This specification document is Section 26 23 00.16 for Arc-Resistant Metal-Enclosed Drawout Switchgear serving the Lehigh County Authority's Electrical Substation Replacement Project – Equipment Procurement Phase at Substations #2 and #4 located at 7676 Industrial Boulevard, Allentown, Pennsylvania. The specification requires furnishing and installation of deadfront-type, arc-resistant low-voltage metal-enclosed switchgear assemblies utilizing Eaton Magnum PXR drawout power circuit breakers, with equipment to be rated for 600 Vac maximum service, 150 kA symmetrical short-circuit withstand rating, and Type 2B arc-resistant classification per IEEE/ANSI C37.20.7. Sealed bids will be received via PennBid until 11:00 a.m. prevailing time on Wednesday, October 28, 2026, with self-guided site visits available by scheduling with Charles Volk, P.E., Chief Capital Works Officer. Bids shall remain open for 60 days from the bid opening date, and each bid must include bid security of 10 percent of the bid total in the form of a certified check, bank check, or bid bond. The project includes comprehensive specifications for circuit breaker trip units with advanced monitoring capabilities, arc flash detection and quenching systems, automatic transfer controls for main-tie-main arrangements, and metering and communications compartments.
The specification mandates compliance with multiple IEEE/ANSI and UL standards and requires submittals including main drawing indices, three-line and schematic diagrams, component lists, assembly ratings, and product data sheets for engineer approval prior to manufacturing. Approved manufacturers include Eaton, ABB, Siemens, and Square D/Schneider Electric, with alternative manufacturers requiring pre-approval from the engineer ten days prior to the bid date. The manufacturer must be ISO 9001 or 9002 certified and have produced similar electrical equipment for a minimum of five years. Factory testing shall include 2200 V dielectric testing of the main bus system and 1500 V dielectric testing of control circuits, with a certified test report to be witnessed by the owner's representative. Field quality control shall include five working days of factory-trained manufacturer support for equipment startup, along with one-day training for up to five owner representatives conducted by a qualified manufacturer representative. The Lehigh County Authority reserves the right to reject any and all bids and to waive any omissions, errors, or irregularities in submitted bids.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substation #2, #4 Procurement 7676 Industrial Blvd.
Allentown, PA 18106 September 15, 2026
26 23 00.16-1
SECTION 26 23 00.16
ARC-RESISTANT METAL-ENCLOSED DRAWOUT SWITCHGEAR – LOW-VOLTAGE
PART 1 GENERAL
1.01 SCOPE
A. Furnish and install, where indicated on the drawings, a deadfront type, arc-resistant low-voltage metal-enclosed switchgear assembly utilizing Eaton Magnum PXR drawout power circuit breakers, as specified herein and shown on the contract drawings.
B. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section
1.02 RELATED SECTIONS
A. Section 26 43 13 – Transient Voltage Surge Suppression.
B. Section 26 27 13.11 – Microprocessor-Based Metering Equipment.
1.03 REFERENCES
A. The low-voltage metal-enclosed switchgear assembly and all components shall be designed, manufactured, and tested in accordance with the following latest applicable standards:
1. IEEE/ANSI C37.20 – Switchgear assemblies
2. IEEE/ANSI C37.13 – Low-voltage power circuit breakers
3. IEEE/ANSI C37.17 – Trip devices
4. IEEE/ANSI C37.20.7 – Arc Resistant Testing
5. UL 1558 Low-Voltage Switchgear
6. UL 1066 Low-Voltage Power Circuit Breakers
1.04 SUBMITTALS – FOR APPROVAL/REVIEW
A. The following information shall be submitted to the Engineer:
1. Main drawing index
2. Front view and plan view of the assembly
3. Three-line diagram
4. Schematic diagram
5. Nameplate schedule
6. Component list
7. Conduit space locations within the assembly
8. Assembly ratings including:
Allentown, PA 18106 September 15, 2026
26 23 00.16-2
a. Short-circuit rating
b. Voltage
c. Continuous current rating
9. Major component ratings including:
a. Voltage
b. Continuous current rating
c. Interrupting ratings
10. Cable terminal sizes
11. Product data sheets
B. Where applicable, the following additional information shall be submitted to the Engineer:
1. Busway connection
2. Composite front view and plan view of close-coupled assemblies
3. Key interlock scheme drawing and sequence of operations
4. Automatic transfer scheme sequence of operations
5. Mimic bus size and color
6. Arc Plenum and Duct details
1.05 SUBMITTALS – FOR CONSTRUCTION
A. The following information shall be submitted for record purposes:
1. Final as-built drawings and information for items listed in Paragraph 1.04, and shall incorporate all changes made during the manufacturing process
2. Wiring diagrams
3. Certified production test reports
4. Installation information
5. Seismic certification as specified
6. Arc Plenum and Arc Exhaust details as specified
1.06 QUALIFICATIONS
A. The manufacturer of the assembly shall be the manufacturer of the major components within the assembly.
B. For the equipment specified herein, the manufacturer shall be ISO 9001 or 9002 certified.
C. The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of five (5) years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement.
Allentown, PA 18106 September 15, 2026
26 23 00.16-3
1.07 REGULATORY REQUIREMENTS
D. The switchgear shall bear a third-party certification label by one or both regulatory bodies. For all installations, an Underwriter’s Laboratory marking to UL 1558, and where selected, a Canadian Standards Association marking to CSA C22.2 No. 31.
E. A copy of the UL/CSA Certificate of Compliance shall be provided at time of quotation, which demonstrates the offered equipment compliance to these Standards, stating the manufacturers product name.
F. The switchgear shall bear a label specifying that the assembly has been assembled and tested according to the specifications set forth by IEEE/ANSI C37.20.7
1.08 DELIVERY, STORAGE, AND HANDLING
A. Equipment shall be handled and stored in accordance with manufacturer’s instructions. One (1) copy of these instructions shall be included with the equipment at time of shipment.
1.09 OPERATION AND MAINTENANCE MANUALS
A. Equipment operation and maintenance manuals shall be provided with each assembly shipped and shall include instruction leaflets and instruction bulletins for the complete assembly and each major component.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Eaton
B. ABB
C. Siemens
D. Square D/ Schneider Electric
The listing of specific manufacturers above does not imply acceptance of their products that do not meet the specified ratings, features and functions. Manufacturers listed above are not relieved from meeting these specifications in their entirety. Products in compliance with the specification and manufactured by others not named will be considered only if pre-approved by the Engineer ten (10) days prior to bid date.
2.02 RATINGS
A. Voltage rating shall be as indicated on the drawings. The entire assembly shall be suitable for 600 Vac maximum service.
B. The assembly shall be rated to withstand mechanical forces exerted during short-circuit conditions when connected directly to a power source having available fault current of 65 kA symmetrical at rated voltage.
C. The bus system shall have a minimum IEEE/ANSI short-circuit withstand rating of 150 kA symmetrical tested in accordance with IEEE/ANSI C37.20.1 and UL1558.
D. All circuit breakers shall have a minimum symmetrical interrupting capacity of 65 kAIC. To ensure a fully selective system, all circuit breakers shall have 30 cycle
Allentown, PA 18106 September 15, 2026
26 23 00.16-4 short-time withstand ratings equal to their symmetrical interrupting ratings through 85 kA, regardless of whether equipped with instantaneous trip protection or not.
E. All ratings shall be tested to the requirements of IEEE/ANSI C37.20.1, IEEE/ANSI C37.20.7, ANSI C37.50, ANSI C37.51, and UL 1558 witnessed and approved.
2.03 CONSTRUCTION
A. The switchgear shall consist of the required number of vertical sections bolted together to form a rigid assembly. The sides shall be covered with removable bolt-on covers. All edges of front covers or hinged front panels shall be formed. Provide ventilators located on the top of the switchgear over the breaker and bus compartments to ensure adequate ventilation within the enclosure. Cable compartment access shall be provided by hinged rear doors, complete with quarter turn latches and provisions for padlocking.
B. The assembly shall be provided with adequate lifting means and shall be capable of being moved into installation position and bolted directly to the floor without the required use of floor sills providing the floor is level to 1/8 inch per three feet distance in any direction. Provisions shall be made for jacking of shipping groups, for removal of skids or insertion of equipment rollers. Base of assembly shall be suitable for rolling directly on pipes without skids. The base shall be equipped with slots in the base frame members to accommodate the use of pry bars for moving the equipment to its final position.
C. Each vertical steel unit forming part of the switchgear line-up shall be a self-contained housing having one or more individual breaker or instrument compartments, a centralized bus compartment and a rear cable compartment.
Each individual circuit breaker compartment, or cell, shall be segregated from adjacent compartments and sections by means of steel barriers to the maximum extent possible. An arc ventilation system shall be provided within each breaker cell to redirect arc energy to the top of the enclosure away from operating personnel. Each cell shall be equipped with drawout rails and primary and secondary disconnecting contacts. Removable hinge pins shall be provided on the breaker compartment door hinges. Current transformers for feeder instrumentation, where shown on the plans, shall be located within the appropriate breaker cells and be front accessible, removable and provided with shorting terminal blocks in the front wireway. Circuit breaker doors shall not be ventilated.
D. The stationary part of the primary disconnecting devices for each power circuit breaker shall be breaker mounted and consist of a set of contacts extending to the rear through a glass polyester insulating support barrier; corresponding moving finger contacts, suitably spaced, shall be furnished on the power circuit breaker studs which engage in only the connected position. The assembly shall provide multiple silver-to-silver full floating high pressure point contacts with uniform pressure on each finger maintained by springs. Each circuit shall include the necessary three-phase bus connections between the section bus and the breaker line side studs. Load studs shall be equipped with insulated copper load extension buses terminating in solderless type terminals in the rear cable compartment of each structure. Bus extensions shall be plated similar to the main bus where outgoing terminals are attached.
E. The circuit breaker door design shall be such that the following functions may be performed without the need to open the circuit breaker door: lever circuit breaker between positions, operate manual charging system, close and open circuit breaker, examine and adjust trip unit, and read circuit breaker rating nameplate.
The circuit breaker door shall be one-piece and shall be specifically designed to resist forces produced during an arcing event. A two-point latch shall be provided
Allentown, PA 18106 September 15, 2026
26 23 00.16-5 for additional rigidity. A door bellows system shall be placed around the front of each breaker to prevent arc gasses from escaping around the breaker escutcheon, while also allowing easy racking of the breaker into the disconnected position with the door closed.
F. The secondary disconnecting devices shall consist of floating terminals mounted on the stationary unit and engaging mating contacts at the front of the breaker.
The breaker secondary disconnecting devices shall be maintained in the “connected” and “test” positions. Customer access to secondary terminations shall be in a separate compartment from the breaker cell and the compartment shall be rated Type 2B per IEEE/ANSI C37.20.7.
G. The removable power circuit breaker element shall be equipped with disconnecting contacts and interlocks for drawout application. It shall have four positions, “connected,” “test,” “disconnected” and “removed.” The breaker drawout element shall contain a worm gear levering “in” and “out” mechanism with removable lever crank. Levering shall be accomplished via the use of conventional tools.
Mechanical interlocking shall be provided so that the breaker is in the tripped position before levering “in” or “out” of the cell. Interlocking that trips the breaker will not be accepted. The breaker cell shall include an optional provision for key locking open to prevent manual or electric closing. Padlocking shall provide for securing the breaker in the connected, test, or disconnected position by preventing levering. Breaker shall be ready to accept connection of remote racking device without modification of breaker, cell or door.
H. An insulating flash shield shall be mounted above each circuit breaker to prevent flashover from the arc chutes to ground.
I. The switchgear shall be Eaton Magnum PXR low-voltage metal-enclosed switchgear, utilizing Magnum PXR power circuit breakers as herein specified.
J. Provide a glass polyester full height and depth barrier between adjacent vertical structures in the bus compartment with appropriate slots for main bus.
K. The switchgear shall have a ventilation system that allows exhaust of arc gasses regardless of the origination location of the arc event. The ventilation system shall be designed to exhaust arc events originating in the breaker cell, bus compartment, and rear cable compartment. The arc resistant switchgear shall not have an arc plenum and shall require ten (10) feet minimum floor-to-ceiling height for arc exhaust, with no obstructions in the space above the switchgear
L. The arc rating of the switchgear shall be Type 2B as defined by IEEE/ANSI C37.20.7. such that the operator is protected around entire perimeter of equipment with the low-voltage control, instrumentation and breaker secondary customer termination compartment doors open.
M. The switchgear shall be suitable for use as service entrance equipment and be labeled in accordance with UL requirements.
N. Provide a vented barrier between the cable compartment and the main bus to protect against inadvertent contact with main or vertical bus bars.
O. Provide a safety shutter in the cell when the circuit breaker is withdrawn which automatically covers the line and load stabs and protects against incidental contact. Provide key-lockable breaker door to prevent access to shutter when breaker is removed from cell.
P. Provide a metal barrier full height and depth between adjacent vertical structures in the cable compartment.
Allentown, PA 18106 September 15, 2026
26 23 00.16-6
Q. Provide a [4” diameter polymer lens] [4” diameter crystal lens] infrared (IR) scanning window for each set of circuit breaker terminations, mounted on cable compartment door.
2.04 BUS
A. All bus bars shall be silver-plated copper. Main horizontal bus bars shall be mounted with all three phases arranged in the same vertical plane. Bus sizing shall be based on IEEE/ANSI standard temperature rise criteria of 65°C over a 40°C ambient (outside the enclosure).
B. Provide a full capacity neutral bus where a neutral bus is indicated on the drawings.
C. A copper ground bus shall be furnished firmly secured to each vertical section structure and shall extend the entire length of the switchgear. The ground bus short time withstand rating shall meet that of the largest circuit breaker within the assembly. The ground bus plating shall match main bus plating.
D. All hardware used on conductors shall be high-tensile strength and zinc-plated. All bus joints shall be provided with Belleville-type washers.
E. The primary means of insulation and isolation of main and vertical bus shall be by air gap. Minimal use of insulating material in addition to air gap shall be provided.
2.05 WIRING/TERMINATIONS
A. Small wiring, necessary fuse blocks and terminal blocks within the switchgear shall be furnished as required. Control components mounted within the assembly shall be suitably marked for identification corresponding to the appropriate designations on manufacturer’s wiring diagrams.
B. Provide a front accessible, isolated vertical wireway for routing of factory and field wiring. Factory provisions shall be made for securing field wiring without the need for adhesive wire anchors.
C. Front access to all circuit breaker secondary connection points shall be provided for ease of troubleshooting and connection to external field connections without the need of removing the circuit breaker for access.
D. All control wire shall be type SIS. Control wiring shall be $14 AWG for control circuits and #12 AWG for current transformer circuits. Wire bundles shall be secured with nylon ties and anchored to the assembly with the use of pre-punched wire lances or nylon non-adhesive anchors. All current transformer secondary leads shall first be connected to conveniently accessible shorting terminal blocks before connecting to any other device. Shorting screws with provisions for storage shall be provided. All groups of control wires leaving the switchgear shall be provided with terminal blocks with suitable numbering strips and provisions for #10 AWG field connections. Each control wire shall be marked to the origin zone/wire name/destination zone over the entire length of the wire using a cured ink process.
Plug-in terminal blocks shall be provided for all shipping split control wires.
Terminal connections to remote devices or sources shall be front accessible via doors above each circuit breaker
E. NEMA 2-hole compression type lugs shall be provided for all line and load terminations suitable for copper or aluminum cable rated for 75°C of the size indicated on the drawings.
Allentown, PA 18106 September 15, 2026
26 23 00.16-7
F. Lugs shall be provided in the incoming line section for connection of the main grounding conductor and at each end of the ground bus for connection to system ground. Additional lugs for connection of other grounding conductors shall be provided as indicated on the drawings.
2.06 CIRCUIT BREAKERS
A. All protective devices shall be low-voltage power circuit breakers, Eaton type Magnum with Power Xpert Release or approved equal. All breakers shall be UL listed for application in their intended enclosures for 100% of their continuous ampere rating.
B. All power circuit breakers shall be constructed and tested in accordance with IEEE/ANSI C37.13, C37.16, C37.17, ANSI C37.50 and UL 1066 The breaker shall carry a UL label.
C. Breakers shall be provided in drawout configuration. All breaker cell sizes shall have a common height and depth. Breaker frames of the same size shall be fully interchangeable.
D. Power circuit breakers shall utilize a two-step stored-energy mechanism to charge the closing springs. The closing of the breaker contacts shall automatically charge the opening springs to ensure quick-break operation. Slow closing speed shall not be required to properly maintain the breaker contacts.
E. Breakers shall be manually operated (MO) unless electrically operated (EO) is indicated on the drawings.
F. The power circuit breaker shall have a closing time of not more than 3 cycles.
G. The primary contacts shall have an easily accessible wear indicator to indicate contact erosion.
H. The power circuit breaker shall have three windows in the front cover to clearly indicate any electrical accessories that are mounted in the breaker. The accessory shall have a label that will indicate its function and voltage. The accessories shall be plug and lock type and UL listed for easy field installation. They shall be modular in design and shall be common to all frame sizes and ratings.
I. The power circuit breaker shall have three windows in the front cover to clearly indicate any electrical accessories that are mounted in the breaker. The accessory shall have a label that will indicate its function and voltage. The accessories shall be plug and lock type and UL listed for easy field installation. They shall be modular in design and shall be common to all frame sizes and ratings.
J. The breaker control interface shall have color-coded visual indicators to indicate contact open or closed positions as well as mechanism charged and discharged positions. Manual control pushbuttons on the breaker face shall be provided for opening and closing the breaker. The power circuit breaker shall have a “Positive On” feature. The breaker flag will read “Closed” if the contacts are welded and the breaker is attempted to be tripped or opened.
K. Each power circuit breaker shall offer eighty-four (84) front mounted dedicated secondary wiring points for standard and double-wide frame breakers and seventy-two (72) for narrow frame. Each wiring point shall have finger safe contacts, which will accommodate #10 AWG maximum field connections with ring tongue or spade terminals or bare wire.
Allentown, PA 18106 September 15, 2026
26 23 00.16-8
L. The circuit breaker will be labeled with the pre-programmed In value, this value will be stamped on the back of the unit. The In value can only be modified with firmware modification through approved channels.
M. A position indicator shall be located on the faceplate of the breaker and on the side of the cassette. This indicator shall provide color indication of the breaker position in the cell. These positions shall be Connect (Red), Test (Yellow), and Disconnect (Green) and shall all permit closing the compartment door. The levering door shall be interlocked so that when the breaker is in the closed position, the breaker levering-in door shall not open. Mechanical interlocking shall be provided so that the breaker is in the tripped position before levering “in” or “out” of the cell.
N. The breaker shall include padlocking provisions to prevent levering which is capable of securing the breaker in the connected, test or disconnected position.
O. The secondary disconnecting devices shall consist of plug-in connectors mounted on the removable unit and engaging floating plug-in connectors at the front of the compartment. The secondary disconnecting devices shall be gold-plated, and pin and socket contact engagement shall be maintained in the “connected” and “test” positions
P. To facilitate lifting, the power circuit breaker shall have integral handles on the side of the breaker.
Q. Provide a safety shutter in the cell when the circuit breaker is withdrawn, which automatically covers the line and load stabs and protects against incidental contact.
R. The circuit breaker door design shall be such that the following functions may be performed without the need to open the circuit breaker door: lever circuit breaker between positions, operate manual charging system, close and open circuit breaker, examine and adjust trip unit, and read circuit breaker rating nameplate.
S. The secondary disconnecting devices shall consist of floating terminals mounted on the stationary unit and engaging mating contacts at the front of the breaker.
The breaker secondary disconnecting devices shall be maintained in the “connected” and “test” positions.
T. The removable power circuit breaker element shall be equipped with disconnecting contacts and interlocks for draw-out application. It shall have four positions, “connected,” “test,” “disconnected” and “removed.” The breaker draw-out element shall contain a worm gear levering “in” and “out” mechanism with removable lever crank. Levering shall be accomplished via the use of conventional tools.
Mechanical interlocking shall be provided so that the breaker is in the tripped position before levering “in” or “out” of the cell.
U. Breaker shall be ready to accept connection of remote racking device without modification of breaker, cell or door.
V. Key interlocks shall be provided as indicated on the drawings. These interlocks shall keep the circuit breakers trip-free when actuated trip units
2.07 TRIP UNITS
A. Each low-voltage power circuit breaker shall be equipped with a true RMS sensing, solid-state tripping system consisting of at least three current sensors microprocessor-based trip device and flux-transfer shunt trip. The trip unit shall use microprocessor-based technology to provide the basic adjustable time-current protection functions. Current sensors shall be of Rogowski coil type. The continuous current rating (In) shall be established via trip device firmware.
Allentown, PA 18106 September 15, 2026
26 23 00.16-9
B. The nominal current rating (In) sets the maximum continuous ratings of the breaker and can be reduced by changing the firmware-based rating only. Replacing current sensors shall not be required.
C. The trip unit shall be Eaton Power Xpert Release (PXR) or Approved Equal
D. The trip unit shall have an information system that utilizes battery backup LEDs to indicate mode of trip following an automatic trip operation. The indication of the mode of trip shall be retained after an automatic trip. A reset button shall be provided to turn off the LED indication after an automatic trip. A test pushbutton shall energize a LED to indicate the battery status.
E. The trip unit shall be provided with a display panel, including a representation of the time/current curve that will indicate the protection functions. The unit shall be continuously self-checking and provide a visual indication that the internal circuitry is being monitored and is fully operational.
F. The trip unit shall be provided with a making-current release circuit. The circuit shall be armed for approximately two cycles after breaker closing and shall operate for all peak fault levels above 25 times the ampere value of the rated current In.
G. Trip unit shall have selectable powered and unpowered thermal memory for enhanced circuit protection.
H. Complete system selective coordination shall be provided by the addition of the following individually adjustable time/current curve shaping solid-state elements:
1. All circuit breakers shall have adjustments for long delay pickup and time
2. All circuit breakers shall have individual adjustments for short delay pickup and time, and include I2t settings
3. All circuit breakers shall have an adjustable instantaneous pickup
4. All circuit breakers shall have individually adjustable ground fault current pickup and time, and include I2t settings or ground alarm only
I. Trip units shall include embedded Modbus RTU communication capability. All monitored parameters and statuses shall be available over the chosen protocol(s).
1. In addition, the trip units shall simultaneously support the following additional protocol:
a. Modbus TCP with HTML5 embedded webpages
b. IEC 61850 (GOOSE messaging)
J. Trip units shall allow remote open and closing of the breaker across the specified communication protocol.
K. Trip units shall be capable of supporting dual communications.
1. Via the integral Modbus RTU and integral Ethernet connectivity.
L. All circuit breakers, where indicated on the drawings,] shall have individually adjustable ground fault alarm only.
M. All circuit breakers shall have four protection sets that include all the protection and alarm settings. The protection sets can be switched using hardwired inputs to the trip unit (ex: a four-position selector switch) or over communications.
Allentown, PA 18106 September 15, 2026
26 23 00.16-10
N. The trip unit shall have a high resolution liquid-crystal display (LCD) capable of navigating settings and programming them via navigation buttons on the trip unit, color touchscreen display capable of navigating settings and programming
O. The trip unit shall be capable of communicating with a PC utilizing the Power Xpert Protection Manager (PXPM) software via micro-B USB connection
P. The trip unit shall utilize ARMS (Arcflash Reduction Maintenance System). ARMS shall be provided in a system that shall reduce the trip unit Instantaneous pickup value when activated. ARMS device shall not compromise breaker phase protection even when enabled. Once ARMS unit is disabled, the recalibration of trip unit phase protection shall not be required. Activation and deactivation of ARMS setting shall be accomplished without opening the circuit breaker door and exposing operators to energized parts. ARMS shall provide a clearing time of 0.04 seconds, adjustable with a minimum of five settings ranging from 1.5x to 10x of the In value.
1. ARMS shall be enabled via a switch on the trip unit. It shall also provide confirmation of protection via a Blue LED.
2. ARMS shall be provided with remote “enable/disable” control
3. ARMS shall be provided with a switchgear panel mounted enable padlockable selector switch and indication via Blue LED pilot light.
Q. The trip unit shall include a power/relay module which shall supply control to the readout display. Following an automatic trip operation of the circuit breaker, the trip unit shall maintain the cause of trip history and the mode of trip LED indication as long as its internal power supply is available. An internal relay shall be programmable to provide contacts for remote ground alarm indication.
R. The trip unit shall include a voltage divider board, suitable for operation up to 600 V, 50/60 Hz which shall not require a disconnect plug for high-potential (hi-pot) or dielectric testing.
S. The display for the trip units shall be an LCD or LED touchscreen display. Metering display accuracy of the complete system, including current sensors, auxiliary CTs, and the trip unit, shall be ±0.5% of metered current values
T. Metering display accuracy of the complete system shall be ±0.5% of metered voltage value, and ±1.0% of full scale for power and energy values to IEEE/ANSI C12.1.
U. The trip unit shall display the harmonic content current up to the 35th harmonic as a percentage
V. The unit shall be capable of monitoring the following data:
1. Instantaneous, minimum, and maximum of line-to-line voltage and line-to-neutral voltage
2. Power metering including demand power and power factor
3. Energy metering including directional, nets and total
W. The energy-monitoring parameter values (peak demand, present demand, and energy consumption) shall be indicated on the trip units LCD screen.
X. The trip unit shall display the following power quality values: crest factor, power factor, percent total harmonic distortion, and harmonic values of all phases through the 35th harmonic.
Allentown, PA 18106 September 15, 2026
26 23 00.16-11
Y. Trip unit shall be capable of monitoring the frequency.
Z. An adjustable high load alarm shall be provided adjustable from 50 to 100% of the long delay pickup setting along with the ability to disable the alarm.
AA. System coordination shall be provided by the following microprocessor-based programmable time-current curve shaping adjustments. The short-time pickup adjustment shall be dependent on the long delay setting.
1. Programmable long-time setting
2. Programmable long-time delay with either:
a. Selectable I2t, It, I1/2t, I4t curve shaping, IEEE Moderate, IEEE Extreme, IEEE Very Extreme, IEC A, IEC B, or IEC C
3. Programmable short-time setting
4. Programmable short-time delay with selectable flat or I2t curve shaping, and zone selective interlocking
5. Programmable instantaneous setting that can be disabled
6. Programmable ground fault setting trip or ground fault setting alarm that can be disabled
7. Programmable ground fault delay with selectable flat or I2t curve shaping and zone selective interlocking
BB. The trip unit shall have the following advanced features integral to the trip unit which can be configured to trip or alarm, or set to off:
1. Directional Power pickups and delay (ANSI 32P, 32Q/40)
2. Power factor (ANSI 55)
3. Over and under frequency (ANSI 81O/U)
4. Real, apparent and reactive power demand
5. Synchronism check (ANSI 25)
a. Includes ability to check for dead bus
CC. The trip unit shall include the ability to configure alarms for total harmonic distortion for both voltage and current.
DD. Breaker Health Monitoring and Diagnostics
1. The trip units shall collect and store pertinent information to the trip unit and circuit breaker health and event history. The trip unit shall also include diagnostic features to allow the user to investigate events and dynamically monitor the health of the trip unit and the breaker.
2. Breaker Health
a. The trip unit shall contain a circuit breaker health monitoring system that collects information pertaining to the health and life of the breaker.
1) Number of operations (load and no-load)
2) Number of trips (overload trips, short circuit trips)
3) Run time
Allentown, PA 18106 September 15, 2026
26 23 00.16-12
4) Breaker ambient temperature.
5) Breaker remaining life - Then the trip unit shall utilize an algorithm that applies a weighted value to all of these inputs to determine the remaining life of the breaker. The remaining life of the breaker shall be displayed or communicated in calculated percentage of life remaining.
6) All breaker health information shall be available via local display and via communications.
3. Breaker Diagnostics
a. Trip units shall be continuously self-checking and provide a visual indication that the internal circuitry is being monitored and is fully operational.
b. Trip units shall have an information system that provides LEDs to indicate mode of trip following an automatic trip operation. The indication of the mode of trip shall be retained after an automatic trip. A reset button shall be provided to turn off the LED indication after an automatic trip.
1) Cause-of-trip LED indications shall include battery backup to indicate mode of trip following an automatic trip operation. Battery charge status shall be displayed on the face of the trip unit and available via alarm relay.
c. The trip unit shall capture and record information surrounding events, alarms, and trips into a set of time-stamped logs. The trip unit shall store a minimum of 200 time-stamped log events. Log events shall be categorized as follows:
1) Event Log – system events, user interactions, programming changes, breaker operations, causes, and descriptions.
2) Alarm Log – trip unit and circuit breaker alarm conditions indicating an abnormal operating or user specified condition.
3) Trip Log – any event resulting in the automatic trip of the circuit breaker.
4) Alarm and Trip Log events shall capture and store the following information:
5) Real-time Current (IA, IB, IC, IN, IG), Temperature, Frequency, Power Factor, Operations Count
6) Real-time Voltages (VAB, VBC, VCA, VAN, VBN, VCN), Power and Demand (Watts, Vars, VA)
d. The trip unit shall perform a waveform capture on trip, alarm, or user-initiated events.
1) Any breaker trip event shall capture a 10-cycle waveform; (6) pre-event cycles and (4) post-event cycles. The trip unit shall store the most recent trip event waveform.
2) Any alarm event shall capture a 10-cycle waveform; (6) pre-event cycles and (4) post-event cycles. The trip unit shall store the most recent alarm event waveform.
Allentown, PA 18106 September 15, 2026
26 23 00.16-13
3) Any user-initiated waveforms shall capture a 1-cycle waveform.
4) Waveform events shall capture and store the following information:
a) Cause-of-trip
b) All phase, neutral, and ground currents
c) Temperature, operations count
d) Time and date
e) Phase-to-phase and Phase-to-Neutral voltage waveforms, power, energy, power factor, frequency
5) The trip unit shall contain an integral trip test capability. The user can initiate a breaker trip from the keypad to confirm breaker trip actuator and breaker mechanism functionality.
e. Trip unit shall include programmable (3) alarm relays. Relay activation can be programmed to any of 30 various status, alarm, health, or trip conditions.
f. Trip units shall be capable of being programmed and tested with an industry standard USB cable using a software tool available from the manufacturer’s website. The software shall provide the follow functionality
1) Setting / Saving / Uploading / Downloading of trip unit setpoints including a setpoint wizard
2) Time current curve displays including upstream and downstream breakers to analyze coordination
3) View, download, export (.csv) and trigger waveform captures for troubleshooting and diagnostics
4) Zone Selective Interlocking testing capability
5) Breaker current sensor continuity testing capability
6) Breaker trip actuator testing capability
7) Trip unit secondary injection testing without the need for dedicated test equipment with automatic test reporting capability. Trip units without software secondary injection test / reporting capability must be provided with the required dedicated trip unit test equipment.
2.08 MISCELLANEOUS DEVICES
A. Key interlocks shall be provided as indicated on the drawings. These interlocks shall keep the circuit breakers trip-free when actuated.
B. Each section of the switchgear shall be provided with a 240 V space heater operated at 120 Vac thermostatically controlled. Power for the space heaters shall be obtained from a control power transformer within the switchgear.
C. Fused control power transformers shall be provided as required for proper operation of the equipment. A manual disconnect shall be provided ahead of the primary fuses. If part of substation, the control power transformers shall have adequate capacity to supply power to the transformer cooling fans.
Allentown, PA 18106 September 15, 2026
26 23 00.16-14
2.09 METERING, MONITORING AND CONTROL
A. Microprocessor-Based Metering System as indicated on drawings.
1. Where indicated on the drawings, provide a separate owner metering compartment with front hinged door
2. Provide current transformers for each meter. Current transformers shall be wired to shorting-type terminal blocks.
3. Provide potential transformers including primary and secondary fuses with disconnecting means for metering as shown on the drawings.
B. Web-Enabled Communications
1. Where indicated on the drawings, provide a separate compartment with a front facing hinged door as a central point of connection for all internally located communicating devices to an external Ethernet network and allow close monitoring of the power infrastructure with real-time, web-enabled data.
2. The compartment shall have a hinged door with a functional through-the-door RJ45 network access port. Power for the components in the compartment shall be supplied by a pre-wired, bus-connected control transformer in the compartment that is fused and has a disconnecting means.
1. The communication protocol shall be Ethernet Modbus TCP either native to the metering device or following interconnection to Eaton PXG1000.
2.10 AUTOMATIC AND REMOTE TRANSFER CONTROL – THREE BREAKER WITH
TWO MAINS AND A NORMALLY OPEN TIE
A. Main-tie-main arrangement controlled by Eaton PLC and Touchscreen
1. Furnish at Substation #2 and #4, two (2) switchgear assemblies with a remote transfer control system for two (2) mains and normally open tie. The automatic/remote transfer switchboard shall consist of a dead front, metal-enclosed and integrated assembly including two (2) main breakers and one
(1) tie breaker each being driven by a motor operator, and an integrated remote transfer control system, with redundant power sources for the remote transfer control scheme and breaker motor operators, sensing devices, low voltage logic control, touch screen operator interface (HMI), breaker control SW’s with status indicating lights, and auxiliary equipment.
2. The logic of the transfer shall function via a microprocessor controller. The set points shall be field adjustable without the use of special tools. LED lights shall be included on the controller to show:
a. Source 1 Available
b. Source 2 Available
c. Source 1 Connected
d. Source 2 Connected
3. A digital readout shall display each option as it is functioning. Readouts shall display actual line-to-line voltage, line frequency and timers. When timers are functioning, the microprocessor shall display the timer counting down. All set points shall be reprogrammed from the front panel of the controller when it is in the program mode. In addition, the controller shall display date, time and reason of last 16 transfers, set points of timers, voltage pickup and dropout set
Allentown, PA 18106 September 15, 2026
26 23 00.16-15 points. It shall be able to communicate onto the new power monitoring and SCADA systems all values and historical data that are displayed locally and have the capability to change settings. The transfer system shall include the following features and functions:
4. INTERLOCKING and LOCK-OUT FUNCTIONS.
a. In “manual” and “automatic” mode of operation, main and tie breakers may not be closed simultaneously. Main and tie breakers mechanical Open/Close buttons on the face of the breakers shall be blocked with mechanical means to avoid unintended operation and paralleling of the two power sources.
b. All “manual” operations of main and tie breakers shall be performed using the operator interface HMI or breaker control switch. When in manual mode, control of breakers is in the hands of the operator and no automatic transfers shall occur.
c. Overcurrent trip switch (OTS) on main and tie breakers shall be incorporated in the control scheme such that there will be no closure of any breaker onto a fault. Scheme shall not be defeated and shall be active except during emergency operations (inoperative controls).
Breaker trip unit and OTS switch shall be reset to resume automatic operations.
d. Electrical Interlocking shall prevent paralleling of power two sources in manual and automatic mode.
5. BREAKER CONTROLS AND TIME-DELAY FUNCTIONS
a. After transfer has been initiated, a time delay transfer from the power source 1 to power source 2 and from power source 2 to the power source 1, forcing a neutral position to ensure the load voltage has decayed before reconnecting to the source from which the load is to be fed (0 seconds to 30 minutes).
b. A time delay to override a momentary power outage or voltage fluctuation (0 seconds to 120 seconds).
c. Two Form C relay contacts that changes state when the power is available on power source 1. Two Form C relay contacts that changes state when the power is available on power source 2.
d. Two (2) sets of three-phase “line side” voltage transformers with primary fuses and secondary supplementary protectors to provide sensing power.
e. The automatic transfer system shall contain: One (1) key-operated selector switch with Automatic and Manual positions, One (1) open-close control switch for manual electrical operation of each controlled breaker when in Manual mode. One (1) push button to initiate manual retransfer to preferred source when the transfer controller is functioning in automatic mode and programmed for manual retransfer.
6. SEQUENCE OF OPERATIONS, AUTOMATIC MODE, OPEN TRANSITION
a. Loss of power at Main Breaker No. 1 or Power Source 1
1) Device 27/47-1 detects loss of normal voltage.
2) Time delay 5 seconds (adjustable 0–60 seconds).
Allentown, PA 18106 September 15, 2026
26 23 00.16-16
3) Main Breaker No. 1 opens.
4) Time delay 2 seconds (adjustable 0–10 seconds) and then tie breaker closes.
b. Loss of power at Main Breaker No. 2 or Power Source 2
1) Device 27/47-2 detects loss of normal voltage.
2) Time delay 5 seconds (adjustable 0–60 seconds).
3) Main Breaker No. 2 opens.
4) Time delay 2 seconds (adjustable 0–10 seconds) and then tie breaker closes.
c. Loss of power at Main Breaker No.1 and Main Breaker No. 2 No action is taken.
d. Return of normal voltage to Main Breaker No. 1. (Following sequence “1” above).
1) Device 27/47-1 detects normal voltage.
2) Time delay 10 seconds (adjustable 0–60 seconds).
3) Tie breaker opens.
4) Time delay 2 seconds (adjustable 0–10 seconds) and then main breaker 1 closes.
e. Return of normal voltage to Main Breaker No. 2 (Following sequence “2” above).
1) Device 27/47-2 detects normal voltage.
2) Time delay 10 seconds (adjustable 0–60 seconds).
3) Tie breaker opens.
4) Time delay 2 seconds (adjustable 0–10 seconds), and then main breaker 2 closes.
7. SEQUENCE OF OPERATIONS, MANUAL RE-TRANSFER, OPEN
TRANSITION
a. Loss of power at Main Breaker No. 1 or Power Source 1
1) Device 27/47-1 detects loss of normal voltage.
2) Time delay 5 seconds (adjustable 0–60 seconds).
3) Main Breaker No. 1 opens.
4) Time delay 2 seconds (adjustable 0–10 seconds) and then tie breaker closes.
b. Loss of power at Main Breaker No. 2 or Power Source 2
1) Device 27/47-2 detects loss of normal voltage.
2) Time delay 5 seconds (adjustable 0–60 seconds).
3) Main Breaker No. 2 opens.
Allentown, PA 18106 September 15, 2026
26 23 00.16-17
4) Time delay 2 seconds (adjustable 0–10 seconds) and then tie breaker closes.
c. Loss of power at Main Breaker No.1 and Main Breaker No. 2 No action is taken.
d. Return of normal voltage to Main Breaker No. 1, (following sequence “1” above). No action is taken, requires manual transfer by operator:
1) Set Auto/Manual 43-A control switch to manual.
2) Use breaker control switches.
Or
3) Navigate to one-line screen on HMI.
4) Press “initiate retransfer” button on HMI screen.
e. Return of normal voltage to Main Breaker No. 2, (following sequence “2” above). No action is taken, requires manual transfer by operator:
1) Set Auto/Manual 43-A control switch to manual.
2) Use breaker control switches.
Or
3) Navigate to one-line screen on HMI.
4) Press “initiate retransfer” button on HMI screen.
2.11 ARC FLASH DETECTION SYSTEM
A. Arc flash detection system shall satisfy NEC 240.87 requirements.
B. System shall consist of an arc flash detection relay, point light sensors and current transformers per source bus.
C. Relay light sensors shall be placed in the cable, bus and circuit breaker compartments to provide comprehensive switchgear protection. Locations of point sensors shall be tested and proven effective by switchgear manufacturer.
D. Arc flash detection system shall utilize techniques to prevent nuisance tripping from the light emitted when an air circuit breaker interrupts a fault downstream from the switchgear during normal operation.
E. System shall be factory installed and tested.
F. Control power for the arc flash detection system shall be from a power source internal to the switchgear.
2.12 ARC QUENCHING SYSTEM
A. Provide arc quenching system integral to switchgear. System shall detect and quench arcing faults within the switchgear by creating a low impedance current path in a controlled compartment. System shall consist of an arc flash detection relay, point light sensors, current transformers and an arc quenching device per source bus.
B. Arc quenching device shall be rated for up to 100 kA available short circuit current at 635 Vac.
C. Arc quenching device shall be a draw-out, through-the-door device.
Allentown, PA 18106 September 15, 2026
26 23 00.16-18
D. Arc quenching system shall provide a quenching time of 4 milliseconds or less.
E. Arc quenching device shall be component registered to UL 2748.
F. Entire arc quenching system shall be installed, and factory verified, prior to shipment.
G. Arc quenching device shall be designed for one operation and electrically interlocked with source breaker to prevent re-energization of the switchgear until quenching device has been replaced or removed.
H. Control power for the arc flash detection system shall be from a power source internal to the low voltage switchgear.
I. Arc quenching system shall be tested, 3rd party certified and labeled according to the ANSI/IEEE C37.20.7, Type 2B arc-resistant test guide.
J. Arc quenching system shall include an arc flash detection relay to satisfy NEC
240.87 requirements.
K. Relay light sensors shall be placed in the cable, bus and circuit breaker compartments to provide comprehensive switchgear protection.
L. Arc quenching system shall utilize techniques to prevent nuisance tripping from the light emitted when an air circuit breaker interrupts a fault downstream from the switchgear.
M. Arc quenching system shall be an always-on system that does not require operator activation.
N. Arc quenching system shall reduce the available peak fault current by at least 25% that of a bolted fault during quenching operation.
O. Arc quenching system shall provide local and remote system status indication by dry status contacts.
P. The switchgear manufacturer shall provide field commissioning of the arc quenching system.
2.13 ENCLOSURES
A. NEMA 3R Outdoor Non-Walk-in Enclosure with Arc Quenching System
1. Switchgear shall be enclosed in an outdoor non-walk-in NEMA 3R enclosure conforming to all applicable requirements of UL and designed to withstand wind velocities of 125 mph. The enclosure shall have a roof sloping toward the rear. Outer sections shall be the same widths as indoor structures except the end sections of a walk-in enclosure shall be wider than the inner sections to permit opening the inner door. Each end of the outdoor structure shall have an end trim. Front aisle depth for walk-in structures shall be 42 inches, minimum.
2. The enclosure shall be provided with undercoating applied to all members in contact with the foundation surface to retard corrosion. The base material shall be standard steel.
3. Power for the space heaters, lights and receptacles shall be obtained from a control power transformer within the switchgear. Supply voltage shall be 120 Vac.
4. Each shipping section shall be shipped completely assembled
Allentown, PA 18106 September 15, 2026
26 23 00.16-19
2.14 NAMEPLATES
A. Engraved nameplates, mounted on the face of the assembly, shall be furnished for all main and feeder circuits as indicated on the drawings. Nameplates shall be laserable impact plastic, white characters on dark gray background and secured with screws. Characters shall be 3/16-inch high, minimum.
B. Furnish nameplate giving switchgear designation, voltage ampere rating, short-circuit rating, and manufacturer’s name.
C. Control components mounted within the assembly, such as fuse blocks, relays, pushbuttons, switches, etc., shall be suitably marked for identification corresponding to appropriate designations on manufacturer’s drawings.
D. Arc-Resistant Labeling – Labels shall be provided for each section that specify the gear has been assembled and tested as required by IEEE/ANSI C37.20.7.
2.15 FINISH
A. All exterior and interior steel surfaces of the switchgear shall be properly cleaned and provided with a rust-inhibiting phosphatized coating. Color and finish of the switchgear shall be Eaton Legacy Grey - ANSI 61.
2.16 SURGE PROTECTIVE DEVICE
A. Provide Eaton surge protective device as indicated on drawing and as specified in Section 26 43 13.
B. An advanced monitoring display with communication capabilities, Eaton Xpert SPD, shall be provided when utilizing an Eaton Power Xpert gateway or Eaton Power Distribution Monitoring and Control Enhanced.
PART 3 EXECUTION
3.01 FACTORY TESTING
A. The switchgear shall be completely assembled, wired, adjusted, and tested at the factory. After assembly, the complete switchgear shall be tested to ensure the accuracy of the wiring and the functioning of all equipment. The main bus system shall be given a 2200 V dielectric test for one minute between live parts and ground and between opposite polarities.
B. The wiring and control circuits shall be given a 1500 V dielectric test for one minute, or 1800 V for one second, between live parts and ground, in accordance with IEEE/ANSI C37.20.1.
C. A certified test report of all standard production tests shall be shipped with each assembly.
D. Factory test as outlined above shall be witnessed by the owner’s representative.
1. The manufacturer shall notify the owner two (2) weeks prior to the date the tests are to be performed
3.02 FIELD QUALITY CONTROL
Allentown, PA 18106 September 15, 2026
26 23 00.16-20
A. Provide the services of a qualified factory-trained manufacturer’s representative to provide start-up of the equipment specified under this section for a period of five…