26 13 26.11 - Metal Clad MV Arc Resistent Switchgear.pdf
PDF 320 KB Posted
- Solicitation number
- US.255952
- Issued by
- Lehigh County, Pennsylvania
About this file
This specification document is for the procurement of metal-clad medium voltage arc-resistant switchgear equipment for Lehigh County Authority's Electrical Substation Replacement Project, with equipment to be installed at Substations #2 and #4 located at 7676 Industrial Boulevard, Allentown, Pennsylvania. The project requires furnishing and installing 15 kV metal-clad switchgear assemblies with integrated SEL protective relays, communication equipment, and related auxiliary devices. The specification details comprehensive technical requirements including equipment ratings (15 kV class, 1200-ampere continuous current, 25-40 kV short-circuit ratings), arc-resistant construction with Type-2B accessibility, motorized racking devices for circuit breakers and auxiliary drawers, partial discharge sensing equipment, and extensive factory and field testing protocols. Sealed bids are due by 11:00 a.m. on Wednesday, October 28, 2026, through the PennBid electronic bidding service, with self-guided site visits available by email coordination with Charles Volk, P.E., Chief Capital Works Officer. Bids must remain open for 60 days following the bid opening, and bid security of 10 percent of the total bid amount is required in the form of a certified check, bank check, or bid bond.
Approved manufacturers listed in the specification include Eaton, ABB, Siemens, and Square D/Schneider Electric, with pre-approval required for products from other manufacturers at least 10 days prior to the bid date. The manufacturer must be ISO 9001 or 9002 certified and have produced similar electrical equipment for a minimum of five years. The specification requires submittal of detailed drawings, ratings, product data sheets, wiring diagrams, and certified production test reports prior to equipment delivery. Field quality control activities include factory-witnessed tests, two days of factory-trained manufacturer's representative support for installation and startup, and comprehensive field testing conducted by independent testing agencies in accordance with NFPA 70B, IEEE standards, and NETA standards. Training for up to five owner representatives over two workdays and manufacturer's certification of proper installation and testing are also required. The Lehigh County Authority reserves the right to reject any and all bids and to waive any omissions, errors, or irregularities in submitted bids.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substation #2, #4 Procurement 7676 Industrial Blvd.
Allentown, PA 18106 September 15, 2026
26 13 26.11-1
SECTION 26 13 26.11
METAL-CLAD MEDIUM VOLTAGE ARC RESISTANT SWITCHGEAR
PART 1 GENERAL
1.01 SCOPE
A. The Contractor shall furnish and install the medium voltage metal clad switchgear equipment as specified herein and as shown on the contract drawings. The manufacturer shall procure SEL relays, communication equipment and listed on drawings and integrate them on the MV Gear.
B. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.02 REFERENCES
A. The metal-clad switchgear and all components shall be designed, manufactured and tested in accordance with the latest applicable standards of ANSI/IEEE C37.20.2. The switchgear shall also be tested in accordance with ANSI C37.20.7, guide for testing metal-enclosed switchgear for internal arcing faults. 15kV class MV switchgear shall be UL listed and supplied with UL labels.
1.03 SUBMITTALS – FOR REVIEW/APPROVAL
A. The following information shall be submitted to the Engineer:
1. Master drawing index
2. Front view elevation
3. Floor plan
4. Top view
5. Single line diagram
6. Schematic diagram
7. Nameplate schedule
8. Component list
9. Conduit entry/exit locations
10. Assembly ratings including:
a. Switchgear assembly short-circuit withstand rating
b. Accessibility Type
c. Enclosure internal arc short circuit rating and duration
d. Voltage
e. Continuous current
f. Basic impulse level for equipment over 600 volts
Allentown, PA 18106 September 15, 2026
26 13 26.11-2
11. Major component ratings including:
a. Voltage
b. Continuous current
c. Interrupting ratings
12. Cable terminal sizes.
13. Product data sheets.
B. Where applicable the following additional information shall be submitted to the Engineer:
1. Busway connection
2. Connection details between close-coupled assemblies
3. Composite floor plan of close-coupled assemblies
4. Key interlock scheme drawing and sequence of operations
5. Descriptive bulletins
1.04 SUBMITTALS – FOR CONSTRUCTION
A. The following information shall be submitted for record purposes:
1. Final as-built drawings and information for items listed in paragraph 1.04, incorporating all changes made during the manufacturing process.
2. Wiring diagrams
3. Certified production test reports
4. Installation information including equipment anchorage provisions
5. Seismic certification, when applicable
1.05 QUALIFICATIONS
A. The manufacturer of the assembly shall be the manufacturer of the major components within the assembly.
B. For the equipment specified herein, the manufacturer shall be ISO 9001 or 9002 certified.
C. The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of five (5) years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement.
1.06 DELIVERY, STORAGE AND HANDLING
A. Equipment shall be handled and stored in accordance with manufacturer’s instructions. One (1) copy of these instructions shall be included with the equipment at time of shipment.
B. Shipping groups shall be designed to be shipped by truck, rail, or ship. Breakers and accessories shall be packaged and shipped separately.
Allentown, PA 18106 September 15, 2026
26 13 26.11-3
C. Switchgear shall be equipped to be handled by crane. Where cranes are not available, switchgear shall be suitable for skidding in place on rollers using jacks to raise and lower the groups.
D. Switchgear being stored prior to installation shall be stored so as to maintain the equipment in a clean and dry condition. If stored outdoors, indoor gear shall be covered and heated, and outdoor gear shall be heated.
1.07 OPERATION AND MAINTENANCE MANUALS
A. Equipment operation and maintenance manuals shall be provided with each assembly shipped, and shall include instruction leaflets and instruction bulletins for the complete assembly and each major component.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Eaton
B. ABB
C. Siemens
D. Square D / Schneider Electric
The listing of specific manufacturers above does not imply acceptance of their products that do not meet the specified ratings, features and functions. Manufacturers listed above are not relieved from meeting these specifications in their entirety. Products in compliance with the specification and manufactured by others not named will be considered only if pre-approved by the Engineer ten (10) days prior to bid date.
2.02 RATINGS
A. The switchgear described in this specification shall be designed for operation on a
12.47 kV, three-phase, three-wire, solidly grounded, 60-hertz system. 15 kV switchgear enclosure shall provide protection against internal arcing faults at the front, sides, and rear as designated by accessibility Type 2B under IEEE test guide C37.20.2. The switchgear assembly shall be rated for 95 kV (15 kV assemblies).
Table 26 13 26-1 Rated Maximum Voltage
Lightning Impulse Withstand Voltage
Rated Short Circuit Current at Rated Maximum Voltage
Rated Voltage Range Factor
Maximum Symmetrical Interrupting and 2-Second Short Time Current Carrying Capability
Closing and Latching Capability (Momentary)
V I K K * I kV rms kV peak kA rms sym kA rms sym kA peak
15 95 25 1.0 25 65
Allentown, PA 18106 September 15, 2026
26 13 26.11-4
15 95 40 1.0 40 104 15 95 50 1.0 50 130 15 95 63 1.0 63 164
B. Each circuit breaker shall have the following ratings:
Rated Maximum Voltage 15kV Lightning Impulse Withstand Voltage (BIL) 95kV Peak Continuous Current (15 kV) 1200Ampere
SCCR at Maximum kV 25kA rms sym Rated Voltage Range Factor K 1 Closing and Latching Capability 65kA crest Maximum Symmetrical Interrupting and Short Time Rating 25kA rms sym Rated Interrupting Time 3 Cycle
C. The switchgear assembly short-time and momentary current withstand ratings shall be same as that of circuit breaker. The 15 kV switchgear enclosure internal arc-short circuit rating shall be same as rated short-time short circuit current withstand rating of the assembly. The rated enclosure internal arc-short circuit duration shall be 0.5 second.
2.03 CONSTRUCTION
A. The switchgear assembly shall consist of individual vertical sections housing various combinations of circuit breakers and auxiliaries, bolted to form a rigid metal-clad switchgear assembly. Metal side sheets shall provide grounded barriers between adjacent structures and solid removable metal barriers shall isolate the major primary sections of each circuit. The 15 kV switchgear shall be arranged in 1/2-high configuration (upper compartment shall be used for housing relays/meters), with two hinged rear covers furnished for each vertical section for circuit isolation and ease of handling.
B. Each breaker compartment door shall include a viewing window. The viewing window will allow the operator to:
1. Visually confirm the breaker position inside of the compartment.
2. Visually confirm that the arc resistant hardware is fully engaged and the door is secured, ensuring that the assembly is arc resistant.
C. The stationary primary contacts shall be silver-plated and recessed within insulating tubes. A steel shutter shall automatically cover the stationary primary disconnecting contacts when the breaker is in the disconnected position or out of the cell. Provide rails to allow withdrawal of each the 15 kV circuit breaker for inspection and maintenance without the use of a separate lifting device.
D. The switchgear assembly shall be of arc resistant construction that provides Type- 2B accessibility around the perimeter (front, sides, and rear) of the line-up plus arc-resistant in front of the instrument/control compartment with instrument/control compartment door opened.
E. Each individual vertical section of the switchgear shall include integral and top mounted pressure release flaps to facilitate a controlled upward release of arc
Allentown, PA 18106 September 15, 2026
26 13 26.11-5 created overpressures, smoke, and gasses. Individual vertical sections shall be of a unitized design to allow removal of a damaged vertical section after a fault incident, without requiring the removal of the adjacent vertical sections.
F. For 15kV switchgear, an enclosed arc-chamber with arc duct exit shall be furnished for installation above the switchgear. Arc-duct exit location(s) shall be as shown on the drawing. Arc exhaust shall be vented from the arc-chamber to the exit location(s) via arc-duct as shown on the drawings. Field assembly of the arc-chamber and arc-duct shall be by installing contractor
G. Space heaters shall be provided in each vertical section to prevent condensation.
A thermostatically controlled heater bus, protected by a properly sized molded case circuit breaker shall be provided in each switchgear assembly to provide control power to space heaters. AC control voltage for space heaters shall be derived from a control power transformer supplied within the switchgear see contract drawings.
2.04 BUS
A. The main bus shall be copper, insulated with fluidized bed epoxy flame-retardant and track-resistant insulation. The bus supports between units shall be flame-retardant, track-resistant, glass polyester for 5 and 15 kV class. The switchgear shall be constructed so that all buses, bus supports and connections shall withstand stresses that would be produced by currents equal to the momentary ratings of the circuit breakers. Main bus 15 kV shall be rated 1200 amperes.
Insulated copper main bus shall be provided and have provisions for future extension. All bus joints shall be silver plated, bolted and insulated with easily installed boots. The bus shall be braced to withstand fault currents equal to the close and latch rating of the breakers. The temperature rise of the bus and connections shall be in accordance with IEEE standards and documented by design tests.
B. A copper ground bus shall extend the entire length of the switchgear.
2.05 WIRING/TERMINATIONS
A. The switchgear manufacturer shall provide suitable terminal blocks for secondary wire terminations with a minimum of 10% spare terminals. One control circuit cutout device shall be provided in each circuit breaker housing. Switchgear secondary wire shall be #14 AWG, type SIS rated 600 volt, 90 degrees C, furnished with wire markers at each termination. Wires shall terminate on terminal blocks with marker strips numbered in agreement with detailed connection diagrams. Wire markers shall be marked with wire ID at each end.
B. Incoming line and feeder cable lugs shall be 2- hole mounting, long barrel, copper compression lugs.
2.06 CIRCUIT BREAKERS
A. The circuit breakers shall be horizontal drawout type, capable of being withdrawn.
The breakers shall be operated by a motor-charged stored energy spring mechanism, charged normally by a universal electric motor and in an emergency by a manual handle. The primary disconnecting contacts shall be silver-plated copper.
B. Each circuit breaker shall contain three vacuum interrupters separately mounted in a self-contained, self-aligning pole unit, which can be removed easily. The vacuum interrupter pole unit shall be mounted on glass polyester supports for 5 and 15 kV class. A contact wear gap indicator for each vacuum interrupter, which requires no
Allentown, PA 18106 September 15, 2026
26 13 26.11-6 tools to indicate available contact life, shall be easily visible when the breaker is removed from its compartment. The current transfer from the vacuum interrupter moving stem to the breaker main conductor shall be a non-sliding design. The breaker front panel shall be removable when the breaker is withdrawn for ease of inspection and maintenance.
C. The secondary contacts shall be silver-plated and shall automatically engage in the breaker operating position. For 15 kV switchgear, there shall be a distinct test position, which shall be automatically engaged.
D. Interlocks shall be provided to prevent closing of a breaker between operating and test positions, to trip breakers upon insertion or removal from housing and to discharge stored energy mechanisms upon insertion or removal from the housing.
The breaker shall be secured positively in the housing between and including the operating and test positions.
E. The circuit breaker compartment door shall be mechanically interlocked with the breaker levering mechanism to prevent opening of the door unless the breaker is first opened and withdrawn to Test/Disconnected position with the door closed.
F. The design shall allow normal circuit breaker functions to be carried out with the door closed. Those functions include: manual open and close, manual levering to and from connected position, and manual charging of the circuit breaker closing springs. Shatter proof viewing windows shall be provided on the door to enable viewing of circuit breaker position inside the compartment, circuit breaker contact status (open/closed), and spring charged/discharged indication.
G. When a remote operable electrical levering device is specified under the accessories, the design shall allow levering of the circuit breaker using such a device with the door closed.
H. The breakers shall be electrically operated by the following control voltages:
1. 120 volt AC close and AC capacitor trip.
For each breaker, provide green and red LED lights to indicate breaker open and closed status.
I. AC control voltage shall be derived from a control power transformer mounted in the switchgear indicated on contract drawings.
J. Each circuit breaker compartment shall be provided with an integral motorized racking device accessory, equal to Eaton VCP-W MR2, with the following features:
1. Allow moving the breaker between the connect, test and disconnect positions from a distance of up to 30 feet via a hand held pendant, with the breaker compartment door closed.
2. Breaker position shall be indicated on the pendant by LED lights. A blinking light indicates that the circuit breaker is in the motion through the selected position. A solid (non-blinking) light indicates that the circuit breaker has reached and stopped in the selected position. In case normal operation fails, the appropriate error code is displayed on the pendant in a separate 2 character LED display window.
Allentown, PA 18106 September 15, 2026
26 13 26.11-7
3. The system shall be designed such that it allows manual racking of the circuit breaker using the levering crank accessory. Manual racking operation shall disable the motorized racking accessory.
4. It shall be possible to enable/disable operation of the motorized racking accessory via Purchaser’s external interlocking/permissive contacts.
5. 120 V AC power for the motorized racking accessory shall be derived from a control power transformer mounted in the switchgear refer to contract drawings.
6. The hand held pendant shall also include “Open” and “Close” pushbuttons to allow remote operation of the circuit breaker.
7. Provide a discrete I/O interface module mounted in each circuit breaker control compartment for control of the motorized racking accessory via external hard-wired dry contacts, for example, via push buttons located at a remote control panel. The I/O interface module to provide output terminals for connections of remote 24 V LEDs for indication of breaker position status at the remote panel. With this I/O interface, the circuit breaker can be moved from disconnect to connect or from connect to disconnect positions from a remote control panel. Whenever the hand-held pendant is in use, the pendant becomes the master and will override the customer’s remote control signals.
2.07 PROTECTIVE RELAYS
A. The switchgear manufacturer shall furnish and install, in the metal-clad switchgear, the quantity, type and rating of protection relays as indicated on the drawings and described hereafter in this specification.
1. Relays shall be mounted in a separate area metal barriered from medium voltage breaker compartment.
B. Microprocessor-Based Protective Relay
1. Coordinate with SEL and integrate SEL relays in MV gear. Refer to Contract
2.08 AUXILIARY DEVICES
A. Ring type current transformers shall be furnished as indicated on the contract drawings. The thermal and mechanical ratings of the current transformers shall be coordinated with the circuit breakers. Their accuracy rating shall be equal to or higher than those specified in IEEE C37.20.2. The standard location for the current transformers on the bus side and line side of the 5, 15 and 27 kV breaker units shall be front accessible to permit adding or changing current transformers without removing high-voltage insulation connections. Shorting terminal blocks shall be furnished on the secondary of all the current transformers. Current transformers in 38kV switchgear shall be accessible from the rear of the switchgear after removal of HV connections and certain barriers.
B. Voltage transformers or resistive voltage dividers shall be supplied as shown on the one-line diagram.
1. The voltage transformers shall be mounted on tilt-out trunnions or drawout drawer assemblies and equipped with current limiting primary fuses. In the withdrawn position, the fuses and the potential transformers shall be disconnected and grounded to permit safe inspection and/or replacement of the fuses. The trunnion frame shall be connected to ground by a flexible copper cable that is attached directly to the frame. The mechanism shall be
Allentown, PA 18106 September 15, 2026
26 13 26.11-8 arranged so that full access to potential transformers or fuses cannot be accomplished until they are disconnected from high voltage and grounded.
Live parts shall be isolated when the voltage transformers are in the withdrawn position to prevent accidental contact by operating or maintenance personnel. Stationary contacts shall be silver plated copper and mounted on porcelain or glass polyester supports. Cables connected to voltage transformer primaries shall be rated for the full voltage and BIL rating of the switchgear.
2. Resistive voltage dividers can be used in place of voltage transformers.
Resistive voltage dividers shall carry the same rating as the specified voltage transformers. They are to be mounted in the cable compartment of the switchgear assembly. Resistive voltage dividers must consist of 4 total non-inductive resistors (two paralleled medium voltage resistors and two paralleled low voltage resistors). When the nominal service voltage is applied, the resistive voltage divider system shall provide a 120 V signal to the auxiliary devices for protection and controls. The resistive voltage divider system shall be agnostic of the auxiliary devices to which they connect.
C. A mechanical interlock shall be provided to require the secondary breaker to be open before the CPT drawer or CPT primary fuse drawer can be withdrawn.
D. For 15kV switchgear only, each auxiliary compartment shall be provided with an integral motorized racking device accessory, equal to Eaton MR2, with the following features:
1. Allow moving the auxiliary drawer between the connect and disconnect positions from a distance of up to 30 feet via a hand held pendant, with the auxiliary compartment door closed. Where the MR2 is provided for breaker racking, the same pendant can be used for auxiliary racking.
2. Auxiliary drawer position shall be indicated on the pendant by - LED lights. A blinking light indicates that the auxiliary drawer is in the motion through the selected position. A solid (non-blinking) light indicates that the auxiliary drawer has reached and stopped in the selected position. In case normal operation fails, the appropriate error code is displayed on the pendant in a separate 2 character LED display window.
3. The system shall be designed such that it allows manual racking of the auxiliary drawer using the levering crank accessory. Manual racking operation shall disable the motorized racking accessory.
4. It shall be possible to enable/disable operation of the motorized racking accessory via Purchaser’s external interlocking/permissive contacts.
5. 120 V AC power for the motorized racking accessory shall be mounted in the switchgear refer to contract drawings.
6. Provide a discrete I/O interface module mounted for each auxiliary drawer for control of the motorized racking accessory via external hard-wired dry contacts, for example, via push buttons located at a remote control panel. The I/O interface module to provide output terminals for connections of remote 24 V LEDs for indication of auxiliary drawer position status at the remote panel.
With this I/O interface, the auxiliary drawer can be moved from disconnect to connect or from connect to disconnect positions from a remote control panel.
Whenever the hand held pendant is in use, the pendant becomes the master and will override the customer’s remote control signals.
E. Where indicated on the drawings, provide surge protection.
Allentown, PA 18106 September 15, 2026
26 13 26.11-9
2.09 POWNER METERING
A. Provide owner metering devices where shown on the drawings. Where indicated provide a separate owner metering compartment with front hinged doors. Include associated instrument transformers.
B. Provide current transformers for each meter. Current transformers shall be wired to shorting type terminal blocks.
C. Potential transformers including primary and secondary fuses with disconnecting means for metering as shown on the drawings.
D. Microprocessor-Based Metering System
E. Web-Enabled Communications are a part of the LV gear. Refer to contract drawings.
2.10 ENCLOSURES
A. The switchgear described in these specifications shall be outdoor construction, with devices arranged as shown on contract drawings.
B. The switchgear shall be installed inside an outdoor Integrated Power Assembly- IPA. Auxiliary power required for the IPA auxiliary loads is to be supplied from a suitably sized control power transformer supplied within the switchgear or as indicated on contract drawings. The switchgear shall include an arc exhaust plenum with arc duct exit(s) as needed for the application. An end piece with suitable louver assembly shall be provided at the end of the exit duct(s) outside the IPA wall to prevent ingress of snow/rain into the duct under normal operation. The switchgear supplier and IPA supplier shall be responsible for all mechanical and electrical coordination between the switchgear and the IPA.
C. When switchgear is installed in an outdoor IPA, 120 V AC auxiliary power for switchgear space heaters shall be provided by the CPT(s). Refer to contract drawings for CPT. Space heaters shall be rated for twice the operating voltage for longer life.
2.11 NAMEPLATES
A. Engraved nameplates, mounted on the face of the assembly, shall be furnished for all main and feeder circuits as indicated on the drawings. Nameplates shall be laminated plastic, black characters on white background, and secured with screws.
Characters shall be 3/16-inch high, minimum. Furnish master nameplate for each switchgear lineup giving information in accordance with IEEE Std C37.20.2-1999, section 7.4.1 and IEEE C37.20.7, section 6.3. Circuit nameplates shall be provided with circuit designations as shown on purchaser’s single-line diagrams.
B. Control components mounted within the assembly, such as fuse blocks, relays, pushbuttons, switches, etc., shall be suitably marked for identification corresponding to appropriate designations on manufacturer’s wiring diagrams.
2.12 FINISH
A. The finish shall consist of a coat of gray (ANSI-61), thermosetting, polyester powder paint applied electrostatically to pre-cleaned and phosphatized steel and aluminum for internal and external parts. The coating shall have corrosion resistance of 600 hours to 5% salt spray.
Allentown, PA 18106 September 15, 2026
26 13 26.11-10
2.13 ACCESSORIES
A. The switchgear manufacturer shall furnish accessories for test, inspection, maintenance, and operation, including:
1. One – Maintenance tool for manually charging the breaker closing spring and manually opening the shutter
2. One – Levering crank for moving the breaker between test and connected positions
3. One – Test jumper for electrically operating the breaker while out of its compartment
4. One – Breaker lifting yoke used for attachment to breaker for lifting breaker on or off compartment rails, when applicable
5. One – Set of rail extensions, when applicable
6. One – Portable lifting device for lifting the breaker on or off the rails
7. One – Ramp for rolling breaker mounted in lower compartment directly onto the floor
2.14 PARTIAL DISCHARGE TESTING
A. The switchgear shall be corona free and shall be tested for partial discharges in accordance with IEEE C37.20.2, 6.6.1. The corona discharges measured during the tests shall be less than 100 picocoulombs.
2.15 PARTIAL DISCHARGE SENSING EQUIPMENT
A. Coordinate with SEL and procure 4 to 8 light/pressure sensors and associated fiber optic cables and integrate it with SEL 751 relay for continuous monitoring of the partial discharges under normal operation. The partial discharge sensing shall identify potential insulation problems (insulation degradation) by trending of PD data over time so that corrective actions can be planned and implemented before permanent insulation deterioration develops.
2.16 BILLS OF MATERIAL
A. The metal-clad switchgear auxiliary section for control and instrumentation shall include the following:
1. Voltage transformers – Refer to contract Drawings
2. Current transformers – Refer to Contract Drawings
3. Control power transformers – Refer to Contract Drawings
4. SEL 751 with Arc Flash Detction and Sensors and 787 Relays – Refer to Contract Drawings
5. Additional requirements as shown on the plans.
B. The metal-clad switchgear main circuit breaker section for control of a main circuit breaker shall include the following:
1. One – Drawout power circuit breaker rated 1200 amperes
2. Three – Current transformers, single secondary
Allentown, PA 18106 September 15, 2026
26 13 26.11-11
3. One – Circuit breaker control switch with red and green indicating lights
4. SEL 75 1 Microprocessor-based three-phase and ground overcurrent relay, ANSI device number 51/50/N/50PAF
5. One – Nameplate
6. One – Microprocessor-based metering system
7. One – Set of cable lugs.
PART 3 EXECUTION
3.01 FACTORY TESTING
A. The following standard factory tests shall be performed on the circuit breaker element provided under this section. All tests shall be in accordance with the latest version of IEEE standards.
1. Alignment test with master cell to verify all interfaces and interchangeability
2. Circuit breakers operated over the range of minimum to maximum control voltage
3. Factory setting of contact gap
4. One-minute dielectric test per IEEE standards
5. Final inspections and quality checks
B. The following production test shall be performed on each breaker housing:
1. Alignment test with master breaker to verify interfaces
2. One-minute dielectric test per IEEE standards on primary and secondary circuits
3. Partial discharge tests, when applicable.
4. Operation of wiring, relays and other devices verified by an operational sequence test
5. Final inspection and quality check.
C. The manufacturer shall provide three (3) certified copies of factory test reports.
D. The owner’s representative shall witness factory tests as outlined under 3.02.B above.
1. The manufacturer shall notify the owner two (2) weeks prior to the date the tests are to be performed.
2. All travel, logding, meals and incidental expenses associated with owner’s test witness shall be owner’s responsibility.
3.02 FIELD QUALITY CONTROL
A. Provide the services of a qualified factory-trained manufacturer’s representative to assist the Contractor in installation and start-up of the equipment specified under this section for a period of 2 working days. The manufacturer’s representative shall provide technical direction and assistance to the contractor in general assembly of
Allentown, PA 18106 September 15, 2026
26 13 26.11-12 the equipment, connections and adjustments, and testing of the assembly and components contained therein.
B. The Contractor shall provide three (3) copies of the manufacturer’s field start-up report.
3.03 MANUFACTURER’S CERTIFICATION
A. A qualified factory-trained manufacturer’s representative shall certify in writing that the equipment has been installed, adjusted and tested in accordance with the manufacturer’s recommendations.
B. The Contractor shall provide three (3) copies of the manufacturer’s representative’s certification.
3.04 TRAINING
A. The Contractor shall provide a training session for up to five (5) owner’s representatives for 2 normal workdays at a jobsite location determined by the owner.
B. A manufacturer’s qualified representative shall conduct the training session.
Training program shall include instructions on the assembly, circuit breaker, protective devices, and other major components.
3.05 INSTALLATION
A. The Contractor shall install all equipment per the manufacturer’s recommendations and contract drawings.
B. All necessary hardware to secure the assembly in place shall be provided by the contractor.
3.06 FIELD ADJUSTMENTS
The relays shall be set in the field by the contractor in accordance with settings in the Manufacturers coordination study
3.07 EXAMINATION
A. Upon delivery of switchgear and prior to unloading, inspect equipment for damage.
1. Examine tie rods and chains to verify they are undamaged and tight and that blocking and bracing are tight.
2. Verify that there is no evidence of load shifting in transit and that readings from transportation shock recorders, if equipped, are within manufacturer's recommendations.
3. Examine switchgear for external damage, including dents or scratches in doors and sill, and termination provisions.
4. Compare switchgear and accessories received with the bill of materials to verify that the shipment is complete. Verify that switchgear and accessories conform to the manufacturer's quotation and shop drawings. If the shipment is
Allentown, PA 18106 September 15, 2026
26 13 26.11-13 not complete or does not comply with project requirements, notify the manufacturer in writing immediately.
5. Unload switchgear, observing packing label warnings and handling instructions.
6. Open compartment doors and inspect components for damage or displaced parts, loose or broken connections, cracked or chipped insulators, bent mounting flanges, dirt or foreign material, and water or moisture.
B. Handling:
1. Handle switchgear in accordance with manufacturer's recommendations; avoid damage to the enclosure, termination compartments, base, frame, tank, and internal components. Do not subject switchgear to impact, jolting, jarring, or rough handling.
2. Protect switchgear compartments against the entrance of dust, rain, and snow.
3. Transport switchgear upright to avoid internal stresses on equipment mounting assemblies. Do not tilt or tip switchgear.
4. Use spreaders or a lifting beam to obtain a vertical lift and to protect switchgear from straps bearing against the enclosure. Lifting cable pull angles may not be greater than 15 degrees from vertical.
5. Do not damage structure when handling switchgear.
C. Storage:
1. Store switchgear in a location that is clean and protected from weather. Protect switchgear from dirt, water, contamination, and physical damage. Do not store switchgear in the presence of corrosive or explosive gases.
2. Store switchgear with compartment doors closed.
3. Regularly inspect switchgear while in storage and maintain documentation of storage conditions, noting any discrepancies or adverse conditions.
D. Examine roughing-in of conduits and grounding systems to verify the following:
1. Wiring entries comply with layout requirements.
2. Entries are within conduit-entry tolerances specified by manufacturer, and no feeders will have to cross section barriers to reach load or line lugs.
E. Pre-Installation Checks:
1. Verify removal of any shipping bracing after placement.
Allentown, PA 18106 September 15, 2026
26 13 26.11-14
F. Verify that ground connections are in place. and that requirements in Section 260526 "Grounding and Bonding for Electrical Systems" have been met.
Maximum ground resistance must be 5 ohms at switchgear location.
G. Proceed with installation only after unsatisfactory conditions have been corrected.
3.07 INSTALLATION OF SWITCHGEAR
A. Equipment Mounting:
1. Install switchgear on cast-in-place concrete equipment base(s). Comply with requirements for equipment bases and foundations specified in Section 033000 "Cast-in-Place Concrete."
2. Comply with requirements for vibration isolation and seismic control devices specified in Section 260548.16 "Seismic Controls for Electrical Systems."
3. Comply with requirements for vibration isolation devices specified in
Section 260529 "Hangers and Supports for Electrical Systems."
B. Switchgear must be installed level and plumb. Switchgear must tilt less than 1.5 degrees while energized.
C. Maintain minimum clearances and workspace at equipment in accordance with manufacturer's written instructions and NFPA 70.
D. Comply with NECA 430.
3.08 CONNECTIONS
A. Ground equipment in accordance with Section 260526 "Grounding and Bonding for Electrical Systems."
B. Grounding Connections at Interior Locations:
1. Install bare copper cable not smaller than No. 4/0 AWG for grounding to grounding electrodes.
2. Bond surge arrester and neutrals directly to the switchgear enclosure and then to the grounding electrode system with bare copper conductors.
3. Keep leads as short as practicable with no kinks or sharp bends.
4. Make joints in grounding conductors and loops by exothermic weld or compression connector.
Allentown, PA 18106 September 15, 2026
26 13 26.11-15
C. Grounding Connections at Exterior Locations:
1. Install tinned bare copper cable not smaller than No. 4/0 AWG, for counterpoise buried not less than 30 inch below grade interconnecting the grounding electrodes.
2. Bond surge arrester and neutrals directly to the switchgear enclosure and then to the grounding electrode system with bare copper conductors, sized as shown.
3. Keep lead lengths as short as practicable with no kinks or sharp bends.
4. Fence and equipment connections must not be smaller than No. 4 AWG.
5. Ground fence at each gate post and corner post and at intervals not exceeding 10 ft..
6. Bond each gate section to the fence post using 1/8 by 1 inch tinned flexible braided copper strap and clamps.
7. Make joints in grounding conductors and loops by exothermic weld or compression connector.
D. Terminate all grounding and bonding conductors on a common equipment grounding terminal on the switchgear enclosure. Install supplemental terminal bars, lugs, and bonding jumpers as required to accommodate the number of conductors for termination.
E. Complete switchgear grounding and lightning arrester connections prior to making any other electrical connections.
F. Terminate medium-voltage cables in accordance with Section 260513 "Medium- Voltage Cables."
3.09 SIGNS AND LABELS
A. Comply with the installation requirements for labels and signs specified in Section 260553 "Identification for Electrical Systems."
B. Install warning signs as required to comply with OSHA in 29 CFR 1910.269.
3.10 FIELD QUALITY CONTROL
A. Field tests and inspections must be witnessed by independent testing agencies.
Allentown, PA 18106 September 15, 2026
26 13 26.11-16
B. General Field Testing Requirements:
1. Comply with the provisions of NFPA 70B, "Testing and Test Methods."
2. After installing switchgear and after electrical circuitry has been energized, test for compliance with requirements.
3. Perform each visual and mechanical inspection and electrical test. Certify compliance with test parameters.
C. Medium-Voltage Switchgear Assembly Field Tests:
1. Visual and Mechanical Inspection:
a. Verify that fuse and circuit breaker sizes and types correspond to
Drawings and coordination study, as well as to the circuit breaker's address in the control network.
b. Verify that current and voltage transformer ratios correspond to Drawings.
c. Inspect bolted electrical connections using calibrated torque-wrench method in accordance with manufacturer's published data or NETA ATS, Table 100.12. Bolt-torque levels must be in accordance with manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
d. Confirm correct operation and sequencing of electrical and mechanical interlock systems.
1) Attempt closure on locked-open devices. Attempt to open locked-closed devices.
2) Make key exchange with devices operated in off-normal positions.
e. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
f. Inspect insulators for evidence of physical damage or contaminated surfaces.
g. Verify correct barrier and shutter installation and operation.
h. Exercise active components.
i. Inspect mechanical indicating devices for correct operation.
j. Verify that filters are in place and vents are clear.
Allentown, PA 18106 September 15, 2026
26 13 26.11-17
k. Perform visual and mechanical inspection of instrument transformers in accordance with Article "Instrument Transformer Field Tests."
l. Inspect control power transformers.
1) Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
2) Verify that primary and secondary fuse or circuit breaker ratings match drawings.
3) Verify correct functioning of drawout disconnecting and grounding contacts and interlocks.
2. Electrical Tests:
a. Inspect bolted electrical connections using a low resistance ohmmeter to compare bolted resistance values to values of similar connections.
Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Perform dc voltage insulation-resistance tests on each bus section, phase to phase and phase to ground, for one minute. If the temperature of the bus is other than plus or minus 20 deg C, adjust the resulting resistance as provided in NETA ATS, Table 100.11.
1) Insulation-resistance values of bus insulation must be in accordance with manufacturer's published data. In the absence of manufacturer's published data, comply with NETA ATS, Table 100.1. Investigate and correct values of insulation resistance less than manufacturer's recommendations or NETA ATS, Table 100.1.
2) Do not proceed to the dielectric withstand voltage tests until insulation-resistance levels are raised above minimum values.
c. Perform a dielectric withstand voltage test on each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer's published data. If manufacturer has no recommendation for this test, it must be conducted in accordance with NETA ATS, Table 100.2. Apply the test voltage for one minute.
1) If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
d. Perform insulation-resistance tests on control wiring with respect to ground. Applied potential must be 500 V(dc) for 300 V rated cable and 1000 V(dc) for 600 V rated cable. Test duration must be one minute.
Allentown, PA 18106 September 15, 2026
26 13 26.11-18
For units with solid-state components or control devices that cannot tolerate the applied voltage, follow the manufacturer's recommendation.
1) Minimum insulation-resistance values of control wiring must not be less than two megohms.
e. Control Power Transformers:
1) Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground.
Insulation-resistance values of winding insulation must be in accordance with manufacturer's published data. In the absence of manufacturer's published data, comply with NETA ATS, Table 100.1. Investigate and correct values of insulation resistance less than manufacturer's recommendations or NETA ATS, Table 100.1.
2) Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices.
3) Verify correct secondary voltage by energizing the primary winding with system voltage. Measure secondary voltage with the secondary wiring disconnected.
4) Verify correct function of control transfer relays located in the switchgear with multiple control power sources.
f. Voltage Transformers:
1) Perform secondary wiring integrity test. Verify correct potential at all devices.
2) Verify secondary voltages by energizing the primary winding with system voltage.
g. Perform current-injection tests on the entire current circuit in each section of switchgear.
1) Perform current tests by secondary injection with magnitudes such that a minimum current of 1.0 A flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.
2) Perform current tests by primary injection with magnitudes such that a minimum of 1.0 A flows in the secondary circuit.
Verify correct magnitude of current at each device in the circuit.
26 13 26.11-19
h. Perform system function tests in accordance with "System Function
Tests" Article.
i. Verify operation of space heaters.
j. Perform phasing checks on double-ended or dual-source switchgear to ensure correct bus phasing from each source.
D. Medium-Voltage Vacuum Circuit Breaker Field Tests:
1. Visual and Mechanical Inspection:
a. Inspect physical and mechanical condition.
b. Inspect anchorage, alignment, grounding, and required clearances.
c. Verify that maintenance devices such as special tools and gages specified by the manufacturer are available for servicing and operating the breaker.
d. Verify the unit is clean.
e. Perform mechanical operation tests on operating mechanism in accordance with manufacturer's published data.
f. Measure critical distances on operating mechanism as recommended by the manufacturer. Critical distances of the operating mechanism must be in accordance with manufacturer's published data.
g. Verify cell fit and element alignment.
h. Verify racking mechanism operation.
i. Verify appropriate lubrication on moving current-carrying parts and on
j. Verify appropriate lubrication on moving current-carrying parts and on
k. Perform time-travel analysis. Travel and velocity values must be in accordance with manufacturer's published data.
l. Record as-found and as-left operation counter reading. Operation counter must advance one digit per close-open cycle.
a. Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-to ground with switch closed, and across each open
Allentown, PA 18106 September 15, 2026
26 13 26.11-20 pole. Apply voltage in accordance with manufacturer's published data.
In the absence of manufacturer's published data, comply with NETA ATS, Table 100.1. Insulation-resistance values must be in accordance with manufacturer's published data. In the absence of manufacturer's published data, comply with NETA ATS, Table 100.1.
Investigate and correct values of insulation resistance less than this table or manufacturer's recommendations. Dielectric-withstand-voltage tests must not proceed until insulation-resistance levels are raised above minimum values.
b. Perform a contact/pole-resistance test. Compare bolted connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value. Microhm or dc millivolt drop values must not exceed the high levels of the normal range in accordance with manufacturer's published data. If manufacturer's published data is not available, investigate values that deviate from adjacent poles or similar switches by more than 50 percent of the lowest value.
c. Perform minimum pickup voltage tests on trip and close coils in accordance with manufacturer's published data. Minimum pickup voltage of the trip and close coils must comply with manufacturer's published data. In the absence of the manufacturer's published data, comply with NETA ATS, Table 100.20.
d. Verify correct operation of any auxiliary features, such as electrical close and trip operation, trip-free operation, and anti-pump function. Auxiliary features must operate in accordance with manufacturer's published data.
e. Trip circuit breaker by operation of each protective device. Reset trip logs and indicators.
f. Perform power-factor or dissipation-factor tests on each pole with the breaker open and each phase with the breaker closed. Power-factor or dissipation-factor values must comply with manufacturer's published data.
g. Perform vacuum bottle integrity (dielectric-withstand-voltage) test across each vacuum bottle, with the contacts in the "open" position in accordance with manufacturer's published data. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the vacuum bottle integrity test, the test specimen is considered to have passed the test.
h. Perform a dielectric-withstand-voltage test in accordance with manufacturer's published data. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application
Allentown, PA 18106 September 15, 2026
26 13 26.11-21 during the dielectric-withstand-voltage test, the test specimen is considered to have passed the test.
i. Verify operation of heaters.
E. Instrument Transformer Field Tests:
a. Verify that equipment nameplate data complies with Contract Documents.
b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements.
d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify the unit is clean.
f. Inspect bolted electrical connections using calibrated torque-wrench method in accordance with manufacturer's published data or NETA ATS, Table 100.12. Bolt-torque levels must be in accordance with manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
g. Verify that required grounding and shorting connections provide contact.
h. Verify correct operation of transformer withdrawal mechanism and grounding operation.
i. Verify correct primary and secondary fuse sizes for voltage transformers.
j. Verify appropriate lubrication on moving current-carrying parts and on
2. Electrical Tests of Current Transformers:
to compare bolted resistance values to values of similar connections.
Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Perform insulation-resistance test of each current transformer and its secondary wiring with respect to ground at 1000 V(dc) for one minute.
For units with solid-state components that cannot tolerate the applied
Allentown, PA 18106 September 15, 2026
26 13 26.11-22 voltage, follow manufacturer's written recommendations. Investigate and correct values of insulation resistance less than manufacturer's recommendations or NETA ATS, Table 100.5.
c. Perform a polarity test of each current transformer in accordance with IEEE C57.13.1. Polarity results must agree with transformer markings.
d. Perform a ratio-verification test using the voltage or current method in accordance with IEEE C57.13.1. Ratio errors must be in accordance with IEEE C57.13.
e. Perform an excitation test on transformers used for relaying applications in accordance with IEEE C57.13.1. Excitation results must match the curve supplied by the manufacturer or be in accordance with IEEE C57.13.1.
f. Measure current circuit burdens at transformer terminals in accordance with IEEE C57.13.1. Measured burdens must be compared with and must match instrument transformer ratings.
g. Perform insulation-resistance tests on the primary winding with the secondary grounded. Test voltages must be in accordance with Table 100.5.
h. Perform dielectric withstand tests on the primary winding with the secondary grounded. Test voltages must be in accordance with Table 100.9.
i. Perform power-factor or dissipation-factor tests in accordance with test equipment manufacturer's published data.
j. Verify that current transformer secondary circuits are grounded and have only one grounding point in accordance with IEEE C57.13.3.
That grounding point should be located as specified by the engineer in the project drawings.
3. Electrical Tests of Voltage Transformers:
to compare bolted resistance values to values of similar connections.
Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
b. Perform insulation-resistance tests winding-to-winding and each winding to ground. Test voltages must be applied for one minute in accordance with Table 100.5. For units with solid-state components that cannot tolerate the applied voltage, follow manufacturer's recommendations. Investigate and correct values of insulation
Allentown, PA 18106 September 15, 2026
26 13 26.11-23 resistance less than manufacturer's recommendations or NETA ATS, Table 100.5.
c. Perform a polarity test on each transformer to verify the polarity marks or H1- X1 relationship as applicable. Polarity results must agree with transformer markings.
d. Perform a turns-ratio test on all tap positions. Ratio errors must be in accordance with IEEE C57.13.
e. Measure voltage circuit burdens at transformer terminals. Measured burdens must be compared with and must match instrument transformer ratings.
f. Perform a dielectric withstand test on the primary windings with the secondary windings connected to ground. The dielectric voltage must be in accordance with Table 100.9. The test voltage must be applied for one minute.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .