1-LCA-ELECTRICAL SUBSTATION PROCUREMENT DWGS.pdf
PDF 3 MB Posted
- Solicitation number
- US.255952
- Issued by
- Lehigh County, Pennsylvania
About this file
File Summary
This is a Scope of Work and Procurement Drawing Package for the Lehigh County Authority's Electrical Substation Replacement Project, specifically the equipment procurement phase for Substation #2 and Substation #4 located at the Authority's Pretreatment Plant in Allentown, Pennsylvania. The project involves procurement of electrical switchgear and related equipment for two substations, including 15kV class metal-clad switchgear assemblies, 600V class low-voltage switchgear, power transformers, protective relaying systems, and associated components. The work is limited to equipment procurement only and does not include installation or construction. Sealed bids will be received via PennBid until 11:00 a.m. on Wednesday, October 28, 2026, with public opening and reading to follow. Self-guided site visits may be scheduled by contacting Charles Volk, P.E., Chief Capital Works Officer, at charlesvolk@lehighcountyauthority.org. Bids shall remain open for 60 days from the opening date, and equipment delivery is specified as 650 calendar days from the date of agreement approval by the Comptroller, with an expedited delivery alternate available for additional cost.
Bid security of 10 percent of the total bid amount is required in the form of a certified check, bank check, or bid bond. All electrical equipment must be manufactured to comply with NEC, NEMA, IBC, ANSI, IEEE, and UL standards, and must be rated for the specified voltage classes, short-circuit ratings, and environmental conditions. The procurement documents require bidders to submit certified test reports, factory acceptance testing results, shop drawings, one-line diagrams, control wiring diagrams, and arc flash studies prior to fabrication and shipment. An Extended Warranty Alternate 1 is mandatory, with bidders required to provide separate line-item pricing for 12, 24, and 36-month extended warranties beyond the standard 24-month manufacturer warranty. All bidders must submit a Deviation List identifying any deviations from contract documents or compliance will be assumed. The Lehigh County Authority reserves the right to reject any and all bids and to waive any omissions, errors, or irregularities. Bidding documents are available at no cost through PennBid.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
1. THIS IS A PROCUREMENT PROJECT ONLY AND THESE DRAWINGS SHALL NOT BE USED FOR
CONSTRUCTION.
2. ALL ELECTRICAL EQUIPMENT SHALL BE DESIGNED, MANUFACTURED, TESTED, FOR INSTALLATION IN ACCORDANCE WITH THE LATEST APPLICABLE EDITIONS OF NEC, NEMA, IBC, ANSI, IEEE, AND UL STANDARDS. MANUFACTURER OF THE 15kV CLASS SWITCHGEAR ASSEMBLY SHALL HIRE AN
APPROVED 3RD PARTY AGENCY ACCEPTED BY AHJ AND PROVIDE THE REQUIRED UL AND OR IBC
CERTIFICATION ON THE PRODUCT ACCORDING TO LOCAL/NATIONAL ADMINISTRATIVE CODE
REQUIREMENTS IF NECESSARY.
3. ALL EQUIPMENT SHALL BEAR UL LABEL OR BE LISTED BY A NATIONALLY RECOGNIZED TESTING
LABORATORY (NRTL) AS APPLICABLE.
4. WINNING BIDDER SHALL PROVIDE OWNER AND EOR WITH FULLY DIMENSIONED PLANS WITH
CONDUIT ENTRY LOCATIONS AND CLEARANCES PRIOR TO FABRICATION FOR APPROVAL.
5. ALL EQUIPMENT SHALL BE PROVIDED WITH MANUFACTURER'S STANDARD NAMEPLATES INDICATING VOLTAGE, CURRENT, SHORT-CIRCUIT RATING, AND MANUFACTURER'S DATA (PER ANSI C37.20.2 /
NEMA AS APPLICABLE).
6. EQUIPMENT SHALL BE SUITABLE FOR THE INSTALLATION ALTITUDE, AMBIENT TEMPERATURE
RANGE, AND ENVIRONMENTAL CONDITIONS SPECIFIED (OUTDOOR, NEMA 3/3R AND OR AS
APPLICABLE).
7. ALL EQUIPMENT SHALL MEET SEISMIC QUALIFICATION REQUIREMENTS PER IBC/ASCE 7 AND SITE-SPECIFIC SEISMIC DESIGN CATEGORY, WITH CERTIFICATION BY A LICENSED PROFESSIONAL
ENGINEER WHERE REQUIRED.
8. PROVIDE ARC-RESISTANT CONSTRUCTION WHERE INDICATED ON DRAWINGS/SCHEDULES, TESTED
PER IEEE C37.20.7.
9. ALL EQUIPMENT SHALL BE FACTORY TESTED IN ACCORDANCE WITH APPLICABLE ANSI/IEEE
STANDARDS; CERTIFIED TEST REPORTS SHALL BE SUBMITTED PRIOR TO SHIPMENT.
10. PROVIDE COMPLETE SUBMITTAL PACKAGE INCLUDING SHOP DRAWINGS, ONE-LINE DIAGRAMS, ELEVATION VIEWS, CONTROL WIRING DIAGRAMS, FACTORY TEST RESULTS, SHORT-CIRCUIT/COORDINATION STUDY INPUTS, AND O&M MANUALS FOR GEAR ASSOCIATED WITH
SUBSTATION #2 AND #4 AND OBTAIN APPROVAL PRIOR TO FABRICATION.
11. MANUFACTURER SHALL PROVIDE ARC FLASH HAZARD LABELS PER NFPA 70E BASED ON THE
PROJECT'S ARC FLASH STUDY PRIOR TO ENERGIZATION.
12. ALL EQUIPMENT SHALL BE NEW, CURRENT PRODUCTION, AND FROM A SINGLE MANUFACTURER PER
GEAR TYPE UNLESS OTHERWISE NOTED.
13. PROVIDE FACTORY-APPLIED ANSI 61 GRAY FINISH (OR MATCH EXISTING) UNLESS OTHERWISE
SPECIFIED.
14. ALL EQUIPMENT SHALL INCLUDE LIFTING PROVISIONS AND BE SUITABLE FOR RIGGING/TRANSPORT
WITHOUT DAMAGE; PROVIDE SHIPPING SPLITS AS REQUIRED FOR ACCESS.
15. PROVIDE EQUIPMENT GROUNDING PER NEC 250 AND UTILITY/AHJ REQUIREMENTS; GROUND BUS
SHALL BE CONTINUOUS THROUGH ALL SHIPPING SECTIONS.
16. COORDINATE SHORT-CIRCUIT AND COORDINATION STUDY WITH EQUIPMENT RATINGS PRIOR TO RELEASE FOR FABRICATION; ALL DEVICES SHALL BE RATED TO WITHSTAND THE AVAILABLE FAULT
CURRENT SHOWN ON THE ONE-LINE DIAGRAM.
17. DELIVERY OF ELECTRICAL EQUIPMENT SHALL BE 650 DAYS FROM THE DATE OF THE APPROVAL OF
THE AGREEMENT. ALL BIDDERS MUST PROVIDE A SEPARATE LINE ITEM FOR ALTERNATE 2 FOR
EXPEDITED DELIVERY OF THE EQUIPMENT AS SHOWN ON THE BID FORM.
18. WINNING BIDDER MUST SHIP AND DELIVER THE EQUIPMENT AND PRODUCT TO A DESIGNATED SITE/LOCATION AT LEHIGH COUNTY AUTHORITY'S PRETREATMENT PLANT AT THE ADDRESS IN THE
TITLE BLOCK. THE EQUIPMENT DELIVERY SHALL BE COORDINATED WITH THE INSTALLATION
CONTRACTOR (TBD BY THE AUTHORITY).
19. THE VENDOR/MANUFACTURER REPRESENTATIVE SHALL ALLOW THE LEHIGH COUNTY AUTHORITY OR THE CONTRACTOR HIRED BY THE AUTHORITY TO PERFORM INSPECTION AT THE TIME OF THE DELIVERY OF THE EQUIPMENT AT SITE. VENDOR/MANUFACTURER NEEDS TO MAKE ARRANGEMENTS
FOR THE EQUIPMENT INSPECTION.
20. INCLUDE, SHIPPING AND LABOR COSTS IN THE PROCUREMENT BID.
21. THE WINNING VENDOR/MANUFACTURER SHALL PROVIDE SHOP DRAWINGS OF THE ELECTRICAL EQUIPMENT TO THE AHJ, EOR AND OWNER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. IF REQUIRED THE WINNING BIDDER SHALL HIRE A LICENSED ENGINEER AND FILE WITH THE AHJ TO
OBTAIN APPROVAL PRIOR TO FABRICATION.
22. WINNING BIDDER SHALL PROVIDE POWER SYSTEM STUDIES TO THE EOR INCLUDING, ARC FLASH
STUDIES AND ARC FLASH LABELS FOR THE EQUIPMENT.
23. INCLUDE FACTORY ACCEPTANCE TESTING IN THE PROCUREMENT BID.
24. ALL SWITCHGEAR SHALL BE INSTALLED ON A CONCRETE PAD ON GRADE, WITH ALL CONDUITS
ENTERING AND EXITING FROM THE BOTTOM OF THE SWITCHGEAR. INSTALLATION OF THE
CONCRETE PAD WILL BE A SEPARATE CONTRACT.
25. ALL BIDDERS ARE REQUIRED TO PROVIDE A LIST OF DEVIATIONS THAT THEY ARE TAKING FROM THE CONTRACT DOCUMENTS, IF NO LIST OF DEVIATIONS ARE PROVIDED IT WILL BE ASSUMED THAT THE
CONTRACTORS PROPOSED EQUIPMENT ARE IN COMPLIANCE WITH THE CONTRACT DOCUMENTS
AND INTENT.
26. EXTENDED WARRANTY ALTERNATE 1:
ALL BIDDERS MUST INCLUDE A SEPARATE LINE ITEM (ALTERNATE 1) FOR THE FOLLOWING
EXTENDED WARRANTY IN ADDITION TO THE STANDARD 24 MONTHS MANUFACTURER
WARRANTY.
a. 12 MONTHS
b. 24 MONTHS
c. 36 MONTHS
27. EQUIPMENT DELIVERY LEAD-TIME EXPEDITING ALTERNATE 2
ALL BIDDERS SHALL PROVIDE A SEPARATE LINE-ITEM PRICE AS AN ALTERNATE 2 FOR EXPEDITING THE MANUFACTURER'S STANDARD EQUIPMENT DELIVERY LEAD TIME. THE ALTERNATE PRICE SHALL REPRESENT THE ADDITIONAL COST REQUIRED TO REDUCE THE STANDARD DELIVERY LEAD TIME AND
EXPEDITE DELIVERY OF THE EQUIPMENT TO THE PROJECT SITE, THEREBY ALLOWING THE
EQUIPMENT TO BE DELIVERED EARLIER AND POTENTIALLY ALLOWING THE PROJECT TO ACHIEVE SUBSTANTIAL COMPLETION EARLIER THAN THE MAXIMUM 650-CALENDAR-DAY PERIOD SPECIFIED
BELOW.
THE BASE BID SHALL BE BASED ON THE MANUFACTURER'S/BIDDER'S STANDARD EQUIPMENT
DELIVERY LEAD TIME. THE EXPEDITED DELIVERY ALTERNATE SHALL IDENTIFY THE ADDITIONAL COST
AND THE CORRESPONDING REDUCTION IN DELIVERY TIME FROM THE STANDARD LEAD TIME.
UNDER NO CIRCUMSTANCES SHALL THE SUBSTANTIAL COMPLETION DATE EXCEED 650 CALENDAR
DAYS FROM THE DATE THE AGREEMENT IS APPROVED BY THE COMPTROLLER. ACCEPTANCE OF THE
EXPEDITING ALTERNATE MAY BE CONSIDERED BY THE OWNER TO FACILITATE AN EARLIER
SUBSTANTIAL COMPLETION DATE.
BIDDERS SHALL CLEARLY IDENTIFY THE FOLLOWING INFORMATION IN THEIR BID:
a. ADDITIONAL COST FOR EXPEDITING EQUIPMENT DELIVERY: $____________
b. NUMBER OF CALENDAR DAYS SAVED BY EXPEDITING: __________ DAYS
c. MANUFACTURER'S/BIDDER'S STANDARD EQUIPMENT DELIVERY LEAD TIME INCLUDED IN BASE BID:
__________ DAYS
THE STANDARD DELIVERY LEAD TIME IDENTIFIED ABOVE SHALL BE THE BASIS OF THE BIDDER'S ORIGINAL/BASE BID PRICE. THE EXPEDITED DELIVERY COST SHALL BE PROVIDED SEPARATELY AS AN
ALTERNATE/ADDITIVE COST AND SHALL NOT BE INCLUDED IN THE BASE BID.
THE OWNER RESERVES THE RIGHT TO ACCEPT OR REJECT THE EXPEDITING ALTERNATE.
12.47kV (15kV CLASS) SWITCHGEAR GENERAL NOTES:
1. METAL-CLAD SWITCHGEAR SHALL CONFORM TO IEEE C37.20.2 AND ANSI C37.06 FOR RATINGS, AND BE FACTORY
ASSEMBLED, WIRED, AND TESTED.
2. SWITCHGEAR SHALL BE RATED 15kV CLASS NOMINAL FOR UTILITY COMPANY'S 12.47kV SERVICE, 95kV BIL.
3. FOR BUS, SYMMETRICAL CURRENT INTERRUPTING RATING REFER TO ONE LINE DIAGRAM.
4. CIRCUIT BREAKERS SHALL BE VACUUM TYPE, DRAWOUT CONSTRUCTION, CONFORMING TO IEEE C37.04/C37.06/C37.09, WITH MECHANICAL AND ELECTRICAL INTERLOCKS TO PREVENT RACKING UNDER LOAD.
5. PROVIDE STORED-ENERGY (SPRING-CHARGED) OPERATING MECHANISMS WITH MANUAL AND ELECTRICAL
CHARGING, REMOTE CLOSE/TRIP CAPABILITY, AND ANTI-PUMP FEATURE.
6. PROVIDE PROTECTIVE RELAYING — MICROPROCESSOR-BASED MULTIFUNCTION RELAYS (PER INSTALLATION
DRAWINGS) WITH ETHERNET/FIBER COMMUNICATION PROTOCOL NEEDED BY THE AUTHORITY.
7. CURRENT TRANSFORMERS AND POTENTIAL/VOLTAGE TRANSFORMERS SHALL MEET IEEE C57.13 ACCURACY
CLASSES AS REQUIRED FOR METERING AND PROTECTION.
8. PROVIDE VIEWING WINDOWS OR EQUIVALENT MEANS TO VISUALLY VERIFY BREAKER DISCONNECTED POSITION
WITHOUT OPENING COMPARTMENT DOORS.
9. BUS BARS SHALL BE SILVER-PLATED COPPER, BRACED FOR THE SPECIFIED MOMENTARY/FAULT RATING;
PROVIDE HEAT-SHRINK OR EQUIVALENT INSULATION ON BUS CONNECTIONS.
10. PROVIDE SPACE HEATERS WITH THERMOSTAT CONTROL IN EACH VERTICAL SECTION TO PREVENT
CONDENSATION.
11. ALL MEDIUM VOLTAGE CABLE TERMINATIONS SHALL BE MADE WITH STRESS CONES/TERMINATIONS RATED FOR
THE SYSTEM VOLTAGE, INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
12. PROVIDE CONTROL POWER TRANSFORMER(S) SIZED PER CONNECTED LOAD, FUSED PRIMARY AND SECONDARY, MOUNTED WITHIN SWITCHGEAR.
13. FACTORY TESTS SHALL INCLUDE PRODUCTION TESTS PER IEEE C37.20.2 (DIELECTRIC, MECHANICAL OPERATION, WIRING CONTINUITY); PROVIDE CERTIFIED TEST REPORTS.
MOTOR OPERATED
MOUNTED
NEUTRALN
LP
MTD
MCC
MO
MOTOR CONTROL CENTER
LIGHTING PANEL
SWITCHBOARD
TYPICAL
SWITCH
SURFACE
STANDARD
PANEL
POLE(S)
PULL BOX
RELOCATED
P
RGC
TYP
SUR
SWBD
SW
STD
RC
PNL
PB
N.C.
N.O.
REL
WEATHER PROOF
VOLT
WATT
V
WP
W
UOI
RIGID GALVANIZED CONDUIT
UNLESS OTHERWISE INDICATED
NORMALLY OPEN
REMOTE CONTROL
NORMALLY CLOSED
AUTH. HAVING JURISDICTION
CONDUIT
ARCHITECTURAL
AMPERE
ATS
C
AHJ
ARCH
AS
AFF/G
AF
A
AC
GROUND
GUARD
CIRCUIT BREAKER
DRAWING
CIRCUIT(S)
EXISTING TO REMAIN
G,GND
GR
DWG
CB
CKT(S)
E
ER
ERR
ISOLATED GROUND
JUNCTION BOXJB
IG
GFI GROUND FAULT INTERRUPTER
AUTOMATIC TRANSFER SWITCH
ABOVE FINISHED FLOOR/GRADE
SWITCH RATING IN AMPS
FUSE/FRAME RATING IN AMPS
ALTERNATING CURRENT
EXISTING TO BE REMOVED
EXISTING TO BE RELOCATED
EUH ELECTRIC UNIT HEATER
EF EXHAUST FAN
KILOWATT
KILOVOLT AMPERE
KW
KVA
SECTIONSECT
MAIN LUG ONLYMLO
POWERPWR
POWER PANELPP
KILOWATT HOURKWH
PORT PATCH PANELPPP
ABBREVIATIONS
SUMMARY OF WORK:
1. PROCUREMENT OF ELECTRICAL GEAR FOR SUBSTATION #2 AND #4.THIS CONTRACT
DOESN'T INCLUDE INSTALLATION OF ELECTRICAL EQUIPMENT AND GEAR. DESIGN FOR
CONSTRUCTION WILL BE PART OF A SEPARATE CONTRACT.
NOTE - NOT ALL THE ABBREVIATIONS MAY BE USED
SHEET LIST TABLE
DWG. SHEET TITLE CONTRACT
SHEET #
E001.00 ELECTRICAL SYMBOLS, GENERAL NOTES & ABBREVIATIONS 1
E002.00 ELECTRICAL SITE PLAN - DEMOLITION 2
E003.00 ELECTRICAL SITE PLAN - INSTALLATION 3
E008.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - DEMOLITION 8
E009.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #2 9
E010.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4
SHEET#1 10
E011.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4
SHEET#2 11
7E007.00 ELECTRICAL SUBSTATION#4 PART PLAN - INSTALLATION
6E006.00 ELECTRICAL SUBSTATION#4 PART PLAN - DEMOLITION
5E005.00 ELECTRICAL SUBSTATION#2 PART PLAN - INSTALLATION
4E004.00 ELECTRICAL SUBSTATION#2 PART PLAN - DEMOLITION
480V (600V CLASS) SWITCHGEAR GENERAL NOTES:
1. LOW-VOLTAGE SWITCHGEAR/SWITCHBOARDS SHALL CONFORM TO UL 1558 AND ANSI C37.20.
2. EQUIPMENT SHALL BE RATED 600V, 4000A BUS, 65kA SCCR FULLY RATED (OR AS INDICATED ON ONE LINE
DIAGRAM.
3. POWER CIRCUIT BREAKERS SHALL CONFORM TO UL 1066 AND SHALL BE DRAWOUT TYPE FOR USE IN UL 1558
SWITCHGEAR.
4. PROVIDE GROUND FAULT PROTECTION PER NEC 230.95 FOR SERVICES 1000A AND ABOVE AT 480Y/277V, AS
APPLICABLE.
5. BUS BRACING SHALL MEET OR EXCEED THE CALCULATED AVAILABLE FAULT CURRENT AT THE POINT OF
INSTALLATION, PER THE PROJECT SHORT-CIRCUIT STUDY.
6. PROVIDE COPPER BUS FULLY RATED (NON-TAPERED) THROUGHOUT UNLESS SPECIFICALLY NOTED
OTHERWISE.
7. PROVIDE 100% RATED MAIN BREAKER(S) WHERE CONTINUOUS LOADING EXCEEDS 80% OF FRAME RATING, PER NEC 215.2/230.90.
8. PROVIDE SURGE PROTECTIVE DEVICE (SPD) AT SERVICE ENTRANCE EQUIPMENT PER UL 1449 LISTED.
9. PROVIDE FACTORY-INSTALLED METERING (MULTIFUNCTION POWER METER) AT MAIN/TIE SECTIONS AS
SCHEDULED, WITH COMMUNICATION CAPABILITY AS SPECIFIED.
10. ALL EQUIPMENT SHALL BE PROVIDED WITH HINGED, GASKETED DOORS WITH QUARTER-TURN OR BOLTED
LATCHES AS SPECIFIED, AND NEMA 3/3R RATING PER INSTALLATION ENVIRONMENT.
11. FACTORY TESTS SHALL INCLUDE DIELECTRIC WITHSTAND, MECHANICAL OPERATION, AND CONTROL WIRING/CONTINUITY CHECKS PER UL 1558/845; PROVIDE CERTIFIED TEST REPORTS PRIOR TO SHIPMENT.
12. PROVIDE ELECTRICAL INTERLOCKING SCHEME BETWEEN MAIN-TIE-MAIN BREAKERS TO PREVENT
INADVERTENT PARALLELING OF SOURCES.
13. PROVIDE CONTROL POWER TRANSFORMER(S) SIZED PER CONNECTED LOAD, FUSED PRIMARY AND
SECONDARY, MOUNTED WITHIN SWITCHGEAR.
UTILITY COMPANY DATA:
1. THE FACILITY IS FED FROM TWO FEEDERS - FEEDER A AND B.
2. 12.47KV UTILITY FEEDER 1 (BUS A):
SHORT-CIRCUIT BOX
NODE - 2594844.216_455463.749
FAULT TYPE LG LL LLG LLL
AMPERE ---> 3564 3618 4037 4178
MVA ------> 27 81 90 93
THEVENIN RTH XTH R0TH X0TH
OHMS ------> 0.4256 1.7314 0.8920 2.5604
PU ---------> 0.2737 1.1134 0.5737 1.6465
IMPEDANCE R X RATIO X/R TOTAL
POSITIVE 0.2737 1.1134 4.07 3.454
NEGATIVE 0.2737 1.1134 4.07
ZERO 0.5737 1.6465 2.87
FEEDER PHASE DISTANCE
14701 ABC 0.98
3. 12.47KV UTILITY FEEDER 2 (BUS B):
SHORT-CIRCUIT BOX
SWITCH - 59500S45533-3
FAULT TYPE LG LL LLG LLL
AMPERE ---> 4550 4263 4971 5016
MVA ------> 34 95 111 112
THEVENIN RTH XTH R0TH X0TH
OHMS ------> 0.1526 1.4770 0.4446 1.8424
PU ---------> 0.0981 0.9498 0.2859 1.1848
IMPEDANCE R X RATIO X TOTAL/R TOTAL
POSITIVE 0.0981 0.9498 9.68 6.393
NEGATIVE 0.0981 0.9498 9.68
ZERO 0.2859 1.1848 4.14
FEEDER PHASE DISTANCE
14704 ABC 0.79
GROUND ROD AND OR CONNECTION TO GROUND
DESCRIPTIONSYMBOL
DUPLEX THREE WIRE GROUNDED WEATHER PROOF RECEPTACLE, 20A,
125V. (NEMA 5-20R) WITH "GFI" GROUND FAULT INTERRUPTER
WALL/STANCHION MOUNTED AT 18" A.F.F. U.O.I.
GFI
POWER TRANSFORMER / DISTRIBUTION TRANSFORMER
- INDICATES "DELTA" CONNECTED COPPER WINDINGS.
- INDICATES "GROUNDED WYE" CONNECTED COPPER WINDINGS.
- INDICATES kVA RATING.
- INDICATES PRIMARY AND SECONDARY VOLTAGE.
- INDICATES IMPEDANCE PERCENTAGE.
100kVA 480/277V 1.2Z
POWER SYMBOL LIST
SEL-751
SEL-787
SEL-2414
1200A
ET, LSIG
100A/5A
METERING
DRAWOUT TYPE 600V CLASS CIRCUIT BREAKER. "ET" INDICATES
ELECTRONIC TRIP. "LSIG" INDICATES LONG, SHORT, INSTANTENEOUS AND
GROUND CURRENT DETECTION.
INSTRUMENT CURRENT TRANSFORMER, 100/5A INDICATES CT RATIO.
15 kV CLASS MEDIUM VOLTAGE DRAWOUT TYPE CIRCUIT BREAKER. "1200A"
INDICATES CIRCUIT BREAKER AMPERE RATING.
4' HIGH 8" DIAMETER BOLLARD
TOUCH SCREEN TYPE SEL-751 FEEDER PROTECTION RELAY BY
SCHWEITZER ENGINEERING LABORATORIES. NUMBERING INDICATES ANSI
DEVICE NUMBER. PROVIDE CONFORMAL COATING.
TOUCH SCREEN TYPE SEL-787 TWO TERMINAL TRANS. PROTECTION RELAY
BY SCHWEITZER ENGINEERING LABORATORIES. NUMBERING INDICATES
ANSI DEVICE NUMBER. PROVIDE PROVIDE CONFORMAL COATING.
TOUCH SCREEN TYPE SEL2414 TRANSFORMER AUTOMATION, MONITORING
AND CONTROLLER BY SCHWEITZER ENGINEERING LABORATORIES.PROVIDE
CONFORMAL COATING.
PLC FOR AUTOMATIC MAIN-TIE-MAIN CONTROLLER WITH TOUCH SCREEN
AND ELECTRICAL INTERLOCKS BY EATON OR APPROVED EQUAL.
JUNCTION BOX, SIZE IS REQUIRED.J
GROUND ROD AND TEST PIT
MTM-PLC
EATON PXQ-ST2-1A1 OR APPROVED EQUAL OUTDOOR METER INSTALLED IN
600V CLASS SWITCHGEAR.
50,51
50,51
Δ
Y
100KVA
460/277 1.2Z
HMI HUMAN MACHINE INTERFACE IN NEMA 3/3R ENCLOSURE.
LIGHTINGLTG
TIE CIRCUIT BREAKERTCB
Y
CONTROL POWER TRANSFORMER 480 TO 120V
DRAW OUT TYPE VOLTAGE TRANSFORMER
VT
CPT
SPD
SWITCHGEAR INTEGRATED SURGE PROTECTIVE DEVICE WITH SURGE
COUNTER BY EATON OR APPROVED EQUAL.
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
SYMBOLS,
GENERAL NOTES
& ABBREVIATIONS
E001.00
PROCUREMENT BID 09/15/26
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X X
X X
X X
X X
X
X
SCALE:
ELECTRICAL SITE PLAN - DEMOLITION1
E002 1" = 40'-0"
EXISTING SUBSTATION #2 TO BE REMOVED AFTER
NEW SUBSTATION #2 IS INSTALLED.
EXISTING SUBSTATION #4 TO BE REMOVED
AFTER NEW SUBSTATION #4 IS INSTALLED.
ER
ER
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE PROCUREMENT
OF ELECTRICAL GEAR FOR SUBSTATION #2 AND #4.
3. DEMOLITION OF SUBSTATION #2 AND #4 WILL BE CARRIED OUT AS A PART
OF A SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #2
AND SUBSTATION #4 IS COMPLETED.
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL SITE
PLAN -
DEMOLITION
E002.00
PROPOSED POSSIBLE LOCATION
OF NEW SUBSTATION #4.
REFER TO E007.00.
PROPOSED POSSIBLE LOCATION
OF NEW SUBSTATION #2. REFER
TO E005.00.
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X X
X X
X X
X X
X
SCALE:
ELECTRICAL SITE PLAN - INSTALLATION1
E003 1" = 40'-0"
X
EXISTING FEEDER MANHOLES
FOR SUBSTATION #4
EXISTING SUBSTATION #2 TO BE REMOVED
AFTER NEW SUBSTATION #2 IS INSTALLED.
EXISTING SUBSTATION #4 TO BE REMOVED AFTER
NEW SUBSTATION #4 IS INSTALLED.
ER
ER
ER
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE PROCUREMENT
OF ELECTRICAL GEAR FOR SUBSTATION #2 AND #4.
3. DEMOLITION OF SUBSTATION #2 AND #4 WILL BE CARRIED OUT AS A PART
OF A SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #2
AND SUBSTATION #4 IS COMPLETED.
EXISTING MAIN MV GEAR TO REMAIN.
FUSES TO BE REPLACED AS PER ONE-LINE
DIAGRAM IN A FUTURE CONTRACT.
E
EXISTING FEEDER MANHOLES
FOR SUBSTATION #2
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL SITE
PLAN -
INSTALLATION
E003.00
SCALE:
ELECTRICAL SUBSTATION#2 PART PLAN - DEMOLITION1
E004 1/8" = 1'-0"
EXISTING SUBSTATION #2 TO BE
REMOVED AFTER NEW
SUBSTATION #2 IS INSTALLED.
ER
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE PROCUREMENT
OF ELECTRICAL GEAR FOR SUBSTATION #2.
3. DEMOLITION OF SUBSTATION #2 WILL BE CARRIED OUT AS A PART OF A
SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #2
IS COMPLETED.
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
SUBSTATION#2
PART PLAN -
DEMOLITION
E004.00
ELECTRICAL SUBSTATION#2 PART PLAN - INSTALLATION1
E005 3/8" = 1'-0"
MEDIUM
VOLTAGE
BREAKER
MVS-2A
TR
AN
SI
TI
O N
SE
C
TI
O
N
TRANSFORMER
T2-A
MEDIUM
VOLTAGE
BREAKER
MVS-2B
4000A COPPER
FLEXIBLE BRAIDED
BUS 600V CLASS
4000A COPPER
FLEXIBLE BRAIDED
BUS 600V CLASS
1 2 3 4 5 6 7
3'
8'
2'
6'-2" 2'
2' 3'-10" 3'-10" 2'-6" 3'-10" 3'-10" 2'
2' 2'
3'
8'
5'-4"
5'-7"
7'-6"
8" CONCRETE PAD
2 2
INSTALLATION PLAN KEY NOTES:
1. 2.3/2.576 MVA LIQUID FILLED KNAN/KNAF 55/75°C RISE, Z=6.6% SUBSTATION TYPE OUTDOOR STEP-DOWN CU
TRANSFORMER (12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T2-A AND T2-B. PROVIDE SEL787 IN MVS-2A/B ENCLOSURE FOR TRANSFORMER PROTECTION AND SEL 2414 FOR TRANSFORMER MONITORING.TRANSFORMER COLOR SHALL BE ANSI 61.WINNING BIDDER MUST COORDINATE WITH SEL TO INTEGRATE SEL RELAYS IN 15kV
CLASS MV GEAR. GAUGES SHALL BE INSTALLED AT EYE LEVEL.
2. 15kV CLASS, METAL CLAD SWITCHGEAR WITH 15KV CLASS 1200A MV CIRCUIT BREAKER. FEEDER CONDUIT TO ENTER MV GEAR FROM BOTTOM, OUTGOING CABLES SHALL RUN TO AIR TERMINAL CHAMBER/THROAT. WINNING BIDDER MUST COORDINATE WITH SEL TO INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
3. FULL/PARTIAL HEIGHT AIR TERMINAL CHAMBER OR THROAT TYPE TRANSITION SECTION FOR 15kV CLASS HV SIDE OF TRANSFORMER. CABLES TO BE USED FOR CONNECTION FROM MV LOAD SIDE TO TRANSFORMER HV
SIDE.
4. FLANGE TYPE TRANSITION SECTION FOR 600V CLASS LV SIDE OF TRANSFORMER TO LV SWITCHGEAR. COPPER FLEXIBLE BRAIDED BUS TO BE USED FOR CONNECTION FROM TRANSFORMER SECONDARY TO LV SWITCHGEAR.
5. WINNING BIDDER TO COORDINATE WITH SEL, PROCURE THEIR RELAYS AND INTEGRATE ON NEW METAL CLAD/TRANSFORMER/LV SWITCHGEAR. ALL SEL RELAYS SHALL HAVE TOUCH SCREENS. SEL 2414 SHALL BE HOUSED IN A DEDICATED NEMA 4X CONTROL BOX. FOR SEL 751 WINNING BIDDER SHALL PROCURE LIGHT AND PRESSURE SENSORS FROM SEL AND INTEGRATE IT ON THEIR SWITCHGEAR FOR ARC FLASH DETECTION AND
PROTECTION.
6. TRANSITION SECTION OF LV SWITCHGEAR
7. MAIN CIRCUIT BREAKERS, SPD'S, CPT METERING AND CONTROLS
8. BREAKERS AND LSIG ELECTRONIC TRIP UNITS. REFER TO ONE LINE DIAGRAM FOR FOR OUTGOING CIRCUIT
BREAKERS.
9. TIE CIRCUIT BREAKER, ASSOCIATED HMI, PLC AND ELECTRICAL INTERLOCK CONTROLS. THIS TIE-BREAKER WILL
BE NORMALLY OPEN.
10. PROVIDE WEATHER PROOF LOCK BOX FOR MAINTENANCE RECEPTACLE.
11. HMI IN NEMA 3/3R ENCLOSURE
NOTES:
1. DRAWING IS ONLY FOR THE PURPOSE OF EQUIPMENT PROCUREMENT AND IS NOT FOR CONSTRUCTION.
2. DIMENSIONS INDICATED ARE FOR EATON'S FAMILY OF EQUIPMENT FOR THE PURPOSE OF BIDDING. THE WINNING BIDDER MUST SUBMIT DIMENSIONS SCALED SHOP DRAWINGS AND A COORDINATED PLAN FOR EOR'S
REVIEW AND FINAL APPROVAL.
3. FOR SYMBOL LIST, GENERAL NOTES AND ABBREVIATIONS REFER TO DWGS E001.00.
4. ALL EQUIPMENT SHALL BE PROVIDED WITH GROUND BUS AND LUGS FOR CONNECTION TO GROUNDING
RING/RODS.
5. FOR RATINGS OF EQUIPMENT REFER TO ONE LINE DIAGRAM / KEY NOTES.
6. PROVIDE DIMENSIONED PART PLAN DRAWINGS OF EQUIPMENT REFLECTING ACTUAL INSTAL TO THE EOR FOR
REVIEW AND APPROVAL.
7. PROVIDE O&M MANUALS AND EQUIPMENT WARRANTY DOCUMENTATION TO OWNER.
8. SWITCHGEAR SHALL BE FACTORY-ASSEMBLED, TESTED, AND UL-LISTED (OR THIRD-PARTY CERTIFIED) FOR THE SPECIFIED VOLTAGE CLASS, BIL RATING, AND SHORT-CIRCUIT RATING AS INDICATED ON THE ONE-LINE
DIAGRAM.
9. PROVIDE ARC-RESISTANT CONSTRUCTION WHERE INDICATED, TESTED PER IEEE C37.20.7.
10. ALL SWITCHGEAR SHALL BE PROVIDED WITH A MANUFACTURER'S NAMEPLATE INDICATING RATED VOLTAGE, CURRENT, BIL, AND SHORT-CIRCUIT RATING.
11. EQUIPMENT ENCLOSURES SHALL BE RATED NEMA 3R (OR AS SPECIFIED) FOR OUTDOOR INSTALLATION.
12. PROVIDE SURGE/LIGHTNING ARRESTERS AT EQUIPMENT AS INDICATED, COORDINATED WITH INSULATION
COORDINATION STUDY.
13. ALL EQUIPMENT SHALL HAVE PERMANENT, ENGRAVED PHENOLIC NAMEPLATES IDENTIFYING SOURCE, VOLTAGE, AND EQUIPMENT DESIGNATION, PER ONE-LINE DIAGRAM.
14. PROVIDE ARC-FLASH WARNING LABELS ON ALL EQUIPMENT PER NFPA 70E, BASED ON PROJECT-SPECIFIC
ARC-FLASH HAZARD ANALYSIS.
15. PROVIDE HIGH-VOLTAGE WARNING SIGNAGE AT SWITCHGEAR ENCLOSURES AND FENCE PERIMETER PER
NESC/OSHA REQUIREMENTS.
16. EQUIPMENT LABELING SHALL MATCH ONE-LINE DIAGRAM DESIGNATIONS EXACTLY.
17. CPT SHALL BE SIZED TO POWER ALL SEL RELAYS, REMOTE OPERATORS, (2) MAINTENANCE RECEPTACLES AND
OTHER 120V LOADS.
18. WINNING BIDDER MUST TAKE RESPONSIBILITY FOR THE ALIGNMENT OF MV AND LV GEAR WITH TRANSFORMER
PRIMARY AND SECONDARY BUSHINGS AND ASSOCIATED ACCESSORIES.
SEL-751
SEL-787
SEL-2414
SEL-751
SEL-787
GROUND ROD 5/8" X 10' /TEST POINT (TYP)
#4/0 AWG BARE GROUND CONDUCTOR BELOW
GRADE (TYP)
CONCRETE
WALKWAY
TR
AN
SI
TI
O N
SE
C
TI
O
N
TR
AN
SI
TI
O N
SE
C
TI
O
N
CONCRETE WALL
CONCRETE WALL / METAL STRUCTURE TO
BE DESIGNED AFTER PROCUREMENT
PHASE
BOLLARDS. (TYP)
3 3
TR
AN
SI
TI
O N
SE
C
TI
O
N
GROUND BAR
6 67 8 789
8'
62'-1"
22'-7"
TRANSFORMER
T2-B
6'-2"
SEL-2414
6'
6'
GFI
GFI
METERING
H M
I
6 7 8 9 LV GEAR SHALL BE NEMA 3R NON-WALK IN OUTDOOR RATED UL 1558 EATON MAGNUM PXR OR APPROVED EQUAL.
SPD
METERING
SPD
MTM-PLC
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
SUBSTATION#2
PART PLAN -
INSTALLATION
E005.00
ELECTRICAL SUBSTATION#4 PART PLAN - DEMOLITION1
E006 1/8" = 1'-0"
EXISTING SUBSTATION #4 TO BE REMOVED AFTER NEW
SUBSTATION #4 IS INSTALLED.
ER
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE PROCUREMENT
OF ELECTRICAL GEAR FOR SUBSTATION #4.
3. DEMOLITION OF SUBSTATION #4 WILL BE CARRIED OUT AS A PART OF A
SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #4
IS COMPLETED.
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
SUBSTATION#4
PART PLAN -
DEMOLITION
E006.00
TRANSFORMER
T4-B
MEDIUM
VOLTAGE
BREAKER
MVS-4B
4000A COPPER FLEXIBLE
BRAIDED BUS 600V
CLASS
TRANSFORMER
T4-A
MEDIUM
VOLTAGE
BREAKER
MVS-4A
4000A COPPER FLEXIBLE
BRAIDED BUS 600V CLASS
2' 5'-10"
5'
2'
2' 3'-10" 3'-10" 2'-6" 3'-10" 3'-10" 2'
2' 5'-10" 2'
CONCRETE
WALKWAY
NOTES:
1. DRAWING IS ONLY FOR THE PURPOSE OF PROCUREMENT AND NOT FOR CONSTRUCTION.
2. DIMENSIONS INDICATED ARE FOR EATON'S FAMILY OF EQUIPMENT FOR THE PURPOSE OF BIDDING. THE WINNING BIDDER MUST SUBMIT DIMENSIONS SCALED SHOP DRAWINGS AND A COORDINATED PLAN FOR EOR'S
REVIEW AND FINAL APPROVAL.
3. FOR SYMBOL LIST, GENERAL NOTES AND ABBREVIATIONS REFER TO DWGS E001.00.
4. ALL EQUIPMENT SHALL BE PROVIDED WITH GROUND BUS AND LUGS FOR CONNECTION TO GROUNDING
RING/RODS.
5. FOR RATINGS OF EQUIPMENT REFER TO ONE LINE DIAGRAM / KEY NOTES.
6. PROVIDE DIMENSIONED PART PLAN DRAWINGS OF EQUIPMENT REFLECTING ACTUAL INSTAL TO THE EOR FOR
REVIEW AND APPROVAL.
7. PROVIDE O&M MANUALS AND EQUIPMENT WARRANTY DOCUMENTATION TO OWNER.
8. SWITCHGEAR SHALL BE FACTORY-ASSEMBLED, TESTED, AND UL-LISTED (OR THIRD-PARTY CERTIFIED) FOR THE SPECIFIED VOLTAGE CLASS, BIL RATING, AND SHORT-CIRCUIT RATING AS INDICATED ON THE ONE-LINE
DIAGRAM.
9. PROVIDE ARC-RESISTANT CONSTRUCTION WHERE INDICATED, TESTED PER IEEE C37.20.7.
10. ALL SWITCHGEAR SHALL BE PROVIDED WITH A MANUFACTURER'S NAMEPLATE INDICATING RATED VOLTAGE, CURRENT, BIL, AND SHORT-CIRCUIT RATING.
11. EQUIPMENT ENCLOSURES SHALL BE RATED NEMA 3R (OR AS SPECIFIED) FOR OUTDOOR INSTALLATION.
12. PROVIDE SURGE/LIGHTNING ARRESTERS AT EQUIPMENT AS INDICATED, COORDINATED WITH INSULATION
COORDINATION STUDY.
13. ALL EQUIPMENT SHALL HAVE PERMANENT, ENGRAVED PHENOLIC NAMEPLATES IDENTIFYING SOURCE, VOLTAGE, AND EQUIPMENT DESIGNATION, PER ONE-LINE DIAGRAM.
14. PROVIDE ARC-FLASH WARNING LABELS ON ALL EQUIPMENT PER NFPA 70E, BASED ON PROJECT-SPECIFIC
ARC-FLASH HAZARD ANALYSIS.
15. PROVIDE HIGH-VOLTAGE WARNING SIGNAGE AT SWITCHGEAR ENCLOSURES AND FENCE PERIMETER PER
NESC/OSHA REQUIREMENTS.
16. EQUIPMENT LABELING SHALL MATCH ONE-LINE DIAGRAM DESIGNATIONS EXACTLY.
17. CPT SHALL BE SIZED TO POWER ALL SEL RELAYS, REMOTE OPERATORS, (2) MAINTENANCE RECEPTACLES AND
OTHER 120V LOADS.
18. WINNING BIDDER MUST TAKE RESPONSIBILITY FOR THE ALIGNMENT OF MV AND LV GEAR WITH TRANSFORMER
PRIMARY AND SECONDARY BUSHINGS AND ASSOCIATED ACCESSORIES.
22'-7" TR
AN
SI
TI
O N
SE
C
TI
O
N
TR
AN
SI
TI
O N
SE
C
TI
O
N
TR
AN
SI
TI
O N
SE
C
TI
O
N
TR
AN
SI
TI
O N
SE
C
TI
O
N
GROUND ROD 5/8" X 10' /TEST POINT (TYP)
8" CONCRETE PAD
BOLLARDS. (TYP)
8'
3'
8' 8'
3'
1 2 3 4 5 6 7
6 67 8 7895
5'-7"
3 4
4 3
7'-6"
#4/0 AWG BARE GROUND CONDUCTOR BELOW
GRADE (TYP)
CONCRETE WALL
CONCRETE WALL / METAL STRUCTURE TO
BE DESIGNED AFTER PROCUREMENT
PHASE
SCALE:
ELECTRICAL SUBSTATION #4 PART PLAN - INSTALLATION1
E007 3/8" = 1'-0"
INSTALLATION PLAN KEY NOTES:
1. 1.725/2.106 MVA LIQUID FILLED KNAN/KNAF 55/75°C RISE, Z=5.75% SUBSTATION TYPE OUTDOOR STEP-DOWN CU
TRANSFORMER (12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T4-A AND T4-B. PROVIDE SEL787 IN MVS-4A/B ENCLOSURE FOR TRANSFORMER PROTECTION AND SEL 2414 FOR TRANSFORMER MONITORING. TRANSFORMER COLOR SHALL BE ANSI 61.WINNING BIDDER MUST COORDINATE WITH SEL TO INTEGRATE SEL RELAYS IN 15kV
CLASS MV GEAR. GAUGES SHALL BE INSTALLED AT EYE LEVEL.
2. 15kV CLASS, METAL CLAD SWITCHGEAR WITH 15KV CLASS 1200A MV CIRCUIT BREAKER. FEEDER CONDUIT TO ENTER MV GEAR FROM BOTTOM, OUTGOING CABLES SHALL RUN TO AIR TERMINAL CHAMBER/THROAT. WINNING BIDDER MUST COORDINATE WITH SEL TO INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
3. FULL/PARTIAL HEIGHT AIR TERMINAL CHAMBER OR THROAT TYPE TRANSITION SECTION FOR 15kV CLASS HV SIDE OF TRANSFORMER. CABLES TO BE USED FOR CONNECTION FROM MV LOAD SIDE TO TRANSFORMER HV
SIDE.
4. FLANGE TYPE TRANSITION SECTION FOR 600V CLASS LV SIDE OF TRANSFORMER TO LV SWITCHGEAR. COPPER FLEXIBLE BRAIDED BUS TO BE USED FOR CONNECTION FROM TRANSFORMER SECONDARY TO LV SWITCHGEAR.
5. WINNING BIDDER TO COORDINATE WITH SEL, PROCURE THEIR RELAYS AND INTEGRATE ON NEW METAL CLAD/TRANSFORMER/LV SWITCHGEAR. ALL SEL RELAYS SHALL HAVE TOUCH SCREENS. SEL 2414 SHALL BE HOUSED IN A DEDICATED NEMA 4X CONTROL BOX. FOR SEL 751 WINNING BIDDER SHALL PROCURE LIGHT AND PRESSURE SENSORS FROM SEL AND INTEGRATE IT ON THEIR SWITCHGEAR FOR ARC FLASH DETECTION AND
PROTECTION.
6. TRANSITION SECTION OF LV SWITCHGEAR
7. MAIN CIRCUIT BREAKER, SPD's, CPT METERING AND CONTROLS.
8. BREAKERS AND LSIG ELECTRONIC TRIP UNITS. REFER TO ONE LINE DIAGRAM FOR FOR OUTGOING CIRCUIT
BREAKERS.
9. TIE CIRCUIT BREAKER, ASSOCIATED HMI, PLC AND ELECTRICAL INTERLOCK CONTROLS. THIS TIE-BREAKER WILL
BE NORMALLY OPEN.
10. PROVIDE WEATHER PROOF LOCK BOX FOR MAINTENANCE RECEPTACLE
11. HMI IN NEMA 3/3R ENCLOSURE
61'-4"
GROUND BAR
6'
6'
GFI
GFI
H M
I
6 7 8 9 LV GEAR SHALL BE NEMA 3R NON-WALK IN OUTDOOR RATED UL 1558 EATON MAGNUM PXR OR APPROVED EQUAL.
SEL-751
SEL-787
SEL-751
SEL-787
SEL-2414
SEL-2414
METERING
SPD
METERING
SPD
MTM-PLC
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
SUBSTATION#4
PART PLAN -
INSTALLATION
E007.00
ELECTRICAL POWER SINGLE LINE DIAGRAM - DEMOLITION1
E008 NTS
EXISTING SUBSTATION #2 TO BE REMOVED AFTER NEW
SUBSTATION #2 IS INSTALLED
ER
EXISTING 15kV CLASS
FEEDERS TO REMAIN
EXISTING LV FEEDERS TO
REMAIN
ER
EXISTING 15kV CLASS
FEEDERS TO REMAIN
EXISTING LV
FEEDERS TO
REMAIN
EEEEEEEEEEEE
E E
E E
EXISTING SUBSTATION #4 LV SWITCHGEAR, FEEDER AND
BRANCH CIRCUITS TO REMAIN.
NOT IN CONTRACT.
EXISTING SUBSTATION #2 LV
SWITCHGEAR, FEEDER AND
BRANCH CIRCUITS TO REMAIN.
E
E
E
EXISTING TO REMAIN.
NOT IN CONTRACT.
EEEEE
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE PROCUREMENT OF
ELECTRICAL GEAR FOR SUBSTATION #2 AND #4.
3. DEMOLITION OF SUBSTATION #2 AND #4 WILL BE CARRIED OUT AS A PART
OF A SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #2
AND SUBSTATION #4 IS COMPLETED.
KEYED NOTES:
1. REPLACE EXISTING EXPULSION TYPE FUSE WITH NEW EXPULSION TYPE
FUSE. REFER TO NEW DRAWINGS.
2. EXISTING SUBSTATION TO BE REMOVED AFTER NEW SUBSTATION IS
INSTALLED1 1 1 1
E
E
E
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
POWER SINGLE
LINE DIAGRAM -
DEMOLITION
E008.00
ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #21
E009 NTS
KEYED NOTES:
1. PROVIDE ADDITIONAL CPT'S IF NEEDED FOR SWITCHGEAR HEATING.
2. PROVIDE MV/LV CIRCUIT BREAKER REMOTE OPERATOR. REMOTE OPERATOR SHALL
BE POWERED FROM THE LV BUS CPT AFTER SS#2-MCB-A/B.
3. TRIP/CLOSE/BREAKER STATUS AND BREAKER MONITORING.
4. PROVIDE ELECTRICAL INTERLOCKS BETWEEN MAIN-TIE-MAIN BREAKER AND FEEDER
#1 AND FEEDER #2 LV BREAKERS AS NEEDED. FOR MAIN-TIE-MAIN SEQUENCE OF
OPERATION REFER TO SPECIFICATION 26 23 00.13.
EXISTING TO REMAIN.
NOT IN CONTRACT.
TO SUBSTATION #4 REFER TO
DRAWING E010
(3) LIGHTNING ARRESTERS, 15kV MCOV.
PROVIDE SURGE EVENT COUNTER
#2/0G, 15kV CLASS CABLE
FOR EACH ARRESTER
1200A
Δ
SEL-787
SEL-2414
MVS-2A
ET, LSIG
METERING4000A/5A
2.3/2.576 MVA LIQUID FILLED KNAN/KNAF 55/65°C RISE, Z=6.6%
SUBSTATION TYPE OUTDOOR STEP-DOWN CU TRANSFORMER
(12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T2-A. PROVIDE
SEL787 IN MVS-2A ENCLOSURE FOR TRANSFORMER PROTECTION
AND SEL 2414 FOR TRANSFORMER MONITORING.TRANSFORMER
COLOR SHALL BE ANSI 61.WINNING BIDDER MUST COORDINATE
WITH SEL TO INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
150A/5A
4000A/5A
POWER XPERT METER PXQ-ST2-1A1 OR APPROVED EQUAL
CPT-480 TO 120V
4000AF
3100AT
EXISTING TO REMAIN.
NOT IN CONTRACT.
ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG
ET, LSIG
SPARE
TO SUBSTATION #4 REFER TO
DRAWING E010
NEW CABLES & FROM EXISTING MANHOLE TO NEW MVS-2A/B
3#250MCM+1#2/0G IN 5"C.
PART OF FUTURE CONTRACT. NOT IN THIS CONTRACT.
INSTALL NEW CABLES FROM MAIN
SWITCHGEAR TO MANHOLE IN EXISTING
CONDUIT.
3#250MCM+1#2/0G IN EXISTING CONDUIT.
PART OF FUTURE CONTRACT. NOT IN
THIS CONTRACT.
T2-A
INTERCEPT EXISTING CABLES AND
EXTEND TO NEW BREAKERS. PROVIDE
SIMILAR MATCHING NEW CABLES,
CONDUITS, ACCESSORIES AND
FITTINGS TO MAKE THE EXTENSION.
480V, 3 PHASE, 4W + G
SS#2-BUS-2, 4000A BUS
SCCR 65kA, 600V CLASS
480V, 3 PHASE, 4W + G
SS#2-BUS-1, 4000A BUS
SCCR 65kA, 600V CLASS
4000AF
3100AT 1600AF
1200AT
SPARE
1600AF
1200AT
MCC-OGB
1600AF
1200AT
MCC-SPBB
1600AF
1200AT
MCC-OGA
1600AF
1200AT
MCC-SPBAMCC-OGC
600AF
300AT
MTM-PLC
PLC FOR AUTOMATIC MAIN-TIE-MAIN
CONTROLLER WITH ELECTRICAL
INTERLOCKS BY EATON OR APPROVED
EQUAL FOR TCB#2
SPD
150A/5A
SS#2-
MCB-A
POWER TO GFI MAINTENANCE RECEPTACLE
120V CONTROL POWER FROM CPT FOR METERING
ET, LSIG 400AF
400AT
SPARE
(3) LIGHTNING ARRESTERS, 15kV MCOV.
PROVIDE SURGE EVENT COUNTER
#2/0G, 15kV CLASS CABLE
FOR EACH ARRESTER
Δ SEL-2414
MVS-2B
ET, LSIG
METERING4000A/5A
2.3/2.576 MVA LIQUID FILLED KNAN/KNAF 55/65°C RISE, Z=6.6%
SUBSTATION TYPE OUTDOOR STEP-DOWN CU TRANSFORMER
(12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T2-B.
PROVIDE SEL787 IN MVS-2B ENCLOSURE FOR TRANSFORMER
PROTECTION AND SEL 2414 FOR TRANSFORMER
MONITORING.TRANSFORMER COLOR SHALL BE ANSI
61.WINNING BIDDER MUST COORDINATE WITH SEL TO
INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
150A/5A
POWER XPERT METER PXQ-ST2-1A1 OR APPROVED EQUAL
CPT-480 TO 120V
4000AF
3100AT
T2-B
SPD
120V CONTROL POWER FROM CPT FOR SEL 751,787,2414
SS#2-
MCB-B
POWER TO GFI MAINTENANCE RECEPTACLE
120V CONTROL POWER FROM CPT FOR METERING
150E 150E
INSTALL NEW CABLES FROM MAIN
SWITCHGEAR TO MANHOLE IN EXISTING
CONDUIT.
3#250MCM+1#2/0G IN EXISTING CONDUIT.
PART OF FUTURE CONTRACT. NOT IN
THIS CONTRACT.
REPLACE EXISTING 100A
EXPULSION TYPE FUSE WITH
150A EXPULSION TYPE FUSE.
PART OF FUTURE CONTRACT.
NOT IN THIS CONTRACT.
REPLACE EXISTING 100A
EXPULSION TYPE FUSE WITH
150A EXPULSION TYPE FUSE.
PART OF FUTURE CONTRACT.
NOT IN THIS CONTRACT.
120V CONTROL POWER FROM
CPT FOR MAIN-TIE-MAIN PLC
1 1
2.3/2.576MVA
12.47kV/480V 5.75Z
2.3/2.576MVA
12.47kV/480V 5.75Z
NOTES:
1. FOR UTILITY COMPANY DATA, SYMBOLS GENERAL NOTES AND ABBREVIATIONS REFER TO
DRAWING E001.00
2. BASIS OF DESIGN FOR OUTDOOR 15kV CLASS ELECTRICAL MEDIUM VOLTAGE SWITCHGEAR
AND BREAKERS IS EATON OR APPROVED EQUAL.
3. BASIS OF DESIGN FOR SUBSTATION TYPE 12.47kV TO 480V TRANSFORMERS IS EATON
TRANSFORMERS OR APPROVED EQUAL.
4. ALL EQUIPMENT MUST BE PROVIDED FROM A SINGLE MANUFACTURER.
5. ALL LV EQUIPMENT SHALL BE RATED FOR SCCR OF 65kA. ALL LV BREAKERS SHALL BE RATED FOR 65 kAIC.
6. PROVIDE CIRCUIT BREAKER REMOTE MOTOR OPERATOR FOR ALL 15kV CLASS BREAKERS.
PROVIDE CIRCUIT BREAKER REMOTE MOTOR OPERATOR FOR 480V CIRCUIT BREAKERS
MARKED "MO".
7. ALL CIRCUIT BREAKERS, FUSE DISCONNECT SWITCHES ARE THREE (3) POLE U.O.I.
8. FUSE RATING/CIRCUIT BREAKER FRAME RATINGS IN AMPS ARE DENOTED BY THE LETTERS
"AF", SWITCH RATING IN AMPS ARE DENOTED BY THE LETTERS "AS" AND "AT" DENOTES TRIP
RATING IN AMPS.
9. INCOMING MV CABLES/CONDUITS ARE BOTTOM ENTRY, OUTGOING LV CABLES/CONDUIT ARE
BOTTOM EXIT.
10. COORDINATE SPECIFICS OF INCOMING SERVICE FROM THE NEAREST MANHOLE IN THE FIELD.
11. SPD SHALL BE INTEGRALLY MOUNTED IN THE LV BOARD BY THE SAME MANUFACTURER AS
THE SWITCHBOARD. SPD SHALL BE SERVICE ENTRANCE TYPE AND MUST INCLUDE A SURGE
COUNTER.
12. MANUFACTURERS SELECTION OF PRIMARY TYPE OF FUSE SHALL ENSURE COORDINATION
WITH SUBSTATION #2 AND #4. IF MIS-COORDINATION IS IDENTIFIED THE MANUFACTURER
SHALL REPLACE THE FUSE THAT WILL PROPERLY COORDINATE AT NO ADDITIONAL COST.
13. WINNING BIDDER SHALL PROVIDE POWER SYSTEM STUDIES TO THE EOR INCLUDING, ARC
FLASH STUDIES AND ARC FLASH LABELS.
14. INCLUDE FACTORY ACCEPTANCE TESTING IN THE PROCUREMENT BID.
E
TCB#2
N.O.
WORK TO BE DONE IN A FUTURE
CONTRACT
25kAIC
SEL-751
100A/5A
50,51,50PAF
E
1200A
SEL-787
150A/5A
325kAIC
SEL-751
100A/5A
50,51,50PAF
ET, LSIG 400AF
400AT
SPARE
Y Y
(3)VT-480/120V
4000A/5A
TO SEL-787 TO SEL-787
3 3
49,50N/G,51, 52A/B,87
49,50N/G,51, 52A/B,87
HMI
ETHERNET TO SEL-751,787,2414,PQ METER,
MAIN -TIE-MAIN CONTROLLER AND SPD's
ASSOCIATED WITH SUBSTATION #2.
TO SCADA IN MAIN OFFICE VIA
ETHERNET/FIBER.
4 4
MO MO
MO MO
2 2
MO
27,47
1 1
27,47
(3)VT-480/120V
120V CONTROL POWER FROM CPT FOR SEL 751,787,2414
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
POWER SINGLE
LINE DIAGRAM -
SUBSTATION #2
E009.00
ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4 SHEET#11
E010 NTS
TO SUBSTATION #2 REFER TO
DRAWING E009
ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG ET, LSIG
480V, 3 PHASE, 4W + G
SS#4-BUS 2, 3000A BUS
SCCR 65kA, 600V CLASS
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
REFER TO E011 FOR
CONTINUATION
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
800AF
600AT
INTERCEPT EXISTING CABLES AND EXTEND TO
NEW BREAKERS. PROVIDE SIMILAR MATCHING
NEW CABLES, CONDUITS, ACCESSORIES AND
FITTINGS TO MAKE THE EXTENSION.
2 SETS OF
(3#500MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#500MCM+
1#4/0G) IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
2 SETS OF
(3#600MCM+1#4/0G)
IN 2-4"C
MCC-FEB-A MCC-DCBA PP-OBA MCC-MBA MCC-PCA MCC-HWA MCC-HWB MCC-PCB MCC-MBB PP-OBB MCC-DCBB MCC-FEB-B
TO SUBSTATION #2 REFER TO
DRAWING E009
480V, 3 PHASE, 4W + G
SS#4-BUS 1, 3000A BUS
SCCR 65kA, 600V CLASS
MTM-PLC
#2/0G, 15kV CLASS CABLE
FOR EACH ARRESTER
1200A
SEL-751
Δ
SEL-787
SEL-2414
MVS-4A
ET, LSIG
METERING
100A/5A
3000A/5A
1.725/2.106 MVA LIQUID FILLED KNAN/KNAF 55/75°C RISE,
Z=5.75% SUBSTATION TYPE OUTDOOR STEP-DOWN CU
TRANSFORMER (12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T4-A. PROVIDE SEL787 IN MVS-2A
ENCLOSURE FOR TRANSFORMER PROTECTION AND SEL 2414
FOR TRANSFORMER MONITORING.TRANSFORMER COLOR
SHALL BE ANSI 61.WINNING BIDDER MUST COORDINATE WITH
SEL TO INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
150A/5A
3000A/5A
POWER XPERT METER PXQ-ST2-1A1 OR APPROVED EQUAL
CPT-480 TO 120V
3000AF
2600AT
T4-A
50,51,50PAF
150A/5A
120V CONTROL POWER FROM CPT FOR SEL 751,787,2414SS#4-
MCB-A
POWER TO GFI MAINTENANCE RECEPTACLE
120V CONTROL POWER FROM CPT FOR METERING
#2/0G, 15kV CLASS CABLE
FOR EACH ARRESTER
Δ SEL-2414
MVS-4B
ET, LSIG
METERING3000A/5A
1.725/2.106 MVA LIQUID FILLED KNAN/KNAF 55/75°C RISE,
Z=5.75% SUBSTATION TYPE OUTDOOR STEP-DOWN CU
TRANSFORMER (12.47kV) Δ-Y (480/277V) Dyn1, K-4, TRANSFORMER T4-B. PROVIDE SEL787 IN MVS-4B ENCLOSURE
FOR TRANSFORMER PROTECTION AND SEL 2414 FOR
TRANSFORMER MONITORING.TRANSFORMER COLOR SHALL
BE ANSI 61.WINNING BIDDER MUST COORDINATE WITH SEL TO
INTEGRATE SEL RELAYS IN 15kV CLASS MV GEAR.
150A/5A
3000A/5A
POWER XPERT METER PXQ-ST2-1A1
OR APPROVED EQUAL
CPT-480 TO 120V
3000AF
2600AT
T4-B
120V CONTROL POWER FROM
CPT FOR SEL 751,787,2414
SS#4-
MCB-B
POWER TO GFI
MAINTENANCE RECEPTACLE
120V CONTROL POWER
FROM CPT FOR METERING
SPD SPD
PLC FOR AUTOMATIC MAIN-TIE-MAIN
CONTROLLER WITH ELECTRICAL INTERLOCKS
BY EATON OR APPROVED EQUAL FOR TCB#4.
120V CONTROL POWER FROM
CPT FOR MAIN-TIE-MAIN PLC
ET, LSIG
3000AF
2600AT
125E 125E
REPLACE EXISTING 75A EXPULSION TYPE
FUSE WITH 125A EXPULSION TYPE FUSE.
PART OF FUTURE CONTRACT. NOT IN THIS
CONTRACT.
REPLACE EXISTING 75A EXPULSION TYPE
FUSE WITH 125A EXPULSION TYPE FUSE.
PART OF FUTURE CONTRACT. NOT IN THIS
CONTRACT.
NEW CABLES & FROM EXISTING MANHOLE TO NEW MVS-4A/B
3#250MCM+1#2/0G IN 5"C.
PART OF FUTURE CONTRACT. NOT IN THIS CONTRACT.
INSTALL NEW CABLES FROM MAIN
SWITCHGEAR TO MANHOLE IN EXISTING
CONDUIT.
3#250MCM+1#2/0G IN EXISTING CONDUIT.
PART OF FUTURE CONTRACT. NOT IN
THIS CONTRACT.
INSTALL NEW CABLES FROM MAIN
SWITCHGEAR TO MANHOLE IN EXISTING
CONDUIT.
3#250MCM+1#2/0G IN EXISTING CONDUIT.
PART OF FUTURE CONTRACT. NOT IN THIS
CONTRACT.
NOTES:
1. FOR UTILITY COMPANY DATA, SYMBOLS GENERAL NOTES AND
ABBREVIATIONS REFER TO DRAWING E001.00
2. BASIS OF DESIGN FOR OUTDOOR 15kV CLASS ELECTRICAL MEDIUM
VOLTAGE SWITCHGEAR AND BREAKERS IS EATON OR APPROVED
EQUAL.
3. BASIS OF DESIGN FOR SUBSTATION TYPE 12.47kV TO 480V
TRANSFORMERS IS EATON TRANSFORMERS OR APPROVED EQUAL.
4. ALL EQUIPMENT MUST BE PROVIDED FROM A SINGLE
MANUFACTURER.
5. ALL LV EQUIPMENT SHALL BE RATED FOR SCCR OF 65kA. ALL LV BREAKERS SHALL BE RATED FOR 65kAIC.
6. PROVIDE CIRCUIT BREAKER REMOTE MOTOR OPERATOR FOR ALL
15kV CLASS BREAKERS. PROVIDE CIRCUIT BREAKER REMOTE
MOTOR OPERATOR FOR 480V CIRCUIT BREAKERS MARKED "MO".
7. ALL CIRCUIT BREAKERS, FUSE DISCONNECT SWITCHES ARE THREE
(3) POLE U.O.I.
8. FUSE RATING/CIRCUIT BREAKER FRAME RATINGS IN AMPS ARE
DENOTED BY THE LETTERS "AF", SWITCH RATING IN AMPS ARE
DENOTED BY THE LETTERS "AS" AND "AT" DENOTES TRIP RATING IN
AMPS.
9. INCOMING MV CABLES/CONDUITS ARE BOTTOM ENTRY, OUTGOING
LV CABLES/CONDUIT ARE BOTTOM EXIT.
10. COORDINATE SPECIFICS OF INCOMING SERVICE FROM THE
NEAREST MANHOLE IN THE FIELD.
11. SPD SHALL BE INTEGRALLY MOUNTED IN THE LV BOARD BY THE
SAME MANUFACTURER AS THE SWITCHBOARD. SPD SHALL BE
SERVICE ENTRANCE TYPE AND MUST INCLUDE A SURGE COUNTER.
12. MANUFACTURERS SELECTION OF PRIMARY TYPE OF FUSE SHALL
ENSURE COORDINATION WITH SUBSTATION #2 AND #4. IF
MIS-COORDINATION IS IDENTIFIED THE MANUFACTURER SHALL
REPLACE THE FUSE THAT WILL PROPERLY COORDINATE AT NO
ADDITIONAL COST.
13. WINNING BIDDER SHALL PROVIDE POWER SYSTEM STUDIES TO THE
EOR INCLUDING, ARC FLASH STUDIES AND ARC FLASH LABELS.
14. INCLUDE FACTORY ACCEPTANCE TESTING IN THE PROCUREMENT
BID.
KEYED NOTES:
1. PROVIDE ADDITIONAL CPT'S IF NEEDED FOR SWITCHGEAR HEATING.
2. PROVIDE MV/LV CIRCUIT BREAKER REMOTE OPERATOR. REMOTE OPERATOR SHALL BE POWERED FROM THE
LV BUS CPT AFTER SS#4-MCB-A/B.
3. TRIP/CLOSE/BREAKER STATUS AND BREAKER MONITORING.
4. PROVIDE ELECTRICAL INTERLOCKS BETWEEN MAIN-TIE-MAIN BREAKER AND FEEDER #1 AND FEEDER #2 LV BREAKERS AS NEEDED. FOR MAIN-TIE-MAIN SEQUENCE OF OPERATION REFER TO SPECIFICATION 26 23 00.13.
1 1
1.725/2.106MVA
12.47kV/480V 5.75Z
1.725/2.106MVA
12.47kV/480V 5.75Z
E E E E E E E E E E E E
TCB#4
N.O.
HMI
ETHERNET TO SEL-751,787,2414, PQ METER,
MAIN -TIE-MAIN CONTROLLER AND SPD'S
ASSOCIATED WITH SUBSTATION #4.
WORK TO BE DONE IN A
FUTURE CONTRACT
5225kAIC
Y Y
EXISTING TO REMAIN.
NOT IN CONTRACT.
E
1200A
SEL-751
SEL-787
100A/5A
50,51,50PAF
150A/5A
35225kAIC 3
TO SEL-787 TO SEL-787
3 3
49,50N/G,51, 52A/B,87
49,50N/G,51, 52A/B,87
TO SCADA IN MAIN OFFICE VIA
ETHERNET/FIBER.
4 4
ET, LSIG 400AF
400AT
SPARE
ET, LSIG 400AF
400AT
SPARE
MO MO
MO MO
MO
27,47
1 1
27,47
(3)VT-480/120V (3)VT-480/120V
(3) LIGHTNING ARRESTERS, 15kV MCOV.
PROVIDE SURGE EVENT COUNTER
(3) LIGHTNING ARRESTERS, 15kV MCOV.
PROVIDE SURGE EVENT COUNTER
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
POWER SINGLE
LINE DIAGRAM -
SUBSTATION #4
SHEET#1
E010.00
EXISTING TO REMAIN.
NOT IN CONTRACT.
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
REFER TO E010 FOR
CONTINUATION
SCALE:
ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4 SHEET#21
E011 NTS
E
E E E E E E E E E E E E
NOTES:
1. THIS DRAWING IS NOT FOR CONSTRUCTION.
2. THIS DRAWING IS ONLY TO CONVEY THE INTENT OF THE THE
PROCUREMENT OF ELECTRICAL GEAR FOR SUBSTATION #4.
3. DEMOLITION OF SUBSTATION #4 WILL BE CARRIED OUT AS A PART OF A
SEPARATE CONTRACT, ONCE THE PROCUREMENT AND THE
INSTALLATION OF THE NEW ELECTRICAL SWITCHGEAR AT SUBSTATION #4
IS COMPLETED.
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
GPI PROJECT/CONTRACT NO.:
ISSUED FOR PERMIT REVIEW ONLY. THESE DRAWINGS ARE
IN SUBSTANTIAL CONFORMANCE WITH THE BUILDING CODE.
Construction Inspection
Engineering Design Planning
2 Executive Boulevard, Suite 202 Suffern, NY 10901
Greenman-Pedersen, Inc.
845.368.4050 GPINET.COM
MNY-2600015.00
1053 SPRUCE ROAD
ALLENTOWN, PA
IN
DU
ST
RI
AL
B
LV
D, AL
LE
NT
O
W N, P A
LE
HI
G H
CO
UN
TY
A
UT
HO
RI
TY
EL
EC
TR
IC
AL
S
UB
ST
AT
IO
N #2
A
ND
#4 P
RO
CU
RE
M
EN
T
NOT FOR CONSTRUCTION. FOR EQUIPMENT PROCUREMENT ONLY.
DK SH
ELECTRICAL
POWER SINGLE
LINE DIAGRAM -
SUBSTATION #4
SHEET#2
E011.00
| Sheets and Views |
| E002.00 ELECTRICAL SITE PLAN - DEMOLITION |
| E003.00 ELECTRICAL SITE PLAN - INSTALLATION |
| E004.00 ELECTRICAL SUBSTATION#2 PART PLAN - DEMOLITION |
| E005.00 ELECTRICAL SUBSTATION#2 PART PLAN - INSTALLATION |
| E006.00 ELECTRICAL SUBSTATION#4 PART PLAN - DEMOLITION |
| E007.00 ELECTRICAL SUBSTATION#4 PART PLAN - INSTALLATION |
| E008.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - DEMOLITION |
| E009.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #2 |
| E010.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4 SHEET#1 |
| E011.00 ELECTRICAL POWER SINGLE LINE DIAGRAM - SUBSTATION #4 SHEET#2 |
File details come from the government source that posted it. Updated .