About this file

This is a Coastal Construction Control Line (CCCL) Permit issued by the State of Florida Department of Environmental Protection (FDEP) to the Town of Palm Beach for the Mid-Town Seawall Replacement Project. Permit Number PB-1399 AR authorizes the Town to construct a cantilevered sheetpile bulkhead immediately seaward of the existing wall along South Ocean Boulevard, between approximately 10 feet north of DEP reference monument R-97 and 330 feet south of DEP reference monument R-99 in Palm Beach County. The project encompasses the replacement of approximately 2,715 linear feet of coastal armoring, with the new structure located a maximum of 288.3 feet seaward of the coastal construction control line. The scope includes excavation of approximately 10,744 cubic yards of temporary sandy material and placement of approximately 11,522 cubic yards of fill material, demolition of existing structures as required, replacement of sidewalk and concrete areas, construction of north and south return walls measuring 16.8 feet and 12.2 feet respectively, and landscape planting with native dune species. The permit was issued on December 13, 2022, with an expiration date of December 13, 2025, allowing three years for project completion.

The permit includes extensive special conditions addressing marine turtle protection, environmental compliance, and construction management. All excavated sandy material must be placed in the immediate vicinity of the bulkhead seaward of the control line, and all fill material must be obtained from sources landward of the control line and be free of construction debris. No construction, operation, or equipment storage is authorized on marine turtle nesting habitat between March 1 and October 31, and all activity must be confined to daylight hours with no temporary lighting authorized during nesting season. The permittee must hold a preconstruction conference with FDEP staff prior to commencement, submit a sample of fill material for approval, and provide a final certification report signed by a registered professional engineer within 30 days of project completion. Additional requirements include yearly monitoring for erosion, immediate reporting of any marine turtle impacts to the Florida Fish and Wildlife Conservation Commission, and restoration of disturbed topography and vegetation with a minimum 80 percent plant survival rate within 180 days of installation.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
30-Eligibility and Minimum Reqirements .pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERMIT NUMBER: PB-1399 AR

PERMITTEE

Town of Palm Beach c/o Michael R. Barnett, P.E., D.CE., GHD Inc.

3380 Fairlane Farms Road, Suite 16 Wellington, Florida 33414

NOTICE TO PROCEED AND PERMIT FOR CONSTRUCTION OR OTHER ACTIVITIES

PURSUANT TO SECTION 161.053, FLORIDA STATUTES

FINDINGS OF FACT: An application for authorization to conduct the activities seaward of the coastal construction control line that are indicated in the project description, was filed by the applicant/permittee named herein on July 21, 2022 and was determined to be complete pursuant to rule on September 15, 2022.

On May 25, 2022, the Department granted a waiver from the requirements of Rules 62B-33.002(27) and 62B-33.0051(2)(b)3., F.A.C.

CONCLUSIONS OF LAW: After considering the merits of the proposal and any written objections from affected persons, the Department finds that upon compliance with the permit conditions, the activities indicated in the project description of this permit are of such a nature that they will result in no significant adverse impacts to the beach/dune areas or to adjacent properties; that the work is not expected to adversely impact nesting sea turtles, their hatchlings, or their habitat; that the work is expendable in nature and/or is appropriately designed in accordance with Section 62B-33.0051, Florida Administrative Code. Based on the foregoing considerations, the Department approves the application; authorizes construction and/or activities at the location indicated below in strict accordance with the project description, the approved plans (if any) and the General Permit Conditions which are by this reference incorporated herein, and any additional conditions shown below, pursuant to Section 161.053(4), Florida Statutes.

EXPIRATION DATE: December 13, 2025

LOCATION: Between approximately 10 feet north of DEP’s reference monument R-97 and 330 feet south of DEP’s reference monument R-99, in Palm Beach County. Project address: 270 to 470 South Ocean Boulevard, Palm Beach.

PROJECT DESCRIPTION:

Cantilevered Sheetpile Bulkhead Immediately Seaward of Existing Wall (Major Reconstruction of Coastal Armoring)

1. Location relative to control line: A maximum of 288.3 feet seaward.

2. Length of bulkhead: 2,715 linear feet.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Office of Resilience and Coastal Protection Coastal Construction Control Line Program 2600 Blair Stone Road - Mail Station 3522

Tallahassee, Florida 32399-2400

(850) 245-2094

PERMITTEE: Town of Palm Beach

3. Top of cap elevation: Varies from +15.3 feet (NAVD) to +14.6 feet (NAVD), northern to southern extent, respectively.

4. Bottom elevation of sheet piles: Varies from -34.7 (NAVD) to -35.1 feet (NAVD).

5. Length of north return wall: 16.8 feet.

6. Length of south return wall: 12.2 feet.

Excavation/Fill

1. Volume of excavation seaward of the control line: Approximately 10,744 cubic yards, temporary excavation. See Special Permit Condition 2.

2. Location of excavation: Across the site to a maximum of distance of approximately 300 feet seaward of the control line.

3. Volume of fill to be placed: Approximately 11,522 cubic yards. See Special Permit Conditions 3.

4. Location of fill to be placed: Immediately seaward and landward of the bulkhead.

Other Structures/Activities

1. Demolition as required for new construction activities.

2. Replacement of existing sidewalk and concrete areas landward of existing bulkhead, as necessary for new construction.

3. A 25-feet wide vehicular access opening is to be located a maximum of 284.7 feet seaward of the control line, as noted on the approved plans.

4. Landscape planting immediately landward of the bulkhead which include but not limited to sod and hedges and native dune species planting immediately seaward of the bulkhead. See Special Permit Condition 11.

SPECIAL PERMIT CONDITIONS:

1. Prior to commencement of construction activity authorized by this permit, a preconstruction conference shall be held at the site among the contractor, the owner or authorized agent, and a staff representative of the Department to establish an understanding among the parties as to the items specified in the special and general conditions of the permit. The proposed locations of the structures shall be staked out for the conference. Contact David Kieckbusch at (561) 313-9007 or email at David.Kieckbusch@FloridaDEP.gov to schedule a conference.

2. All excavated sandy material for installation of the bulkhead shall be placed in the immediate vicinity of the bulkhead seaward of the coastal construction control line. All sandy material excavated for installation of the bulkhead from the seaward side of the bulkhead shall be placed back on the seaward side of the bulkhead and not used as backfill material.

3. All fill material shall be obtained from a source landward of the control line and shall be consistent with the criteria specified in Rule 62B-33.005(7), Florida Administrative Code, and shall consist of sand which is similar to that already on the site in both grain size and coloration. This fill material shall be free of construction debris, rocks, or other foreign matter. A sample of the sand shall be provided to the staff representative during the preconstruction conference.

4. All existing rubble and debris, and that resulting from the authorized construction shall be removed and disposed of in a location landward of the coastal construction control line prior to expiration of the permit, or immediately following construction of the authorized bulkhead, whichever occurs first.

5. No construction, operation, transportation or storage of equipment or materials is authorized on marine turtle nesting habitat (sandy beach) during nesting season of March 1 through October 31.

6. To minimize impacts to existing marine turtle nesting habitat, the seawall shall be sited as close as practicable to the seaward face of the existing seawall. For areas with an existing toe wall as specified, the seawall shall be sited immediately seaward of the existing toe wall.

7. The project area shall be monitored yearly and after major storm events for the occurrence of significant erosion. If significant erosion damage occurs to the dune feature that exposes the underlying toe stone, the area should be repaired by the replacement of beach compatible sand and dune vegetation in order to restore the designed dune and continuous sand coverage of at least 4.5 feet above the top of the toe stone.

8. All activity shall be confined to daylight hours. No temporary lighting of the construction area is authorized at any time during the marine turtle nesting season. No permanent lighting is authorized.

9. All activities shall avoid marked marine turtle nests including those that may be on the beach before or after the marine turtle nesting season. Any impacts to nests that may have inadvertently occurred or if a marine turtle nest is exposed, or a dead, injured, or sick marine turtle is discovered, the Permittee shall ensure that the Marine Turtle Permit Holder be notified immediately such that appropriate conservation measures can be taken. Within 24 hours of any such occurrence, the Permittee shall submit a report detailing the incident (e.g., date, time, permit number, location, photos, contact information, incident and response descriptions) to the FWC at MarineTurtle@MyFWC.com.

10. All debris (including rocks, sandbags, construction materials, etc.) shall be removed and disposed of in a location landward of the Coastal Construction Control Line. All temporary disturbances in the sand (including, but not limited to, ruts, depressions, mounds, etc.) resulting from work activities shall be filled in and raked smooth after project completion.

11. Planting of dune vegetation is encouraged outside of marine turtle nesting season. However, planting activities may occur during the marine turtle nesting season March 1 through October 31 under the following conditions:

11.1. It is the responsibility of the Permittee to ensure that the project area and access sites are surveyed for marine turtle nesting activity. All nest surveys and activities involving marine turtles shall be conducted only by persons with a valid FWC permit issued pursuant to Florida Administrative Code 68E-1. For information regarding marine turtle permit holders, contact the FWC at MTP@MyFWC.com.

11.2. Marine turtle nest surveys shall be initiated at the beginning of the nesting season or 65 days prior to installation of plants (whichever is later). Surveys shall continue until completion of the project or through October 31 (whichever is earliest). Surveys shall be conducted throughout the project area and all beach access sites.

11.3. Any nests deposited in the area shall be left in place. The marine turtle permit holder shall install an on-beach marker at any nest site and a secondary marker located at a point as far landward as possible to ensure that future location of the nest will be possible should the on-beach marker be lost. A series of stakes and survey ribbon or string shall be installed to establish an area of three (3) feet radius surrounding the nest. No planting or other activity shall occur within this area nor shall any activity occur which might cause indirect impacts within this area. Nest sites shall be inspected daily to ensure nest markers have not been removed.

11.4. The use of heavy equipment (including vehicles such as trucks) is not authorized in marine turtle nesting habitat. A lightweight (ATV style) vehicle, with tire pressures of 10 psi or less can operate on the beach if required.

11.5. Any vegetation planting shall be installed by hand labor/tools only.

11.6. All activity shall be confined to daylight hours and shall not occur prior to the completion of all necessary marine turtle surveys and conservation activities within the project area.

Nighttime storage of equipment or materials shall be off the beach.

11.7. In the event a nest is disturbed or uncovered during planting activity, the Permittee shall cease all work and immediately contact the marine turtle permit holder responsible for marine turtle conservation measures within the project area. If a nest(s) cannot be safely avoided during construction, all activity within the affected project area shall be delayed until complete hatching and emergence of the nest.

11.8. All planting related activities must avoid marked marine turtle nests including those that may be on the beach before and after the marine turtle nesting season dates (March 1 through October 31). Any impacts to nests or marine turtles that inadvertently occur shall be immediately reported the Florida Fish and Wildlife Conservation Commission (FWC) at MarineTurtle@MyFWC.com, and all work shall stop until authorized to continue by the Department and the FWC.

11.9. All irrigation lines for the dune restoration planting, if proposed, will be temporarily installed along the landward side of the dune only and will be removed once the plants have become established. Any watering necessary along the seaward side of the dune will be done by hand on an “as needed” basis.

12. Permittee shall submit compliance reports as specified in Special and General Permit Conditions of this permit. General Permit Condition 1(r) pertain to a written report which must be submitted to the Department of Environmental Protection at specified times. The form for the report: 1(r) Final Certification (DEP Form 73-115B) is available by clicking on the following link http://www.dep.state.fl.us/beaches/forms.htm#CCCL. The form may be submitted electronically.

GENERAL PERMIT CONDITIONS:

(1) The following general permit conditions shall apply, unless waived by the Department or modified by the permit:

(a) The permittee shall carry out the construction or activity for which the permit was granted in accordance with the plans and specifications that were approved by the Department as part of the permit.

Deviations therefrom, without written approval from the Department, shall be grounds for suspension of the work and revocation of the permit pursuant to section 120.60(7), F.S., and shall result in assessment of civil fines or issuance of an order to alter or remove the unauthorized work, or both. No other construction or activities shall be conducted. No modifications to project size, location, or structural design are authorized without prior written approval from the Department. A copy of the notice to proceed shall be conspicuously displayed at the project site. Approved plans shall be made available for inspection by a Department representative.

(b) The permittee shall conduct the construction or activity authorized under the permit using extreme care to prevent any adverse impacts to the beach and dune system, marine turtles, their nests and habitat, or adjacent property and structures.

(c) The permittee shall allow any duly identified and authorized member of the Department to enter upon the premises associated with the project authorized by the permit for the purpose of ascertaining compliance with the terms of the permit and with the rules of the Department until all construction or activities authorized or required in the permit have been completed and all project performance reports, certifications, or other documents are received by the Department and determined to be consistent with the permit and approved plans.

(d) The permittee shall hold and save the State of Florida, the Department, and its officers and employees harmless from any damage, no matter how occasioned and no matter what the amount, to persons or property that might result from the construction or activity authorized under the permit and from any and all claims and judgments resulting from such damage.

(e) The permittee shall allow the Department to use all records, notes, monitoring data, and other information relating to construction or any activity under the permit, which are submitted, for any purpose necessary except where such use is otherwise specifically forbidden by law.

(f) Construction traffic shall not occur and building materials shall not be stored on vegetated areas seaward of the control line unless specifically authorized by the permit. If the Department determines that this requirement is not being met, positive control measures, such as temporary fencing, designated access roads, adjustment of construction sequence, or other requirements, shall be provided by the permittee at the direction of the Department. Temporary construction fencing shall not be sited within marine turtle nesting habitats.

(g) The permittee shall not disturb existing beach and dune topography and vegetation except as expressly authorized in the permit. Before the project is considered complete, any disturbed topography or vegetation shall be restored as prescribed in the permit with suitable fill material or revegetated with appropriate beach and dune vegetation. When required for mitigation, dune vegetation will be considered successfully established if within 180 days of planting, a minimum of 80 percent of the planting units survive, a minimum of 80 percent of the planted area is covered with native species and the vegetation is continuous without gaps along the shoreline.

(h) All fill material placed seaward of the CCCL shall meet the requirements of subsection 62B- 33.005(7), F.A.C. All such fill material shall be free of construction debris, rocks, clay, or other foreign matter; and shall be obtained from a source landward of the CCCL.

(i) If surplus sand fill results from any approved excavation seaward of the control line, such material shall be distributed seaward of the control line on the site, as directed by the Department, unless otherwise specifically authorized by the permit. Sand fill placed seaward of the frontal dune, bluff or coastal armoring in marine turtle nesting habitat shall be configured such that it does not interfere with marine turtle nesting.

(j) Any native salt-tolerant vegetation destroyed during construction shall be replaced with plants of the same species or, by authorization of the Department, with other native salt-tolerant vegetation suitable for beach and dune stabilization. Unless otherwise specifically authorized by the Department, all plants installed in beach and coastal areas – whether to replace vegetation displaced, damaged, or destroyed during construction or otherwise – shall be of species indigenous to Florida beaches and dunes, such as sea oats, sea grape, saw palmetto, panic grass, saltmeadow hay cordgrass, seashore saltgrass, and railroad vine, and grown from stock indigenous to the region in which the project is located.

(k) All topographic restoration and revegetation work is subject to approval by the Department, and the status of restoration shall be reported as part of the final certification of the actual work performed.

(l) If not specifically authorized elsewhere in the permit, no operation, transportation, or storage of equipment or materials is authorized seaward of the dune crest or rigid coastal structure during the marine turtle nesting season. The marine turtle nesting season is May 1 through October 31 in all counties except Brevard, Indian River, St. Lucie, Martin, Palm Beach, and Broward counties where leatherback turtle nesting occurs during the period of March 1 through October 31.

(m) If not specifically authorized elsewhere in the permit, no temporary lighting of the construction area is authorized at any time during the marine turtle nesting season and no additional permanent exterior lighting is authorized.

(n) All non-opaque walls, balcony railings, deck railings, windows and doors visible from any point on the beach must be tinted to a transmittance value (light transmission from inside to outside) of 45 percent or less through the use of tinted glass or window film.

(o) The permit has been issued to a specified property owner and is not valid for any other person unless formally transferred. An applicant requesting transfer of the permit shall sign the permit transfer agreement form, agreeing to comply with all terms and conditions of the permit, and return it to the Department. The transfer request shall be provided on the form entitled “Permit Transfer Agreement” – DEP Form 73-103 (Revised 1/04), which is hereby adopted and incorporated by reference. No work shall proceed under the permit until the new owner has received a copy of the transfer agreement approved by the Department. A copy of the transfer agreement shall be displayed on the construction site along with the permit. An expired permit shall not be transferred. Copies of the “Permit Transfer Agreement” form are available at the following website: https://floridadep.gov/water/coastal-construction-control-line/content/coastal-construction-control-line-cccl-forms.

(p) The permittee shall immediately inform the Department of any change of mailing address of the permittee and any authorized agent until all requirements of the permit are met.

(q) For permits involving habitable major structures, all construction on the permitted structure shall stop when the foundation pilings have been installed. At that time the foundation location form shall be submitted to and accepted by the Department prior to proceeding with further vertical construction above the foundation. The form shall be signed by a professional surveyor, licensed pursuant to chapter 472, F.S., and shall be based upon such surveys performed in accordance with chapter 472, F.S., as are necessary to determine the actual configuration and dimensioned relationship of the installed pilings to the control line.

The information shall be provided to the Department using the form entitled “Foundation Location Certification” – DEP Form 73-114B (Revised 9/05), which is hereby adopted and incorporated by reference.

Phasing of foundation certifications is acceptable. The Department shall notify the permittee of approval or rejection of the form within seven (7) working days after staff receipt of the form. All survey information upon which the form is based shall be made available to the Department upon request. Permits for repairs or additions to existing structures with nonconforming foundations are exempt from this condition.

(r) For permits involving major structures and exterior lighting on major structures, the permittee shall provide the Department with a report by a registered professional within 30 days following completion of the work. For permits involving armoring or other rigid coastal structures, the permittee shall provide the Department with a report by an engineer licensed in the State of Florida within 30 days following completion of the work. The report shall state that all locations specified by the permit have been verified and that other construction and activities authorized by the permit, including exterior lighting, have been performed in compliance with the plans and project description approved as a part of the permit and all conditions of the permit; or shall describe any deviations from the approved plans, project description, or permit conditions, and any work not performed. Such report shall not relieve the permittee of the provisions of paragraph 62B-33.0155(1)(a), F.A.C. If none of the permitted work is performed, the permittee shall inform the Department in writing no later than 30 days following expiration of the permit. The report shall be provided on the form entitled “Final Certification” DEP Form 73-115B (Revised 9/05), which is hereby adopted and incorporated by reference. Copies of the “Final Certification” form are available at the following website: https://floridadep.gov/water/coastal-construction-control-line/content/coastal-construction-control-line-cccl-forms.

(s) Authorization for construction of armoring or other rigid coastal structures is based on an engineering review and assessment of the design and anticipated performance and impact of the structure as a complete unit. Construction of any less than the complete structure as approved by the Department is not authorized and shall result in the assessment of an administrative fine and the issuance of an order to remove the partially constructed structure. Modifications to the project size, location, or structural design shall be authorized by the Department in accordance with rule 62B-33.013, F.A.C.

(2) The permittee shall not commence any excavation, construction, or other physical activity on or encroaching on the sovereignty land of Florida seaward of the mean high water line or, if established, the erosion control line until the permittee has received from the Board of Trustees of the Internal Improvement Trust Fund the required lease, license, easement, or other form of consent authorizing the proposed use.

(3) The permittee shall obtain any applicable licenses or permits required by Federal, state, county, or municipal law.

(4) This permit does not authorize trespass onto other property.

(5) In the event of a conflict between a general permit condition and a special permit condition, the special permit condition shall prevail.

(6) Copies of any forms referenced above can be obtained by contacting the Department of

Environmental Protection, 2600 Blair Stone Road, MS 3522, Tallahassee, Florida 32399-2400, at https://floridadep.gov/water/coastal-construction-control-line/content/coastal-construction-control-line-cccl-forms or by telephoning (850) 245-2094.

Approved plans are incorporated into this permit by reference.

NOTICE OF RIGHTS

This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application.

Petition for Administrative Hearing A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:

(a) The name and address of each agency affected and each agency’s file or identification number, if known;

(b) The name, address, and telephone number of the petitioner; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests are or will be affected by the agency determination;

(c) A statement of when and how the petitioner received notice of the agency decision;

(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;

(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;

(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and

(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.

The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.

Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28- 106.205, F.A.C.

Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.

Mediation Mediation is not available in this proceeding.

Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.

EXECUTION AND CLERKING

Executed in Tallahassee, Florida.

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Doug Aarons, P.E., M.B.A., Program Administrator Coastal Construction Control Line Program Office of Resilience and Coastal Protection

CERTIFICATE OF SERVICE

The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons:

Michael R. Barnett, P.E., D.CE., Agent, michael.barnett@ghd.com Town of Palm Beach, Property Representative, kblouin@townofpalmbeach.com David Kieckbusch, Field Inspector, David.kieckbusch@floridadep.gov Wayne Bergman, Town of Palm Beach, wbergman@townofpalmbeach.com FWC, MarineTurtle@MyFWC.com

FILING AND ACKNOWLEDGMENT

FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged.

12/13/2022 Clerk Date

Clerk

File details come from the government source that posted it. Updated .