This is a Liquidated Damages Form from the Town of Palm Beach related to the Progressive Design-Build Services for the Town of Palm Beach Mid-Town Seawall Replacement Project in Florida. The project involves the design and construction of a new seawall approximately 2,700 linear feet along South Ocean Boulevard between Gulfstream Road and Royal Palm Way to replace the existing Mid-Town Seawall, which was originally constructed in the early 1900s. The Town will select a qualified Design-Build firm to deliver the project at a Guaranteed Maximum Price. A mandatory pre-proposal meeting and site visit is scheduled for March 31, 2026, at 10:00 AM EST at the Public Works Building, 951 Okeechobee Road, West Palm Beach, Florida, with an immediate follow-up site visit at the Worth Avenue Clock Tower, 423 South Ocean Boulevard, Palm Beach, Florida. Failure to attend this meeting will result in disqualification. Proposals must be submitted online through the EUNA Procurement platform.

The contractor and its surety will be liable to the Town for liquidated damages in the amount of 0.1% of the Guaranteed Maximum Price for each calendar day after the scheduled completion date, including any time extensions granted through approved written change orders. If the contractor is terminated for default prior to completion, liquidated damages will continue to accrue and be charged against the contractor until the work is completed. The contractor must acknowledge and confirm understanding and compliance with these liquidated damages terms as a condition of contract execution.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF PALM BEACH

Liquidated Damages Form

Contractor is aware of Town's requirement that the Work achieve timely Completion, time being of the essence. Town and Contractor recognize and hereby acknowledge the difficulty and uncertainty of computing the damages that would be realized by Town in the event the Completion is not timely achieved. It is therefore agreed by Town and Contractor, that the Contractor and the Contractor's surety, shall be liable to and shall pay Town liquidated damages in the amount 0.1% of the Guaranteed Maximum Price for each calendar day after the date on which Completion was to have been achieved (including any Time Extension in approved, written Change Order(s) until Completion of the Work is achieved. In the event Contractor is terminated by reason of default prior to Completion being achieved, any liquidated damages shall continue to accrue and be charged against Contractor until Completion is achieved.

I hereby confirm that our company understands and will comply with Liquidated Damages Term above:

Company Name: Name:

Date: Authorized Signature:

TOWN OF PALM BEACH – Liquidated Damages Form

Company Name:
Name:
Date:

File details come from the government source that posted it. Updated .