This document summarizes a federal solicitation for construction services. The solicitation is being issued by the Department of Veterans Affairs to upgrade infrastructure in support of an Electronic Health Record Modernization project at the Minneapolis VA Medical Center. The solicitation will be a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. The opportunity is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. The construction work includes building a new server room and infrastructure upgrades spread throughout the medical center. The period of performance is approximately 450 calendar days with a magnitude of construction estimated between $20-50 million. Questions regarding the solicitation must be submitted in writing to the point of contact by the specified deadline.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:0

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-503

TELECOMMUNICATION ROOM OIT TEMPLATE

DETAILS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

NOTE:

1. UTP JACKET COLOR TO COMPLY WITH 27 15 00.

05/06/2022

WAP

ROOF DECK

LAY-IN CEILING AND/OR INTERSTITIAL

FIRST FLOOR

EXISTING 1-1/4" CONDUIT/NEW CAT6A

(TYP.)

J

J

IT CLOSET

J

EXISTING 1-1/4" CONDUIT/NEW

CAT6A (TYP.)

EXISTING 1-1/4" CONDUIT/NEW

CAT6A (TYP.)

EXISTING 1-1/4" CONDUIT/NEW

CAT6A (TYP.)

3 4 4

8 9 10

PROPOSED END USER DEVICE (EUD)

REPLACEMENT SEQUENCE

1. MOVE A COMPUTER CABLE TO AN ADJACENT,

OPEN PORT IN THE ROOM (OR IN THE NEXT

ROOM).

2. REMOVE THE PORT COVER

3. CUT THE EXISTING CAT6E ABOVE THE CEILING

AND PULL IT OUT OF THE CONDUIT AT THE

PORT

4. FEED THE CAT6A INTO THE CONDUIT ABOVE

THE CEILING

5. FISH IT THROUGH TO THE J-BOX. TEST AND

TERMINATE THE CAT6A

6. INSTALL THE NEW PORT COVER

7. LABEL AND RECONNECT THE COMPUTER TO

THE ORIGINAL PORT JACK

8. MOVE TO THE NEXT PORT IN THE ROOM

RACK 1 RACK 2

1111 12 1212

NOTE: THE ABOVE EQUIPMENT LIST IS PROVIDED TO PRESENT BASIS OF DESIGN EQUIPMENT

SELECTIONS THAT MEET PROJECT REQUIREMENTS. CONTRACTOR MAY SUBMIT EQUIVALENT

PRODUCT SUBSTITUTIONS FOR REVIEW IF THEY ADHERE TO SPECIFICATION AND DRAWING

REQUIREMENTS. THE EQUIPMENT SCHEDULE IS NOT ALL INCLUSIVE FOR ALL MATERIALS

REQUIRED BY THE PROJECT. CONTRACTOR SHALL PROVIDE ALL DEVICES, ACCESSORIES,

FITTINGS, ATTACHMENTS, MOUNTING SYSTEMS, AND OTHER COMPONENTS REQUIRED TO

SATISFY ALL DRAWING AND SPECIFICATION REQUIREMENTS AND PROVIDE THE OWNER FULLY-

OPERATIONAL, COMMISSIONED SYSTEM AT PROJECT COMPLETION.

EQUIPMENT LIST - CONTRACTOR FURNISHED & INSTALLED

DESCRIPTION MANUFACTURER'S NUMBER OR EQUAL

DATA JACKS REF. 27 15 00 FOR COLORS

PATCH PANELS CAT-6A 48 PORT FLAT (ANGLED)

LAN CABLE: PLENUM-RATED

UNSHIELDED, TWISTED PAIR

CAT-6A COM SCOPE, BERK-TEK, MOHAWK/CDT, ESSEX

OR APPROVED EQUIVALENT (YELLOW, BLUE, RED)

LAN CABLE STANDOFFS

PANDUIT PPIS-SIOX (2"), PP2S-SIO-X (4-5/8") OR

APPROVED EQUIVALENT.

LAN CABLE TIE MOUNTING DEVICE

PANDUIT PLC-2S-S 1 0 SERIES, OR APPROVED

EQUIVALENT

LAN WIRE MANAGEMENT ORTRONICS (OR-60400129)

DATA FACE PLATES

PORT OUTLET RJ45 UNIVERSAL KEYSTONE

JACK FACE PLATE UNSPSC

43201612 OR APPROVED EQUIVALENT

FIRESTOP PUTTY

TYPE SIMILAR TO 3M UNSPSC# 46191503 WITH A 3+

HOUR FIRE RATING AND IN

COMPLIANCE WITH UL/ASTM 1479 IN COLOR RED-

BROWN, OR APPROVED EQUIVALENT.

DECORATIVE TRIM RINGS

WHITE OR IVORY DECORATIVE TRIM OR ESCUTCHEON

RING SIZED APPROPRIATELY FOR

THE CABLE TO PASS THROUGH, TO BE VERIFIED BY COR

OR COTR AS APPROPRIATE PRIOR TO INSTALLATION.

WIRE MESH CABLE TRAY

MINIMUM OF 4"X20" OR 6"X16" IN ORDER TO SUPPORT

384 CAT 6A UTP CABLES WITH SECOND LEVEL OF FIBER

DUCT SLOTTED WALL CABLE TRAY (4"X4" MINIMUM).

ZONEIT 30 AMP 3-PHASE PDU BASE

UNIT - FRONT

(ZONIT ZON-C-ZPDU1)

REQUIRES TWO 30 AMP 3-PHASE (WYE) CIRCUITS WITH

L21-30R RECEPTACLES (OR EQUIVALENT).

APC AP8861 RPDU OR EQUIVALENT; RACK PDU 2G,

METERED; L21-20 PLUG; 3-PHASE; 120/208 V INPUT;

20A; ZERO U, 5.7 KW, 208V, (36) C13 & (6)C19 & (2) 5-20

OUTLETS; FOR USE IN TELECOMMUNICATION ROOMS

WHERE 110V DISTRIBUTION USING NEMA 5-15 OR 5-20

RECEPTACLES ARE REQUIRED

6" WIDE VERTICAL CABLE

MANAGEMENT

OR-MM20VMD706 (OR EQUIVALENT)

MM20 VERTICAL CABLE MANAGEMENT "CAGE", WITH

DOOR, 6.45" X 10.26" X 76.94" WHITE

CAPACITY: 350 CATEGORY 6 PATCH CORDS OR 245

CATEGORY 6A PATCH CORDS

LARGER VCM AUTHORIZED IN ACCORDANCE WITH

CABLING REQUIREMENT

TYPICAL RACK

MIGHTY MO 20 CABLE MANAGEMENT RACK

30" CHANNEL DEPTH, 7' HIGH, WHITE FINISH OR

EQUIVALENT

SECURITY DOOR FRONT

MOUNTING HARDWARE

OR-MM2024DFHD-W

PDU MOUNTING BRACKET KIT

(TWO KITS PER RACK)

OR-MM20PDUMB1D2W

SECURITY DOOR REAR MOUNTING

HARDWARE

OR-MM2024DMRHD-W

FRONT AND REAR HEAVY DUTY

PERFORATED SECURITY DOOR

OR-MM20724PDHD-W

F-SERIES TERAFRAME GEN 3

CABINET SYSTEM

FF1N-113C-E42-B

12" X 4" BONDING BAR, UP 8'-6" TO

TOP, SET OF INSULATORS STAND-

OFF BRACKETS, STAINLESS STEEL

SCREWS

CASSETTE

NEW 5KW EATON BLADEUPS RACK-MOUNTED 208 V

UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH NEMA

20A L21-20P INPUT AND L21-20R OUTPUT

UNINTERRUPTIBLE POWER

SUPPLY (UPS)

POWER DELIVERY UNIT (PDU)

CHATSWORTH #10622-012

HDP12 COMPLIANT CARD READER

WITH PINPAD CARD PIV READY

LEVITON HDX ENTERPRISE MTP

STI EZ PATH SERIES 44+

iSTAR EDGE 1-READER WITH ENCLOSURE & PoE

MODULE

EZ PATH

NEW IP ADDRESSABLE

NETWORK CAMERA, POE+,

PTZ, MOTION SENSOR, AUTO-

TRACKING, DOME WITH WALL

MOUNT.

WISENET XNP-6320.

MOUNT AT 8’ – 6” A.F.F. TO

TOP OF WALL BRACKET.

CUT SHEET REFERENCES

T-501

T-503 | T-901

T-501 | T-601

T-901

T-501

T-501

T-501

T-501

T-504

T-502 | T-901

T-901

T-902

T-502

T-503

T-901

T-503

T-503

T-503

T-504

T-901

T-901

T-504

T-901

LEVITON ANGLED OPT-X UHDX 144 FIBERFIBER DISTRIBUTION CABINET T-901

SCHLAGE - L-SERIESELECTRIFIED LOCK T-901

IVES - TW4/TW8 & TW4M/TW8MELECTRIFIED HINGE T-901 & E-901

NOT SHOWN IN SET

NOT SHOWN IN SET

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:0

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-601

TELECOMMUNICATIONS RISER DIAGRAMS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS (PER MANUFACTURER UL-LISTING INSTALLATION

REQUIREMENTS), AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. TELECOMMUNICATIONS OUTLETS TO BE MOUNTED AT +18" A.F.F. (BOTTOM OF

BOX) UNLESS OTHERWISE NOTED. FOR EXAMPLE, DEVICES SPECIFIED AT +18"

A.F.F. SHALL MATCH THE STANDARD MOUNTING HEIGHT FOR POWER

RECEPTACLES AND TELECOMMUNICATIONS OUTLETS. DEVICES SPECIFIED AT

+44" A.F.F. SHALL MATCH STANDARD MOUNTING HEIGHT FOR LIGHT SWITCHES

ETC.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL

THINWALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE

NOTED. UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK. CONTRACTOR SHALL REPLACE ANY FIRE STOP REMOVED

DURING THE DEMO PROCESS TO RETURN THE PENETRATION TO AN

APPROVED UL-LISTED FIRE STOP ASSEMBLY.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION

M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE IT CLOSET.

N. REFER TO T-600 SERIES SHEET FOR PHOTO DOCUMENTATION OF EXISTING

CONDITIONS.

NTS

F2

TYPICAL TELECOMMUNICATIONS RISER DIAGRAM B70

CONDUIT FILL GUIDE

1. NEW WIRE BASKET STYLE CABLE TRAY FOR HORIZONTAL TELECOMMUNICATIONS

CABLING MOUNTED ABOVE LAY-IN CEILING AND/OR INTERSTITIAL. PROVIDE SIZE

PER MANUFACTURERS RECOMMENDATION BASED ON TOTAL CABLE COUNT AND

SPACE SUPPORT TO NOT EXCEED MAXIMUM LOADING.

2. PROVIDE NEW HILTI SPEED SLEEVE OR EQUIVALENT SIZED PER THE TOTAL

NUMBER OF CAT 6A CABLES ROUTED TO THE SPACE AND RATED FOR THE

EXISTING WALL ASSEMBLY. CONTRACTOR SHALL SUBMIT SPECIFIC COMPONENTS

BASED ON THE ACTUAL NUMBER OF DATA CIRCUITS BEING PROVIDED.

3. NEW TELECOMMUNICATIONS OUTLET BOX WITH EXISTIING 1-1/4" EMT STUB UP TO

NEAREST ACCESSIBLE CEILING SPACE. REFER TO DETAILS ON SHEET T-501 AND

SCHEDULE ON SHEET T-701 FOR ADDIONAL INFORMATION.

4. NEW TELECOMMUNICATIONS OUTLET. DATA CABLES TO BE ROUTED TO

JUNCTION BOX TO BE STUBBED UP TO ACCESSIBLE CEILING SPACE.

5. EXISTING CEILING MOUNTED JUNCTION BOX FOR DATA CABLES, PROTECT IN

PLACE. ROUTE CABLES FOR TELECOMMUNICATIONS OUTLET THROUGH WALL TO

FURNITURE SYSTEM. PROVIDE PROPER WIRE MANAGEMENT.

6. EXISTING RECESSED JUNCTION BOX FOR FURNITURE SYSTEM DATA CABLES TO

BE ROUTED TO ACCESSIBLE CEILING SPACE, PROTECT IN PLACE.

7. EXISTING WIRELESS ACCESS POINT WITH TELECOMMUNICATIONS OUTLET ABOVE

CEILING, PROTECT IN PLACE.

8. NEW COMBINATION POWER/DATA IN-FLOOR WIREWAY DEVICE. COORDINATE

FINAL FINISHES WITH COR PRIOR TO COMMENCEMENT OF ANY WORK.

9. EXISTING IN-FLOOR WIREWAY SEGMENT FOR POWER WIRING AND DATA CABLES.

CONNECTS POWER/DATA DEVICE TO WALL BASE TRIM.

10. EXISTING WALL BASE TRIM TRANSITIONS CABLING AT THE WALL, PROTECT IN

PLACE.

11. NEW WHITE 4 POST EQUIPMENT RACK, FREESTANDING, STEEL, PROTECT IN

PLACE. TELECOMUNICATIONS CHANEL RACK, 19" RAILS, #12-24 TAPED EIA HOLE

PATERN, 30" DEP CHANEL MINIMUM, 7' HIGH, 45RU.

12. NEW 6" VERTICAL WIRE MANAGEMENT SYSTEM, PROTECT IN PLACE.

13. NEW 12" LADDER STYLE HORIZONTAL CABLE TRAY MOUNTED ABOVE RACKS,

PROTECT IN PLACE. COORDINATE WITH LIGHTING FIXTURE LOCATIONS.

14. NEW 4U OPTICAL FIBER TERMINATION SHELF WITH (2) NEW 12F SM AND (2) NEW

12F MM WITH CABLE MANAGEMENT IN BREAKOUT ENCLOSURE WITH CAPACITY

FOR 48 STRANDS SM OPTICAL FIBER AND 48 STRANDS MULTI-MODE FIBER.

15. NEW CAT 6A 48 PORT DATA PATCH PANEL. CONTRACTOR TO SUBMIT NEW RACK

ELEVATION FOR VA/AE REVIEW PRIOR TO COMMENCING WORK.

16. NEW CAT 6A 48 PORT VOICE PATCH PANEL. CONTRACTOR TO SUBMIT NEW RACK

ELEVATION FOR VA/AE REVIEW PRIOR TO COMMENCING WORK.

17. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH

NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. SEE T-502 FOR MORE DETAILS.

18. NEW "ZONEIT" 30A 3-PHASE PDU BASE UNIT, REQUIRES (2) 30A 3-PHASE WYE

CIRCIRCUITS WITH L21-30R RECEPTACLES. SEE T-502 FOR MORE DETAILS.

19. NEW ORTRONICS POWER DELIVERY UNIT (PDU), BASIS OF DESIGN RO-

MM20PDUMB1D2W-B OR EQUAL. SEE T-502 FOR MORE DETAILS.

20. PROVIDE NEW FIBER CANS IN THE TELECOM ROOMS WILL BE RACK MOUNTED,

AND STACKED.

21. NEW RACK BONDING, SEE F1/T-501.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:1

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-602

TELECOMMUNICATIONS FIBER RISER

DIAGRAM - OUT-BUILDINGS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

3/4" = 1'-0" F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEETKEYNOTES

2 2 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:1

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-603

TELECOMMUNICATIONS FIBER RISER

DIAGRAM - OUT-BUILDINGS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

3/4" = 1'-0" F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NOTE: NOT ALL KEYNOTES

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B49

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:2

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-604

TELECOMMUNICATIONS FIBER RISER

DIAGRAM - OUT-BUILDINGS

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

3/4" = 1'-0" F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM - OUT-BUILDINGS

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NOTE: NOT ALL KEYNOTES

BASEMENT LEVEL

FIRST LEVEL

(BU-107A)

GREEN STACK

(CB35C)

CYAN STACK

(BH-111A)

MAIN SERVER ROOM

ORANGE STACK

(BQ-110H)

YELLOW STACK

(BM-122A)

BLUE STACK

(N/A)

PINK STACK

NO TR ON

THIS

LEVEL

(1U-104)

GREEN STACK

(1C-106)

CYAN STACK

(N/A)

ORANGE STACK

(1F-119F)

PINK STACK

(C1-111)

BLUE STACK

(1Q-117E)

YELLOW STACK

NO TR ON

THIS

LEVEL

(2U-117)

GREEN STACK

(2C-107A)

CYAN STACK

(2F-121F)

PINK STACK

(N/A)

BLUE STACK

(2V-153G)

YELLOW STACK

(2H-112)

ORANGE STACK

BASEMENT LEVEL INTERSTITIAL

FIRST LEVEL INTERSTITIAL

SECOND LEVEL INTERSTITIAL

THIRD LEVEL INTERSTITIAL

FOURTH LEVEL INTERSTITIAL

SECOND LEVEL

THIRD LEVEL

FOURTH LEVEL

NO TR ON

THIS

LEVEL

(3U-101A)

GREEN STACK

(3C-107)

CYAN STACK

(3F-122E)

PINK STACK

(3Q-118G)

YELLOW STACK

(3H-114)

ORANGE STACK

(3N-101A)

BLUE STACK

(4U-100A)

GREEN STACK

(4C-102)

CYAN STACK

(4F-121E)

PINK STACK

(4Q-118E)

YELLOW STACK

(4H-118)

ORANGE STACK

(4P-103)

BLUE STACK

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

NO SCALE

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:2

P

M

05/06/2022 M. Perkins K. Hutchinson

618-21-700

1383 - 70T-605

TELECOMMUNICATIONS FIBER RISER

DIAGRAM - NEW - B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

NO SCALE

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM

1. MAIN SERVICE ENTRANCE INTO BUILDING 70, SEE B70 AND

TELECOMMUNICATIONS SITE PLAN SHEETS FOR ADDITIONAL INFORMATION.

2. PROVIDE NEW CABLE TRAY ON REDUNDANT/DIVERSE A AND B PATHWAYS IN

INTERSTITIAL SPACES PER REQUIREMENTS LISTED IN CABLE TRAY SCHEDULE.

COORDINATE WITH EXISTING CONDITIONS AND SUBMIT COORDINATION

DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK. SEE INTERSTITIAL

PLANS FOR SCHEMATIC ROUTING.

3. ROUTE CABLING IN 2.5"C OR CABLE TRAY WITHIN THE INTERSITIAL LEVEL.

SEE SHEET 70T-606 FOR CONTINUATION TO TR 1H-120

BH-111A (1) 24ST

OS2

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:3

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-606

TELECOMMUNICATIONS FIBER RISER

DIAGRAM – B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NTS

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM – EXISTING – B70

FOR REFERENCE ONLY

PATH A

PATH B

LEGEND

NOTE: NOT ALL KEYNOTES

BM-122A (1) 24ST

OS2

CB35C (1) 24ST

OS2

SEE SHEET

70T-605 FOR

CONTINUATION TO

TR BH-111A

1C-106

(1) 24ST

OS2

1H-120

(1) 24ST

OS2

SEE SHEET

70T-605 FOR

CONTINUATION TO

TR BH-111A

C1-111

4C-102

(1) 24ST

OS2

4H-118

(1) 24ST

OS2

4P-103

(1) 24ST

OS2

3C-107

(1) 24ST

OS2

3H-114

(1) 24ST

OS2

3N-101A

(1) 24ST

OS2

2C-107A

(1) 24ST

OS2

2V-153G

(1) 24ST

OS2

TYP.

TYP.

TYP.

3 34 4

TYP.

6 6 6

6 6 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:3

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-607

TELECOMMUNICATIONS FIBER RISER

DIAGRAM – B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NTS

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM – EXISTING – B70

FOR REFERENCE ONLY

PATH A

PATH B

LEGEND

NOTE: NOT ALL KEYNOTES

BU-104 (1) 24ST

1U-104 (1) 24ST

OS2

4U-100A

(1) 24ST

OS2

3U-101A

(1) 24ST

OS2

2U-117

(1) 24ST

OS2

TYP.

TYP.

TYP.

TYP.

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:4

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-608

TELECOMMUNICATIONS FIBER RISER

DIAGRAM – B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NTS

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM – EXISTING – B70

FOR REFERENCE ONLY

PATH A

PATH B

LEGEND

NOTE: NOT ALL KEYNOTES

BQ-110H (1) 24ST

1Q-117E

(1) 24ST

OS2

4Q-118E

(1) 24ST

OS2

3Q-118G

(1) 24ST

OS2

2V-153G

(1) 24ST

OS2

TYP.

TYP.

TYP.

TYP.

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:5

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-609

TELECOMMUNICATIONS FIBER RISER

DIAGRAM – B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NTS

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM – EXISTING – B70

FOR REFERENCE ONLY

PATH A

PATH B

LEGEND

NOTE: NOT ALL KEYNOTES

1F-119F (1) 24ST

4F-121E

(1) 24ST

OS2

3F-122E

(1) 24ST

OS2

2F-121F

(1) 24ST

OS2

TYP.

TYP.

TYP.

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B70

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

3/4" = 1'-0"

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .G e n e ra l.

S h e e ts

.r v t

/5

/2

:2

:5

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70T-610

TELECOMMUNICATIONS FIBER RISER

DIAGRAM – B70

1 Veterans Drive, Minneapolis, MN 55417

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

KEYNOTES

1. CONTRACTOR TO PROVIDE NEW CABLE TRAY AND CONDUIT FOR ALL NEW

FIBER PATHS. PROVIDE COORDINATION DRAWINGS FOR REVIEW WITH COR AND

A/E PRIOR TO COMMENCING WORK. FIELD VERIFY ROUTES AND MAINTAIN

REQUIRED CLEARANCES.

2. CONTRACTOR TO RETERMINATE EXISTING FIBER TO NEW RACK LOCATION,

COORDINATE WITH COR AND A/E PRIOR TO COMMENCING WORK.

3. LOCATION OF CABLING AND CABLE TRAY INTERCEPTION FOR NEW FIBER PULL,

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

4. CONTRACTOR TO PROVIDE NEW FIRE RATED PENETRATION.

5. CONTRACTOR TO PROVIDE NEW FIBER ROUTED FROM NEW TR TO THE

EXISTING TR TO SUPPLY EXISTING EQUIPMENT TO REMAIN.

6. CONTRACTOR TO PROVIDE NEW ANGLED FIBER CASSETTES AND DISTRIBUTION

CABINETS. SEE 27 15 00 FOR BASIS OF DESIGN EQUIPMENT.

NTS

F1

TELECOMMUNICATIONS FIBER RISER DIAGRAM – EXISTING – B70

FOR REFERENCE ONLY

PATH A

PATH B

LEGEND

NOTE: NOT ALL KEYNOTES

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BA-103

EXISTING RACK ELEVATION

BLANK

BASEMENT

FLOOR

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BA-111

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

BLANK

CISCO

CISCO

CISCO

BLANK

CISCO VERIZON

BLANK

CORNING MOBILE ACCESS

BLANK

ATTACHMENT BAR

BLANK

AOCC PUBLIC SAFETY

BLANK

PANDUIT 24 PORT

PANDUIT 24 PORT

ORTRONICS CAT5 24 PORT

ORTRONICS CAT5 24 PORT

BASEMENT

FLOOR

24 PORT

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BC-101

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

CISCO VERIZON

24 PORT

BLANK

VOCIA AMPLIEFIER 8600 AMP5

VOCIA AMPLIEFIER 8600 AMP4

CISCO OVERHEAD PAGE

BLANK

CISCO

CISCO

SOPHOS SG 125 DHCP

BLANK

CISCO WIRELESS

BLANK

24 PORT TEMP PATCH TO 66

BLANK

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

BELKIN 24 PORT

PANDUIT 48 PORT

BASEMENT

FLOOR

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101A

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

APC UPS

BLANK

CISCO

CISCO

CISCO

BLANK

CISCO 3750 POE 24

BLANK

BLANK

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

PANDUIT 48 PORT

PANDUIT 48 PORT

CISCO

BASEMENT

FLOOR

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BA-103

EXISTING RACK ELEVATION

BLANK

APC UPS

APC UPS

APC UPS

BLANK

CISCO VERIZON

CAT 5 24 PORT

BLANK

CISCO

CISCO

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

BLANK

BASEMENT

FLOOR

PANDUIT 24 PORT

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BLANK

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101D

EXISTING RACK ELEVATION

BLANK

PANDUIT 24 PORT

PANDUIT 24 PORT

C5E 24 PORT

ORTRONICS 24 PORT

BASEMENT

WALL

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101A

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

BLANK

BASEMENT

FLOOR

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101D

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

BLANK

CISCO VERIZON

24 PORT

BLANK

CISCO

CISCO

CISCO

BLANK

BASEMENT

FLOOR

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101E

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

APC UPS

BLANK

CISCO

CISCO

CISCO

CISCO

CISCO

BLANK

CISCO

BLANK

PANDUIT 24 PORT

PANDUIT 48 PORT

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

CSE 24 PORT

ORTRONICS 24 PORT

48 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

BASEMENT

FLOOR

COMSCOPE

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BD-101E

EXISTING RACK ELEVATION

APC UPS

APC UPS

BLANK

CORNING MOBILE ACCESS

BLANK

BASEMENT

FLOOR

T-MOBILE ATTACHMENT BAR

BLANK

AOCC PUBLIC SAFETY

BLANK

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:5 :0

P

M

05/06/2022 M. Perkins C.McKnight

618-21-700

1383 - 70T-611

TELECOMMUNICATION RACK ELEVATIONS

BASEMENT

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BN-102

EXISTING RACK ELEVATION

POWER AMP

GROUP 2 AMP

GROUP 1 AMP

POWER SUPPLY BOX

BLANK

VOCIA AMPLIFIER 8600 AMP 7

VOCIA AMPLIFIER 8600 AMP 6

BLANK

CISCO WIRELESS

BLANK

52 PORT GPE MANAGED SWITCH

BLANK

CISCO

BLANK

PANDUIT 48 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

24 PORT

CAT 5E 24 PORT

CISCO

BASEMENT

FLOOR

24 PORT

BLANK

SIGNAMAX POLICE

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BN-102

EXISTING RACK ELEVATION

CORNING MOBILE ACCESS

BLANK

WIRELESS ATTACHMENT BAR

BLANK

AOCC VERIZON

BASEMENT

WALL

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BP-107

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

APC UPS

BLANK

CISCO VERIZON

CAT 6A 24 PORT

BLANK

CISCO

CISCO

CISCO

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

BLANK

BASEMENT

FLOOR

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BLANK

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BQ-110B

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

APC UPS

BLANK

CISCO

CISCO

CISCO

CISCO

BLANK

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

PANDUIT 24 PORT

BELKIN 24 PORT

BASEMENT

FLOOR

24 PORT

BLANK

PANDUIT OPTICOM FIBER BOX

PANDUIT OPTICOM FIBER BOX

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BQ-110B

EXISTING RACK ELEVATION

APC UPS

APC UPS

BLANK

BASEMENT

FLOOR

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BQ-110D

EXISTING RACK ELEVATION

APC UPS

APC UPS

APC UPS

BLANK

CORNING MOBILE ACCESS

BASEMENT

FLOOR

WIRELESS ATTACHMENT BAR

AOCC WIRELESS

BUILDING NUMBER

RACK NUMBER

ROOM NUMBER

BUILDING LEVEL

MOUNTING TYPE

BQ-110D

EXISTING RACK ELEVATION

BLANK

APC UPS

APC UPS

APC UPS

DATA STORAGE DEVICE

BLANK

CISCO WIRELESS

24 PORT

BLANK

CISCO

CISCO

CISCO

CISCO

BLANK

CISCO VERIZON

BLANK

24 PORT

PANDUIT 24 PORT

PANDUIT 48 PORT

24 PORT

24 PORT

24 PORT

24 PORT

24 PORT

24 PORT

48 PORT

48 PORT

BASEMENT

FLOOR

BLANK

SIGNAMAX POLICE

BLANK

PANDUIT FIBER BOX

PANDUIT FIBER BOX

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .