This is an Application for a Permit Time Extension form issued by the Florida Department of Environmental Protection (FDEP), Office of Resilience and Coastal Protection, Coastal Construction Control Line (CCCL) Program, in coordination with the Town of Palm Beach. The application pertains to permit number PB-1399, for which Coastal Protection Engineering, represented by authorized agent Stacy Buck, is requesting a three-year extension on behalf of the Town of Palm Beach (property owner of record). The project involves work subject to CCCL regulations under Florida Administrative Code Rule 62B-33.013. The permit extension application must be submitted to CCCL@dep.state.fl.us or mailed to the Florida Department of Environmental Protection at 2600 Blair Stone Road, Tallahassee, Florida 32399-2400. To process the extension request, applicants must provide evidence of project completion status certified by a licensed professional engineer or architect, revised construction schedules demonstrating feasibility of completion within the requested extension period, and verification from the applicable county or municipality that previously granted authorizations will remain valid throughout the extension duration.

Extension fees are structured based on project completion levels: $200 for projects certified at least 75 percent complete, $500 for projects less than 75 percent complete but above foundation level, and $750 for projects with incomplete foundations. The FDEP will deny extension requests if shoreline or other conditions have changed rendering the project non-permissible, if the request is submitted after permit expiration, or if construction has not commenced within five years of initial permit issuance for major structures. This application form (DEP Form 73-113, Revised 6/22) was executed on November 26, 2025, by Sara Gutekunst. The extension request is directly related to the Town of Palm Beach's Mid-Town Seawall Replacement Project, which involves constructing approximately 2,700 linear feet of new seawall along South Ocean Boulevard between Gulfstream Road and Royal Palm Way.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permit Number Additional Time Requested

Name of Authorized Agent for Permit Time Extension Application (if applicable) Mailing Address or Email Address

City State Zip Code Telephone

Name of Owner of Record Mailing Address, or Email Address

City State Zip Code Telephone

I hereby certify that all information submitted with this request is true and complete to the best of my knowledge.

Signature of Applicant (Property Owner or Date Typed or Printed name of Applicant (include title and name of Authorized Agent) corporation or other business entity, if applicable)

Application for a Permit Time Extension

Pursuant to Rule 62B-33.013, Florida Administrative Code

Email To: CCCL@dep.state.fl.us

Coastal Construction Control Line Program Office of Resilience and Coastal Protection

Or Mail to: Florida Department of Environmental Protection 2600 Blair Stone Road, Mail Station 3522 Tallahassee, Florida 32399-2400

Pursuant to Rule 62B-33.013, Florida Administrative Code (F.A.C.), a permittee may request an extension of the Coastal Construction Control Line (CCCL) permit expiration date by filing a written request for a permit time extension. If a timely and sufficient time extension request is received prior to the permit expiration date, the permit will be valid until the Department acts upon the extension request. If the CCCL permit has expired, construction is incomplete, and no time extension has been requested, then construction must cease until after the time extension has been granted.

The Department shall deny a request for a time extension if shoreline or other conditions have changed so that the project is no longer permissible under Chapter 62B-33, F.A.C.; if the request for a time extension is received by the Department after the permit expiration date; or if construction has not started within a five-year period following the date of permit issuance for major structures.

If you have questions about the form, please contact the Department at (850) 245-2094 (ask the operator to connect you with the staff member responsible for time extension requests in the coastal county in which your project is proposed).

When received, an approved time extension must be posted as part of the permit.

Please attach the following items:

a. The fee for time extensions, pursuant to paragraph 62B-33.0085(4)(m), F.A.C., is $200 for projects that are certified by a professional engineer or architect licensed in the State of Florida to be at least 75% complete, $500 for projects that are certified by a professional engineer or architect licensed in the State of Florida to be less than 75% complete and above the foundation, and $750 for projects in which the foundation is incomplete.

b. Evidence provided by the applicable county or municipality that the authorization previously provided by that county or municipality will remain in effect throughout the duration of the requested time extension.

c. A revised construction schedule indicating that the activity can be completed within the time extension requested.

DEP Form 73-113 (Revised 6/22)

PB-1399 AR 3 years

Coastal Protection Engineering, Stacy Buck 5301 N Federal Hwy, Suite 335

Boca Raton FL 33487 561-632-1210

Town of Palm Beach 360 South County Road, P.O. Box 2029

Palm Beach FL 33480 561-838-5440

Sara Gutekunst Digitally signed by Sara Gutekunst Date: 2025.11.26 08:59:11 -05'00'

File details come from the government source that posted it. Updated .