30-Eligibility and Minimum Reqirements .pdf

PDF 86 KB Posted

Attached to
Progressive Design-Build Services for Town of Palm Beach Mid-Town Seawall Replacement Project
Solicitation number
RFQ No.2026-020
Issued by
Palm Beach County, Florida

About this file

This is an Eligibility and Minimum Requirements document for the Town of Palm Beach's Progressive Design-Build Services solicitation for the Mid-Town Seawall Replacement Project in Florida. The project involves the design and construction of a new seawall approximately 2,700 linear feet along South Ocean Boulevard between Gulfstream Road and Royal Palm Way, replacing an existing seawall constructed in the early 1900s. A mandatory pre-proposal meeting and site visit will be held on March 31, 2026, at 10:00 AM EST at the Public Works Building in West Palm Beach, with the site visit to follow at the Worth Avenue Clock Tower in Palm Beach. Failure to attend this mandatory meeting will result in disqualification from the solicitation process. Proposals must be submitted online through the Town's EUNA Procurement platform (ex Bonfire).

To be eligible for consideration and award, proposers must meet specific minimum qualifications, including forming a Design-Build Firm comprised of an architectural and engineering firm and a general contractor holding a Florida state contractor license and marine contractor certification. The firm must have a demonstrated history of successfully performing seawall construction work within the municipal sector and possess qualified staff capable of managing the project with minimal reliance on Town resources. Additionally, the contractor must have relevant experience and working knowledge of coastal construction work performed within the last ten years and prior experience working in dense urban settings similar to Palm Beach. Proposers must submit written documentation such as client reference letters or client lists as evidence of meeting these requirements, with reference letters not older than three years.

View the file

Other files

File Type Posted
15-Design-Build Sample Agreement.pdf PDF
22-11ATMG~1.PDF PDF
5-Subcontractors Form.pdf PDF
41-Bonds Requirements Form Surety2000.pdf PDF
4-TOPB Drug Free Workplace Form.pdf PDF
26-152012~1.PDF PDF
39-Example - AIA A141 Desgin-Build Agreement DRAFT.pdf PDF
19-7. 1929 ToPB Seawall Drawing.pdf PDF
9-Vendors Conflict of Interest Form.pdf PDF
18-Design Criteria Package.pdf PDF
42-Insurance Requirements.pdf PDF
29-Legal Advertisement.pdf PDF
36-6TOWN ~1.PDF PDF
2-Reference Form.pdf PDF
35-5. 2021 Mid-TownSeawall Temp.Dune PermitSet.pdf PDF
7-Bidder’s Qualification Form - Rev001.pdf PDF
23-12BEAC~1.PDF PDF
14-Liquidated Damages Form.pdf PDF
32-2CCCLP~1.PDF PDF
11-FS 119.0701 and FS 119.071 for Public Records 2024 version.pdf PDF
20-8100WO~1.PDF PDF
40-Example - Design-Build Amendment DRAFT.pdf PDF
33-3CCCLP~1.PDF PDF
13-RFQ - Instructions to Suppliers and General Conditions.pdf PDF
28-Direct Owner Purchasing Program.pdf PDF
21-91987T~1.PDF PDF
12-Contact Information Form.pdf PDF
27-102019~1.PDF PDF
38-8. 62-621.300 2b 2.pdf PDF
34-4. CCCL Permit Time Extension Approval.pdf PDF
8-Protest Procedure Form.pdf PDF
24-13. Ocean Outfall 1955.pdf PDF
10-Affidavit of Compliance with Foreign Entity and Human Trafficking.pdf PDF
3-Scrutinized Companies Form.pdf PDF
31-1. CCCL Permit PB-1399 AR FO SECURED.pdf PDF
37-7TOWN ~1.PDF PDF
16-Statement of Qualifications Requirements.pdf PDF
6-Truth-in-Negotiations.pdf PDF
25-14RECO~1.PDF PDF
17-Special Terms and Conditions.pdf PDF
1-E-Verify.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELIGIBILITY AND MINIMUM REQUIREMENTS

To be eligible to respond to this solicitation and be considered for award, the proposer shall demonstrate to the satisfaction of the Town that it or the persons assigned to the project have successfully performed the kind of work required in this solicitation, similar in scope and complexity, to private or public clients.

Proposers must meet the following minimum qualifications to be awarded. Failure to meet the minimum qualifications may result in rejection of the proposal. Proposers shall submit written documentation such as letters of references or a list of clients, as evidence that they meet the requirements stated below. Letters of references should not be older than three years.

a. The Design-Build Firm shall consist of an architectural and engineering firm, and a general contractor, and shall hold a Florida state contractor license and certification as a marine contractor.

b. The Design-Build Firm shall have continuously demonstrated the ability to successfully perform seawall construction work within the municipal sector.

c. Proposers shall have qualified staff with the experience to manage the project without undue reliance on the Town's staff.

d. The Contractor shall have relevant experience/working knowledge of performing coastal construction work within the last 10 years. The Contractor shall have prior experience working in dense urban settings similar to the Town of Palm Beach.

File details come from the government source that posted it. Updated .