36C77622R0045 0008.docx

DOCX document 94 KB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document provides details for a construction solicitation for infrastructure upgrades at the Minneapolis VA Medical Center. The solicitation will be issued as a Request for Proposal to be conducted in accordance with FAR Parts 15, 19, and 36 for the construction and commissioning of infrastructure to support the Electronic Health Record Modernization project. Key aspects include a service-disabled veteran-owned small business set-aside, a period of performance of approximately 450 calendar days from notice to proceed, a magnitude of construction between $20-50 million, a new server room to be built on the roof, and coordination required with multiple phases of structural/civil work. All questions must be submitted in writing by email to the issuing office.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-29-32.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

07-13-2022

618-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

00076 Department of Veterans Affairs Department of Veterans Affairs

6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77622R0045 07-13-2022

X

X

NA

1 (ONE)

The purpose of this amendment is to provide the following:

1. A site visit will be allowed by appointment to only visit Building 70 anything associated with the chilled piping. No additional areas of the project will be visited.

2. A copy of the Minneapolis EHRM Construction Question andanswers, no additional questions will be addressed. There is 1 additional questions that will be addressed in a follow up amendment. Just to reiterate please do not contact any direct staff other than myself.

Donald A. Marsh III Contracting Officer

PCAC15L3-1697

See attached document: Technical Question Tracking Sheet - Infra Upgrades - FINAL.

End of Document Page 1 of