38-8. 62-621.300 2b 2.pdf
PDF 155 KB Posted
- Attached to
- Progressive Design-Build Services for Town of Palm Beach Mid-Town Seawall Replacement Project
- Solicitation number
- RFQ No.2026-020
- Issued by
- Palm Beach County, Florida
About this file
This is a Notice of Intent to Use the Generic Permit for Discharge of Ground Water from Dewatering Operations issued by the Florida Department of Environmental Protection (DEP) pursuant to subsection 62-621.300(2), F.A.C. The form serves as an application for permit coverage of temporary groundwater discharge activities related to construction dewatering operations such as excavations, building foundations, vaults, trenches, and aquifer performance tests. Applicants must submit the completed form and supporting documentation to their local DEP office at least 14 days prior to the planned commencement of discharge. The form requires submission of a $100 application fee payable to the Florida Department of Environmental Protection. A mandatory pre-proposal meeting for the related Town of Palm Beach Mid-Town Seawall Replacement Project will be held on March 31, 2026 at 10:00 AM EST at the Public Works Building in West Palm Beach, with an immediate site visit to follow at the Worth Avenue Clock Tower in Palm Beach. Failure to attend the mandatory pre-proposal meeting and site visit will result in disqualification from consideration.
The permit application requires applicants to address Best Management Practices (BMPs) in accordance with generic permit requirements, which must be implemented upon commencement of discharge. Sites must be evaluated for contamination status using DEP's Contamination Locator Map and Institutional Controls Registry, and applicants must certify that receiving surface water bodies and site-specific conditions comply with applicable water quality standards. Chemical treatment is permitted under the generic permit; however, sites utilizing cationic treatment chemicals require advance concurrence from the local DEP office. The application process requires owner or operator certification under penalty of law, with signatory requirements specified in Rule 62-620.305, F.A.C. All proposals must be submitted electronically through the Town's EUNA Procurement platform (eProcurement system), with the project encompassing approximately 2,700 linear feet of seawall replacement along South Ocean Boulevard in the Town of Palm Beach right-of-way and coastal waters.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP Form 62-621.300(2)(b) incorporated in subsection 62-621.300(2), F.A.C.
Effective 02/2015
NOTICE OF INTENT
TO USE THE GENERIC PERMIT
FOR DISCHARGE OF GROUND WATER
FROM DEWATERING OPERATIONS
(subsection 62-621.300(2), F.A.C.)
PART I INSTRUCTIONS
A. Will dewatering operations be performed as part of construction activities?
NO Continue completing this form.
YES You may elect to obtain coverage under the Generic Permit for Stormwater Discharge from Large and Small Construction Activities (CGP), DEP Form 62-621.300(4)(b), which will cover both the construction and dewatering operations.
B. This Notice of Intent (NOI) form shall be completed and submitted to the industrial wastewater program at the local DEP office as part of the request for coverage under the Generic Permit for Discharge of Ground Water from Dewatering Operations subsection 62-621.300(2)(a), F.A.C., at least 14 days prior to planned commencement of discharge. For the purposes of this generic permit, ‘dewatering operations’ means temporarily lowering the water table by draining or pumping of ground water from activities such as excavations, building foundations, vaults, trenches and aquifer performance tests for exploratory purposes. Applicants should be familiar with the rule, generic permit document and instructions before completing this NOI form. Attach additional information on separate sheets as necessary.
1. Submit this completed form and supporting documentation and the $100.00 application fee to the industrial wastewater program at the local DEP office. Electronic submittal is preferred and may be available at http://www.dep.state.fl.us/water/wastewater/iw/iw-forms.htm. To locate a local DEP office, go to:
http://www.dep.state.fl.us/secretary/dist/default.htm.
2. Checks should be payable to the Florida Department of Environmental Protection. DEP will not process this form without the appropriate fee.
3. If an item is not applicable to your project, indicate “NA” in the appropriate space provided.
PART II DEWATERING INFORMATION:
A. Is the project site currently identified as contaminated, or is there a site within 500 feet of the dewatering project identified as contaminated, by a DEP or EPA cleanup/restoration program?
You may use the Quick Links to DEP’s Contamination Locator Map (CLM) and DEP’s Institutional Controls Registry (ICR) Web Viewer to determine cleanup restoration status. You may access the CLM at: http://webapps.dep.state.fl.us/DepClnup/welcome.do, or http://ca.dep.state.fl.us/mapdirect/?focus=contamlocator. The ICR may be accessed at:
http://www.dep.state.fl.us/waste/categories/brownfields/pages/ICR.htm, or http://ca.dep.state.fl.us/mapdirect/?focus=icr
YES Continue to B.
NOS Continue to D.
Effective 02/2015
B. Has the site been remediated?
YES Continue to D.
NOS Continue to C.
C. Are the pollutants of concern (i.e. contamination) present in ground water at the dewatering project site at concentrations equal to or exceeding the surface water criteria in Rule 62-302.530?
YES Dewatering operations do not qualify for coverage under this generic permit. However, the site may qualify for coverage under Rule 62-621.300(1), F.A.C., or under an individual wastewater permit on the appropriate form listed in Rule 62-620.910, F.A.C.
NOS Continue to D.
D. Have Best Management Practices (BMPs) for this generic permit been developed or addressed in an existing BMP plan in accordance to the requirements of this generic permit. BMPs must be implemented upon commencement of the discharge
YES Continue to Part III.
NOS Your application cannot be processed until this item is complete.
NOTE: Chemical treatment is allowed as described in the Best Management Practices of the Generic Permit. However, sites that use cationic treatment chemicals are not eligible for coverage under Generic Permit for Discharge of Ground Water from Dewatering Operations unless concurrence from the applicable local DEP office is obtained in advance of the submittal of this NOI. Appropriate controls and implementation procedures designed to ensure that the use of cationic treatment chemicals will not cause or contribute to a violation of water quality standards shall be included in the site specific BMPs.
PART III DISCHARGE INFORMATION:
A. Please identify receiving surface water body.
PART IV SITE INFORMATION
A. COVERAGE STATUS:
1. Is this application for new coverage or for renewal of coverage under the generic permit? New Renewal
2. If this application is for renewal of coverage under the generic permit, provide the FLG No. FLG No:
B. NAME OF SITE:
Site Name:
Effective 02/2015
C. PERMITTEE INFORMATION:
1. Name: 2. Title (Owner, Operator, Contractor, etc.):
3. Phone No.: ( )___ - 4. Fax No.: ( )___ -
4. Email Address:
5. Street or P. O. Box:
6. City or Town: 7. State: 8. Zip Code:
D. SITE LOCATION INFORMATION:
1. Street, Route or Other Specific Identifier:
2. County:
3. City or Town: 4. State: 5. Zip Code:
6. Latitude: °_____ ′_____ ″ 7. Longitude: °_____ ____ ″ ′_
8. If records required in accordance with Part V. of DEP Document 62-621.300(2)(a), are kept off-site, please provide the physical address of site where records will be kept. Note: location must be accessible for inspection of records by the Department.
PART V CERTIFICATIONS
A. OWNER OR OPERATOR1
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Name & Official Title (type or print) Signature
Telephone No. Date signed
Email Address
1 Signatory requirements are contained in Rule 62-620.305, F.A.C.
File details come from the government source that posted it. Updated .