618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf

PDF 20 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document provides details for a federal contract opportunity for construction design and build services. The solicitation is for infrastructure upgrades needed to support an Electronic Health Record Modernization project at the Minneapolis VA Medical Center. Key aspects of the opportunity include construction and commissioning of a new server room and upgrades throughout hospital departments. The period of performance is approximately 450 calendar days from notice to proceed. The estimated value is between $20-50 million. The solicitation is set aside as a total Service-Disabled Veteran-Owned Small Business opportunity. All questions must be submitted in writing to the identified point of contact by the specified deadline.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-29-32.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:1

:4

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70G-000

COVER SHEET

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

FINAL BID DOCUMENTS

05/06/2022

618-21-700 EHRM INFRASTRUCTURE UPGRADES -

MINNEAPOLIS VA HEALTH CARE SYSTEM

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

S A NITA RY

S EW ER

STORM

S T

OR

M

S T

ORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

STORM

T

H A

V E

S

O U

T H

54TH STREET

L

IG

H T

R A

IL

S

T A

T

IO

N

M

IN

N E

H A

H A

A V

E . S

O U

T H

T .H

. 5

SRO

SOUTH

SRO

EAST

SRO

NORTH

CREDIT

UNION

LOADING

DOCK

PROJECT LOCATION

BUILDING 70

PROJECT SCOPE OF WORK:

COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN

REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR).

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY REFERENCE

TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR

QUALIFIED TO PERFORM THE WORK. CREDENTIALS SHALL BE

SUPPLIED TO THE VA/AE AS REQUIRED BY THIS CONTRACT. ALL

INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE

PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR

OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR

VA USE ONLY, WHEN PERFORMED, AND

DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

THIRD-PARTY INSPECTIONS:

The purpose of this project is to provide complete recabling within multiple buildings at the Minneapolis VA Medical Center Campus.

Multiple buildings on campus including Buildings 9, 10, 49, 68, 69, 70, 72, 73, 74, 75, 76, 78, 89, 222, and also site infrastructure upgrades.

See main project cover sheet for building priority.

This project will include all materials and labor to replace all telecommunications cable, outlets, and associated equipment for buildings in this project. The scope also includes replacement of all fiber optic cabling, conduit and providing new conduit, fiber and manholes serving the buildings' Telecommunications Rooms (TR) in accordance with the drawings and specifications.

Un-terminated "future capacity" cables are not permitted. All installed cables shall be terminated at each end with documentation, labeling, and (where applicable) test results provided. This applies to all permanently installed cable types.

In addition to replacing all of the communications cabling and additional 20% capacity shall be provided as shown on the drawings and specifications.

All Copper replacement will be CAT 6A. The contractor shall utilize Electrical Metal Tubing (EMT) conduit or cable tray in all locations where the cable may touch the interstitial floor. Any conduit used will be marked appropriately with “low-voltage/data” at regular intervals to be visible in interstitial spaces with minimal effort.

CAT6A cabling installed for end user devices (terminated at wall plates) will follow the jacket color standards as outlined in Specification 27 15 00. The facility has a required 1 Gbe connectivity to desktops, and other EUD, and this will include the replacement of wall jacks at EUDs to become CAT6A compliant. All in-building copper cabling will be terminated and labeled in accordance with the drawings and specifications and will be terminated to CAT6A modular jacks capable of accepting and functioning with other modular (i.e.: RJ11) plugs without damage to the jack.

For every TR in the SOW, Contractor shall provide and install new patch panels conforming to EIA/ECA 310-3 dimensions and suitable for mounting in standard equipment racks, with 48 RJ45 jacks aligned in two horizontal rows per patch panel and Labeled in accordance with the drawings and specifications. Contractor shall also supply and label all new CAT6A patch cables for every device in the telecom room, (NOT at the end user device) to be sized and labeled appropriately in accordance with 27 15 00. Each TR shall also be provided with new four-post racks with minimum 40% spare capacity for future expansion. All racks and patch panels will be labeled in accordance with Specification 27 15 00.

Contractor shall provide and install and utilize a series of welded cabling support structures (“ladder racks”) around the perimeter of the telecom room and above all new racks to support the weight of the cable. Cable tray "wire basket style" shall be used in corridor spaces.

No wireless access points will be replaced and will be protected-in-place, only the cabling will be replaced. All cabling for wireless access points will be labeled in accordance with the specifications and shall be checked against facility color standards.

The project scope also includes addition of new Computer Room Air- Conditioning split systems with temperature and humidity monitoring station for all TR's and the electrical circuits as indicated.

This project utilizes new construction and renovations to meet all EHRM requirements as a stand alone project. Where a TR does not occur on every floor, or the TR does not meet the size specified in the EHRM Standard, it is due to the fact that a compliant TR will be built on that floor with a future project. When that occurs, the future project is referenced but in no way diminishes the effectiveness of the designed solution.

THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE

PROJECT CANNOT DEPEND ON ANOTHER PROJECT OR OTHER

FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE

AND USABLE.

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE DATE: 05/06/2022

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

CO:

Rosella Torcaso Rosella.Torcaso@va.gov Contracting Officer Department of Veterans Affairs

COR:

Robert C. Malecha Minneapolis VA Health Care System 1 Veterans Drive Minneapolis, MN 55417

USER:

Zende Wisdom, CAPM, CSM Operations Manager Minneapolis (MIN) Area, Territory 1, District 3 Midwest End-User Operations (EUO) IT Operations and Services (ITOPS)

Office of Information and Technology (OIT) Office: (612) 467-6728 M-F 7:30am – 4:00pm CST

GENERAL NOTES:

1. ALL EXISTING PORTS ARE BEING REPLACED LIKE FOR LIKE ON THIS

PROJECT. DEMO SHEETS HAVE NOT BEEN PROVIDED UNLESS WALL

REVISIONS ARE REQUIRED.

2. WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS

ARE REQUIRED TO PROVIDE A 20% ALLOWANCE FOR NEW DATA PORTS.

ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND

QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA

COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND

DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 120 DATA

DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT

BUILDING. DURING THE COURSE OF THE INSTALLATION THE

CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY

DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS

CAPTURED IN THE RECORD DRAWINGS AND THE OWNER HAS AN

ACCURATE COUNT AT THE END OF THE PROJECT.

LOCATION MAP

VICINITY MAP

SERVICE PROVIDERS:

Meagan (Kellagher) North Associate Director, Program Management Global Public Sector Solutions, Operations & Wholesale Global Operations & Services m 703-362-7243 Take the WWIT Pledge

SERVICE PROVIDERS:

Frederick Kraft (Rick) VA National LEC Program Manager CenturyLink Federal Solutions 4250 N Fairfax Dr, Arlington VA 22203 Office: 703-363-8745 Mobile: 301-509-3952 frederick.kraft@centurylink.com

Aaron Lesmeister Local Network Implementation 301 65th St W, Richfield, MN, 55423 tel: 763-326-2525 | cell: 651-272-6580 aaron.lesmeister1@lumen.com

CAMPUS MAP

ELECTRONIC HEALTH RECORDS MODERNIZATION

/06

/20

ADDENDUM #1 07/07/2022

ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/7

/2

:1

:3

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70G-001

DRAWING INDEX

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

DRAWING INDEX 01 - BUILDING 70

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED

IN 65% DD

INCLUDED IN

95% CD

FINAL BID

DOCUMENTS

70M-101M MECHANICAL PLAN - FIRST LEVEL AREA M Yes Yes Yes Yes

70M-101N MECHANICAL PLAN - FIRST LEVEL AREA N Yes Yes Yes Yes

70M-102AC MECHANICAL PLAN - SECOND LEVEL AREA A AND C Yes Yes Yes Yes

70M-102B MECHANICAL PLAN - SECOND LEVEL AREA B Yes Yes Yes Yes

70M-102D MECHANICAL PLAN - SECOND LEVEL AREA D Yes Yes Yes Yes

70M-102E MECHANICAL PLAN - SECOND LEVEL AREA E Yes Yes Yes Yes

70M-102F MECHANICAL PLAN - SECOND LEVEL AREA F Yes Yes Yes Yes

70M-102G MECHANICAL PLAN - SECOND LEVEL AREA G Yes Yes Yes Yes

70M-102H MECHANICAL PLAN - SECOND LEVEL AREA H Yes Yes Yes Yes

70M-102J MECHANICAL PLAN - SECOND LEVEL AREA J Yes Yes Yes Yes

70M-102K MECHANICAL PLAN - SECOND LEVEL AREA K Yes Yes Yes Yes

70M-102L MECHANICAL PLAN - SECOND LEVEL AREA L Yes Yes Yes Yes

70M-102M MECHANICAL PLAN - SECOND LEVEL AREA M Yes Yes Yes Yes

70M-103AC MECHANICAL PLAN - THIRD LEVEL AREA A Yes Yes Yes Yes

70M-103B MECHANICAL PLAN - THIRD LEVEL AREA B Yes Yes Yes Yes

70M-103D MECHANICAL PLAN - THIRD LEVEL AREA D Yes Yes Yes Yes

70M-103E MECHANICAL PLAN - THIRD LEVEL AREA E Yes Yes Yes Yes

70M-103F MECHANICAL PLAN - THIRD LEVEL AREA F Yes Yes Yes Yes

70M-103G MECHANICAL PLAN - THIRD LEVEL AREA G Yes Yes Yes Yes

70M-103H MECHANICAL PLAN - THIRD LEVEL AREA H Yes Yes Yes Yes

70M-103J MECHANICAL PLAN - THIRD LEVEL AREA J Yes Yes Yes Yes

70M-103K MECHANICAL PLAN - THIRD LEVEL AREA K Yes Yes Yes Yes

70M-103L MECHANICAL PLAN - THIRD LEVEL AREA L Yes Yes Yes Yes

70M-103M MECHANICAL PLAN - THIRD LEVEL AREA M Yes Yes Yes Yes

70M-104A MECHANICAL PLAN - FOURTH LEVEL AREA A Yes Yes Yes Yes

70M-104B MECHANICAL PLAN - FOURTH LEVEL AREA B Yes Yes Yes Yes

70M-104C MECHANICAL PLAN - FOURTH LEVEL AREA C Yes Yes Yes Yes

70M-104D MECHANICAL PLAN - FOURTH LEVEL AREA D Yes Yes Yes Yes

70M-104E MECHANICAL PLAN - FOURTH LEVEL AREA E Yes Yes Yes Yes

70M-104F MECHANICAL PLAN - FOURTH LEVEL AREA F Yes Yes Yes Yes

70M-104G MECHANICAL PLAN - FOURTH LEVEL AREA G Yes Yes Yes Yes

70M-104H MECHANICAL PLAN - FOURTH LEVEL AREA H Yes Yes Yes Yes

70M-104J MECHANICAL PLAN - FOURTH LEVEL AREA J Yes Yes Yes Yes

70M-104K MECHANICAL PLAN - FOURTH LEVEL AREA K Yes Yes Yes Yes

70M-104L MECHANICAL PLAN - FOURTH LEVEL AREA L Yes Yes Yes Yes

70M-104M MECHANICAL PLAN - FOURTH LEVEL AREA M Yes Yes Yes Yes

70M-105 MECHANICAL PLAN - FIFTH LEVEL No No No No

70M-401 MECHANICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70M-402 MECHANICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70M-411 MECHANICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70M-412 MECHANICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70M-413 MECHANICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70M-421 MECHANICAL ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70M-422 MECHANICAL ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70M-431 MECHANICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70M-432 MECHANICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70M-433 MECHANICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70M-441 MECHANICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70M-442 MECHANICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70M-443 MECHANICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70M-501 MECHANICAL DETAILS Yes Yes Yes Yes

70M-600 MECHANICAL CHILLED WATER PIPING RISER DIAGRAM No No Yes Yes

70M-701 MECHANICAL SCHEDULES No No Yes Yes

70M-711 MECHANICAL SCHEDULES No No Yes Yes

70M-721 MECHANICAL SCHEDULES No No Yes Yes

70M-731 MECHANICAL SCHEDULES No No Yes Yes

70M-741 MECHANICAL SCHEDULES Yes Yes Yes Yes

70M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No No Yes Yes

70M-802 MECHANICAL CONTROL DIAGRAMS No No Yes Yes

70M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No No No Yes

70M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

DRAWING INDEX 01 - BUILDING 70

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED

IN 65% DD

INCLUDED IN

95% CD

FINAL BID

DOCUMENTS

GENERAL

70G-000 COVER SHEET Yes Yes Yes Yes

70G-001 DRAWING INDEX Yes Yes Yes Yes

70G-002 DRAWING INDEX Yes Yes Yes Yes

70G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes

70G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes

70G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ARCHITECTURAL

70A-001 SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes

70A-100 OVERALL ARCHITECTURAL FLOOR PLAN - BASEMENT No No Yes Yes

70A-101 OVERALL ARCHITECTURAL FLOOR PLAN - FIRST LEVEL Yes Yes Yes Yes

70A-102 OVERALL ARCHITECTURAL FLOOR PLAN - SECOND LEVEL Yes Yes Yes Yes

70A-103 OVERALL ARCHITECTURAL FLOOR PLAN - THIRD LEVEL Yes Yes Yes Yes

70A-104 OVERALL ARCHITECTURAL FLOOR PLAN - FOURTH LEVEL Yes Yes Yes Yes

70A-400A ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA A Yes Yes Yes Yes

70A-400B ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA B Yes Yes Yes Yes

70A-400D ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA D Yes Yes Yes Yes

70A-400F ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA F Yes Yes Yes Yes

70A-400G ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA G Yes Yes Yes Yes

70A-400H ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA H Yes Yes Yes Yes

70A-400J ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA J Yes Yes Yes Yes

70A-400K ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA K Yes Yes Yes Yes

70A-400L ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA L Yes Yes Yes Yes

70A-400M ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA M Yes Yes Yes Yes

70A-400N ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA N Yes Yes Yes Yes

70A-400P ARCHITECTURAL ENLARGED VIEWS - BASEMENT LEVEL AREA P Yes Yes Yes Yes

70A-401A ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA A Yes Yes Yes Yes

70A-401B ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA B Yes Yes Yes Yes

70A-401C ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA C Yes Yes Yes Yes

70A-401D ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA D Yes Yes Yes Yes

70A-401E ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA E Yes Yes Yes Yes

70A-401F ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA F Yes Yes Yes Yes

70A-401G ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA G Yes Yes Yes Yes

70A-401H ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA H Yes Yes Yes Yes

70A-401J ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA J Yes Yes Yes Yes

70A-401K ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA K Yes Yes Yes Yes

70A-401L ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA L Yes Yes Yes Yes

70A-401M ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA M Yes Yes Yes Yes

70A-401N ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL AREA N Yes Yes Yes Yes

70A-402AC ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA A & AREA C Yes Yes Yes Yes

70A-402B ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA B Yes Yes Yes Yes

70A-402D ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA D Yes Yes Yes Yes

70A-402E ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA E Yes Yes Yes Yes

70A-402F ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA F Yes Yes Yes Yes

70A-402G ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA G Yes Yes Yes Yes

70A-402H ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA H Yes Yes Yes Yes

70A-402J ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA J Yes Yes Yes Yes

70A-402K ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA K Yes Yes Yes Yes

70A-402L ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA L Yes Yes Yes Yes

70A-402M ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL AREA M Yes Yes Yes Yes

70A-403AC ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA A & AREA C No No Yes Yes

70A-403B ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA B No No Yes Yes

70A-403D ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA D No No Yes Yes

70A-403E ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA E No No Yes Yes

70A-403F ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA F No No Yes Yes

70A-403G ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA G No No Yes Yes

70A-403H ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA H No No Yes Yes

70A-403J ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA J No No Yes Yes

70A-403K ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA K No No Yes Yes

70A-403L ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA L No No Yes Yes

70A-403M ARCHITECTURAL ENLARGED VIEWS - THIRD LEVEL AREA M No No Yes Yes

70A-404A ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA A Yes Yes Yes Yes

70A-404B ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA B Yes Yes Yes Yes

70A-404C ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA C Yes Yes Yes Yes

70A-404D ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA D Yes Yes Yes Yes

70A-404E ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA E Yes Yes Yes Yes

70A-404F ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA F Yes Yes Yes Yes

70A-404G ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA G Yes Yes Yes Yes

70A-404H ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA H Yes Yes Yes Yes

70A-404J ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA J Yes Yes Yes Yes

70A-404K ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA K Yes Yes Yes Yes

70A-404L ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA L Yes Yes Yes Yes

70A-404M ARCHITECTURAL ENLARGED VIEWS - FOURTH LEVEL AREA M Yes Yes Yes Yes

70A-405 ARCHITECTUREAL ENLARGED VIEWS - PENTHOUSE No No No Yes

70A-501 ARCHITECTURAL ROOF PLAN & DETAILS Yes Yes Yes Yes

70A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS Yes Yes Yes Yes

70A-512 ARCHITECTURAL PARTITION HEAD DETAILS Yes Yes Yes Yes

70A-531 ARCHITECTURAL CEILING DETAILS Yes Yes Yes Yes

INTERIORS

70IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES Yes Yes Yes Yes

70IN-102 ROOM FINISH SCHEDULE Yes Yes Yes Yes

FIRE PROTECTION

70FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS Yes Yes Yes Yes

70FX100A FIRE PROTECTION PLAN - BASEMENT LEVEL AREA A Yes Yes Yes Yes

70FX100D FIRE PROTECTION PLAN - BASEMENT LEVEL AREA D Yes Yes Yes Yes

70FX100G FIRE PROTECTION PLAN - BASEMENT LEVEL AREA G Yes Yes Yes Yes

70FX100K FIRE PROTECTION PLAN - BASEMENT LEVEL AREA K Yes Yes Yes Yes

70FX100M FIRE PROTECTION PLAN - BASEMENT LEVEL AREA M Yes Yes Yes Yes

70FX101A FIRE PROTECTION PLAN - FIRST LEVEL AREA A Yes Yes Yes Yes

70FX101D FIRE PROTECTION PLAN - FIRST LEVEL AREA D Yes Yes Yes Yes

70FX101G FIRE PROTECTION PLAN - FIRST LEVEL AREA G Yes Yes Yes Yes

70FX101L FIRE PROTECTION PLAN - FIRST LEVEL AREA L Yes Yes Yes Yes

70FX101M FIRE PROTECTION PLAN - FIRST LEVEL AREA M Yes Yes Yes Yes

70FX102AC FIRE PROTECTION PLAN - SECOND LEVEL AREA A AND C Yes Yes Yes Yes

70FX102D FIRE PROTECTION PLAN - SECOND LEVEL AREA D Yes Yes Yes Yes

70FX102G FIRE PROTECTION PLAN - SECOND LEVEL AREA G Yes Yes Yes Yes

70FX102K FIRE PROTECTION PLAN - SECOND LEVEL AREA K Yes Yes Yes Yes

70FX102M FIRE PROTECTION PLAN - SECOND LEVEL AREA M Yes Yes Yes Yes

70FX103A FIRE PROTECTION PLAN - THIRD LEVEL AREA A Yes Yes Yes Yes

70FX103D FIRE PROTECTION PLAN - THIRD LEVEL AREA D Yes Yes Yes Yes

70FX103G FIRE PROTECTION PLAN - THIRD LEVEL AREA G Yes Yes Yes Yes

70FX103K FIRE PROTECTION PLAN - THIRD LEVEL AREA K Yes Yes Yes Yes

70FX103M FIRE PROTECTION PLAN - THIRD LEVEL AREA M Yes Yes Yes Yes

70FX104A FIRE PROTECTION PLAN - FOURTH LEVEL AREA A Yes Yes Yes Yes

70FX104D FIRE PROTECTION PLAN - FOURTH LEVEL AREA D Yes Yes Yes Yes

70FX104G FIRE PROTECTION PLAN - FOURTH LEVEL AREA G Yes Yes Yes Yes

70FX104L FIRE PROTECTION PLAN - FOURTH LEVEL AREA L Yes Yes Yes Yes

70FX104M FIRE PROTECTION PLAN - FOURTH LEVEL AREA M Yes Yes Yes Yes

70FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

PLUMBING

70P-100M BASEMENT LEVEL PLUMBING PLAN AREA A No No No Yes

MECHANICAL

70M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes

70M-100A MECHANICAL PLAN - BASEMENT LEVEL AREA A Yes Yes Yes Yes

70M-100B MECHANICAL PLAN - BASEMENT LEVEL AREA B Yes Yes Yes Yes

70M-100D MECHANICAL PLAN - BASEMENT LEVEL AREA D Yes Yes Yes Yes

70M-100F MECHANICAL PLAN - BASEMENT LEVEL AREA F Yes Yes Yes Yes

70M-100G MECHANICAL PLAN - BASEMENT LEVEL AREA G Yes Yes Yes Yes

70M-100H MECHANICAL PLAN - BASEMENT LEVEL AREA H Yes Yes Yes Yes

70M-100J MECHANICAL PLAN - BASEMENT LEVEL AREA J Yes Yes Yes Yes

70M-100K MECHANICAL PLAN - BASEMENT LEVEL AREA K Yes Yes Yes Yes

70M-100L MECHANICAL PLAN - BASEMENT LEVEL AREA L Yes Yes Yes Yes

70M-100M MECHANICAL PLAN - BASEMENT LEVEL AREA M Yes Yes Yes Yes

70M-100N MECHANICAL PLAN - BASEMENT LEVEL AREA N Yes Yes Yes Yes

70M-100P MECHANICAL PLAN - BASEMENT LEVEL AREA P Yes Yes Yes Yes

70M-101A MECHANICAL PLAN - FIRST LEVEL AREA A Yes Yes Yes Yes

70M-101B MECHANICAL PLAN - FIRST LEVEL AREA B Yes Yes Yes Yes

70M-101C MECHANICAL PLAN - FIRST LEVEL AREA C Yes Yes Yes Yes

70M-101D MECHANICAL PLAN - FIRST LEVEL AREA D Yes Yes Yes Yes

70M-101E MECHANICAL PLAN - FIRST LEVEL AREA E Yes Yes Yes Yes

70M-101F MECHANICAL PLAN - FIRST LEVEL AREA F Yes Yes Yes Yes

70M-101G MECHANICAL PLAN - FIRST LEVEL AREA G Yes Yes Yes Yes

70M-101H MECHANICAL PLAN - FIRST LEVEL AREA H Yes Yes Yes Yes

70M-101J MECHANICAL PLAN - FIRST LEVEL AREA J Yes Yes Yes Yes

70M-101K MECHANICAL PLAN - FIRST LEVEL AREA K Yes Yes Yes Yes

70M-101L MECHANICAL PLAN - FIRST LEVEL AREA L Yes Yes Yes Yes

1 Revision 1 Date 1

05/06/2022 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/7

/2

:1

:3

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70G-002

DRAWING INDEX

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

DRAWING INDEX 02 - BUILDING 70

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED

IN 65% DD

INCLUDED IN

95% DD

FINAL BID

DOCUMENTS

70T-704C TELECOMMUNICATION SCHEDULES No No No Yes

70T-704D TELECOMMUNICATION SCHEDULES No No No Yes

70T-704E TELECOMMUNICATION SCHEDULES No No No Yes

70T-704F TELECOMMUNICATION SCHEDULES No No No Yes

70T-704G TELECOMMUNICATION SCHEDULES No No No Yes

70T-704H TELECOMMUNICATION SCHEDULES No No No Yes

70T-704J TELECOMMUNICATION SCHEDULES No No No Yes

70T-704K TELECOMMUNICATION SCHEDULES No No No Yes

70T-704L TELECOMMUNICATION SCHEDULES No No No Yes

70T-704M TELECOMMUNICATION SCHEDULES No No No Yes

70T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

REFERENCE

70R-900 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-901 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-902 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-903 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-904 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-905 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-906 PHOTO REFERENCES - BASEMENT LEVEL Yes Yes Yes Yes

70R-910 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-911 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-912 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-913 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-914 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-915 PHOTO REFERENCES - FIRST LEVEL Yes Yes Yes Yes

70R-920 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-921 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-922 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-923 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-924 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-925 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-926 PHOTO REFERENCES - SECOND LEVEL Yes Yes Yes Yes

70R-930 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-931 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-932 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-933 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-934 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-935 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-936 PHOTO REFERENCES - THIRD LEVEL Yes Yes Yes Yes

70R-940 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

70R-941 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

70R-942 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

70R-943 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

70R-944 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

70R-945 PHOTO REFERENCES - FOURTH LEVEL Yes Yes Yes Yes

DRAWING INDEX 02 - BUILDING 70

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED

IN 65% DD

INCLUDED IN

95% DD

FINAL BID

DOCUMENTS

70T-102K TELECOMMUNICATION PLAN - SECOND LEVEL AREA K Yes Yes Yes Yes

70T-102L TELECOMMUNICATION PLAN - SECOND LEVEL AREA L Yes Yes Yes Yes

70T-102M TELECOMMUNICATION PLAN - SECOND LEVEL AREA M Yes Yes Yes Yes

70T-103 TELECOMMUNICATION THIRD LEVEL INTERSTITIAL Yes Yes Yes Yes

70T-103AC TELECOMMUNICATION PLAN - THIRD LEVEL AREA A AND C Yes Yes Yes Yes

70T-103B TELECOMMUNICATION PLAN - THIRD LEVEL AREA B Yes Yes Yes Yes

70T-103D TELECOMMUNICATION PLAN - THIRD LEVEL AREA D Yes Yes Yes Yes

70T-103E TELECOMMUNICATION PLAN - THIRD LEVEL AREA E Yes Yes Yes Yes

70T-103F TELECOMMUNICATION PLAN - THIRD LEVEL AREA F Yes Yes Yes Yes

70T-103G TELECOMMUNICATION PLAN - THIRD LEVEL AREA G Yes Yes Yes Yes

70T-103H TELECOMMUNICATION PLAN - THIRD LEVEL AREA H Yes Yes Yes Yes

70T-103J TELECOMMUNICATION PLAN - THIRD LEVEL AREA J Yes Yes Yes Yes

70T-103K TELECOMMUNICATION PLAN - THIRD LEVEL AREA K Yes Yes Yes Yes

70T-103L TELECOMMUNICATION PLAN - THIRD LEVEL AREA L Yes Yes Yes Yes

70T-103M TELECOMMUNICATION PLAN - THIRD LEVEL AREA M Yes Yes Yes Yes

70T-104 TELECOMMUNICATION FOURTH LEVEL INTERSTITIAL Yes Yes Yes Yes

70T-104A TELECOMMUNICATION PLAN - FOURTH LEVEL AREA A Yes Yes Yes Yes

70T-104B TELECOMMUNICATION PLAN - FOURTH LEVEL AREA B Yes Yes Yes Yes

70T-104C TELECOMMUNICATION PLAN - FOURTH LEVEL AREA C Yes Yes Yes Yes

70T-104D TELECOMMUNICATION PLAN - FOURTH LEVEL AREA D Yes Yes Yes Yes

70T-104E TELECOMMUNICATION PLAN - FOURTH LEVEL AREA E Yes Yes Yes Yes

70T-104F TELECOMMUNICATION PLAN - FOURTH LEVEL AREA F Yes Yes Yes Yes

70T-104G TELECOMMUNICATION PLAN - FOURTH LEVEL AREA G Yes Yes Yes Yes

70T-104H TELECOMMUNICATION PLAN - FOURTH LEVEL AREA H Yes Yes Yes Yes

70T-104J TELECOMMUNICATION PLAN - FOURTH LEVEL AREA J Yes Yes Yes Yes

70T-104K TELECOMMUNICATION PLAN - FOURTH LEVEL AREA K Yes Yes Yes Yes

70T-104L TELECOMMUNICATION PLAN - FOURTH LEVEL AREA L Yes Yes Yes Yes

70T-104M TELECOMMUNICATION PLAN - FOURTH LEVEL AREA M Yes Yes Yes Yes

70T-401 TELECOMMUNICATION ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70T-402 TELECOMMUNICATION ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70T-403 TELECOMMUNICATION ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70T-404 TELECOMMUNICATION ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70T-411 TELECOMMUNICATION ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70T-412 TELECOMMUNICATION ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70T-413 TELECOMMUNICATION ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70T-421 TELECOMMUNICATION ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70T-422 TELECOMMUNICATION ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70T-431 TELECOMMUNICATION ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70T-432 TELECOMMUNICATION ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70T-433 TELECOMMUNICATION ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70T-441 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-442 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-443 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-444 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-445 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-446 TELECOMMUNICATION ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes

70T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes

70T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes

70T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes

70T-602 TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS Yes Yes Yes Yes

70T-603 TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS Yes Yes Yes Yes

70T-604 TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS Yes Yes Yes Yes

70T-605 TELECOMMUNICATIONS FIBER RISER DIAGRAM - NEW - B70 Yes Yes Yes Yes

70T-606 TELECOMMUNICATIONS FIBER RISER DIAGRAM – B70 Yes Yes Yes Yes

70T-607 TELECOMMUNICATIONS FIBER RISER DIAGRAM – B70 Yes Yes Yes Yes

70T-608 TELECOMMUNICATIONS FIBER RISER DIAGRAM – B70 Yes Yes Yes Yes

70T-609 TELECOMMUNICATIONS FIBER RISER DIAGRAM – B70 Yes Yes Yes Yes

70T-610 TELECOMMUNICATIONS FIBER RISER DIAGRAM – B70 Yes Yes Yes Yes

70T-611 TELECOMMUNICATION RACK ELEVATIONS BASEMENT Yes Yes Yes Yes

70T-612 TELECOMMUNICATION RACK ELEVATIONS BASEMENT Yes Yes Yes Yes

70T-613 TELECOMMUNICATION RACK ELEVATIONS BASEMENT Yes Yes Yes Yes

70T-614 TELECOMMUNICATION RACK ELEVATIONS FIRST LEVEL Yes Yes Yes Yes

70T-615 TELECOMMUNICATION RACK ELEVATIONS FIRST LEVEL Yes Yes Yes Yes

70T-616 TELECOMMUNICATION RACK ELEVATIONS FIRST LEVEL Yes Yes Yes Yes

70T-617 TELECOMMUNICATION RACK ELEVATIONS FIRST LEVEL Yes Yes Yes Yes

70T-618 TELECOMMUNICATION RACK ELEVATIONS SECOND LEVEL Yes Yes Yes Yes

70T-619 TELECOMMUNICATION RACK ELEVATIONS SECOND LEVEL Yes Yes Yes Yes

70T-620 TELECOMMUNICATION RACK ELEVATIONS SECOND LEVEL Yes Yes Yes Yes

70T-621 TELECOMMUNICATION RACK ELEVATIONS SECOND LEVEL Yes Yes Yes Yes

70T-622 TELECOMMUNICATION RACK ELEVATIONS THIRD LEVEL Yes Yes Yes Yes

70T-623 TELECOMMUNICATION RACK ELEVATIONS THIRD LEVEL Yes Yes Yes Yes

70T-624 TELECOMMUNICATION RACK ELEVATIONS THIRD LEVEL Yes Yes Yes Yes

70T-625 TELECOMMUNICATION RACK ELEVATIONS FOURTH LEVEL Yes Yes Yes Yes

70T-626 TELECOMMUNICATION RACK ELEVATIONS FOURTH LEVEL Yes Yes Yes Yes

70T-627 TELECOMMUNICATION RACK ELEVATIONS FOURTH LEVEL Yes Yes Yes Yes

70T-700A TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700B TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700D TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700F TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700G TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700H TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700J TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700K TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700L TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700L-2 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700M TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700N TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-700P TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701A TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701B TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701C TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701D TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701E TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701F TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701G TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701H TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701J TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701K TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701K-2 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701L TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701M TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701M-2 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701M-3 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-701N TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702A TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702B TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702C TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702D TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702D2 TELECOMMUNICATION SCHEDULES No No No Yes

70T-702E TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702F TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702G TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702H TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702J TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702K TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702K-2 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702L TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702M TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702M-2 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-702M-3 TELECOMMUNICATION SCHEDULES No No Yes Yes

70T-703A TELECOMMUNICATION SCHEDULES No No No Yes

70T-703B TELECOMMUNICATION SCHEDULES No No No Yes

70T-703C TELECOMMUNICATION SCHEDULES No No No Yes

70T-703D TELECOMMUNICATION SCHEDULES No No No Yes

70T-703E TELECOMMUNICATION SCHEDULES No No No Yes

70T-703F TELECOMMUNICATION SCHEDULES No No No Yes

70T-703G TELECOMMUNICATION SCHEDULES No No No Yes

70T-703H TELECOMMUNICATION SCHEDULES No No No Yes

70T-703J TELECOMMUNICATION SCHEDULES No No No Yes

70T-703K TELECOMMUNICATION SCHEDULES No No No Yes

70T-703L TELECOMMUNICATION SCHEDULES No No No Yes

70T-703L2 TELECOMMUNICATION SCHEDULES No No No Yes

70T-703M TELECOMMUNICATION SCHEDULES No No No Yes

70T-704A TELECOMMUNICATION SCHEDULES No No No Yes

70T-704B TELECOMMUNICATION SCHEDULES No No No Yes

DRAWING INDEX 02 - BUILDING 70

SHEET

NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED

IN 65% DD

INCLUDED IN

95% DD

FINAL BID

DOCUMENTS

ELECTRICAL

70E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes

70E-100A ELECTRICAL PLAN - BASEMENT LEVEL AREA A Yes Yes Yes Yes

70E-100B ELECTRICAL PLAN - BASEMENT LEVEL AREA B Yes Yes Yes Yes

70E-100D ELECTRICAL PLAN - BASEMENT LEVEL AREA D Yes Yes Yes Yes

70E-100F ELECTRICAL PLAN - BASEMENT LEVEL AREA F Yes Yes Yes Yes

70E-100G ELECTRICAL PLAN - BASEMENT LEVEL AREA G Yes Yes Yes Yes

70E-100H ELECTRICAL PLAN - BASEMENT LEVEL AREA H Yes Yes Yes Yes

70E-100J ELECTRICAL PLAN - BASEMENT LEVEL AREA J Yes Yes Yes Yes

70E-100K ELECTRICAL PLAN - BASEMENT LEVEL AREA K Yes Yes Yes Yes

70E-100L ELECTRICAL PLAN - BASEMENT LEVEL AREA L Yes Yes Yes Yes

70E-100M ELECTRICAL PLAN - BASEMENT LEVEL AREA M Yes Yes Yes Yes

70E-100N ELECTRICAL PLAN - BASEMENT LEVEL AREA N Yes Yes Yes Yes

70E-100P ELECTRICAL PLAN - BASEMENT LEVEL AREA P Yes Yes Yes Yes

70E-101A ELECTRICAL PLAN - FIRST LEVEL AREA A Yes Yes Yes Yes

70E-101B ELECTRICAL PLAN - FIRST LEVEL AREA B Yes Yes Yes Yes

70E-101C ELECTRICAL PLAN - FIRST LEVEL AREA C Yes Yes Yes Yes

70E-101D ELECTRICAL PLAN - FIRST LEVEL AREA D Yes Yes Yes Yes

70E-101E ELECTRICAL PLAN - FIRST LEVEL AREA E Yes Yes Yes Yes

70E-101F ELECTRICAL PLAN - FIRST LEVEL AREA F Yes Yes Yes Yes

70E-101G ELECTRICAL PLAN - FIRST LEVEL AREA G Yes Yes Yes Yes

70E-101H ELECTRICAL PLAN - FIRST LEVEL AREA H Yes Yes Yes Yes

70E-101J ELECTRICAL PLAN - FIRST LEVEL AREA J Yes Yes Yes Yes

70E-101K ELECTRICAL PLAN - FIRST LEVEL AREA K Yes Yes Yes Yes

70E-101L ELECTRICAL PLAN - FIRST LEVEL AREA L Yes Yes Yes Yes

70E-101M ELECTRICAL PLAN - FIRST LEVEL AREA M Yes Yes Yes Yes

70E-101N ELECTRICAL PLAN - FIRST LEVEL AREA N Yes Yes Yes Yes

70E-102AC ELECTRICAL PLAN - SECOND LEVEL AREA A AND C Yes Yes Yes Yes

70E-102B ELECTRICAL PLAN - SECOND LEVEL AREA B Yes Yes Yes Yes

70E-102D ELECTRICAL PLAN - SECOND LEVEL AREA D Yes Yes Yes Yes

70E-102E ELECTRICAL PLAN - SECOND LEVEL AREA E Yes Yes Yes Yes

70E-102F ELECTRICAL PLAN - SECOND LEVEL AREA F Yes Yes Yes Yes

70E-102G ELECTRICAL PLAN - SECOND LEVEL AREA G Yes Yes Yes Yes

70E-102H ELECTRICAL PLAN - SECOND LEVEL AREA H Yes Yes Yes Yes

70E-102J ELECTRICAL PLAN - SECOND LEVEL AREA J Yes Yes Yes Yes

70E-102K ELECTRICAL PLAN - SECOND LEVEL AREA K Yes Yes Yes Yes

70E-102L ELECTRICAL PLAN - SECOND LEVEL AREA L Yes Yes Yes Yes

70E-102M ELECTRICAL PLAN - SECOND LEVEL AREA M Yes Yes Yes Yes

70E-103A ELECTRICAL PLAN - THIRD LEVEL AREA A Yes Yes Yes Yes

70E-103B ELECTRICAL PLAN - THIRD LEVEL AREA B Yes Yes Yes Yes

70E-103C ELECTRICAL PLAN - THIRD LEVEL AREA C Yes Yes Yes Yes

70E-103D ELECTRICAL PLAN - THIRD LEVEL AREA D Yes Yes Yes Yes

70E-103E ELECTRICAL PLAN - THIRD LEVEL AREA E Yes Yes Yes Yes

70E-103F ELECTRICAL PLAN - THIRD LEVEL AREA F Yes Yes Yes Yes

70E-103G ELECTRICAL PLAN - THIRD LEVEL AREA G Yes Yes Yes Yes

70E-103H ELECTRICAL PLAN - THIRD LEVEL AREA H Yes Yes Yes Yes

70E-103J ELECTRICAL PLAN - THIRD LEVEL AREA J Yes Yes Yes Yes

70E-103K ELECTRICAL PLAN - THIRD LEVEL AREA K Yes Yes Yes Yes

70E-103L ELECTRICAL PLAN - THIRD LEVEL AREA L Yes Yes Yes Yes

70E-103M ELECTRICAL PLAN - THIRD LEVEL AREA M Yes Yes Yes Yes

70E-104A ELECTRICAL PLAN - FOURTH LEVEL AREA A Yes Yes Yes Yes

70E-104B ELECTRICAL PLAN - FOURTH LEVEL AREA B Yes Yes Yes Yes

70E-104C ELECTRICAL PLAN - FOURTH LEVEL AREA C Yes Yes Yes Yes

70E-104D ELECTRICAL PLAN - FOURTH LEVEL AREA D Yes Yes Yes Yes

70E-104E ELECTRICAL PLAN - FOURTH LEVEL AREA E Yes Yes Yes Yes

70E-104F ELECTRICAL PLAN - FOURTH LEVEL AREA F Yes Yes Yes Yes

70E-104G ELECTRICAL PLAN - FOURTH LEVEL AREA G Yes Yes Yes Yes

70E-104H ELECTRICAL PLAN - FOURTH LEVEL AREA H Yes Yes Yes Yes

70E-104J ELECTRICAL PLAN - FOURTH LEVEL AREA J Yes Yes Yes Yes

70E-104K ELECTRICAL PLAN - FOURTH LEVEL AREA K Yes Yes Yes Yes

70E-104L ELECTRICAL PLAN - FOURTH LEVEL AREA L Yes Yes Yes Yes

70E-104M ELECTRICAL PLAN - FOURTH LEVEL AREA M Yes Yes Yes Yes

70E-105 ELECTRICAL PLANS - PENTHOUSE LEVEL No No No Yes

70E-401 ELECTRICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70E-402 ELECTRICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70E-403 ELECTRICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70E-404 ELECTRICAL ENLARGED PLANS - BASEMENT LEVEL Yes Yes Yes Yes

70E-411 ELECTRICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70E-412 ELECTRICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70E-413 ELECTRICAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes

70E-421 ELECTRICAL ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70E-422 ELECTRICAL ENLARGED PLANS - SECOND LEVEL Yes Yes Yes Yes

70E-431 ELECTRICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70E-432 ELECTRICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70E-433 ELECTRICAL ENLARGED PLANS - THIRD LEVEL Yes Yes Yes Yes

70E-444 ELECTRICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70E-445 ELECTRICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70E-446 ELECTRICAL ENLARGED PLANS - FOURTH LEVEL Yes Yes Yes Yes

70E-450 ELECTRICAL ENLARGED PLANS - PENTHOUSE LEVEL No No No Yes

70E-501 ELECTRICAL DETAILS Yes Yes Yes Yes

70E-601 ELECTRICAL ONE-LINE DIAGRAMS No No Yes Yes

70E-701 ELECTRICAL SCHEDULES No No Yes Yes

70E-702 ELECTRICAL SCHEDULES No No Yes Yes

70E-711 ELECTRICAL SCHEDULES No No Yes Yes

70E-712 ELECTRICAL SCHEDULES No No Yes Yes

70E-721 ELECTRICAL SCHEDULES No No Yes Yes

70E-722 ELECTRICAL SCHEDULES No No Yes Yes

70E-731 ELECTRICAL SCHEDULES No No Yes Yes

70E-732 ELECTRICAL SCHEDULES No No Yes Yes

70E-741 ELECTRICAL SCHEDULES No No Yes Yes

70E-742 ELECTRICAL SCHEDULES No No Yes Yes

70E-743 ELECTRICAL SCHEDULES No No No Yes

70E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

TELECOMMUNICATION

70T-001 TELECOMMUNICATION ABBREVIATIONS, SYMBOLS & GENERAL NOTES Yes Yes Yes Yes

70T0 DIAMOND ANALYSIS - BASEMENT LEVEL Yes Yes Yes Yes

70T1 DIAMOND ANALYSIS - FIRST LEVEL Yes Yes Yes Yes

70T2 DIAMOND ANALYSIS - SECOND LEVEL Yes Yes Yes Yes

70T3 DIAMOND ANALYSIS - THIRD LEVEL Yes Yes Yes Yes

70T4 DIAMOND ANALYSIS - FOURTH LEVEL Yes Yes Yes Yes

70T-100 TELECOMMUNICATION BASEMENT INTERSTITIAL Yes Yes Yes Yes

70T-100A TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA A Yes Yes Yes Yes

70T-100B TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA B Yes Yes Yes Yes

70T-100D TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA D Yes Yes Yes Yes

70T-100F TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA F Yes Yes Yes Yes

70T-100G TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA G Yes Yes Yes Yes

70T-100H TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA H Yes Yes Yes Yes

70T-100J TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA J Yes Yes Yes Yes

70T-100K TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA K Yes Yes Yes Yes

70T-100L TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA L Yes Yes Yes Yes

70T-100M TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA M Yes Yes Yes Yes

70T-100N TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA N Yes Yes Yes Yes

70T-100P TELECOMMUNICATION PLAN - BASEMENT LEVEL AREA P Yes Yes Yes Yes

70T-101 TELECOMMUNICATION FIRST LEVEL INTERSTITIAL Yes Yes Yes Yes

70T-101A TELECOMMUNICATION PLAN - FIRST LEVEL AREA A Yes Yes Yes Yes

70T-101B TELECOMMUNICATION PLAN - FIRST LEVEL AREA B Yes Yes Yes Yes

70T-101C TELECOMMUNICATION PLAN - FIRST LEVEL AREA C Yes Yes Yes Yes

70T-101D TELECOMMUNICATION PLAN - FIRST LEVEL AREA D Yes Yes Yes Yes

70T-101E TELECOMMUNICATION PLAN - FIRST LEVEL AREA E Yes Yes Yes Yes

70T-101F TELECOMMUNICATION PLAN - FIRST LEVEL AREA F Yes Yes Yes Yes

70T-101G TELECOMMUNICATION PLAN - FIRST LEVEL AREA G Yes Yes Yes Yes

70T-101H TELECOMMUNICATION PLAN - FIRST LEVEL AREA H Yes Yes Yes Yes

70T-101J TELECOMMUNICATION PLAN - FIRST LEVEL AREA J Yes Yes Yes Yes

70T-101K TELECOMMUNICATION PLAN - FIRST LEVEL AREA K Yes Yes Yes Yes

70T-101L TELECOMMUNICATION PLAN - FIRST LEVEL AREA L Yes Yes Yes Yes

70T-101M TELECOMMUNICATION PLAN - FIRST LEVEL AREA M Yes Yes Yes Yes

70T-101N TELECOMMUNICATION PLAN - FIRST LEVEL AREA N Yes Yes Yes Yes

70T-102 TELECOMMUNICATION SECOND LEVEL INTERSTITIAL Yes Yes Yes Yes

70T-102AC TELECOMMUNICATION PLAN - SECOND LEVEL AREA A AND C Yes Yes Yes Yes

70T-102B TELECOMMUNICATION PLAN - SECOND LEVEL AREA B Yes Yes Yes Yes

70T-102D TELECOMMUNICATION PLAN - SECOND LEVEL AREA D Yes Yes Yes Yes

70T-102E TELECOMMUNICATION PLAN - SECOND LEVEL AREA E Yes Yes Yes Yes

70T-102F TELECOMMUNICATION PLAN - SECOND LEVEL AREA F Yes Yes Yes Yes

70T-102G TELECOMMUNICATION PLAN - SECOND LEVEL AREA G Yes Yes Yes Yes

70T-102H TELECOMMUNICATION PLAN - SECOND LEVEL AREA H Yes Yes Yes Yes

70T-102J TELECOMMUNICATION PLAN - SECOND LEVEL AREA J Yes Yes Yes Yes

1 Revision 1 Date 1

05/06/2022 ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:4

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70G-010

GENERAL PROJECT NOTES

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS

AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN

CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND

COR IMMEDIATELY.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS

NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF

WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11.

This is the start of the file's text. The full file is on GovTribe.