This is a Coastal Construction Control Line (CCCL) Permit Time Extension Approval letter issued by the Florida Department of Environmental Protection (FDEP) Office of Resilience and Coastal Protection to the Town of Palm Beach for the Mid-Town Seawall Replacement Project. The permit (PB-1399 AR) for construction activities at 270 to 470 South Ocean Boulevard, Palm Beach, has been extended for three years and is now valid until December 13, 2028. The approval is issued pursuant to Section 161.053, Florida Statutes, and all existing permit requirements and conditions remain in effect. The permittee is required to post a copy of the approval letter on-site along with the Notice to Proceed for the entire construction period. No further extensions of this permit are authorized, although the Town may apply for a new permit in the future with no assurance that equivalent authorization will be granted.
The permit extension does not specify pricing terms, funding sources, or set-asides as this is an administrative approval document rather than a procurement solicitation. The related design-build solicitation for the Mid-Town Seawall Replacement Project requires qualified firms to submit statements of qualifications to provide design and construction services for approximately 2,700 linear feet of new seawall along South Ocean Boulevard between Gulfstream Road and Royal Palm Way. A mandatory pre-proposal meeting and site visit is scheduled for March 31, 2026, at 10:00 AM EST at the Public Works Building in West Palm Beach, followed by a site visit at the Worth Avenue Clock Tower; failure to attend will result in disqualification. Proposals must be submitted online through the Town's EUNA Procurement platform, with a proposal deadline indicated in the solicitation documents.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 1, 2025 Via Electronic Transmittal
Town of Palm Beach c/o Stacy Buck
Coastal Protection Engineering
Dear Sir/Madam:
Approval of Permit Time Extension
Permit File Number: PB-1399 AR
Permittee Name: Town of Palm Beach
Project Address: 270 to 470 South Ocean Boulevard, Palm Beach
Your request for a 3-year time extension of permit number PB-1399 AR for construction or other activities pursuant to Section 161.053, Florida Statutes, is hereby approved. The permit is now valid until December 13, 2028.
No further extensions of this permit are authorized. You may apply for a new permit. However, there is no assurance that a permit for any of the same construction or activities will be authorized upon future application.
You are required to post a copy of this letter on the site along with the Notice to Proceed for the entire period of construction. All requirements and conditions of the permit remain in effect.
If you have any questions or concerns, or need additional information, please contact me by mail at the letterhead address (add Mail Station 3522), by telephone at 850/245-7672, or by e-mail at
Douglas.Aarons@FloridaDEP.gov
Sincerely, Doug W. Aarons, P.E., Program Administrator
Coastal Construction Control Line
Office of Resilience and Coastal Protection cc: David Kieckbusch, Field Inspector
Town of Palm Beach, Property Representative, kblouin@townofpalmbeach.com
Wayne Bergman, Town of Palm Beach, wbergman@townofpalmbeach.com
File details come from the government source that posted it. Updated .