This document provides details for a federal contract opportunity for construction design and build services. The solicitation is for infrastructure upgrades at the Minneapolis VA Medical Center to support the mandated Electronic Health Record Modernization project. Key aspects of the opportunity include services for building a new server room, conducting phased structural and civil works with coordination requirements, and performing the majority of work on off hours and weekends to minimize hospital disruptions. The solicitation will be issued as a Request for Proposal evaluated according to FAR and preference will be given to Service-Disabled Veteran-Owned Small Businesses. The performance period is approximately 450 calendar days from notice to proceed. The magnitude of construction is estimated between $20-50 million. Questions must be submitted in writing by the specified deadline.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1S-1251S-125
1S-127B1S-127B
1S-121A1S-121A
1S-1211S-121
1R-2501R-250
1S-1281S-128
C1-192C1-192
1S-1121S-112
1S-1001S-100
1S -1
1S
-1
1S-1071S-107
1S-1091S-109
C1-191C1-191
1S-1231S-123
1S-1101S-110
1S-1061S-106
C1-196C1-196
TELECOM
ROOM
1T-1021T-102
C1-195C1-195
ELECTRIC
ROOM
1T-1011T-101 1-S31-S3
C1-197C1-197
1S -1
1S
-1
1S-1041S-104 1S-1031S-103
1S-1021S-102
1S-1011S-101
C1-193C1-193
C1-199C1-199
C1-198C1-198
C1-200C1-200
1A-1051A-105
1A-1091A-109
C1-25C1-25
1A-1041A-104 1A-1061A-106
1A-106A1A-106A
1A-110B1A-110B
1S-51S-5
ELECTRIC
ROOM
1A-1081A-108
1A-1071A-107 1A-1101A-110
1A-110C1A-110C
1A-110A1A-110A
1B-1021B-102
1B-1031B-103
1A-1151A-115
1A-1141A-114
1A-1131A-113
C1-127AC1-127A
1A-1121A-112
C1-27C1-27 1B-1041B-104
1B-1051B-105
C1-127BC1-127B
1A-112A1A-112A
C1-193AC1-193A
AA
1C-1201C-120
1G-1131G-113
1G-1121G-112
1A-111A1A-111A
1G-1091G-109 1G-109B1G-109B
1G-109A1G-109A
1G-105C1G-105C
1G-1011G-101
1G-1021G-102
1G-1041G-104
1G-1031G-103
1G-101C1G-101C 1S-41S-4
ELECTRIC
ROOM
1D-1741D-174
TELECOM
ROOM
1C-1231C-123
C1-202C1-202
1R-1081R-108
1S-1431S-143
1S-1421S-142
1S-1441S-144
1S-1411S-141
1S-1401S-140 1S-141A1S-141A
1R-105C1R-105C1R-1061R-106
1R-1031R-103 1R-1041R-104
M-4M-4
1R-105B1R-105B
1R-105A1R-105A
1R-1051R-105
CAGE
1R-1091R-109
C1-147C1-147
1A-1021A-102
1A-1031A-103
M-2M-2
C-10C-10 1A-1011A-101
C-9C-9
C1-194C1-194
C1-194AC1-194A
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2" CHWS
2" CHWR
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :3
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101B
MECHANICAL PLAN - FIRST LEVEL AREA B
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F3
MECHANICAL PLAN - FIRST LEVEL
AREA B
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
05/06/2022
05/06/2022
ADDENDUM #1 07/07/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
TELECOM
ROOM
(CYAN-STACK)
1C-1061C-106
SHARED
OFFICE
1C-1071C-107
C1-35C1-35
1U-1621U-162
1U-162A1U-162A
1U-162B1U-162B C1-34AC1-34A
1D-121A1D-121A
1D-1211D-121
1D-1221D-122C1-34C1-34
1D-1171D-117
1D-1151D-115
1D-1141D-114
1D-1161D-116
1D-1181D-118
1D-1231D-123
1D-122A1D-122A 1D-115A1D-115A
C1-36C1-36
C1-32C1-32
1D-116A1D-116A
1D-1251D-125
1D-1241D-124
1D-124A1D-124A
1D-125A1D-125A
1D-112A1D-112A
1D-1131D-113
1D-113A1D-113A
1D-1111D-111
1D-1121D-112
1D-1091D-109
C1-38C1-38
1D -1
1D
-1
1D-1261D-126
1D-1271D-127
1D-1301D-130
1D-1321D-132
1D-127A1D-127A
1D-1281D-128
1D-1081D-108
1D-1291D-129
1D-1061D-106 1D-1311D-131
1D-1331D-133 1D-135A1D-135A
C1-31C1-31
1D-105A1D-105A 1D-1051D-105
1D-1071D-107
1D-1031D-103
1D-1021D-102
1D-1341D-134
1D-1351D-135
1D-132A1D-132A
1D-134A1D-134A
C1-30C1-30
1D -1
A
1D -1
A
1D-1011D-101
1D-136A1D-136A
1C-1051C-105
1D-102A1D-102A
1D-107A1D-107A
1C-1041C-104
C1-28C1-28
C1-29C1-29
1C-1011C-101
1C-1211C-121
TOILET
1C-1031C-103
1C-1111C-111
C1-37C1-37
1C-1081C-108
C1-40C1-40
1E-101A1E-101A
70M-412
C7 70M-412
C3 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :4
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101C
MECHANICAL PLAN - FIRST LEVEL AREA C
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F6
MECHANICAL PLAN - FIRST LEVEL
AREA C
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
05/06/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
TELECOM
ROOM
(CYAN-STACK)
1C-1061C-106
SHARED
OFFICE
1C-1071C-107
1D -1
A
1D -1
A
1D-1011D-101
1D-136A1D-136A
1C-1051C-105
1C-1041C-104
C1-50C1-50
1C-1201C-120
C1-49C1-49
1C-1121C-112
M7M7
1C-1151C-115
C1-28C1-28
C1-29C1-29
1C-1011C-101
1C-1211C-121
TOILET
1C-1031C-103
1C-1111C-111
C1-48AC1-48A
C1-37C1-37
1C-1081C-108
C1-48C1-48
1C-1161C-116
1C-1171C-117
1C-1181C-118
1C-1191C-119
1C-114B1C-114B
1C-114D1C-114D
1C-114C1C-114C
1C-114A1C-114A
C1-40C1-40
1E-101A1E-101A
1E-1011E-101 1E-1031E-103 1E-1051E-105
1E-103A1E-103A 1E-105A1E-105A
1E-1071E-107 1E-1101E-110
1E-110A1E-110A
1E-1121E-112 1E-1131E-113 1E-1141E-114
1E-1151E-115
1E-113A1E-113A
1E-115A1E-115A
1E-1161E-116
C1-45C1-45
C1-44C1-44
??1E-1111E-111
1E-111A1E-111A
1E-1091E-109
1E-1231E-123 1E-120A1E-120A
1E-123A1E-123A
C1-43C1-43
C1-42C1-42
C1-46C1-46
TELECOM
ROOM
1E-117C1E-117C
1E-1171E-117
1E-117A1E-117A
ELECTRICAL
ROOM
1E-117B1E-117B
1E-1181E-118
1E-118A1E-118A
1E-1191E-1191E-1211E-121
1E-119A1E-119A
1E-1221E-122
1E-122A1E-122A
1E-1241E-1241E-1251E-125
1E-125A1E-125A
1E-1281E-128
C1-47C1-47
1E-1261E-126
1E-1081E-108
1E-1271E-127
1E-1061E-1061E-1041E-1041E-1021E-102
1E-1311E-131
C1-41C1-41
1E-1301E-130
1E-130A1E-130A
1E-1321E-132
1E-132A1E-132A
1E-1331E-133
1E-1291E-129
1E-1341E-134
C1-39C1-39
1C-1351C-135
1E-134A1E-134A
1C-1221C-122
1F-1361F-136
1F-136A1F-136A
1 1/2" CHWR
1 1/2" CHWS
2" CHWS
2" CHWR
70M-412
C7 70M-412
C3
1" CD
1 1/2" CHWS
1 1/2" CHWR
2 1/2" CHWR
2 1/2" CHWS
3/4" CD
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :5
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101D
MECHANICAL PLAN - FIRST LEVEL AREA D
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
SCALE: 1" = 10'-0"
F2
MECHANICAL PLAN - FIRST LEVEL
AREA D
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
05/06/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
C1-50C1-50
1C-1201C-120
1C-114D1C-114D
1C-114C1C-114C 1E-1341E-134
1C-1221C-122
1F-1361F-136
1F-136A1F-136A
1F-1021F-102
C1-52C1-52
1F-1351F-135
1F-1341F-134
1F-1321F-132
1F-1301F-130
1F-132A1F-132A
1F-134A1F-134A
C1-52C1-52
1F-102A1F-102A
1F-105A1F-105A
1F-1031F-103
1F-1051F-105
1F-1071F-107
1F-1091F-109
1F-1121F-112
1F-107A1F-107A
1F-1041F-1041F-1331F-133
1F-1311F-131
1F-1061F-106
1F-1081F-108 1F-1291F-129
1F-127A1F-127A
1F-1271F-127
1F-1101F-110
C1-54C1-54
1F-1261F-126
C1-55AC1-55A
1F-125A1F-125A
1F-1111F-111
1F-1251F-125
1F-113A1F-113A 1F-112A1F-112A
1F-1141F-114
C1-53C1-53 1F-124A1F-124A
1F-1241F-124
1F-1231F-123
1F-1211F-121
1F-1131F-113
1F-122A1F-122A
1F-121A1F-121A
C1-55C1-55
1F-1151F-115
1F-1161F-116
1F-115A1F-115A
1F-1171F-1171F-117A1F-117A
1F-1181F-118 C1-56C1-561F-120A1F-120A
1F-1201F-120
C1-202C1-202
C1-204C1-204
1L-1161L-116
C1-56AC1-56A
ELECTRIC
ROOM
1F-119A1F-119A
1L-1171L-117
1L-1181L-118
C1-58C1-58
C1-57BC1-57B
1L-1151L-115
STAIRSTAIR
2" CHWR
2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2 1/2" CHWS
2 1/2" CHWR
1 1/2" CHWR
1 1/2" CHWS
2" CHWR
2 1/2" CHWR
2 1/2" CHWS
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :0
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101E
MECHANICAL PLAN - FIRST LEVEL AREA E
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F6
MECHANICAL PLAN - FIRST LEVEL
AREA E
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
05/06/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
C1-198C1-198
C1-200C1-200
1A-1051A-105
1A-1041A-104 1A-1061A-106
1A-106A1A-106A
1A-110B1A-110B
1S-51S-5
ELECTRIC
ROOM
1A-1081A-108
1A-1071A-107 1A-1101A-110
1A-110C1A-110C
1A-110A1A-110A
1A-1131A-113
C1-127AC1-127A
1A-1121A-112
C1-127BC1-127B
1A-112A1A-112A
C1-50C1-50
1C-1201C-120
C1-49C1-49
1F-1361F-136
1F-1351F-135
1F-1341F-134
1F-1321F-132
1F-1301F-130
1F-1271F-127
1F-1261F-126
1F-1241F-124
1F-1231F-123
1F-1211F-121
1F-1201F-120
1G-1131G-113
1G-1121G-112
1A-111A1A-111A
1G-1091G-109 1G-109B1G-109B
1G-109A1G-109A
C1-201C1-201 C1-201AC1-201A
1G-105C1G-105C
1G-105B1G-105B
1G-1051G-105
1G-1011G-101
1G-1021G-102
1G-1041G-104
1G-1031G-103
1G-101C1G-101C 1S-41S-4
ELECTRIC
ROOM
1D-1741D-174
TELECOM
ROOM
1C-1231C-123
C1-202C1-202
1G-1071G-107
C1-109C1-109
1G-1141G-114 1G-1111G-111 1G-1101G-110
1G-106A1G-106A
1G-106B1G-106B
1G-108A1G-108A
1G-1081G-108
1G-105A1G-105A
1G-106D1G-106D
1G-106C1G-106C
1G-1061G-106
1G-1161G-116
1G-115-a1G-115-a
1G-1151G-115
1G-1171G-117
1H-1231H-123
1G-117A1G-117A 1G-1211G-121
1G-1201G-120
1H-1221H-122
C1-64C1-64
TELECOM
ROOM
1H-1201H-120
ELECTRIC
ROOM
1H-1191H-119
1G-1191G-1191G-1181G-118
1G-121B1G-121B
1G-1211G-121
1G-1221G-122
C1-203C1-203
C1-204C1-204
C1-205C1-205
1H-1211H-121
C-6C-6
1L-1161L-1161L-1031L-103 1L-1041L-104 1L-1051L-105 1L-1121L-112 1L-1131L-113
1L-1151L-115
TELECOM
ROOM
(ORANGE-STACK)
1H-1011H-101 1H-1021H-102
C-9C-9
2" CHWR
2" CHWS
2 1/2" CHWR
2 1/2" CHWS2 1/2" CHWR
2 1/2" CHWS
4" CHWS
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
2" CHWR
2" CHWS
4" CHWR
2 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2" CHWS
2" CHWR
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :1
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101F
MECHANICAL PLAN - FIRST LEVEL AREA F
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F3
MECHANICAL PLAN - FIRST LEVEL
AREA F
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
05/06/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1F-1171F-1171F-117A1F-117A
1F-1181F-118 C1-56C1-561F-120A1F-120A
C1-65C1-65
1H-1211H-121
C-6C-6
1L-1021L-102
C1-64AC1-64A
M-8M-8
C1-66C1-66
1H-1161H-116 1H-1171H-117
1L-1401L-140
1L-1391L-139
1L-1411L-141
1L-1381L-1381H-114A1H-114A
1H-114C1H-114C
1H-1141H-114
1H-114B1H-114B
1H-1181H-118 C1-313C1-313
1L-1161L-116
C1-56AC1-56A
ELECTRIC
ROOM
1F-119A1F-119A
TELECOM
ROOM
1F-119B1F-119B
1L-1171L-117
1L-1181L-118
1L-1191L-119
1L-1221L-122
C1-58C1-58
C1-57AC1-57A
C1-57C1-57
ELECTRIC
ROOM
1F-119E1F-119E
TELECOM
ROOM
(PINK-STACK)
1F-119D1F-119D
C1-57BC1-57B
1L-1261L-126
1L-1251L-125
1L-1241L-124
ELECTRIC
ROOM
1F-119C1F-119C
1L-1031L-103 1L-1041L-104 1L-1051L-105
1L-108A1L-108A 1L-108B1L-108B
1L-1091L-109
1L-1121L-112 1L-1131L-113
1L-1151L-115
1L-1141L-1141L-116A1L-116A1L-108C1L-108C 1L-105A1L-105A
1L-104A1L-104A
C1-61C1-61
1L-1071L-107
1L-131B1L-131B
1L-131A1L-131A
1L-1101L-110
1L-1111L-111
1L-1211L-121
1L-121A1L-121A 1L-1231L-123
1L-1291L-129
1L-129A1L-129A1L-1311L-131
C1-60C1-60
1L-131C1L-131C
1L-131D1L-131D
1L-1321L-132 1L-1431L-143
1L-1331L-133
C1-63C1-63
1L-138A1L-138A 1L-136A1L-136A
1L-1371L-137 1L-1361L-136 1L-1351L-135
1L-135A1L-135A 1L-134A1L-134A
1L-128A1L-128A 1L-127A1L-127A
1L-1271L-127
1L-128C1L-128C1L-128B1L-128B
1L-1301L-130
1L-134B1L-134B1L-134C1L-134C
C1-61AC1-61A C1-61BC1-61B
C1-61CC1-61C
1L-1281L-1281L-1341L-134
C-5C-5
C1-59C1-59
STAIRSTAIR
1K-1011K-101
C1-310C1-310
MECHANICAL
ROOM
1F-1191F-119
1 1/4" CHWS
1 1/4" CHWR
2 1/2" CHWR
2 1/2" CHWS
1 1/4" CHWR
1 1/4" CHWS 1 1/2" CHWR
1 1/2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
2" CHWR
2" CHWS
2" CHWR
2" CHWS
2 1/2" CHWR
2 1/2" CHWS2 1/2" CHWR
2 1/2" CHWS
4" CHWS
2 1/2" CHWR
2 1/2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2 1/2" CHWS
2 1/2" CHWR
70M-412
E6
70M-412
E3 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/7
/2
:2
:4
A
M
05/06/2022 M. Perkins G. Weaver
618-21-700
1383 - 70M-101G
MECHANICAL PLAN - FIRST LEVEL AREA G
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
MECHANICAL PLAN - FIRST LEVEL
AREA G
1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,
CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE
CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER
DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.
PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.
2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH
CONTROLLABILITY THROUGH THE BMS.
4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT
WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS.
5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET.
6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.
SEE ELECTRICAL SHEETS.
8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
11. EXISTING PENETRATION TO REMAIN.
12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.
1 Revision 1 Date 1ADDENDUM #1 07/07/2022
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
1H-1161H-116 1H-1171H-117
1L-1391L-139
1L-1381L-1381H-114A1H-114A
1H-114C1H-114C
1H-1141H-114
1H-114B1H-114B
1L-138A1L-138A
1K-1011K-101
1K-1361K-136
C1-68AC1-68A
1K-1341K-134 C1-68C1-68 1K-102A1K-102A
1K-1021K-102
1K-1031K-103
1K-1041K-104
1K-103A1K-103A
1K-103B1K-103B
1K-102B1K-102B
1K-104A1K-104A
C1-69BC1-69B1K-1001K-100
1K-1311K-131 1K-1051K-105
1K-1061K-106
1K-1081K-108
C1-74C1-74
C1-70C1-70
C1-69C1-69
1K-1071K-107 1K-1301K-130
1K-133A1K-133A
1K-1331K-133
1K-1321K-132
1K-1291K-129
1K-132A1K-132A
1K-104B1K-104B
1K-129A1K-129A 1K-1101K-110 1K-1091K-109
1K-107A1K-107A
1K-1131K-113 1K-1121K-112
C1-71C1-71
1K-1111K-111 1K-1141K-114
1K-1161K-116
1K-1271K-127
1K-127A1K-127A
1K-126A1K-126A
1K-1281K-128
1K-1261K-126
1K-115A1K-115A
1K-1151K-115
1K-116A1K-116A
1K-117A1K-117A
1K-1171K-117
1K-1211K-121
1K-121A1K-121A
1K-1221K-122
C1-72C1-72
1K-125A1K-125A
1K-1251K-125
1K-1241K-124 1K-124A1K-124A
1K-1231K-123
C1-72AC1-72A
1K-1191K-119 1K-1181K-118
C1-73C1-73
1K-1201K-120
1K-120A1K-120A
1K-120B1K-120B
1K-120C1K-120C
C1-310C1-310
C7C7
1J-101B1J-101B
1J-1011J-101
1J-1021J-102
1H-1061H-106
1H-1111H-111
C1-67C1-67
1H-1121H-112
1K-1351K-135 C1-67AC1-67A
1 1/2" CHWS
1 1/2" CHWR
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
A
B D
TRUE NORTH
PLAN NORTH
E F
G
H
J
K
L
M
N
C
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:3 :3
P
M
11/05/2021 M. Perkins G. Weaver
618-21-700
1383 - 70M-101H
MECHANICAL PLAN - FIRST LEVEL AREA H
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .