5-Subcontractors Form.pdf

PDF 53 KB Posted

Attached to
Progressive Design-Build Services for Town of Palm Beach Mid-Town Seawall Replacement Project
Solicitation number
RFQ No.2026-020
Issued by
Palm Beach County, Florida

About this file

This is a List of Proposed Subcontractors Form for the Town of Palm Beach, Florida, required as part of the Progressive Design-Build Services solicitation for the Mid-Town Seawall Replacement Project. Bidders must designate all major subcontractors they propose to utilize for major areas of work, listing each subcontractor's name, address, scope of work, and license number on the form. The form requires bidders to confirm that all subcontractors will be properly licensed, bondable, and able to provide a Certificate of Insurance in accordance with contract general conditions. Failure to provide this information constitutes grounds for rejection of the bidder's proposal. The mandatory Pre-Proposal Meeting and Site Visit are scheduled for March 31, 2026, at 10:00 AM EST at the Public Works Building in West Palm Beach, with the site visit meeting point at the Worth Avenue Clock Tower in Palm Beach. Attendance at both the meeting and site visit is mandatory; failure to attend will result in disqualification from the solicitation process.

The form itself contains five numbered lines for subcontractor entries, with columns for name and address, scope of work, and license number. Bidders with no proposed subcontractors must state "None" on the first line. The completed form must be signed and dated by an authorized representative of the bidding firm, including the title and company name. All proposals must be submitted online through the Town's EUNA Procurement (formerly Bonfire) eProcurement platform linked to the Town website, and proposals may not be withdrawn for a period of 180 days following submission.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF PALM BEACH

LIST OF PROPOSED SUBCONTRACTORS FORM

The undersigned bidder hereby designates, as follows, all major subcontractors whom he/she proposes to utilize for the major areas of work for the project. The bidder is further notified that all subcontractors shall be properly licensed, bondable and shall be required to furnish the TOWN with a Certificate of Insurance in accordance with the contract general conditions. Failure to furnish this information shall be grounds for rejection of the bidder’s proposal. (If no subcontractors are proposed, state “None” on first line below.)

Name and Address of Subcontractor Scope of Work License # 1.

2.

3.

4.

5.

Signature and Date _____________________________________

Title/Company _________________________________________

1Row2:
1Row3:
1Row4:
2:
2Row1:
2Row2:
2Row3:
2Row4:
3:
3Row1:
3Row2:
3Row3:
3Row4:
4:
4Row1:
4Row2:
4Row3:
4Row4:
5:
5Row1:
5Row2:
5Row3:
5Row4:
TitleCompany:
1:
1Row1:

File details come from the government source that posted it. Updated .