1-TITLE page.pdf

PDF 42 KB Posted

Attached to
Electrical Substation Replacement Project – Equipment Procurement Phase
Solicitation number
US.255952
Issued by
Lehigh County, Pennsylvania

About this file

This is a title page for a project manual from the Lehigh County Authority in Pennsylvania for the procurement of equipment related to the Electrical Substation Replacement Project, specifically for Substations #2 and #4. The project is located at 7676 Industrial Boulevard in Allentown, Pennsylvania. Online sealed bids will be received through the PennBid electronic bidding service until 11:00 a.m. on Wednesday, October 28, 2026, at which time bids will be publicly opened and read. A pre-bid meeting will not be held; however, site visits are available on a self-guided basis and can be scheduled via email with Charles Volk, P.E., Chief Capital Works Officer, at charlesvolk@lehighcountyauthority.org. All bidding documents are available at no cost through PennBid (www.PennBid.net). Bids shall remain open for 60 days from the bid opening date.

Each bid must be accompanied by bid security in the form of a certified check, bank check, or bid bond equal to 10 percent of the total bid amount. The Lehigh County Authority reserves the right to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in any submitted bid. Bids may only be withdrawn after bid opening in compliance with Commonwealth of Pennsylvania laws and regulations. Bid results will be made available through PennBid.

View the file

Other files

File Type Posted
26 11 16.11 - Secondary Unit Substations - Secondary Less Than 1000V.pdf PDF
26 12 13.01 - Liquid-Filled Medium Voltge Unit Substation Transformers.pdf PDF
9-Agreement of Surety Form Contract.pdf PDF
23-EJCDC - Payment Bond (C-620-2002).pdf PDF
1-LCA-ELECTRICAL SUBSTATION PROCUREMENT DWGS.pdf PDF
017716 – CONTRACT CLOSEOUT.pdf PDF
15-Affidavit of Non-Collusion.pdf PDF
21-EJCDC - Performance Bond (C-600-2002).pdf PDF
012977.02 - MEASUREMENT AND PAYMENT.pdf PDF
13-List of Proposed Subcontractors.pdf PDF
26 27 13.11 - Microprocessor-Based Metering Equipment.pdf PDF
017900.01 - VIDEO TRAINING PROGRAMS.pdf PDF
26 23 00.16 - Arc Resistant Metal Enclosed Drawout Switchgear LV.pdf PDF
27-PA Prevailing Wage Act Duties00810.pdf PDF
26 05 73.13 - Short Circuit Studies.pdf PDF
26 13 26.11 - Metal Clad MV Arc Resistent Switchgear.pdf PDF
24-EJCDC - General Conditions (with Supplementary shown).pdf PDF
2-TOC.pdf PDF
011000.03 -SUMMARY OF THE WORK.pdf PDF
26 05 53 - Identification For Electrical Systems.pdf PDF
26 05 73.19 - Arc Flash Hazard Analysis.pdf PDF
26 43 13A - LV Surge Protective Devices For Electrical Distribution Systems.pdf PDF
19-EJCDC - Agreement Stipulated Price (C-520-2002).pdf PDF
5-EJCDC - Bid Form for Construction Contracts 00300 (003).pdf PDF
4-7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002) Revised 10-30-2026.pdf PDF
11-Experience Questionnaire.pdf PDF
013300.0 - SUBMITTALS.pdf PDF
3-Addendum 1 LCA.pdf PDF
4-EJCDC - Instructions to Bidders (C-200-2002).pdf PDF
7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002).pdf PDF
3-00010_Invitation to Bid.pdf PDF
26 05 73.16 - Coordination Studies.pdf PDF
17-CertAsToCorpPrincipal.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEHIGH COUNTY AUTHORITY

LEHIGH COUNTY

PROJECT MANUAL

FOR

ELECTRICAL SUBSTATION #2 AND #4

PROCUREMENT

7676 INDUSTRIAL BLVD

ALLENTOWN, PA 18106

September 2026

Lehigh County Authority 1053 Spruce St

Allentown, PA 18106 610-398-2503

File details come from the government source that posted it. Updated .