This specification section details the short-circuit studies required for the Electrical Substation Replacement Project at Substation #2 and #4 located at 7676 Industrial Blvd., Allentown, PA 18106. The Lehigh County Authority is procuring computer-based, fault-current studies to determine the minimum interrupting capacity of circuit protective devices for the substations. The studies must be performed using commercially developed power system analysis software compliant with IEEE 399 and IEEE 551 standards, with acceptable manufacturers including EasyPower LLC, Power Analytics Corporation, and SKM Systems Analysis Inc. The work requires a qualified Power Systems Analysis Specialist holding a professional engineering license in Pennsylvania to perform and seal the study report, along with a NETA-certified Field Adjusting Agency responsible for field adjustments. Sealed bids are due by 11:00 a.m. on Wednesday, October 28, 2026, through the PennBid electronic bidding service, with a 60-day bid holding period following the public opening. Self-guided site visits can be scheduled via email with Charles Volk, P.E., Chief Capital Works Officer. Bid security of 10 percent of the bid total is required in the form of a certified check, bank check, or bid bond.
The specification requires comprehensive study deliverables including executive summaries, revised one-line diagrams reflecting field investigation results, protective device evaluations, input data documentation, and detailed output reports covering low-voltage fault, momentary duty, and interrupting duty calculations. All field data gathering must be conducted by qualified technicians under direct supervision of the licensed engineer and must comply with NFPA 70E qualifications. The study shall extend from the service through the electrical distribution system to normal low-voltage load buses where fault current does not exceed 10 kA, excluding equipment rated 240 V or less supplied by transformers rated below 125 kVA. No specific pricing information, funding sources, set-asides, or contract term details are provided in this specification section. All submittals are subject to re-evaluation fees as identified in Article 4 of the General Conditions, and closeout submittals must include final one-line diagrams, study reports, data files, and power system data for inclusion in operation and maintenance manuals.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substation #2, #4 Procurement 7676 Industrial Blvd.
Allentown, PA 18106 September 15, 2026
26 05 73.13-1
SECTION 26 05 73.13
SHORT-CIRCUIT STUDIES
PART 1 GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes a computer-based, fault-current study to determine the minimum interrupting capacity of circuit protective devices.
1.03 DEFINITIONS
A. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled.
Existing to remain items shall remain functional throughout the construction period.
B. Field Adjusting Agency: An independent electrical testing agency with full-time employees and the capability to adjust devices and conduct testing indicated and that is a member company of NETA.
C. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein.
D. Power System Analysis Software Developer: An entity that commercially develops, maintains, and distributes computer software used for power system studies.
E. Power Systems Analysis Specialist: Professional engineer in charge of performing the study and documenting recommendations, licensed in the state where Project is located.
F. Protective Device: A device that senses when an abnormal current flow exists and then removes the affected portion of the circuit from the system.
G. SCCR: Short-circuit current rating.
H. Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served.
I. Single-Line Diagram: See "One-Line Diagram."
Allentown, PA 18106 September 15, 2026
26 05 73.13-2
1.04 ACTION SUBMITTALS
A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
B. Manufacturer’s installation instructions shall be provided along with product data.
C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals).
D. Product Data:
1. For computer software program to be used for studies.
2. Submit the following after the approval of system protective devices submittals.
Submittals shall may be in digital form.
a. Short-circuit study input data, including completed computer program input data sheets.
b. Short-circuit study and equipment evaluation report; signed, dated, and sealed by a qualified professional engineer.
1) Submit study report for action prior to receiving final approval of distribution equipment submittals. If formal completion of studies will cause delay in equipment manufacturing, obtain approval from Architect for preliminary submittal of sufficient study data to ensure that selection of devices and associated characteristics is satisfactory.
2) Revised one-line diagram, reflecting field investigation results and results of short-circuit study.
E. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
F. Qualification Data:
1. For Power Systems Analysis Software Developer.
2. For Power System Analysis Specialist.
3. For Field Adjusting Agency.
G. Product Certificates: For short-circuit study software, certifying compliance with
IEEE 399.
1.05 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data:
1. For overcurrent protective devices to include in emergency, operation, and maintenance manuals.
2. The following are from the Short-Circuit Study Report:
Allentown, PA 18106 September 15, 2026
26 05 73.13-3
a. Final one-line diagram.
b. Final Short-Circuit Study Report.
c. Short-circuit study data files.
d. Power system data.
1.06 QUALITY ASSURANCE
A. Study shall be performed using commercially developed and distributed software designed specifically for power system analysis.
B. Software algorithms shall comply with requirements of standards and guides specified in this Section.
C. Manual calculations are unacceptable.
1. Power System Analysis Software Qualifications: Computer program shall be designed to perform short-circuit studies or have a function, component, or add-on module designed to perform short-circuit studies.
2. Computer program shall be developed under the charge of a licensed professional engineer who holds IEEE Computer Society's Certified Software Development Professional certification.
D. Power Systems Analysis Specialist Qualifications: Professional engineer licensed in the state where Project is located. All elements of the study shall be performed under the direct supervision and control of this professional engineer.
E. Short-Circuit Study Certification: Short-Circuit Study Report shall be signed and sealed by Power Systems Analysis Specialist.
F. Field Adjusting Agency Qualifications:
1. Employer of a NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification responsible for all field adjusting of the Work.
2. A member company of NETA.
3. Acceptable to authorities having jurisdiction.
PART 2 PRODUCTS
2.01 POWER SYSTEM ANALYSIS SOFTWARE DEVELOPERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. EasyPower, LLC (formerly ESA Inc.).
2. Power Analytics, Corporation.
3. SKM Systems Analysis, Inc.
http://www.specagent.com/Lookup?ulid=1919 http://www.specagent.com/Lookup?uid=123457172779 http://www.specagent.com/Lookup?uid=123457100634 http://www.specagent.com/Lookup?uid=123457100635
Allentown, PA 18106 September 15, 2026
26 05 73.13-4
4. Or equal.
B. Comply with IEEE 399 and IEEE 551.
1. Analytical features of power systems analysis software program shall have capability to calculate "mandatory," "very desirable," and "desirable" features as listed in IEEE 399.
C. Computer software program shall be capable of plotting and diagramming time-current-characteristic curves as part of its output.
2.02 SHORT-CIRCUIT STUDY REPORT CONTENTS
A. Executive summary of study findings.
B. Study descriptions, purpose, basis, and scope. Include case descriptions, definition of terms, and guide for interpretation of results.
C. One-line diagram of modeled power system, showing the following:
1. Protective device designations and ampere ratings.
2. Conductor types, sizes, and lengths.
3. Transformer kilovolt ampere (kVA) and voltage ratings.
4. Motor and generator designations and kVA ratings.
5. Switchgear, switchboard, motor-control center, and panelboard designations and ratings.
6. Derating factors and environmental conditions.
7. Any revisions to electrical equipment required by the study.
D. Comments and recommendations for system improvements or revisions in a written document, separate from one-line diagram.
E. Protective Device Evaluation:
1. Evaluate equipment and protective devices and compare to available short-circuit currents. Verify that equipment withstand ratings exceed available short-circuit current at equipment installation locations.
2. Tabulations of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties.
3. For 600-V overcurrent protective devices, ensure that interrupting ratings are equal to or higher than calculated 1/2-cycle symmetrical fault current.
4. For devices and equipment rated for asymmetrical fault current, apply multiplication factors listed in standards to 1/2-cycle symmetrical fault current.
5. Verify adequacy of phase conductors at maximum three-phase bolted fault currents; verify adequacy of equipment grounding conductors and grounding electrode conductors at maximum ground-fault currents. Ensure that short-circuit withstand ratings are equal to or higher than calculated 1/2-cycle symmetrical fault current.
Allentown, PA 18106 September 15, 2026
26 05 73.13-5
F. Short-Circuit Study Input Data:
1. One-line diagram of system being studied.
2. Power sources available.
3. Manufacturer, model, and interrupting rating of protective devices.
4. Conductors.
5. Transformer data.
G. Short-Circuit Study Output Reports:
1. Low-Voltage Fault Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location:
a. Voltage.
b. Calculated fault-current magnitude and angle.
c. Fault-point X/R ratio.
d. Equivalent impedance.
2. Momentary Duty Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location:
a. Voltage.
b. Calculated symmetrical fault-current magnitude and angle.
c. Fault-point X/R ratio.
d. Calculated asymmetrical fault currents:
1) Based on fault-point X/R ratio.
2) Based on calculated symmetrical value multiplied by 1.6.
3) Based on calculated symmetrical value multiplied by 2.7.
3. Interrupting Duty Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location:
a. Voltage.
b. Calculated symmetrical fault-current magnitude and angle.
c. Fault-point X/R ratio.
d. No AC Decrement (NACD) ratio.
e. Equivalent impedance.
f. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a symmetrical basis.
g. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a total basis.
PART 3 EXECUTION
3.01 POWER SYSTEM DATA
A. Obtain all data necessary for conduct of the study.
Allentown, PA 18106 September 15, 2026
26 05 73.13-6
1. Verify completeness of data supplied on one-line diagram. Call any discrepancies to Architect's attention.
2. For equipment included as Work of this Project, use characteristics submitted under provisions of action submittals and information submittals for this Project.
3. For equipment that, relocated equipment and that which is existing to remain, obtain required electrical distribution system data by field investigation and surveys, conducted by qualified technicians and engineers Director’s Representative. Qualifications of technicians and engineers Director’s Representative shall be as defined by NFPA 70E.
B. Gather and tabulate the required input data to support the short-circuit study. Record data on a Record Document copy of one-line diagram. Comply with recommendations in IEEE 551 as to the amount of detail that is required to be acquired in the field. Field data gathering shall be under direct supervision and control of the engineer Director’s Representative in charge of performing the study , and shall be by the engineer Director’s Representative or its representative who holds NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification. Data include, but are not limited to, the following:
1. Product Data for Project's overcurrent protective devices involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcurrent protective device submittals, input and output data, and recommended device settings.
2. Obtain electrical power utility impedance at the service.
3. Power sources and ties.
4. For transformers, include kVA, primary and secondary voltages, connection type, impedance, X/R ratio, taps measured in percent, and phase shift.
5. For reactors, provide manufacturer and model designation, voltage rating, and impedance.
6. For circuit breakers and fuses, provide manufacturer and model designation. List type of breaker, type of trip, SCCR, current rating, and breaker settings.
7. Generator short-circuit current contribution data, including short-circuit reactance, rated kVA, rated voltage, and X/R ratio.
8. Busway manufacturer and model designation, current rating, impedance, lengths, and conductor material.
9. Motor horsepower and NEMA MG 1 code letter designation.
10. Conductor sizes, lengths, number, conductor material and conduit material
(magnetic or nonmagnetic).
11. Derating factors.
3.02 SHORT-CIRCUIT STUDY
A. Perform study following the general study procedures contained in IEEE 399.
B. Calculate short-circuit currents according to IEEE 551.
C. Base study on device characteristics supplied by device manufacturer.
D. Extent of electrical power system to be studied is indicated on Drawings.
Allentown, PA 18106 September 15, 2026
26 05 73.13-7
E. Begin short-circuit current analysis at the service, extending down to system overcurrent protective devices as follows:
1. To normal system low-voltage load buses where fault current is 10 kA or less.
2. Exclude equipment rated 240 V ac or less when supplied by a single transformer rated less than 125 kVA.
F. Study electrical distribution system from normal and alternate power sources throughout electrical distribution system for Project. Study all cases of system-switching configurations and alternate operations that could result in maximum fault conditions.
G. Include the ac fault-current decay from induction motors, synchronous motors, and asynchronous generators and apply to low- and medium-voltage, three-phase ac systems. Also account for the fault-current dc decrement to address asymmetrical requirements of interrupting equipment.
H. Calculate short-circuit momentary and interrupting duties for a three-phase bolted fault and a single line-to-ground fault at each equipment indicated on one-line diagram.
1. For grounded systems, provide a bolted line-to-ground fault-current study for areas as defined for the three-phase bolted fault short-circuit study.
I. Include in the report identification of any protective device applied outside its capacity.
END OF SECTION 260573.13
| PART 1 GENERAL |
| 1.01 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.02 SUMMARY |
| A. Section includes a computer-based, fault-current study to determine the minimum interrupting capacity of circuit protective devices. |
| 1.03 DEFINITIONS |
| A. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled. Existing to remain items shall remain functional throughout the construction ... |
| B. Field Adjusting Agency: An independent electrical testing agency with full-time employees and the capability to adjust devices and conduct testing indicated and that is a member company of NETA. |
| C. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein. |
| D. Power System Analysis Software Developer: An entity that commercially develops, maintains, and distributes computer software used for power system studies. |
| E. Power Systems Analysis Specialist: Professional engineer in charge of performing the study and documenting recommendations, licensed in the state where Project is located. |
| F. Protective Device: A device that senses when an abnormal current flow exists and then removes the affected portion of the circuit from the system. |
| G. SCCR: Short-circuit current rating. |
| H. Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served. |
| I. Single-Line Diagram: See "One-Line Diagram." |
| 1.04 ACTION SUBMITTALS |
| A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions. |
| B. Manufacturer’s installation instructions shall be provided along with product data. |
| C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals). |
| D. Product Data: |
| 1. For computer software program to be used for studies. |
| 2. Submit the following after the approval of system protective devices submittals. Submittals shall may be in digital form. |
| a. Short-circuit study input data, including completed computer program input data sheets. |
| b. Short-circuit study and equipment evaluation report; signed, dated, and sealed by a qualified professional engineer. |
| 1) Submit study report for action prior to receiving final approval of distribution equipment submittals. If formal completion of studies will cause delay in equipment manufacturing, obtain approval from Architect for preliminary submittal of sufficie... |
| 2) Revised one-line diagram, reflecting field investigation results and results of short-circuit study. |
| E. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions. |
| F. Qualification Data: |
| 1. For Power Systems Analysis Software Developer. |
| 2. For Power System Analysis Specialist. |
| 3. For Field Adjusting Agency. |
G. Product Certificates: For short-circuit study software, certifying compliance with IEEE 399.
| 1.05 CLOSEOUT SUBMITTALS |
| A. Operation and Maintenance Data: |
| 1. For overcurrent protective devices to include in emergency, operation, and maintenance manuals. |
| 2. The following are from the Short-Circuit Study Report: |
| a. Final one-line diagram. |
| b. Final Short-Circuit Study Report. |
| c. Short-circuit study data files. |
| d. Power system data. |
| 1.06 QUALITY ASSURANCE |
| A. Study shall be performed using commercially developed and distributed software designed specifically for power system analysis. |
| B. Software algorithms shall comply with requirements of standards and guides specified in this Section. |
| C. Manual calculations are unacceptable. |
| 1. Power System Analysis Software Qualifications: Computer program shall be designed to perform short-circuit studies or have a function, component, or add-on module designed to perform short-circuit studies. |
| 2. Computer program shall be developed under the charge of a licensed professional engineer who holds IEEE Computer Society's Certified Software Development Professional certification. |
| D. Power Systems Analysis Specialist Qualifications: Professional engineer licensed in the state where Project is located. All elements of the study shall be performed under the direct supervision and control of this professional engineer. |
| E. Short-Circuit Study Certification: Short-Circuit Study Report shall be signed and sealed by Power Systems Analysis Specialist. |
| F. Field Adjusting Agency Qualifications: |
| 1. Employer of a NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification responsible for all field adjusting of the Work. |
| 2. A member company of NETA. |
| 3. Acceptable to authorities having jurisdiction. |
| PART 2 PRODUCTS |
| 2.01 POWER SYSTEM ANALYSIS SOFTWARE DEVELOPERS |
| A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: |
| 1. EasyPower, LLC (formerly ESA Inc.). |
| 2. Power Analytics, Corporation. |
| 3. SKM Systems Analysis, Inc. |
| 4. Or equal. |
| B. Comply with IEEE 399 and IEEE 551. |
| 1. Analytical features of power systems analysis software program shall have capability to calculate "mandatory," "very desirable," and "desirable" features as listed in IEEE 399. |
C. Computer software program shall be capable of plotting and diagramming time-current-characteristic curves as part of its output.
| 2.02 SHORT-CIRCUIT STUDY REPORT CONTENTS |
| A. Executive summary of study findings. |
| B. Study descriptions, purpose, basis, and scope. Include case descriptions, definition of terms, and guide for interpretation of results. |
| C. One-line diagram of modeled power system, showing the following: |
| 1. Protective device designations and ampere ratings. |
| 2. Conductor types, sizes, and lengths. |
| 3. Transformer kilovolt ampere (kVA) and voltage ratings. |
| 4. Motor and generator designations and kVA ratings. |
| 5. Switchgear, switchboard, motor-control center, and panelboard designations and ratings. |
| 6. Derating factors and environmental conditions. |
| 7. Any revisions to electrical equipment required by the study. |
| D. Comments and recommendations for system improvements or revisions in a written document, separate from one-line diagram. |
| E. Protective Device Evaluation: |
| 1. Evaluate equipment and protective devices and compare to available short-circuit currents. Verify that equipment withstand ratings exceed available short-circuit current at equipment installation locations. |
| 2. Tabulations of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. |
| 3. For 600-V overcurrent protective devices, ensure that interrupting ratings are equal to or higher than calculated 1/2-cycle symmetrical fault current. |
| 4. For devices and equipment rated for asymmetrical fault current, apply multiplication factors listed in standards to 1/2-cycle symmetrical fault current. |
| 5. Verify adequacy of phase conductors at maximum three-phase bolted fault currents; verify adequacy of equipment grounding conductors and grounding electrode conductors at maximum ground-fault currents. Ensure that short-circuit withstand ratings are... |
| F. Short-Circuit Study Input Data: |
| 1. One-line diagram of system being studied. |
| 2. Power sources available. |
| 3. Manufacturer, model, and interrupting rating of protective devices. |
| 4. Conductors. |
| 5. Transformer data. |
| G. Short-Circuit Study Output Reports: |
| 1. Low-Voltage Fault Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location: |
| a. Voltage. |
| b. Calculated fault-current magnitude and angle. |
| c. Fault-point X/R ratio. |
| d. Equivalent impedance. |
| 2. Momentary Duty Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location: |
| a. Voltage. |
| b. Calculated symmetrical fault-current magnitude and angle. |
| c. Fault-point X/R ratio. |
| d. Calculated asymmetrical fault currents: |
| 1) Based on fault-point X/R ratio. |
| 2) Based on calculated symmetrical value multiplied by 1.6. |
| 3) Based on calculated symmetrical value multiplied by 2.7. |
| 3. Interrupting Duty Report: Three-phase and unbalanced fault calculations, showing the following for each overcurrent device location: |
| a. Voltage. |
| b. Calculated symmetrical fault-current magnitude and angle. |
| c. Fault-point X/R ratio. |
| d. No AC Decrement (NACD) ratio. |
| e. Equivalent impedance. |
| f. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a symmetrical basis. |
| g. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a total basis. |
| PART 3 EXECUTION |
| 3.01 POWER SYSTEM DATA |
| A. Obtain all data necessary for conduct of the study. |
| 1. Verify completeness of data supplied on one-line diagram. Call any discrepancies to Architect's attention. |
| 2. For equipment included as Work of this Project, use characteristics submitted under provisions of action submittals and information submittals for this Project. |
| 3. For equipment that, relocated equipment and that which is existing to remain, obtain required electrical distribution system data by field investigation and surveys, conducted by qualified technicians and engineers Director’s Representative. Qualif... |
| B. Gather and tabulate the required input data to support the short-circuit study. Record data on a Record Document copy of one-line diagram. Comply with recommendations in IEEE 551 as to the amount of detail that is required to be acquired in the fie... |
| 1. Product Data for Project's overcurrent protective devices involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcurrent protective device... |
| 2. Obtain electrical power utility impedance at the service. |
| 3. Power sources and ties. |
| 4. For transformers, include kVA, primary and secondary voltages, connection type, impedance, X/R ratio, taps measured in percent, and phase shift. |
| 5. For reactors, provide manufacturer and model designation, voltage rating, and impedance. |
| 6. For circuit breakers and fuses, provide manufacturer and model designation. List type of breaker, type of trip, SCCR, current rating, and breaker settings. |
| 7. Generator short-circuit current contribution data, including short-circuit reactance, rated kVA, rated voltage, and X/R ratio. |
| 8. Busway manufacturer and model designation, current rating, impedance, lengths, and conductor material. |
| 9. Motor horsepower and NEMA MG 1 code letter designation. |
| 10. Conductor sizes, lengths, number, conductor material and conduit material (magnetic or nonmagnetic). |
| 11. Derating factors. |
| 3.02 SHORT-CIRCUIT STUDY |
| A. Perform study following the general study procedures contained in IEEE 399. |
| B. Calculate short-circuit currents according to IEEE 551. |
| C. Base study on device characteristics supplied by device manufacturer. |
| D. Extent of electrical power system to be studied is indicated on Drawings. |
| E. Begin short-circuit current analysis at the service, extending down to system overcurrent protective devices as follows: |
| 1. To normal system low-voltage load buses where fault current is 10 kA or less. |
| 2. Exclude equipment rated 240 V ac or less when supplied by a single transformer rated less than 125 kVA. |
| F. Study electrical distribution system from normal and alternate power sources throughout electrical distribution system for Project. Study all cases of system-switching configurations and alternate operations that could result in maximum fault condi... |
| G. Include the ac fault-current decay from induction motors, synchronous motors, and asynchronous generators and apply to low- and medium-voltage, three-phase ac systems. Also account for the fault-current dc decrement to address asymmetrical requirem... |
| H. Calculate short-circuit momentary and interrupting duties for a three-phase bolted fault and a single line-to-ground fault at each equipment indicated on one-line diagram. |
| 1. For grounded systems, provide a bolted line-to-ground fault-current study for areas as defined for the three-phase bolted fault short-circuit study. |
I. Include in the report identification of any protective device applied outside its capacity.