618-21-700.MEHRM.FINAL.B70.20220506Part-24.pdf

PDF 15 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document summarizes a federal contract solicitation for infrastructure upgrades at the Minneapolis VA Medical Center to support an Electronic Health Record Modernization project. The solicitation will be issued as a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. It is advertised as a total Service-Disabled Veteran-Owned Small Business set-aside, with offers from other than SDVOSB concerns not being considered. The work includes construction and commissioning of infrastructure such as a new server room to be built on the roof. The period of performance is approximately 450 calendar days from issuance of the notice to proceed, with the magnitude of construction expected to be between $20-50 million. All questions must be submitted in writing to the Department of Veterans Affairs Office of Information Service Center contact by the specified date.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:0

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-901

TELECOMMUNICATION CUTSHEETS & BASIS

OF DESIGN

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

05/06/2022