Progressive Design-Build Services for Town of Palm Beach Mid-Town Seawall Replacement Project
Solicitation number
RFQ No.2026-020
Issued by
Palm Beach County, Florida

About this file

This is a Design-Build Services solicitation issued by the Town of Palm Beach, Florida, for the Mid-Town Seawall Replacement Project. The Town seeks qualified firms to provide design-build services at a Guaranteed Maximum Price (GMP) for the construction of a new seawall approximately 2,700 linear feet along South Ocean Boulevard between Gulfstream Road and Royal Palm Way. The existing seawall, constructed in the early 1900s and subject to multiple repairs, requires replacement with a new structure positioned east (seaward) of the current wall. The project scope encompasses work within the Town's right-of-way, Town-owned property, and areas seaward of the coastal construction control line. A mandatory pre-proposal meeting and site visit will be held on March 31, 2026, at 10:00 AM EST at the Public Works Building (951 Okeechobee Road, West Palm Beach, FL 33401), followed by a site visit at the Worth Avenue Clock Tower (423 South Ocean Boulevard, Palm Beach, FL 33480). Attendance at this meeting is required; firms failing to attend will be disqualified and their proposals will not be considered. Proposals must be submitted online through the Town's EUNA Procurement platform (formerly Bonfire), and proposers may not withdraw their submissions for 180 days.

The solicitation specifies a Guaranteed Maximum Price delivery method, requiring the selected firm to assume cost risk for project completion. Complete design criteria and scope of services details are provided in Section A of the Design Criteria Package. The Town intends to evaluate statements of qualifications and select a qualified design-build team capable of managing complex coastal construction work involving regulatory compliance with coastal control line restrictions. No incumbent information, set-asides, or specific funding sources are detailed in the available documentation; additional contract terms, pricing parameters, and award criteria would be found in the complete Design Criteria Package and evaluation methodology documentation.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .