618-21-700.MEHRM.FINAL.B70.20220506Part-10.pdf

PDF 19 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Solicitation number
36C77622R0045
Issued by

About this file

This document summarizes a federal solicitation for construction services. The solicitation is being issued by the Department of Veterans Affairs to upgrade infrastructure at the Minneapolis VA Medical Center in support of an Electronic Health Record Modernization project. The solicitation will be a Request for Proposal evaluated according to FAR Parts 15, 19, and 36. It is set aside solely for Service-Disabled Veteran-Owned Small Businesses. The construction work includes building a new server room and infrastructure throughout the medical center to support the EHR modernization. The period of performance is approximately 450 calendar days with a magnitude of construction estimated between $20-50 million. Questions must be submitted in writing by email to the point of contact by the date specified in the solicitation.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet Infra Upgrades FINAL.pdf PDF
36C77622R0045 0009.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-1.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-4.pdf PDF
618-21-700.ADD-001.Summary.Log.20220707.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-9.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-5.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-10.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-3.pdf PDF
618-21-700.MEHRM.FINAL.B70.Addendum1.20220707.ReducedPart-8.pdf PDF
36C77622R0045 0008.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - FINAL.pdf PDF
36C77622R0045 0007.pdf PDF
36C77622R0045 0006.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Minneapolis.docx DOCX document
36C77622R0045 0005.docx DOCX document
36C77622R0045 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades.docx DOCX document
36C77622R0045 0003.pdf PDF
Site Visit Sign In sheet.pdf PDF
36C77622R0045 0002.pdf PDF
36C77622R0045 0001.pdf PDF
36C77622R0045 - Update 5.23.22.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-7.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-11.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-33-36.zip ZIP file
618-21-700.MEHRM.FINAL.B76.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-48-52.zip ZIP file
36C77622R0045.docx DOCX document
618-21-700.MEHRM.FINAL.B70.20220506Part-21.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-25-28.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-4.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-23.pdf PDF
618-21-700.MEHRM.FINAL.B75.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL_SPECIFICATIONS.20220506Part-2.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-45-47.zip ZIP file
618-21-700.MEHRM.FINAL.B70.20220506Part-6.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-13.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-20.pdf PDF
618-21-700.MEHRM.FINAL.B73.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B49.20220506-REDUCED.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
618-21-700.MEHRM.FINAL.SITE.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B222.20220506-REDUCED.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-12.pdf PDF
618-21-700.MEHRM.FINAL.B70.20220506Part-16-17.zip ZIP file
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARTITION RATING GRAPHICS:

2 HR FIRE SHAFT

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

4M-101

4M-104

TELECOM ROOM

4M-106

ELECTRICAL ROOM

4M-107

C4-177

4P-133

C4-154

4P-101

4P-102

TELECOM ROOM

4P-103

4P-101A

4N-101

4N-1024N-1034N-104

4N-1054N-106

TELECOM ROOM

4N-107

ELECTRICAL ROOM

4N-108

F

G

4S-8

4S-10

4M-102

4M-103

4M-108

4M-1104M-1114M-1124M-1134M-1144M-115 4M-1164M-117

4M-119

4M-120

4M-121

4M-122

4M-125

4M-126

4M-131

4M-132

4M-133

4M-134

4M-135

4M-122A

4M-109B

4M-109C

4M-115A

4S-7

4Q-101

4Q-102

4Q-103

4Q-104

4Q-105

4Q-106

4Q-107

4Q-108

4Q-109

4Q-111 4Q-112 4Q-123

4Q-124

4Q-125

4Q-126

4Q-127

C4-173

C4-174A

C4-156

C4-165

C4-157

C4-158

C4-166

4M-118

4M-109

4M-109A

C4-164

C4-159 C4-163C4-159 C4-163

70M-441 C5

70M-441 C2

1 1/2" CHWR

1 1/2" CHWS

3/4" CD

1" CDPIPE RISER

PIPE RISER

1 1/2" CHWS

1 1/2" CHWR

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

C

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a st ru ct u re

U p g ra d e s

M P

L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r vt /6

/2

:2 :1

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70M-104L

MECHANICAL PLAN - FOURTH LEVEL AREA L

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

13. REMOVE RADIATORS AND CAP SERVICE LINES IN THE INTERSTITIAL SPACE.

14. CONNECT TO EXISTING CONDENSATE STACK.

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING PLACED WITHIN INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1" = 10'-0" F3

MECHANICAL PLAN - FIRST LEVEL AREA L

05/06/2022

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

70M-443 C6

C4-19C4-19

C4-20C4-20

4T-1034T-103

C4-20C4-20

4S-1174S-117

C4-163C4-163

4Q-118E4Q-118E

4S-1084S-108

4S-1094S-109

4S-1104S-110

4S-1114S-111

4S-1124S-112

4S-1134S-113

4S-1144S-114

4S-1154S-115

4S-1164S-116

4Q-1174Q-117

4Q-1184Q-118

4Q-1194Q-1194Q-1204Q-120

4Q-118A4Q-118A 4Q-118B4Q-118B

4Q-118C4Q-118C

4Q-118D4Q-118D

4V-1014V-101

4V-1024V-102

4V-1034V-1034V-1044V-104

4V-1054V-105

4V-1064V-106

4V-1084V-108

4V-1094V-109

4V-1104V-110

4V-1114V-111

4V-1124V-112

4V-1134V-113

4V-1144V-114 4V-107B4V-107B

4V-100A4V-100A

4T-1064T-106

4T-1074T-107

4T-1084T-108

4T-1094T-109

4T-1104T-110

4T-1114T-111

4T-1124T-112

4T-1134T-113 4T-1144T-114

4T-114A4T-114A

4S-14S-1

4T-1044T-104

4V-1074V-107

4V-107A4V-107A

C4-186C4-186

C4-161C4-161

C4-194C4-194

C4-193C4-193

C4-190C4-190

C4-191C4-191

C4-192C4-192C4-195C4-195

4V-1004V-100

C4-187C4-187

4T-113A4T-113A

C4-136C4-136

70M-443 C3

1 1/2" CHWR

1 1/2" CHWS

1 1/2" CHWR

1 1/2" CHWS

1" CD

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A

B D

TRUE NORTH

PLAN NORTH

E F

G

H

J

K

L

M

C

KEYPLANA/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a st ru ct u re

U p g ra d e s

M P

L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r vt /6

/2

:2 :2

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70M-104M

MECHANICAL PLAN - FOURTH LEVEL AREA M

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

13. REMOVE RADIATORS AND CAP SERVICE LINES IN THE INTERSTITIAL SPACE.

14. CONNECT TO EXISTING CONDENSATE STACK.

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING PLACED WITHIN INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1" = 10'-0" F3

MECHANICAL PLAN - FIRST LEVEL AREA M

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

70M-105

F1

PIPE DROP

PIPE DROP

1" CD

Elec. Equip. Room

5K-107A 200.00

SF

FCU-5K-13

FCU-5K-14

TYP.

3/4" CD

1" CD

3/4" CD

6 9 12 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:2 :0

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70M-105

MECHANICAL PLAN - FIFTH LEVEL

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

13. REMOVE RADIATORS AND CAP SERVICE LINES IN THE INTERSTITIAL SPACE.

14. CONNECT TO EXISTING CONDENSATE STACK.

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING PLACED WITHIN INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

SCALE: 1" = 30'-0"

F4

MECHANICAL PLAN - FIFTH LEVEL

SCALE: 1/2" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

PENTHOUSE - NEW ELECTRICAL

ROOM

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

1 2 7

1 2 7

FCU-0A-01

FCU-0A-02

6 9 12

TELECOM

ROOM

(GREEN-STACK)

BU-107ABU-107A

1 1/4" CHWR

1 1/4" CHWS

3/4" CD

1 1/4" CHWS

1 1/4" CHWR3/4" CD

TYP.

TYP.

1 2 7FCU-0D-03 FCU-0D-04 1 2 7

6 9 12

TELECOM

ROOM

(CYAN-STACK)

CB35CCB35C

1 1/4" CHWR

1 1/4" CHWS3/4" CD

1 1/4" CHWS

1 1/4" CHWR

3/4" CD

TYP.

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :3

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70M-401

MECHANICAL ENLARGED PLANS -

BASEMENT LEVEL

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING TO BE PLACED WITHIN THE INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATIONS TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

13. NEW TO EXISTING CONNECTION, NO HOT TAPPING IS ALLOWABLE. COORDINATE

ALL SHUTDOWNS WITH FACILITY AND PROVIDE TEMPORARY COOLING FOR

AFFECTED SPACES IN ACCORDANCE WITH SPECIFICATION 01 00 00. ALL

SHUTDOWNS SHALL OCCUR AFTER HOURS, AND TOTAL DURATION OF ANY

SHUTDOWN SHALL NOT EXCEED 4 HOURS.

SCALE: 1/2" = 1'-0"

D6

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BU-107A -

NEW

SCALE: 1/2" = 1'-0"

D2

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BU-107A -

DEMO

SCALE: 1/2" = 1'-0"

F6

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM CB35C -

NEW

SCALE: 1/2" = 1'-0"

F2

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM CB35C -

DEMO

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

6 9 12

FCU-0M-08

FCU-0M-07

TELECOM

ROOM

(YELLOW-STACK)

BQ-110HBQ-110H

1 1/4" CHWR

1 1/4" CHWS

3/4" CD

1 1/4" CHWR

1 1/4" CHWS

TYP.

3/4" CD

TYP.

6 9 12

TELECOM

ROOM

(BLUE-STACK)

BM-122ABM-122A

FCU-0K-05

FCU-0K-06

1 2 7

1 1/4" CHWR

1 1/4" CHWS

1 1/4" CHWS

1 1/4" CHWR

3/4" CD

TYP.

TELECOM

ROOM

(BLUE-STACK)

BM-122ABM-122A

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:4 :2

P

M

05/06/2022 M. Perkins G. Weaver

618-21-700

1383 - 70M-402

MECHANICAL ENLARGED PLANS -

BASEMENT LEVEL

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING TO BE PLACED WITHIN THE INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATIONS TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

13. NEW TO EXISTING CONNECTION, NO HOT TAPPING IS ALLOWABLE. COORDINATE

ALL SHUTDOWNS WITH FACILITY AND PROVIDE TEMPORARY COOLING FOR

AFFECTED SPACES IN ACCORDANCE WITH SPECIFICATION 01 00 00. ALL

SHUTDOWNS SHALL OCCUR AFTER HOURS, AND TOTAL DURATION OF ANY

SHUTDOWN SHALL NOT EXCEED 4 HOURS.

SCALE: 1/2" = 1'-0"

C7

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BQ-110H -

NEW

SCALE: 1/2" = 1'-0"

C4

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BQ-110H -

DEMO

SCALE: 1/2" = 1'-0"

F7

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BM-122A -

NEW

SCALE: 1/2" = 1'-0"

F4

MECHANICAL ENLARGED PLAN -

BASEMENT LEVEL - ROOM BM-122A -

DEMO

TYP.

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

1 2 7

6 9 12

FCU-1A-02

FCU-1A-01

TELECOM ROOM

(GREEN-STACK)

1U-104

TYP.

1 1/2" CHWS

1 1/2" CHWR

3/4" CD

3/4" CD

1" CD

1 1/2" CHWR

1 1/2" CHWS

1 1/4" CHWS

1 1/4" CHWR

TYP.

TYP.

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :3

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70M-411

MECHANICAL ENLARGED PLANS - FIRST

LEVEL

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

SCALE: 1/2" = 1'-0"

F7

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1U-104 - NEW

SCALE: 1/2" = 1'-0"

F5

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1U-104 - DEMO

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

6 9 12

TELECOM ROOM (CYAN-STACK)

1C-106

FCU-1D-04 FCU-1D-03

1 2 7 1 2 7

3/4" CD

1 1/4" CHWR

1 1/4" CHWS

3/4" CD

TYP.

1 1/4" CHWR

1 1/4" CHWS

TYP.

6 9 12

FCU-1G-06

FCU-1G-05

1 2 7

1 2 7

TELECOM ROOM (PINK-STACK)

1F-119F

1 1/4" CHWR

3/4" CD

1 1/4" CHWS

1 1/4" CHWR

3/4" CD

TYP.

1 1/4" CHWS

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

A/E:

TRIPLE C - The A/E Group

2508 29th Avenue NE

Minneapolis, MN 55418

(612) 355-1251

Mat Perkins

As indicated

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M

P L S

V A

M C

/6 -2

-7

.M

E H

R M

.M E

P .B

.L

.r v t

/6

/2

:3 :5

P

M

11/05/2021 M. Perkins G. Weaver

618-21-700

1383 - 70M-412

MECHANICAL ENLARGED PLANS - FIRST

LEVEL

1 Veterans Drive, Minneapolis, MN 55417

B70

EHRM INFRASTRUCTURE

UPGRADESFINAL BID DOCUMENTS

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. ALL PIPING TO BE PLACED IN THE INTERSTITIAL AREA.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

1. PROVIDE PACKAGED NEW FAN COIL UNIT, CHILLED WATER PIPING,

CONDENSATE PIPING, THERMOSTAT AND BACNET CONTROLS MODULE

CONNECTED TO EXISTING CHILLED WATER SUPPLY/RETURN RISER. SEE RISER

DIAGRAMS FOR CONNECTIONS. LOCATE FAN COIL UNITS ABOVE DOOR.

PROVIDE DRAIN PAN WITH LEAK DETECTION CONNECTED TO BAS.

2. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

3. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

EXISTING AND NEW EQUIPMENT. THERMOSTATS SHALL BE DISPLAY ONLY WITH

CONTROLLABILITY THROUGH THE BMS.

4. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TR. CONNECT

WITH UTP CABLE TO EXISTING ETHERNET SWITCH IN LOCAL TR TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS.

5. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL. PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET.

6. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

7. PROVIDE ELECTRICAL CIRCUIT FOR EACH NEW CHILLED WATER FAN COIL UNIT.

SEE ELECTRICAL SHEETS.

8. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

9. EXISTING CEILING MOUNTED SUPPLY AND RETURN AIR DEVICES TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR DEVICE AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAIL ON M-500 SERIES SHEETS AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

11. EXISTING PENETRATION TO REMAIN.

12. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETE.

SCALE: 1/2" = 1'-0"

C7

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1C-106 - NEW

SCALE: 1/2" = 1'-0"

C3

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1C-106 - DEMO

SCALE: 1/2" = 1'-0"

E6

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1F-119F -NEW

SCALE: 1/2" = 1'-0"

E3

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM 1F-119F -DEMO

1 HR SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION:

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE AND

SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES.

1 HR INCIDENTAL USE

6 9 12

FCU-1M-11

FCU-1M-12

1 2 7

1 2 7

TYP.

TELECOM

ROOM

(YELLOW-STACK)

1Q-117A1Q-117A

3/4" CD

3/4" CD

1 1/4" CHWS

1 1/4" CHWR

TYP.

TYP.

6 9 12

TELECOM ROOM (BLUE-STACK)

C1-111

FCU-1L-08 FCU-1L-07

1 2 7 1 2 7

2" CHWR 2" CHWS3/4" CD

TYP.

FCU-1L-09FCU-1L-10

1 2 71 2 7

3/4" CD

3/4" CD

1 1/4" CHWS

1 1/4" CHWR

1 1/2" CHWS 1 1/2" CHWR

3/4" CD

4 4 4

TYP.

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS.