This document describes a federal contract opportunity for construction design and infrastructure upgrades at the Minneapolis VA Medical Center. The project involves building infrastructure to support the nationally mandated Electronic Health Record Modernization project, including constructing a new server room on the hospital roof. The solicitation will be issued as a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. It is advertised as a total Service-Disabled Veteran-Owned Small Business set-aside, with proposals due to the Department of Veterans Affairs by June 5, 2022. The period of performance is approximately 450 calendar days from notice to proceed. The magnitude of construction is estimated between $20-50 million. All questions must be submitted in writing to the designated email address by the date specified; phone calls will not be accepted.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP WAPWAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
BU-119-A
B U
-1 -B
B U
-1 -A
BU-123-B
BU-123-C
BU-123-D
BU-104A
BU-107A-A
B U
-1 A
-B
BU-107-C
BU-107-D
BU-107-E
BU-107-F
B U
-1 A
-B
B U
-1 A
-A BU-110B-A
B U
-1 C
-A
B U
-1 D
-A
B U
-1 -A
B U
-1 -B
BU-110-D
BU-110-E
BU-110-C J
C
I C
O N
T R
O L
P A
N E
L
BU-110E-A
BU-110E-B
BU-116-A
BU-116-C
BU-116-B
BU-118C-A
BU-118C-B
BU-118C-C
B U
-1 -A
B U
-1 -B
BU-105-E
B U
-1 -C
BU-105-D
B U
-1 -A
BU-109-B
BU-111-A
B U
-1 -A
BU-103-B
BU-103-C
BU-118-A
BU-118A-A
BU-118A-B
BU-118-H
BU-118-J
BU-118-M
BU-118-B BU-118-C
BU-118-D
BU-118-E
BU-118-F
BU-118-G
BU-118-L
BU-118-K
BU-118-N
BU-118-O
BU-118-P
BU-118-R
BU-118-S
BU-118-T
BU-118-Q
B U
-1 -A
BU-112-B BU-113-A
B U
-1 -B
BU-114-A
B U
-1 -B
BU-117-B
BU-117-A
BU-117-C
BU-122-A
BU-122-B
NO DATA
CB-1-AP-B
CB-2-AP-A
CB-2-AP-B
14-AP-A
BU-103-AP-A
BU-109-AP-A
BU-110-AP-A
BU-110E-AP-A
1-AP-A
CB-14-AP-A
BU-117-AP-A
CB-10-AP-A CB-10-AP-CCB-10--AP-B
C B
-1 -A
NO DATA NO DATA
NO DATA
CARD
READER
CB-13-AP-A
NO DATA
NO DATA
KEYPAD
CB-15-AP-B
CB-15-AP-A
2-AP-A
CB-6-AP-A
BU-103-AP-B
CB-1-AP-A
NO DATA NO DATA
NO DATA NO DATA
70T-401
D6
70T-401
D2
BU-107A-CAM-01
BT-109BT-109
CB-3CB-3
BU-101BU-101BU-102BU-102
BU-103BU-103
TELECOM
ROOM
(GREEN-STACK)
BU-107ABU-107A
BU-105BU-105
BU-106BU-106
BU-107BU-107
BU-108BU-108
BU-109BU-109
BU-110BU-110
BU-111BU-111
BU-112BU-112 BU-113BU-113 BU-114BU-114
CB-4ACB-4A
CB-1CB-1
CB-2CB-2
CB-4CB-4
CB-6CB-6
BU-116BU-116
BU-117BU-117
BU-118BU-118
BU-119BU-119BU-120BU-120
BU-121BU-121
BU-122BU-122 BU-123BU-123
CC
BU-110ABU-110A BU-110BBU-110B
BU-110CBU-110C BU-110DBU-110D
BU-110EBU-110E
BU-118ABU-118A
BU-118BBU-118B
BU-118CBU-118C
BU-118DBU-118D
BU-122ABU-122A
CB-10CB-10
CB-11CB-11
CB-13CB-13
CB-14CB-14
CB-15CB-15
BD-101BD-101
TELECOM
ROOM
BD-101ABD-101A
ELECTRICAL
ROOM
BD-101BBD-101B
ELECTRICAL
ROOM
BD-101CBD-101C
TELECOM
ROOM
BD-101DBD-101D
TELECOM
ROOM
BD-101EBD-101E
ELECTRICAL
ROOM
BD-101FBD-101F
BD-101GBD-101G
BD-103BD-103
BB-128BB-128
BB-144BB-144
BB-146BB-146
TELECOM
ROOM
BT-105BT-105
ELECTRICAL
ROOM
BT-106BT-106
BT-107BT-107
BT-108BT-108
BV-101JBV-101J
/F2 70T-100M
B U
-1 A
-C
BU-104BU-104
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :1
P
M
05/06/2022 M. Perkins G. Weaver
618-21-700
1383 - 70T-100A
TELECOMMUNICATION PLAN - BASEMENT
LEVEL AREA A
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TR.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
TELECOMMUNICATION PLAN -
BASEMENT LEVEL AREA A
NOT TO SCALE
C2
EXISTING CONDITIONS - BU-110
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 2-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’–6”A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4”SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. REMOVE DATA DEVICE AND RELOCATE, REPLACE CABLING WITH CAT6A MATCH
EXISTING CIRCUIT COUNT. PROVIDE NEW 1 -1/4" CONDUIT AS INDICATED ON
T-601.
05/06/2022
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
BB-141-AP-A
BB-141-E
B B
-1 -F
B B
-1 -A
B B
-1 -B
B B
-1 -C
B B
-1 -D
B B
-1 -A
B B
-1 -B
B B
-1 -C
B B
-1 -A
B B
-1 -B
B B
-1 -C
B B
-1 -D
BB-141-G
B B
-1 -J
B B
-1 -Q
BB-141-X
BB-141-AA
BB-141-Y
BB-141-Z
BB-141-W
BB-141-U
BB-141-V
B B
-1 -T
BB-141-R
BB-141-PBB-141-S
BB-141-KBB-141-N
BB-141-L
B B
-1 -M
B B
-1 -O
BB-147-X
BB-147-W
BB-147-V
BB-147-U
BB-147-T
B B
-1 -Y
B B
-1 -S
B B
-1 -E
BB-147-G
BB-147-F
B B
-1 -K
B B
-1 -L
B B
-1 -J
B B
-1 -H
BB-147-M
BB-147-N
BB-147-O
BB-147-P
B B
-1 -Q
BB-147-R
BB-141-H
BB-145-AP-A
BB-145-E
BB-145-F
BB-145-G
BB-145-H
B B
-1 -A
B B
-1 -B
B B
-1 -C
B B
-1 -D
BB-148-A
BB-148-B
B B
-1 -A
BB-149-B
BB-142-A
BB-142-B
BB-143-A
BB-143-B
BB-143-AP-A
BB-123-A
BB-124-B
BB-124-C
B
B -1
-A
B B
-1 -E
BB-125-A
B B
-1 -A
B B
-1 -B
BB-146-C
BB-146-D
BB-146-E
B B
-1 -F
BB-146-G
NO DATA
NO DATA
NO DATA
NO DATA
B B
-1 -A
BB-122-AP-A
BB-122-AP-B
CB-17-AP-A
BA-119-A
BA-119-B
BA-119-C BA-119A-A
B B
-1 A
-B
B B
-1 A
-C
B B
-1 A
-D
B B
-1 A
-E
BB-117A-F
BB-117A-G
B B
-1 A
-H
B B
-1 A
-J
B B
-1 A
-A
B B
-1 A
-L
B B
-1 A
-M
B B
-1 A
-N
B B
-1 A
-O
B B
-1 A
-K
BB-117A-AP-B
BB-117A-AP-A
BB-134-A
B B
-1 -C
B B
-1 -B
B B
-1 -A
BB-136-A
BB-136-B
B A
-1 -B
BA-117-C
B A
-1 -D
B A
-1
-ANO DATA
CB-24-AP-A
BB-122-A
BB-122-R
BB-122-Q
BB-122-P
BB-122-O
BB-127-A
BB-122-N
B B
-1 -F
B B
-1 -G
B B
-1 -H
B B
-1 -J
BB-122-K
BB-122-L
B B
-1 -B
BB-122-C
BB-122-D
BB-122-M
B B
-1 -N
B B
-1 -M
B B
-1 -L
B B
-1 -K
B B
-1 -J
BB-133-H
BB-133-E
BB-133-FBB-133-D
BB-133-B
BB-133-C
BB-133-A
BB-133-G
BB-133-AP-A
B B
-1 -A
B B
-1 -B
B B
-1 -C
BB-115-D
BB-115-E
BB-115-F
B B
-1 -A
B B
-1 -A
BB-114-B
B B
-1 -A
B B
-1 -B
B B
-1 -C
B B
-1 -D
B B
-1 -E
BB-113-E
BB-113-F
BB-113-G
BB-113-H
BB-113-J
BB-113-L
B B
-1 -A
B B
-1 -B
B B
-1
-C BB-118A-A
BB-118A-B
BB-118A-C
BB-118-A
BB-118-B
BB-118-C
BB-112-A
BB-112-B
BB-111-A
B B
-1 -B
BB-110-A
BB-110-B
B D
-1 -A
BB-110-AP-A
CB-27-AP-A
BB-137-AP-A
NO DATA
B D
-1 -C
B D
-1 -A
B D
-1 -B
BD-104-AP-A
B D
-1 -D
B D
-1 -C
BD-104-B
BD-104-A
BD-104-E
BD-104-F
B B
-1 -D
BB-150-C
BB-150-A
BB-150-B
BB-107-A
BB-151-B
BB-151-A
B B
-1
-DB
B
-1 -A
B B
-1 -B
B B
-1 -C
BD-124-AP-A
NO DATA
NO DATA
BD-102-AP-A
BD-102-A
B D
-1 -F
B D
-1 -E
BD-102-D
BD-102-B
BD-102-C
NO DATA
NO DATA
B D
-1 -C
BD-135-E
BD-135-D
BD-135-A
BD-135-B
BD-135-AP-A
B D
-1 -A
BD-131-A
B D
-1 -A
B D
-1 -B
B D
-1 -A
BD-124-A BD-124-B
B D
-1 -A
NO DATA NO DATA
BD-123-A
CB-22-AP-A
BD-123-AP-A
3-AP-A
BD-110-AP-A
BD-110-A
BD-110-B
BD-110-C
BD-110-D
BD-110-E
BD-110-A
B D
-1 -B
B D
-1 -C
NO DATA
NO DATA NO DATA
NO DATA
BD-113-A
BD-113-B
BD-113-C
BD-113-D
B D
-1 -A
B D
-1 -B
B D
-1 -C
B D
-1 -D
B D
-1 -E
NO DATA
BD-117-A
BD-117-B
BD-117-C
BD-118-A
BB-101-A
BB-102-A
B B
-1 -B
BB-103-A
B B
-1 -B
B B
-1 -A
BB-105-A BB-106-A
BB-107-A
BB-108-A
B B
-1
-A NO DATA
BD-116-AP-A
NO DATA
BB-113-KBB-113-D
BB-113-AP-A
NO DATA
BD-130-AP-A
B D
-1 -A
B D
-1 -B
NO DATA NO DATA
N O
D A
T A
BD-135BD-135
BD-110BD-110
BD-111BD-111
BD-112BD-112
BD-113BD-113
BD-114BD-114
BD-115BD-115
BD-116BD-116
BD-117BD-117
BD-118BD-118
BD-119BD-119
BD-120BD-120
BD-121BD-121
BD-122BD-122BD-122ABD-122A
BD-120ABD-120A
BD-109BD-109
BD-123ABD-123A
BD-123BD-123
BD-124BD-124
BD-125BD-125BD-126BD-126BD-127BD-127
BD-128BD-128
BD-129BD-129 BD-130BD-130
BD-131BD-131
BD-132BD-132
BD-133BD-133
BD-134BD-134
BD-102BD-102
BD-103BD-103
BD-104BD-104
BD-105BD-105
BD-105ABD-105A
BD-106ABD-106A
BD-106BD-106
BD-107BD-107
BD-108BD-108
BD-110ABD-110A
BB-101BB-101 BB-102BB-102 BB-103BB-103 BB-104BB-104 BB-105BB-105 BB-106BB-106 BB-107BB-107 BB-108BB-108 BB-109BB-109
BB-110BB-110
BB-111BB-111
BB-112BB-112
BB-113BB-113
BB-114BB-114
BB-115BB-115
BB-116BB-116
BB-117BB-117
BB-118BB-118
BB-118ABB-118A
BB-121BB-121
BB-122BB-122
BB-123BB-123
BB-124BB-124
BB-125BB-125
BB-126BB-126
BB-127BB-127
BB-128BB-128
BB-129BB-129
BB-130BB-130
BB-131BB-131
BB-132BB-132
BB-133BB-133
BB-134BB-134
BB-135BB-135
BB-136BB-136
BB-137BB-137
BB-138BB-138
BB-139BB-139BB-140BB-140
BB-141BB-141
BB-142BB-142
BB-143BB-143
BB-144BB-144
BB-145BB-145
BB-146BB-146
BB-147BB-147
BB-148BB-148
BB-149BB-149
BB-150BB-150
BB-151BB-151
BB-152BB-152
ELECTRICAL
ROOM
BT-101BT-101
BA-113BA-113
BA-117BA-117
BA-117ABA-117A
BA-119BA-119 BA-119ABA-119A
CB-17CB-17 CB-17ACB-17A
CB-19CB-19
CB-20CB-20 CB-21CB-21
CB-22CB-22
CB-23CB-23
CB-23ACB-23A
CB-24CB-24
CB-25CB-25
CB-25ACB-25A
CB-26CB-26
CB-27CB-27
CB-28CB-28 CB-29CB-29
CB35BCB35B
CB32CB32
CB33CB33 CB34CB34
BH-111GBH-111G
/F2 70T-100A
F
T
-1 L
/F2 70T-100A on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :4
P
M
05/06/2022 M. Perkins G. Weaver
618-21-700
1383 - 70T-100B
TELECOMMUNICATION PLAN - BASEMENT
LEVEL AREA B
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TR.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F3
TELECOMMUNICATION PLAN -
BASEMENT LEVEL AREA B
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 2-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’–6”A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4”SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. REMOVE DATA DEVICE AND RELOCATE, REPLACE CABLING WITH CAT6A MATCH
EXISTING CIRCUIT COUNT. PROVIDE NEW 1 -1/4" CONDUIT AS INDICATED ON
WAP WAP
WAP
WAP
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
CB35-AP-B
CB36A-AP-A
CB36B-AP-A
4-AP-A
CB35-AP-A
NO DATA
70T-401
F2
70T-401
F6
C B
C
-C A
M -0
BD-123ABD-123A
CB35CB35
CB36CB36
CB36ACB36A
CB35BCB35B
BC-105BC-105
BC-108ABC-108A
BC-105ABC-105A
TELECOM
ROOM
(CYAN-STACK)
CB35CCB35C
F3
T-1
B
F2
70T-100F on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:4 :5
P
M
05/06/2022 M. Perkins G. Weaver
618-21-700
1383 - 70T-100D
TELECOMMUNICATION PLAN - BASEMENT
LEVEL AREA D
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TR.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F4
TELECOMMUNICATION PLAN -
BASEMENT LEVEL AREA D
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 2-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’–6”A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4”SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. REMOVE DATA DEVICE AND RELOCATE, REPLACE CABLING WITH CAT6A MATCH
EXISTING CIRCUIT COUNT. PROVIDE NEW 1 -1/4" CONDUIT AS INDICATED ON
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
PARTITION RATING GRAPHICS:
2 HR FIRE SHAFT
1 HR SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION:
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND
SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.
1 HR INCIDENTAL USE
CB33-AP-B
NO DATA
CB-34-AP-A
CB40-AP-B
BC-106-AP-B
CB38-AP-A
CB38-AP-B
BC-106-AP-A
CB40-AP-A
B C
-1 -A
B C
-1 -B
B C
-1 -C
B C
-1 -D
B C
-1 -E
B C
-1 -F
B C
-1 -G
B C
-1 -H
BC-104-A
BC-104-B
BC-105-D
BC-105-A
BC-105-B
BC-105-C
BC-104A-AP-A
BF-132-A
BF-131-A
B F
-1 -A
BF-134-A
BF-134-B BF-133-A
B F
-1 -A
B F
-1 -L
B F
-1 -M
B F
-1 -N
B F
-1 -O
B F
-1 -P
B F
-1 -K
B F
-1 -J
B F
-1 -H
B F
-1 -G
B F
-1 -F
B F
-1 -D
B F
-1 -C
B F
-1 -B
B F
-1 -E
BF-129-A
CB42-AP-A
CB42A-AP-B
CB42A-AP-C
CB39-AP-A
BF-136-A
BF-135-A
BF-135-B
BF-135-C
BF-135-D
BF-135-E
BF-135-F
BF-135-G
BF-135-H
BF-135-J
BF-135-K
B F
-1 -A
B F
-1 -A
BF-115-AP-A
BF-112-AP-A
BF-112-AP-B
BF-111-AP-A
C B
A
-A P
-A
BF-103-AP-A
CB42-AP-B
BF-115A-AP-A
CB49-AP-A
CB33-AP-A
CB42A-AP-A
B F
-1 A
-B
BF-115A-A
B F
-1 A
-C
B F
-1 A
-D
B F
-1 A
-E
BF-115A-F
BF-115A-G
NO DATANO DATA
NO DATA
NO DATA
NO DATA
NO DATA
BA-109-A
NO DATA
NO DATA
NO DATA
BD-114BD-114
BD-115BD-115
BD-116BD-116
BB-101BB-101 BB-102BB-102 BB-103BB-103 BB-104BB-104 BB-105BB-105 BB-106BB-106 BB-107BB-107 BB-108BB-108 BB-109BB-109
BA-113BA-113
CB35BCB35B
BA-110BA-110
M-1M-1
TELECOM
ROOM
BC-101BC-101
ELECTRICAL
ROOM
BC-102BC-102
BC-103BC-103
BC-104BC-104
BC-105BC-105
BC-106BC-106
BC-107BC-107 BC-108BC-108
BC-108ABC-108A
BC-105ABC-105A
BC-104ABC-104A
DD
BF-101BF-101
BF-102BF-102
BF-103BF-103
BF-104BF-104 BF-105BF-105 BF-106BF-106
BF-107BF-107 BF-108BF-108
BF-109BF-109
BF-110BF-110
BF-111BF-111
BF-112BF-112
BF-113BF-113
BF-114BF-114
BF-115BF-115
BF-116BF-116
BF-117BF-117 BF-118BF-118
BF-119BF-119
BF-120BF-120
BF-121BF-121
BF-122BF-122
BF-123BF-123
BF-124BF-124
BF-125BF-125 BF-126BF-126
BF-127BF-127
BF-128BF-128
BF-129BF-129
BF-130BF-130
BF-131BF-131
BF-132BF-132
BF-133BF-133
BF-134BF-134
BF-135BF-135
BF-136BF-136
BF-138BF-138
BF-139BF-139
BF-115ABF-115A
BF-115BBF-115B
BF-115CBF-115C
BF-115DBF-115D
BF-115EBF-115E
BF-111ABF-111A
BF-123ABF-123A
BF-125ABF-125A BF-126ABF-126A
TELECOM
ROOM
BA-111BA-111
ELECTRICAL
ROOM
BA-112BA-112
BA-109BA-109
CB32CB32
CB33CB33 CB34CB34
CB37CB37
CB38CB38
CB39CB39
CB40CB40
CB41CB41
CB42CB42
CB42ACB42A
CB32BCB32B
CB50CB50
CB51CB51
CB51ACB51A
CB49CB49
M-7M-7
C B
A
C B
A
BC-103ABC-103A
C4C4
EE
BH-101BH-101
BH-103BH-103
TELECOM
ROOM
BH-105BH-105
ELECTRICAL
ROOM
BH-106BH-106 BH-101ABH-101A
BH-104ABH-104A
CB-54CB-54
BG-101BG-101
BIOMED
COMP
ROOM
BG-111BG-111
BG-112BG-112
BG-101BG-101
BA-107BA-107
CB-87CB-87
CB32ACB32A
BH-111DBH-111D
CB31CB31
AA
BH-111FBH-111F
BH-111GBH-111G
F2
70T-100K
F3
T-1
B
F4
70T-100D
F3
70T-100B
NO DATA
NO DATA
NO DATA
NO DATA NO DATA NO DATA NO DATA
NO DATA
NO DATA
NO DATA
BC-101-CAM-01
B G
-1 -M on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
2508 29th Avenue NE
Minneapolis, MN 55418
(612) 355-1251
Mat Perkins
A
B
D
F
G
H
J
K
L
M
N
P
As indicated
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M
P L S
V A
M C
/6 -2
-7
.M
E H
R M
.M E
P .B
.L
.r v t
/6
/2
:5 :1
P
M
05/06/2022 M. Perkins G. Weaver
618-21-700
1383 - 70T-100F
TELECOMMUNICATION PLAN - BASEMENT
LEVEL AREA F
1 Veterans Drive, Minneapolis, MN 55417
B70
EHRM INFRASTRUCTURE
UPGRADESFINAL BID DOCUMENTS
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TR.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1" = 10'-0"
F2
TELECOMMUNICATION PLAN -
BASEMENT LEVEL AREA F
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 2-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’–6”A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4”SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. REMOVE DATA DEVICE AND RELOCATE, REPLACE CABLING WITH CAT6A MATCH
EXISTING CIRCUIT COUNT. PROVIDE NEW 1 -1/4" CONDUIT AS INDICATED ON