18-Design Criteria Package.pdf

PDF 226 KB Posted

Attached to
Progressive Design-Build Services for Town of Palm Beach Mid-Town Seawall Replacement Project
Solicitation number
RFQ No.2026-020
Issued by
Palm Beach County, Florida

About this file

This is a Design Criteria Package for a progressive Design-Build project issued by the Town of Palm Beach, Florida, for the replacement of the Mid-Town Seawall. The project involves the design and construction of approximately 2,700 linear feet of new seawall along South Ocean Boulevard between Gulfstream Road and Royal Palm Way. The Town seeks a qualified firm to provide comprehensive Design-Build services at a Guaranteed Maximum Price (GMP), with the selected contractor responsible for all design, permitting, cost estimating, value engineering, constructability review, and construction services. The project is structured in two phases: Phase 1 encompasses pre-construction services including conceptual design, cost modeling, value engineering, and permitting, while Phase 2 involves full construction services following execution of the construction agreement. A mandatory Pre-Proposal Meeting and Site Visit is scheduled for March 31, 2026, at 10:00 AM EST at the Public Works Building in West Palm Beach, with the site visit following at the Worth Avenue Clock Tower. Failure to attend this mandatory meeting will result in disqualification. Proposals must be submitted online through the Town's EUNA Procurement platform.

The project budget is established at $20,000,000.00, and the selected Design-Build Firm must hold a Florida state contractor license with marine contractor certification and demonstrate continuous experience in seawall construction within the municipal sector, including coastal construction work in dense urban barrier island settings. The new seawall shall have a minimum design life of 75 years, be installed east of the existing seawall, and maintain the public's view of the beach unchanged. The scope includes replacement of affected utilities (stormwater, potable water, wastewater, irrigation, and electrical), maintenance of two-way traffic on South Ocean Boulevard, preservation of at least one public beach access point throughout construction, protection of the Worth Avenue Clock Tower landmark, and incorporation of nine existing groins into the design. Special design considerations include an emergency wastewater outfall at Royal Palm Way, replacement of beach vehicular gates, ADA pedestrian ramp improvements, and coordination with concurrent Town projects. An existing FDEP permit (PB-1399 AR) valid through December 13, 2028, details approved construction activities, and the contractor bears full responsibility for all permitting requirements and maintenance of traffic implementation.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT E - DESIGN CRITERIA PACKAGE 1

DESIGN CRITERIA PACKAGE

PROGRESSIVE DESIGN-BUILD

MID-TOWN SEAWALL REPLACEMENT

TOWN OF PALM BEACH

INTENT

The Town of Palm Beach (“Town”) invites qualified Firms to submit statements of qualifications to provide Design-Build (“DB”) services at a Guaranteed Maximum Price (“GMP”) for the Mid- Town Seawall Replacement (“Project”). The selected firm will be responsible for the design and construction of the scope items listed below, as well as any additional work necessary to complete the Project.

The DB Firm must hold a Florida state contractor license and a marine contractor certification and must have continuously demonstrated the ability to successfully perform seawall construction work within the municipal sector. The Contractor shall have relevant experience/working knowledge of performing coastal construction work. The Contractor should have prior experience working in dense urban settings on a barrier island, similar to the Town of Palm Beach.

The DB Firm shall lead the design process, obtain permits, perform construction cost estimating, provide value engineering, review constructability, conduct risk analysis, meet permit requirements, manage the project schedule, and perform construction and restoration services.

The DB Firm must be licensed to practice as general contractors in the State of Florida pursuant to Chapter 489, Florida Statutes, by the submittal date for proposals.

Project Site

EXHIBIT E - DESIGN CRITERIA PACKAGE 2

BACKGROUND

The existing Mid-Town Seawall is nearing the end of its useful life. Much of the wall was constructed in the early 1900s and has undergone multiple repairs and reconfigurations. The Town desires to construct a new seawall, east (seaward) of the existing seawall, approximately 2,700 linear feet along South Ocean Blvd, between Gulfstream Rd. and Royal Palm Way. The project site encompasses the Town of Palm Beach right-of-way, Town of Palm Beach-owned property, as well as work seaward of the coastal construction control line. Below are the northern and southern boundary parcels.

Northern property boundary: Parcel No. 50-43-43-23-00-004-0110 Southern property boundary: Parcel No. 50-43-43-26-03-000-0012

The Town and GHD Consulting Services Inc. began preliminary design of the seawall replacement in 2020. A Request for Qualifications (RFQ) and a Request for Proposal (RFP) were advertised in 2023, but ultimately, the project was withdrawn from advertisement at the Town’s discretion. GHD Consulting Services Inc. is not the design criteria professional for this project.

This is a capital project under a progressive DB delivery method to realize synergies between all components, minimize disruptions, and assign a single point of contractual responsibility for the replacement of the Mid-Town Seawall.

Separately, the Town is in the design phase of multiple projects near the Mid-Town Seawall. The design of these projects will likely be complete during the design-build process. The Town intends to design and construct the Seawall project in a manner that will benefit these future projects. Coordination with these projects will be required. Below is a list of these projects.

1. Mid-Town Beach Linear Park & Worth Avenue Clock Tower

2. Mid-Town Beach Bathrooms

EXHIBIT E - DESIGN CRITERIA PACKAGE 3

PHASES

The project shall consist of two (2) phases with two (2) separate contracts with the DB Firm.

Phase 1: The Pre-Construction Services Phase will include design, cost estimating, value engineering, constructability review, risk analysis, permitting, and preparation of the GMP.

Phase 2: The Construction Services Phase will commence after execution of the construction services agreement. This phase will include all aspects of construction of the Mid-Town Seawall project as designed and permitted in Phase 1. The GMP must be accepted by Town staff and Town Council before execution of the agreement. In all aspects of the contract, the DB Firm serves as the single point of responsibility for the successful performance of the project’s pre-construction and construction phases.

EXHIBIT E - DESIGN CRITERIA PACKAGE 4

SCOPE

Comprehensive Pre-Construction and Construction Service Phases shall include, but not be limited to, the following components:

Seawall Replacement:

1. Design and replace approximately 2,700 linear feet of seawall.

a. The top of seawall elevation shall be within 1 ft of the existing knee wall elevation.

b. The design intent is for the public’s view of the beach to remain unchanged.

2. The wall shall have a minimum design life of 75 years.

3. The method of installing the seawall shall minimize the impact on the surrounding environment. The Town, Owners Rep, and DB Team will make the final determination of the chosen installation method based on the DB Team’s approach.

a. Special consideration will be given to impacts on the adjacent properties.

b. This includes vibrations, noise levels, and the duration of the construction impacts.

4. The seawall shall be installed east (seaward) of the existing wall.

5. The existing seawall does not need to be removed.

6. There are a minimum of nine (9) groins within the approximately 2,700 linear feet of seawall; the DB Team shall include integration of these groins into the design.

Restoration of the groins is not required, but they may impact the design of the seawall.

7. There is a tunnel near the 100 Worth Avenue residence. This tunnel connection shall be incorporated into the design.

Maintenance of Traffic (MOT) & Beach Access:

1. South Ocean Boulevard is a major north-south throughfare for the Town. The MOT plan shall maintain 2-way traffic. The parallel parking on both the east and west sides of the road may be temporarily removed during construction as needed for 2-way traffic.

2. The Contractor is responsible for all MOT and permitting associated with its implementation.

3. The intent is for one (1) public beach access point to remain open throughout construction. This access point can be changed throughout the construction sequence depending upon the Contractor’s phasing.

4. Security and maintenance of safety is the sole responsibility of the Contractor. Multiple work zones are expected with this construction. Each location shall meet the standards of the Town and any permitting agencies while ensuring the safety of the public.

Permits:

1. All permitting is the sole responsibility of the DB Firm.

2. Permit PB-1399 AR from the Florida Department of Environmental Protection (FDEP) details the approved construction activities. This permit is valid through December 13, 2028.

EXHIBIT E - DESIGN CRITERIA PACKAGE 5

Utilities:

1. Design and construction for the replacement of existing utilities impacted by construction.

2. Utilities may include, but are not limited to:

a. Stormwater

b. Potable Water

c. Wastewater

d. Irrigation

e. Electrical

Architectural:

1. At the Worth Avenue Clock Tower, the separation between the existing seawall and the new seawall shall be a minimum of 5ft. The design intent is to create a walking path between the Clock Tower and the new wall. The design and construction shall allow for future planned improvements to the Worth Avenue Clock Tower.

2. The pile foundation for the Clock Tower shall not be impacted by the proposed design.

3. The Worth Avenue Clock Tower and its balustrade are a Town landmark that must be protected during construction.

4. The architectural aesthetic of the existing knee wall shall be incorporated into the new design. The scalloped feature and color are key elements to maintain in the design.

5. Architectural Commission (ARCOM) drawing review will be required.

6. The intent is for the public’s view to remain unchanged by the new seawall.

Budget and Guaranteed Maximum Price Development:

1. Develop an overall schedule and GMP that will minimize the impacts to the public.

2. The budget is $20,000,000.00.

Schedule:

1. Develop a schedule for the preparation of the GMP.

2. Develop a project sequence that minimizes the timeframe for the overall shutdown of the public beach, allowing for phased opening of sections such that the Town can obtain beneficial use.

3. Develop a schedule that allows for the incorporation of future planned projects in the area.

4. Construction during Sea Turtle Nesting Season is acceptable. If possible, it is the Town’s desire to construct during only one (1) Sea Turtle Nesting Season (March 1 – October 31).

Special design considerations shall be given to the following:

1. At Royal Palm Way extending east into the ocean, there is an emergency wastewater outfall. The design shall not disrupt this outfall.

2. The beach vehicular gate accesses shall be replaced. One beach vehicular access point shall be accessible to Town Staff throughout construction.

3. The American Disability Act (ADA) pedestrian ramp and upland connection shall be replaced.

4. The pedestrian stairs and access points shall be replaced.

EXHIBIT E - DESIGN CRITERIA PACKAGE 6

TASKS

The Scope of Services includes, but is not limited to:

Task 1 - Pre-Construction Services Phase

1. Conceptual/Schematic Design, Cost Model, and Value Engineering:

a. Facilitate, prepare, and maintain a risk register.

b. Provide design for all components identified within the project scope.

c. Provide design for all components consistent with Town, State, and Federal

Standards.

d. Develop and update at every design milestone a cost model to serve as a basis for the GMP.

e. Provide value engineering services.

f. Identify permitting authorities and requirements, including pre-application meetings

i. Permitting shall be included in the project schedule and sequencing plan.

ii. Town Architectural Commission review will be required.

2. Develop a GMP proposal consistent with the terms of the contract.

Task 2 - Construction Services

1. Provide construction management services identified in the contract.

EXHIBIT E - DESIGN CRITERIA PACKAGE 7

TOWN OBJECTIVES

The Town’s objectives for delivery of the Project are as follows:

1. Quality:

a. Design and construct system components, structures, and equipment that will be sustainable and consistently meet all Federal, State, and Town regulations. The Town places high priority on selecting equipment and designing facilities that deliver a high level of reliability at the lowest maintenance cost and effort.

b. The Town’s aesthetic is important and shall be maintained.

2. Schedule:

a. Achieving the agreed-upon scheduled completion date and focusing on minimizing negative impacts to the public.

3. Cost Control:

a. Maintain or decrease project capital costs, as well as life-cycle costs, while achieving operations, quality, and schedule objectives.

4. Safety and Security:

a. Implement an effective safety program incorporating best industry standards.

b. Implement a security protocol that will ensure a safe environment and protect the premises, property, systems, and individuals.

INTENT
BACKGROUND
PHASES
SCOPE