21-EJCDC - Performance Bond (C-600-2002).pdf
PDF 178 KB Posted
- Solicitation number
- US.255952
- Issued by
- Lehigh County, Pennsylvania
About this file
This is a Performance Bond form (EJCDC C-610) for the Electrical Substation #2 and #4 Procurement – Contract One – General Construction project administered by Lehigh County Authority in Pennsylvania. The bond establishes the contractual obligations between the contractor (as principal) and surety to ensure completion of the electrical substation construction work. The project is located in Allentown, Pennsylvania, with the owner contact at 1053 Spruce Street, P.O. Box 3348, Allentown, PA 18106. Online sealed bids were accepted through PennBid until 11:00 a.m. on Wednesday, October 28, 2026, with results made available through the electronic bidding service. Bids remain open for 60 days from the bid opening date, and site visits are self-guided and can be scheduled via email with Charles Volk, P.E., Chief Capital Works Officer.
The performance bond requires bid security equal to 10 percent of the total bid amount in the form of a certified check, bank check, or bid bond. The bond document establishes that the contractor and surety are jointly and severally liable for contract performance. Upon declaration of a contractor default, the surety must take corrective action within 15 calendar days, including either arranging for the original contractor to complete the work, undertaking completion itself, obtaining qualified replacement contractors, or determining its liability and tendering payment to the owner. The surety's obligations include correction of defective work, completion of the contract, correction work during an 18-month correction period, additional costs resulting from the default, and liquidated or actual damages caused by delayed performance. The bond is limited to the bond amount, with any legal proceedings to be instituted within two years of contractor default or cessation of work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Substation #2 And #4 Procurement – Contract One – General Construction
EJCDC C-610 Performance Bond for Construction Contracts
With Changes by Lehigh County Authority as Indicated
00600 –1
PERFORMANCE BOND
Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable.
Supplemental Provisions, which are revisions by Lehigh County Authority to the original EJCDC form, are indicated.
CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address): Lehigh County Authority
1053 Spruce Street, P.O. Box 3348
Allentown, PA 18106
CONTRACT
Date:
Amount:
Description (Name and Location):
Project Identification: Electrical Substation # 2 and 4 Procurement
Contract Number Identification: No. 1 General Construction
BOND
Bond Number:
Date (Not earlier than Contract Date):
Amount:
Modifications to this Bond Form:
Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this
Performance Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
CONTRACTOR AS PRINCIPAL SURETY
Company:
Signature: (Seal) (Seal)
Name and Title: Surety’s Name and Corporate Seal
By:
Signature and Title
(Attach Power of Attorney)
(Space is provided below for signatures of additional parties, if required.)
Attest:
CONTRACTOR AS PRINCIPAL SURETY
Company:
Signature: (Seal) (Seal)
Name and Title: Surety’s Name and Corporate Seal
By:
(Attach Power of Attorney)
Attest:
Signature and Title:
00610-2
THE PARTIES ACKNOWLEDGE THAT THE REASON FOR, AND INTENT OF, THIS PERFORMANCE BOND IS TO PLACE THE PROJECT AND THE OWNER IN THE
SAME POSITION IT SHOULD HAVE BEEN BEFORE CONTRACTOR ACTIONS, OR LACK OF ACTION, WHICH RESULTED IN DECLARATION OF A DEFAULT, THUS THE FOLLOWING PRINCIPLES SHALL GUIDE ALL INTERPRETATION OF THE PERFORMANCE BOND:
A - The project is to be completed without any additional costs to Owner;
i) since the default is not within the control of Owner, Owner should be compensated for all of its costs caused by the default.
and
B - The project is to be completed with minimal amount of lost time.
i) since time is of the essence in this contract, Owner shouldn’t be penalized by further lost time because of Surety’s processing and internal procedures, including the negotiation of a takeover, if appropriate.
ii) use of the terms “promptly”, “reasonable time”, “with reasonable promptness”, “as soon as practicable”, etc. shall be interpreted as meaning “not to exceed 15 calendar days”, other than in Paragraph 3.1.
1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner for the performance of the Contract, which is incorporated herein by reference.
2. If Contractor performs the Contract, Surety and Contractor have no obligation under this Bond, except to participate in conferences as provided in Paragraph 3.1.
3. If there is no Owner Default, Surety's obligation under this Bond shall arise after:
3.1. Owner has notified Contractor and Surety, at the addresses described in Paragraph 10 below, that Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with Contractor and Surety to be held not later than 15 calendar days after receipt of such notice to discuss methods of performing the Contract. If Owner, Contractor and Surety agree, Contractor shall be allowed a reasonable time to perform the Contract, but such an agreement shall not waive Owner's right, if any, subsequently to declare a Contractor Default; and
3.2. Owner has declared a Contractor Default and formally terminated Contractor's right to complete the Contract. Such Contractor Default shall not be declared earlier than 20 calendar days after Contractor and Surety have received notice as provided in Paragraph 3.1; and
3.3. Owner has agreed to pay the Balance of the Contract Price as the remaining Work is completed to:
1. Surety in accordance with the terms of the Contract;
2. Another contractor selected pursuant to Paragraph 4.3 to perform the Contract.
4. When Owner has satisfied the conditions of Paragraph 3, Surety shall promptly and at Surety's expense take one of the following actions set forth in Paragraphs 4.1 through 4.4.
If Owner determines that it is necessary to secure or protect existing Work following a declaration of Contractor Default, or to continue performance of the Contract Work on an emergency basis while the Surety decides how to proceed pursuant to Paragraph 4, Owner may, with its own forces or by contract, perform such tasks as it deems necessary to secure or protect the Work or to maintain critical progress of the Work. The reasonable costs incurred by Owner in such an effort shall be charged against the Balance of the
Contract Price.
4.1. Arrange for Contractor, with consent of Owner, to perform and complete the Contract; or
4.2. Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or
4.3. Obtain bids or negotiated proposals from qualified contractors acceptable to Owner for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by Owner and Contractor selected with Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Contract, and pay to Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the
Contract Price incurred by Owner resulting from Contractor Default; or
4.4. Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances:
1. After investigation, determine the amount for which it may be liable to Owner and, as soon as practicable after the amount is determined, tender payment therefor to
Owner; or
2. Deny liability in whole or in part and notify Owner citing reasons therefor.
5. If Surety does not proceed as provided in Paragraph 4 with reasonable promptness, Surety shall be deemed to be in default on this Bond 15 calendar days after receipt of an additional written notice from Owner to Surety demanding that Surety perform its obligations under this Bond, and Owner shall be entitled to enforce any remedy available to
Owner. If Surety proceeds as provided in Paragraph 4.4, and Owner refuses the payment tendered or Surety has denied liability, in whole or in part, without further notice Owner shall be entitled to enforce any remedy available to Owner.
6. After Owner has terminated Contractor's right to complete the Contract, and if Surety elects to act under Paragraph 4.1, 4.2, or 4.3 above, then the responsibilities of Surety to
Owner shall not be greater than those of Contractor under the Contract, and the responsibilities of Owner to Surety shall not be greater than those of Owner under the Contract. To a limit of the amount of this Bond, but Subject to commitment by Owner of the Balance of the Contract Price as the remaining Work is completed to mitigation of costs and damages on the Contract, Surety is obligated without duplication for:
6.1. The responsibilities of Contractor for correction of defective Work and completion of the Contract;
6.2. Correction of Work, during the eighteen (18) month Correction Period as defined in Paragraph 13.07 of the General Conditions
6.3 Additional legal, design professional, and delay costs resulting from Contractor's Default, and resulting from the actions or failure to act of Surety under Paragraph 4;
and
6.4. Liquidated damages, or if no liquidated damages are specified in the Contract, actual damages caused by delayed performance or non-performance of Contractor.
7. Surety shall not be liable to Owner or others for obligations of Contractor that are unrelated to the Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than Owner or its heirs, executors, administrators, or successors.
8. Surety hereby waives notice of any change, including changes of time, to Contract or to related subcontracts, purchase orders, and other obligations.
9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the Work or part of the Work is located and shall be instituted within two years after Contractor Default or within two years after Contractor ceased working or within two years after Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.
10. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the address shown on the signature page.
00610-3
11. When this Bond has been furnished to comply with a statutory requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein.
12. Definitions.
12.1 Balance of the Contract Price: The total amount payable by Owner to Contractor under the Contract after all proper adjustments have been made, including allowance to Contractor of any amounts received or to be received by Owner in settlement of insurance or other Claims for damages to which Contractor is entitled, reduced by all valid and proper payments made to or on behalf of Contractor under the Contract.
12.2. Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto.
12.3. Contractor Default: Failure of Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract.
12.4. Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract or to perform and complete or comply with the other terms thereof.