E-1132E-113

C2C2

C2-32AC2-32A 2E-1342E-134

2E-1352E-135

C2-34C2-34

C2-33C2-33

2E-1012E-101

2E-1022E-102

C3C3

2E-1042E-104 2E-1032E-103

2E-1022E-102 ?

2F-1012F-101 2F-1022F-1022F-100A2F-100A

6'-10" 7'-6"

3' -4

5'

-8

3' -4

TYP.

3 4 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :1

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 -

70FX102D

FIRE PROTECTION PLAN - SECOND LEVEL

AREA D

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

3. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

4. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES AND EXISTING CONDITIONS. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1" = 10'-0"

F3

FIRE PROTECTION PLAN - SECOND

LEVEL AREA D

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

PARTITION RATING GRAPHICS:

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

TELECOM

ROOM

(ORANGE-STACK)

2H-1122H-112

TELECOM

ROOM

(PINK-STACK)

2F-121E2F-121E

2L-1012L-101

2L-1022L-102 2L-1032L-103 2L-1042L-104 2L-1052L-105

2L-1062L-106

2L-1072L-107

2L-1082L-108 2L-1092L-109

2L-1102L-110

2L-1112L-111

2L-1122L-112

2L-1132L-113

2L-1142L-114

2L-1152L-115

2L-1162L-116

2L-118A2L-118A

2L-1182L-118

2L-1192L-119

2L-1202L-120 2L-1212L-121

2L-1222L-122

2L-1232L-123

2L-1242L-124

2L-1252L-125

2L-1262L-126

2L-1272L-127

2L-1282L-1282L-1292L-129

2L-1302L-130

2L-1312L-131

2L-1322L-1322L-1332L-1332L-1342L-1342L-1352L-135

2L-1362L-136

2H-1102H-110

2H-1112H-111

2H-1132H-113

2H-1142H-114

C-6C-6

2H-1092H-109

2C-482C-48

2C-492C-49

2C-502C-50

2C-512C-51

C2-52C2-52

C2-53C2-53 C2-54C2-54

C2-55C2-55

C2-56C2-56

C2-57C2-57

2C-582C-58

C2-60C2-60

C2-54AC2-54A

C2-50AC2-50A

ELECTRICAL

ROOM

2F-121A2F-121A

TELECOM

ROOM

2F-121B2F-121B

ELECTRICAL

ROOM

2F-121C2F-121C

TELECOM

ROOM

2F-121D2F-121D

M-5M-5

2H-111A2H-111A2H-111B2H-111B

2H-111C2H-111C

2L-135A2L-135A

2L-102A2L-102A

2L-103A2L-103A

2L-103B2L-103B

2L-104A2L-104A

2L-104B2L-104B

2L-105A2L-105A

2L-109A2L-109A

2L-115A2L-115A 2L-120A2L-120A

2L-121A2L-121A

2L-123A2L-123A

2L-124A2L-124A2L-126A2L-126A

2L-127A2L-127A

2L-128A2L-128A2L-129A2L-129A

2L-132A2L-132A

2L-133A2L-133A

2L-119A2L-119A

2K-1012K-101

2K-103A2K-103A

TYP.

6'-5" 7'-6"

7' -6

TYP.

7'-6" 4'-10"

5' -1

1" 7'

-0

7'-6" on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :2

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 -

70FX102G

FIRE PROTECTION PLAN - SECOND LEVEL

AREA G

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

3. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2022 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

4. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES AND EXISTING CONDITIONS. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1" = 10'-0"

F2

FIRE PROTECTION PLAN - SECOND

LEVEL AREA G

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

C2-154C2-154

C2-114C2-114

2S-72S-7

C-10C-10

ELECTRICAL

ROOM

2M-1152M-115

TELECOM

ROOM

2M-1162M-116

2A-1012A-101

2A-1022A-102

2A-1032A-103 2M-1012M-101

2M-1022M-102 2M-1032M-103

2M-1042M-104

2M-1052M-105

2M-1062M-106

2M-1072M-107

2M-1082M-108

2M-1092M-109

2M-1102M-110

2M-1112M-111

2M-1122M-112

2M-1132M-113 2P-1022P-102

2P-1032P-103

2P-1042P-104

2P-1052P-105

2P-1062P-106

2P-1072P-107

2P-1082P-108 2P-1092P-109

TELECOM

ROOM

(BLUE

STACK -

ALTERNATE)

2P-1102P-110

2P-1012P-101

2P-1112P-111

2P-1122P-112

2P-1132P-113

2P-1142P-114

2P-1152P-115

2P-1162P-116

2P-1172P-117

2P-1182P-118

2P-1192P-119 2P-1202P-120 2P-1212P-121

2P-1222P-122

2P-1232P-123

2P-1242P-124

C2-87C2-87

C2-88C2-88

C2-89C2-89

2P-125B2P-125B

2P-125C2P-125C

2P-125D2P-125D

2P-125E2P-125E

2P-125F2P-125F

2P-125G2P-125G

C2-96C2-96

C2-98C2-98

2P-125H2P-125H 2P-125I2P-125I 2P-125J2P-125J

C2-102C2-102

C2-103C2-103

C2-104C2-104

C2-105C2-105

C2-106C2-106

C2-107C2-107

C2-108C2-108

C2-109C2-109

C2-110C2-110

C2-111C2-111

C2-112C2-112

2M-1142M-114

2P-106A2P-106A 2P-106B2P-106B

C2-102AC2-102A

2S-82S-8FF

2P-112A2P-112A

2P-123A2P-123A

2P-123B2P-123B

2P-123C2P-123C

2P-122A2P-122A

2P-119A2P-119A 2P-120A2P-120A

C2-86C2-86

C2-76C2-76

C2-102BC2-102B

2R-1622R-162

2Q-1042Q-1042Q-1042Q-1042Q-1042Q-104

2Q-1352Q-135

2Q-1042Q-104 2R-149A2R-149A

2R-149A2R-149A 2R-103B2R-103B

2R-1002R-100

TYP.

7'-6" 3'-11"

6' -7

7'

-3 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :4

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 -

70FX102K

FIRE PROTECTION PLAN - SECOND LEVEL

AREA K

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .